Loading...
WITHDRAWFrom: Bill Brammer <billb@churchbcc.org> Sent: Tuesday, September 20, 2022 2:47 PM To: Nelson, Denise <Denise.Nelson @edmondswa.gov> Cc: John Taylor<jtaylor@jtaylorconsulting.net>; Bob Bozorth <PointOfVision@hotmail.com> Subject: Re: BLD2021-0803 7212 220TH ST SW Great, thanks. We're not sure if this was paid directly by Bethany or Taylor Consulting, so let us know if this gets approved and where the refund is going. Thanks so much! Bill B. On Tue, Sep 20, 2022 at 2:46 PM Nelson, Denise <Denise.Nelson @edmondswa.gov> wrote: Email is dandy Q From: Bill Brammer <billb@churchbcc.org> Sent: Tuesday, September 20, 2022 2:42 PM To: Nelson, Denise <Denise.Nelson @edmondswa.gov> Cc: John Taylor <itaylor@itaylorconsulting.net>; Bob Bozorth <PointOfVision@hotmail.com> Subject: Re: BLD2021-0803 7212 220TH ST SW Thank you Denise, can I officially withdraw the permit via this email or do you need something more formal? On Tue, Sep 20, 2022 at 1:09 PM Nelson, Denise <Denise.Nelson @edmondswa.gov> wrote: If you would like to officially withdraw the permit I can see about issuing an 80% refund of the permit fee. I would need a email asking for the withdraw then I would request a refund of $248.00. -Denise From: John Taylor <itaylor@itaylorconsulting.net> Sent: Tuesday, September 20, 2022 9:24 AM To: Nelson, Denise <Denise.Nelson @edmondswa.gov>; Bob Bozorth <PointOfVision@hotmail.com> Cc: Bill Brammer <billb@churchbcc.org>; John Taylor <itaylor@itaylorconsulting.net> Subject: RE: BLD2021-0803 7212 220TH ST SW Thanks Denise; The project has been abandoned due to the devastating fire that took place early on in the construction. The church is looking for another location. Thanks! John Taylor Architect / Facilities for Atmosphere Body / Soul / Spirit John Taylor Consulting LLC 21502 89t" Ave. W. Edmonds, WA. 98026 425-876-8219 From: Nelson, Denise <Denise.Nelson @edmondswa.gov> Sent: Monday, September 19, 2022 1:47 PM To: John Taylor<jtaylor@itaylorconsulting.net>; Bob Bozorth <PointOfVision@hotmail.com> Subject: BLD2021-0803 7212 220TH ST SW Dear Applicant/ Owner/ Contractor: According to Building Division records, the above referenced permit will expire on 10/15/2022 In an effort to ensure your project is inspected and has received an approval per your issued permit, please call for your final inspection(s). If the work is not finished you must renew your permit PRIOR to the expiration date. Permit renewal fees are one quarter of the original building permit fee, and you are only allowed to renew two times. In order to renew your permit at least one required building progress inspection must have been performed by the City Building Inspector (this does not include pre -construction meetings), within the past 12 months. Renewal fee = $77.50 Note: Building permit fees and time frames are established by the Edmonds Community Development Code and cannot be waived by the Building Official. If you do not receive your final or do not renew your permit by the expiration date, a new permit application along with applicable fees will be required in order to complete your project. If a lapse in the building permit creates a code violation, the matter may be turned over to the City's Code Enforcement office. ***Please schedule inspections on MYBUILDINGPERMIT.COM. Please call 425-771-0220 if you have questions or need additional information. DeVdSe NeLSOVL CPT I sevuor PervK%t Coorc{�wator