Loading...
APPROVED Transportation ImpactRESUB Aug 24 2020 CITY OF EDMONDS = DEVELOPMENT SERVIC DEPARTMENT e _ ,JC. t x 4"' PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov BLD2019-1553 APPENDIX A Page 1 of 2 Transportation Impact Analysis orksheet Name of Proposed Project: 4 DU ?I=Ll Owner/Applicant I Name -1 It &C;1 1�,110 ST-"W Street/Mailing Address _AinAn.di WA gRya-o City State Zip Telephone: ctOlo _ (0C110— OCIUI Applicant Contact Person: U,v Name 'J Po x t,-4-19 Street/Mailing Address . �on�il�i,�h ► I,•JA �1�L�11 City State Zip Telephone: _ ZQ U 9?D 1— _?_i F Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): 4 Firm Name Telephone: 1. PROJECT DESCRIPTION Contact Name E-mail: a. Location - Street address: cAyn(M(131 a vicinity map and site plan.) b. Specify existing land use: FIZZ c. Specify proposed type and size of development: 1 Yf-d ell t CLko'haL QAf .U, (# of residentid units and(or square footage of building) d. Date construction will begin and be completed: q and 5 fy9o, &= rm , . e. Define proposed access locations: ()AT 18q0 1_ SW U+1 R JhA.r2d flit mend' �chored trtis�urvF- � �-n a�� �a-�rJt� �f APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X Prior Use $ X Fee $ 1 New Use Fee: $ - Prior Use Fee: $ I� NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Fee Rate # of dwelling, vfp, etc. New Use ! $ X = $ aye• �� . ►' INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee) 1 $ TOTAL TRANSPORTATION EMPACT FEE $ 6249.14 Se City of Edmonds, Engineering Division Approval ber 30, 2020 Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.