APPROVED BLD2022-0477+Architectural_Plan+4.15.2022_5.44.10_AM+2804273NELSON
RBC WEALTH MANAGEMENT
MINOR RENOVATION
303 5TH AVENUE SOUTH
SUITE 100
EDMONDS, WA 98020
LOCATION MAP
rcalrlr-Iv�ar�Er
Lynn 'd
Lvni,Nvood
303 th Ave S, I
Edmonds, WA 96020
f.
Esperance.:
�Lntlake
° Terrace
I I
Shoreline
-:Lake
Fvrek-,Pa rl{
90 LAKE CITY
!rf
FFN0RTHGATE i
N14re.h a La
Alderwood
(Manor
- enmo,e
PROJECT TEAM
PROJECT MANAGER
TURNER & TOWNSEND
475 PARK AVENUE SOUTH
11TH FLOOR
NEW YORK, NY 10016
CONTACT: SARA LINDEKUGEL
P. 929.316.9590
E. SARA.LINDEKUGEL@TURNTOWN.COM
ARCHITECT: NELCO ARCHITECTURE, INC.
1200 FIFTH AVENUE
SUITE #1300
SEATTLE, WA 98101
CONTACT: MARK EVANS
P. 206.408.8519
E. MEVANS@NELSONWW.COM
DESIGNER: NELCO ARCHITECTURE, INC.
1201 MARQUETTE AVENUE S
SUITE 200
MINNEAPOLIS, MN 55403
CONTACT: JOSH DIETZ
P. 612.370.1587
E. JDIETZ@NELSONWW.COM
FURNITURE VENDOR:
FLUID INTERIORS:
100 NORTH 6TH STREET
SUITE 100A
MINNEAPOLIS, MN 55403
CONTACT: LEAH SHULTZE
P. 612.310.8210
E. LEAH.SCHULTZE@FLUIDINTERIORS.COM
PROPERTY MANAGER: RAINIER PROPERTY MANAGEMENT CO. LLC:
12199 VILLAGE CENTER PL
SUITE 201
INN - MUKILTEO, WA 98275
CONTACT: RYAN MEGENITY
P. 425.252.3626
E. RYAN@RPMCOUSA.COM
GENERAL CONTRACTOR: TBD
DRAWING INDEX
Drawing
Sheet Sheet Issue Revision
Number Sheet Name Date Number
GENERAL
Revision
Issue Date
AN-0
COVER SHEET
03/31/2022
AN-1
LIFE SAFETY PLAN
03/31/2022
AN-2
GENERAL NOTES
03/31/2022
ARCHITECTURAL
AO-1
DEMOLITION, CONSTRUCTION & REFLECTED CEILING
PLANS
03/31/2022
Al-1
POWER, FINISH & FURNITURE PLANS
03/31/2022
A2-1
PARTITIONS & DETAILS
03/31/2022
Approved by Fire
05/26/2022 A F M FCFGtt,-rer
Fire Alarm reporting to Tegris Fire is
severely overdue. No inspections or
finals will be granted until system
has an annual inspection done and
entered into the Tegris Fire reporting
system.
A separate permit will be needed for
any alterations, interference or line of
sight blockage of the fire alarm
system.
ALL WORK SUBJECT
TO FIELD
INSPECTION FOR
CODE COMPLIANCE
APPROVED
PLANS MUST BE
ON JOB SITE
BUILDING INFORMATION
SITE ADDRESS:
PARCEL NUMBER:
LEGAL DESCRIPTION
ZONING:
BUILDING DESCRIPTION
DATE OF CONSTRUCTION
CONSTRUCTION TYPE:
303 5TH AVENUE SOUTH
SUITE 100
EDMONDS, WA 98020
PER COUNTY RECORDS
PER COUNTY RECORDS
PER MUNICIPAL LAND USE CODE
2 STORY CLASS B OFFICE BUILDING
1987 - PER JURISDICTIONAL RECORD
II- B
FIRE PROTECTION: UNSPRINKLERED
NUMBER OF STORIES: 2 STORIES
BUILDING TOTAL FLOOR AREA: 6,727 SF
AREA OF WORK: 440 SF
PROJECT DESCRIPTION
PROJECT CONSISTS OF MEZZANINE LEVEL RENOVATION. INTERIOR TENANT
IMPROVEMENT PROJECT, INCLUDING DEMOLITION OF EXISTING FLOOR
FINISHES, ITEMS OF NEW CONSTRUCTION - WALLS, DOORS, AND FINISHES.
NO STRUCTURAL WORK IS REQUIRED. NO CHANGE TO BUILDING OCCUPANCY
TYPE OR EGRESS SYSTEM. MEP DESIGN FOR ELECTRICAL AND HVAC TO BE BY
DESIGN/BUILD CONTRACTORS AS DEFERRED SUBMITTALS.
APPLICABLE CODES
BUILDING CODES ADOPTED BY THE CITY OF EDMONDS AS AMENDED BY
THE STATE OF WASHINGTON
BUILDING CODE COUNCIL (SBCC):
BUILDING:
2018 INTERNATIONAL BUILDING CODE (IBC)
EXISTING BUILDING:
2018 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
FIRE:
2018 INTERNATIONAL FIRE CODE (IFC)
PLUMBING:
2018 UNIFORM PLUMBING CODE (UPC)
MECHANICAL:
2018 INTERNATIONAL MECHANICAL CODE (IMC)
GAS PIPING:
2018 INTERNATIONAL FUEL GAS CODE (IFGC)
ELECTRICAL:
2020 NATIONAL ELECTRICAL CODE (NFPA 70)
ENERGY:
2018 WASHINGTON STATE ENERGY CODE (EC)
ACCESSIBILITY:
ICC/ANSI 117.1-2017 - ACCESSIBILE AND USABLE
BUILDINGS AND FACILITIES
City Of Edmonds
Building Department
Work EXISTING TENANT REMODEL
-------------------------------------------------
Address 303 5TH AVE S #100
-------_-_-_-_-_-_-_-_-_-_--------------------------------
Owner RBC WEALTH MNGT
Approved Dater 051257202
Building Official
Permit Number; BLD2022-0477
: ------
Nelco Architecture, Inc.
1201 Marquette Avenue South,
Suite 200
Minneapolis, MN. 55403
Phone: (612) 822-1211
WWW.NELSONWORLDWIDE.COM
RBC WEALTH
MANAGEMENT
RBC PLAZA
60 SOUTH SIXTH STREET
MINNEAPOLIS, MN 55402
MINOR RENOVATION
303 5TH AVENUE SOUTH
SUITE 100
EDMONDS, WA 98020
Issue: No: Date:
ISSUE FOR LL REVIEW 01/31/2022
ISSUE FOR BID 01/31/2022
ISSUE FOR PERMIT 03/31/2022
COVER SHEET
9119446.
RlXasjl:lil u
,rfi��rl:c I
Ili E4RK DOUGLAS I:VM-
STATE OF WASI IINGTON
RECEIVED
May 04 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
1•
#: 21.0004413.000 Reviewed By:
AN-0
ME
1.
2.
3.
4.
5.
6.
7.
8.
9.
10
31
EGRESS AND LIFE SAFETY NOTES
GENERAL NOTES
EXIT DOORS SHALL BE OPENABLE FROM THE EGRESS SIDE WITHOUT
SPECIAL KNOWLEDGE, EFFORT OR THE USE OF A SPECIAL KEY OR LATCH.
EXIT DOORS SHALL SWING IN THE DIRECTION OF TRAVEL WHEN SERVING
AN OCCUPANT LOAD OF 50 OR MORE OR AN "H" OCCUPANCY.
UNLATCHING FORCE OF PANIC HARDWARE SHALL NOT EXCEED 15 POUNDS
WHEN APPLIED IN THE DIRECTION OF TRAVEL.
MEANS OF EGRESS SHALL BE ILLUMINATED AT ANY TIME THE BUILDING IS
OCCUPIED WITH LIGHT HAVING AN INTENSITY OF NOT LESS THAN ONE
FOOT CANDLE AT WALKING SURFACE LEVEL EXIT ILLUMINATION FIXTURES
SHALL BE ON A SEPARATE NIGHT LIGHT CIRCUIT WITH BATTERY BACK-UP
EXIT ILLUMINATION SHALL BE PROVIDED FOR NOT LESS THAN 90 MINUTES
VIA STORAGE BATTERIES, OR ON -SITE GENERATOR.
CORRIDORS SHALL BE MAINTAINED WITH A MINIMUM CLEAR WIDTH OF 44"
AND T-6" MINIMUM HEIGHT.
EXIT DOORS SHALL BE A MINIMUM OF 32" CLEAR WIDTH & MAXIMUM 48"
WIDE LEAF. MINIMUM 6'-8" DOOR HEIGHT.
DOORS IN ANY POSITION SHALL NOT REDUCE THE REQUIRED CORRIDOR
EXIT WIDTH BY MORE THAN HALF.
EXIT SIGNAGE SHALL BE INTERNALLY ILLUMINATED AT ALL TIMES WITH
EMERGENCY ELECTRICAL BACK-UP POWER.
EXIT SIGN ILLUMINATION SHALL NOT BE LESS THAN 5 FOOT CANDLES EXIT
SIGNS SHALL HAVE TWO POWER SOURCES, ONE FROM THE PREMISES
WIRING SYSTEM, THE OTHER FROM BATTERIES.
FINAL PLACEMENT OF EXIT SIGNS IS SUBJECT TO APPROVAL AND
MODIFICATION OF THE FIRE DEPARTMENT FIELD INSPECTOR.
C
C
PROJECT CODE ANALYSIS
BUILDING: 2018 INTERNATIONAL BUILDING CODE (IBC)
EXISTING BUILDING: 2018 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
FIRE: 2018 INTERNATIONAL FIRE CODE (IFC)
PLUMBING: 2018 UNIFORM PLUMBING CODE (UPC)
MECHANICAL: 2018 INTERNATIONAL MECHANICAL CODE (IMC)
GAS PIPING: 2018 INTERNATIONAL FUEL GAS CODE (IFGC)
ELECTRICAL: 2020 NATIONAL ELECTRICAL CODE (NFPA 70)
ENERGY: 2018 WASHINGTON STATE ENERGY CODE (EC)
ACCESSIBILITY: ICC/ANSI 117.1-2017 - ACCESSIBILE AND USABLE
BUILDINGS AND FACILITIES
NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS (NFPA) AS
REFERENCED BY IBC, IFC, NEC AND IMC
CONSTRUCTION TYPE:
II-B
FIRE SPRINKLER SYSTEM:
NO
PROJECT AREA (U.S.F.):
3,697 SF (440 SF MEZZANINE AREA OF WORK)
NUMBER OF FLOORS (PROJECT):
1 FLOOR W/ MEZZANINE
NUMBER OF FLOORS (BUILDING):
2
1ST FLOOR
OCCUPANCY
U_
�.
w
U
U
O
a
Lu
O
_j <
a
�
<
)
U
z 0
U Lu
< D
LL. Lu
<
o
MEZZANINE OF ICE
B
440
150
3
NO
12%
B
3,257
150
22
NO
88%
TOTAL
B
3,697
150
25
NO
100%
EXITING 1ST FLOOR
REQUIRED
PROVIDED
NUMBER REQUIRED
2
3
EXIT WIDTH
(1) 32"
(3) @ 34"
DOOR SWING DIRECTION
OUT
OUT
1/3 LONGEST DIAGONAL
COMPLIANT (48'-2")
=EXITACCESS' TRAVEL DISTANCE
<-399L 200'
COMPLIANT{f�B-3 �
TH OF EGREssDwrACE
< 100'
COMPLIANT {6-B-6r'-�
MAXIMUM DEAD-END CORRIDOR
N/A
COMPLIANT (N/A)
SUITE ACCESSIBILITY
SUITE CIRCULATION
COMPLIANT
SUITE DOOR CLEARANCES
COMPLIANT
MILLWORK
COMPLIANT (EXISTIN
SUITE SINKS
COMPLIANT (EXISTING)
LEGEND
EGRESS PATH
I? I(* EXIT SIGN
FD FIRE EXTINGUISHER CABINET
FCOMMON PATH OF TRAVEL TERMINATION
Key Plan:
BUILDING IS UNSPRINKLERED
0 4' 8' 16'
NORTH
NELSON
Nelco Architecture, Inc.
1201 Marquette Avenue South,
Suite 200
Minneapolis, MN. 55403
Phone: (612) 822-1211
WWW.NELSONWORLDWIDE.COM
MEASURING TRAVEL DISTANCE IS
NOT PRECISE - ROUND DOWN TO
NEAREST FOOT IS OK
(C-E 68') OR A-E ?T - WHATEVER IS GREATER
(C-D 62')
RBC WEALTH
MANAGEMENT
RBC PLAZA
60 SOUTH SIXTH STREET
MINNEAPOLIS, MN 55402
MINOR RENOVATION
303 5TH AVENUE SOUTH
SUITE 100
EDMONDS, WA 98020
Issue:
ISSUE FOR LL REVIEW
ISSUE FOR BID
ISSUE FOR PERMIT
No: Date:
01/31/2022
01/31/2022
03/31/2022
RECEIVED
May 04 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
LIFE SAFETY PLAN
Proj #: 21.0004413.000 Reviewed By:
AN-1
ME
Scale:
►m
00
0
Ln
N
rn
N
N
CD
N
M
M
GENERAL NOTES GENERAL SYMBOLS AND LEGENDS ABBREVIATIONS
1. THE WORK SHALL CONFORM TO THE APPLICABLE BUILDING CODE AND 13. THE CONTRACTOR SHALL INDEMNIFY AND SAVE HARMLESS THE LANDLORD, 38. FOR ALL NEW WOOD PRODUCTS INCLUDING BUT NOT LIMITED TO SHEET NUMBER BUILDING SECTION TAG A QTY QUANTITY
OTHER ORDINANCES, CODES AND REGULATIONS LISTED IN THE THE TENANT, AND ARCHITECT AGAINST ANY AND ALL CLAIMS AND DEMANDS PARTICLE BOARD, MDF, PLYWOOD, OSB AND WOOD DOORS, THE A/C AIR CONDITIONING H
SPECIFICATIONS OR ON THE DRAWINGS, AND REQUIRED BY LOCAL FOR THE DAMAGE TO THE PROPERTY OF ANY PERSON, FIRM OR INDIVIDUAL CONTRACTOR SHALL FURNISH MATERIALS THAT CONTAIN NO ADDED SECTION
BUILDING AUTHORITIES. THE GOVERNING CODES, RULES AND OR FOR PERSONAL INJURIES (INCLUDING DEATH) ARISING OUT OF, OR UREA-FORMADALHYDE. A/C UNIT AIR CONDITIONING UNIT H HIGH R
REGULATIONS ARE COLLECTIVELY REFERRED TO AS "THE CODE." THE SUFFERED WHILE ENGAGED IN, OR CAUSED, IN WHOLE OR IN PART, BY THE 39. DETAILS ARE INTENDED TO SHOW THE INTENT OF THE DESIGN. DESIGNATION A/E ARCHITECT/ENGINEER HB HOSE BIB R or RAD RADIUS
CONTRACTOR SHALL REPORT ANY INCONSISTENCIES, CONFLICTS OR EXECUTION OF THE WORK; THE CONTRACTOR SHALL WELL AND TRULY MINOR MODIFICATIONS MAY BE REQUIRED TO SUIT FIELD Al-11 1 A/V AUDIO VISUAL HC HOLLOW CORE RB RUBBER BASE
OMISSIONS DISCOVERED TO THE ARCHITECT FOR INTERPRETATION DEFEND THE LANDLORD, TENANT AND ARCHITECT AND SHALL PAY ALL CONDITIONS. REQUIRED MODIFICATIONS SHALL BE INCLUDED AS A7-1 A7-1 ACT ACOUSTICAL CEILING TILE HDW HARDWARE RBR RUBBER
PRIOR TO PERFORMING THE WORK. MONIES AWARDED FOR SUCH DAMAGES OR INJURIES (INCLUDING DEATH), PART OF THE WORK. ADJ ADJACENT HEX HEXAGONAL RCP REFLECTED CEILING PLAN
2. THE GENERAL CONTRACTOR SHALL CONTACT BUILDING MANAGEMENT ALL COSTS INCLUDING ATTORNEY'S FEES SUSTAINED, AND SHALL OBTAIN A 40. ALL WORK SHALL BE EXECUTED IN A WORKMANLIKE MANNER BY T SHEET NUMBER
TO DETERMINE THE RULES OF THE BUILDING RELATIVE TO FULL ACQUAINTANCE AND RELEASE IN FAVOR OF THE LANDLORD, TENANT MECHANICS AND TRADESPERSONS SKILLED IN THEIR RESPECTIVE SHEET NUMBER AFF ABOVE FINISH FLOOR HID HIGH INTENSITY RD ROAD or ROOF DRAIN
CONSTRUCTION; WHEN AND HOW DELIVERIES CAN BE MADE, WHAT AND ARCHITECT, UNLESS SUCH LIABILITY RESULTS SOLELY FROM THE TRADES AND IN ACCORDANCE WITH THE BEST TRADE PRACTICES. AHU AIR HANDLING UNIT DISCHARGE REBAR REINFORCING BAR
PHASES AND TYPES OF CONSTRUCTION MAY BE DONE ON REGULAR OR NEGLIGENCE OF THE LANDLORD, TENANT, ARCHITECT, ITS AGENTS OR 41. THE CONTRACTOR SHALL CONFIRM THE AVAILABILITY AND DELIVERY SHEET GROUP WALL SECTION TAG ALT ALTERNATE(ING) HM HOLLOW METAL RECEPT RECEPTACLE
OVERTIME BASIS, AND IN GENERAL ANY SPECIAL BUILDING EMPLOYEES. TIMES FOR ALL SPECIFIED MATERIALS & EQUIPMENT REQUIRED TO DISCIPLINE CODE ALUM ALUMINUM HORIZ HORIZONTAL RECT RECTANGULAR
REQUIREMENTS WHICH WILL AFFECT THE COST OF ALL WORK BORNE 14. THE ARCHITECT SHALL NOT BE HELD RESPONSIBLE FOR THE PERFORMANCE PERFORM THE WORK UPON RECEIPT OF THE CONTRACT DOCUMENTS. SECTION ANOD ANODIZED HR HOUR REF REFERENCE
BY THE GENERAL CONTRACTOR. ALL WORK SHALL CONFORM TO ALL OF ANY WORK, NOR FOR THE MEANS AND METHODS OF CONSTRUCTION SHOULD THE AVAILABILITY OF SPECIFIED ITEMS POSE A DELAY TO THE DESIGNATION HT HEIGHT
BASE BUILDING STANDARD SPECIFICATIONS AND BUILDING CHOSEN BY THE CONTRACTOR OR ANY SUB -CONTRACTORS, NOR SHALL THE ON -TIME COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL APPROX APPROXIMATE REINF REINFORCING or
REGULATIONS, WHICH THE CONTRACTOR SHALL OBTAIN PRIOR TO ARCHITECT GUARANTEE THE PERFORMANCE OF THEIR CONTRACTS. NOTIFY THE ARCHITECT IMMEDIATELY AND PROPOSE AN EQUIVALENT l ARCH ARCHITECT HTG HEATING REINFORCEMENT
SUBMISSION OF BID. 15. THE CONTRACTOR SHALL PERFORM DAILY CLEANING OF THE JOB SITE SUBSTITUTION TO BE REVIEWED BY THE ARCHITECT IF SUCH A DELAY NORTH ARROW GRAPHIC SCALE A7-1 AUTO AUTOMATIC HTR HEATER REQ'D REQUIRED
3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SUB- DURING THE CONSTRUCTION PERIOD AND SHALL PROTECT FINISHED WORK IS NOT ACCEPTABLE. NORTH AVG AVERAGE HVAC HEATING VENTILATION & RET RETURN
CONTRACTORS' RECEIPT OF COMPLETE SETS OF THESE DOCUMENTS, AS FROM DAMAGE. IMMEDIATELY PRIOR TO TENANT OCCUPANCY, THE 42. SUBSTITUTION OF ALL EQUALS SHALL BE ONLY AS APPROVED BY THE PLAN NORTH SHEET NUMBER AIR COND. REV REVISE or REVISION
WELL AS ALL FUTURE ADDENDA, BULLETINS, FIELD DIRECTIVES AND CONTRACTOR SHALL PERFORM FINAL CLEANING OF THE WORK AREA ARCHITECT. WHERE THE TERM "OR EQUAL" IS USED THE ARCHITECT B HW HOT WATER RH RIGHT HAND
CHANGE ORDERS. INCLUDING, BUT NOT LIMITED TO, WET WIPING OF FURNITURE, AND SHALL BE THE SOLE JUDGE OF EQUALITY BASED UPON THE TRUE NORTH 0 1/2' 1' 2' BETW BETWEEN HWY HIGHWAY RHR RIGHT HAND REVERSE
4. ELECTRONIC DOCUMENT SUBMITTAL SERVICE CASEWORK, WASHING AND WAXING OF VCT FLOORING AND THE VACUUMING INFORMATION FURNISHED BY THE CONTRACTOR. SUBSTITUTIONS DETAIL SECTION TAG
A. ALL DOCUMENTS TRANSMITTED FOR PURPOSES OF OF CARPET. ALL CLEANING SHALL BE IN ACCORDANCE WITH MUST BE ACCEPTED IN WRITING BEFORE THEY MAY BE USED. BEV BEVELED RM ROOM
ADMINISTRATION OF THE CONTRACT ARE TO BE IN ELECTRONIC ( MANUFACTURERS' RECOMMENDATIONS. 43. THE CONTRACTOR SHALL PREPARE SUBMITTALS FOR REVIEW BY THE - SECTION BIT BITUMINOUS I RO ROUGH OPENING
PDF) FORMAT, AS APPROPRIATE TO THE DOCUMENT, AND 16. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE WORK OF ALL ARCHITECT, FOR ALL MATERIALS AND EQUIPMENT SPECIFIED. IF THE DESIGNATION BLDG BUILDING IC IN CONTRACT ROW RIGHT OF WAY
TRANSMITTED VIA AN INTERNET-BASED SUBMITTAL SERVICE THAT SUB -CONTRACTORS AND SHALL PERFORM SUCH MISCELLANEOUS WORK AS CONTRACTOR, THE OWNER, OR THE OWNER'S REPRESENTATIVE l BLK BLOCK IN INCHES RPM REVOLUTIONS PER
RECEIVES, LOGS AND STORES DOCUMENTS, PROVIDES MAY BE NECESSARY FOR THEM TO COMPLETE THEIR WORK. IT IS EXPECTED SUBSTITUTES A MATERIAL, METHOD OF ATTACHMENT, REVISES A COLUMN SYMBOL & GRID LINES INTERIOR ELEVATION TAG A7-1 BLKG BLOCKING INCAND INCANDESCENT MINUTE
ELECTRONIC STAMPING AND SIGNATURES, AND NOTIFIES THAT THE CONTRACTOR SHALL ALSO CLOSELY COORDINATE THE WORK WITH CONSTRUCTION DETAIL, OR IN ANY WAY ALTERS THE WORK SUCH INCL INCLUSIVE RSF RENTABLE SQUARE FEET
ADDRESSEES VIA EMAIL. THAT OF ALL OTHER VENDORS RETAINED BY THE CLIENT TO ASSURE THAT THAT IT NO LONGER CONFORMS TO THESE DOCUMENTS, WITHOUT THE 1 ELEVATION BSMT BASEMENT
1. USERS OF THE SERVICE NEED AN EMAIL ADDRESS, ALL SCHEDULES ARE MET AND THAT WORK PROCEEDS WITHOUT DELAY. WRITTEN ACCEPTANCE OF THE ARCHITECT, SUCH ACTION WILL I DESIGNATION SHEET NUMBER BTM BOTTOM INCLDG INCLUDING RT RUBBER TILE
INTERNET ACCESS, AND PDF REVIEW SOFTWARE THAT 17. BIDDERS, BEFORE SUBMITTING PROPOSALS, SHALL VISIT AND CAREFULLY RELIEVE THE ARCHITECT OF ANY RESPONSIBILITY OR LIABILITY 0 BTU BRITISH THERMAL UNIT INFO INFORMATION RTU ROOF TOP UNIT
INCLUDES ABILITY TO MARK UP AND APPLY ELECTRONIC EXAMINE THE AREA AFFECTED BY THE WORK TO FAMILIARIZE THEMSELVES INCLUDING, BUT NOT LIMITED TO, AESTHETIC CONSEQUENCES, 4 A8-1 2 BUR BUILT UP ROOFING INSUL INSULATION RWC RAINWATER CONDUCTOR
STAMPS. WITH THE EXISTING CONDITIONS AND THE DIFFICULTIES THAT WILL AFFECT SUBSEQUENT FAILURE(S) AND PERSONAL OR PROPERTY DAMAGE EXTERIOR ELEVATION TAG INT INTERIOR
2. PAPER DOCUMENT TRANSMITTALS WILL NOT BE THE EXECUTION OF THE WORK. SUBMISSION OF A PROPOSAL WILL BE ATTRIBUTABLE TO THIS CHANGE. SHEET SECTION C INV INVERT S
REVIEWED. CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE, 44. REVIEW OF A SPECIFIC ITEM SHALL NOT INCLUDE REVIEW OF AN 3 NUMBER
3. ALL OTHER SPECIFIED SUBMITTAL AND DOCUMENT AND LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR, ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. 0 DESIGNATION CER CERAMIC S SOUTH
TRANSMISSION PROCEDURES NOTED ELSEWHERE APPLY, EQUIPMENT, OR MATERIALS, REQUIRED BECAUSE OF DIFFICULTIES 45. SUBMITTALS THAT CONTAIN EXCESSIVE ERRORS OR ARE INCOMPLETE 1 CF CUBIC FEET J SAN SANITARY
EXCEPT THAT ELECTRONIC DOCUMENT REQUIREMENTS ENCOUNTERED WHICH COULD HAVE BEEN REASONABLY FORESEEN HAD SUCH OR INADEQUATE MAY BE RETURNED WITHOUT ACTION. COSTS DATUM POINT A7-1 0 CONTROL JOINT ]AN CLOS JANITOR'S CLOSET SB STONE BASE
DO NOT APPLY TO SAMPLES OR COLOR SELECTION AN EXAMINATION BEEN MADE. THE GENERAL CONTRACTOR SHALL VERIFY ALL INCURRED FOR THE RESULTANT DELAYS WILL BE THE RESPONSIBILITY CL CENTERLINE JB JUNCTION BOX SC SOLID CORE
CHARTS. CONDITIONS AND DIMENSIONS ON THE JOB SITE AND REPORT ANY AND ALL OF THE CONTRACTOR. SHEET NUMBER JST JOIST SCHED SCHEDULE
4. ARCHITECT WILL UTILIZE NEWFORMA PROJECT CENTER DISCREPANCIES AND/OR UNUSUAL CONDITIONS TO THE ARCHITECT PRIOR 46. REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR OF CLG CEILING
AS ITS INTERNET-BASED SERVICE. THIS SERVICE IS TO FINALIZING BIDS OR COMMENCEMENT OF ANY CONSTRUCTION. OBLIGATIONS OR RESPONSIBILITIES FOR DEVIATIONS FROM THE CLOS CLOSET IT JOINT SCHEM SCHEMATIC
AVAILABLE AT NO CHARGE FOR THE CONTRACTOR TO 18. THE GENERAL CONTRACTOR SHALL MAKE KNOWN ANY AND ALL LIMITATIONS, REQUIREMENTS OF THESE CONTRACT DOCUMENTS, UNLESS THE CLR CLEAR SE SOUTHEAST
TRANSMIT SUBMITTALS AND RFIS AND IS SOLELY EXCLUSIONS, OR MODIFICATIONS TO THE PROJECT DURING THE BID ARCHITECT IS NOTIFIED AND SPECIFICALLY APPROVES OF, THE VERTICAL ELEVATION SPOT ELEVATION PARTIAL PLAN & DETAIL TAG CMU CONCRETE MASONRY K SECT SECTION
INTENDED FOR ARCHITECT'S RECEIPT AND SELECTIONS PERIOD. ANY AND ALL LIMITATIONS, EXCLUSIONS, OR DEVIATIONS AT THE TIME OF SUBMISSION. UNIT KD KNOCK DOWN SF SQUARE FOOTAGE
DISTRIBUTION PURPOSES ONLY. NO DOCUMENTS WILL MODIFICATIONS NOT ITEMIZED IN THE BID PROPOSAL DOCUMENTS ARE 47. REVIEW OF SUBMITTALS SHALL NOT RELIEVE THE CONTRACTOR'S Level Name KIT KITCHEN SHWR SHOWER
BE STORED FOR TEAM RETRIEVAL ON THIS SITE. PRESUMED "INCLUDED", IN WHICH CASE NO ADDITIONAL MONIES WILL BE OBLIGATION FOR COORDINATION NOR WAIVE RESPONSIBILITY FOR Elevation COL COLUMN
Level Name PLAN OR DETAIL SIM SIMILIAR
a. ARCHITECT WILL NOT UTILIZE CONTRACTOR'S ALLOCATED FOR THIS WORK. ERRORS AND OMISSIONS IN THE SUBMITTALS, INCLUDING "FIELD 1 1 CONC CONCRETE
SIM DESIGNATION 1
SERVICE. 19. EXISTING CONSTRUCTION AND DIMENSIONS SHOWN ARE PER EXISTING MEASURE." Elevation 1 1 CONSTR CONSTRUCTION L SPEC SPECIFICATION (5)
b. ARCHITECT WILL RETURN DOCUMENTS TO DRAWINGS. ALL EXISTING INFORMATION MUST BE VERIFIED IN THE FIELD. 48. CHANGES IN THE SCOPE OF WORK OR IN CONSTRUCTION DETAILS, 1 CONT CONTINUNOUS L LOW SPKR SPEAKER
CONTRACTOR VIA CLOUD -BASED INFORMATION NEITHER THE OWNER NOR THE ARCHITECTS ARE RESPONSIBLE FOR WHETHER DUE TO FIELD CONDITIONS OR OMISSIONS BY THE 1 1 A6-1 SIMILAR DETAIL CONTR CONTRACTOR LAM LAMINATE(D) SQ SQUARE
EXCHANGE SERVICE FOR CONTRACTOR'S ACCURACY OF EXISTING INFORMATION. EXISTING CONSTRUCTION CONTRACTOR, ARCHITECT OR OWNER, SHALL BE DOCUMENTED BY THE 1 1 CORR CORRIDOR LAV LAVATORY SQ FT SQUARE FOOT
RECORD, USE, AND DISTRIBUTION. CONDITIONS IN AREAS WHERE NEW WORK IS NOT PLANNED MAY BE NOT ARCHITECT AND APPROVED, PRIOR TO EXECUTION. MATCH LINE BREAK LINE 1 1 SHEET NUMBER CPT CARPET LF LINEAR FEET SSTL STAINLESS STEEL
B. PROJECT CLOSEOUT: ARCHITECT WILL DETERMINE WHEN TO COMPLETELY SHOWN. 49. THE PRESENCE OF A REPRESENTATIVE OF THE ARCHITECT ON THE JOB
TERMINATE THE SERVICE FOR THE PROJECT. 20. WITHIN ONE (1) WEEK (5 BUSINESS DAYS), OF THE AWARD OF THIS SITE DOES NOT IMPLY CONCURRENCE WITH OR THE APPROVAL OF ANY CT CERAMIC TILE LH LEFT HAND ST STREET
C. PROJECT CLOSEOUT: CONTRACTOR IS RESPONSIBLE FOR CONTRACT, PRIOR TO MOBILIZATION FOR ANY WORK, THE CONTRACTOR WORK. THE CONTRACTOR SHALL CALL TO THE ATTENTION OF THE 02 / A2-1 CTR CENTER LHR LEFT HAND REVERSE STD STANDARD
MAINTAINING ARCHIVE COPIES OF FILES FOR OWNER AND SHALL FURNISH A CONSTRUCTION SCHEDULE SHOWING CHRONOLOGICALLY ARCHITECT, IN WRITING, ALL SPECIFIC ITEMS FOR WHICH CU FT CUBIC FEET LL LIVE LOAD STL STEEL
ARCHITECT. THE PHASES OF THE WORK, AND ALL RELATED WORK FOR THE COMPLETION ARCHITECT'S REVIEW IS REQUIRED. SHEET NUMBER DRAWING TITLE LONG LONGITUDINAL STOR STORAGE
5. THE AIA STANDARD DOCUMENT "A201" TITLED "GENERAL CONDITIONS OF THE PROJECT. THIS SCHEDULE SHALL INDICATE ALL ORDERING LEAD 50. UPON SUBSTANTIAL COMPLETION OF WORK THE CONTRACTOR SHALL DETAIL NUMBER D LVL LEVEL STRUCT STRUCTURE or
OF THE CONTRACT FOR CONSTRUCTION" SHALL BE CONSIDERED PART TIMES, LENGTH OF TIME FOR EACH PHASE, ITS START AND COMPLETION, PREPARE A "PUNCHLIST" OF CORRECTIONS AND UNSATISFACTORY TITLE D DEPTH STRUCTURAL
OF THE GENERAL CONDITIONS OF THIS WORK. WITH A PROJECTED COMPLETION DATE. AND/OR INCOMPLETE WORK FOR REVIEW BY THE ARCHITECT. 6. THE CONTRACTOR SHALL COORDINATE WITH THE BUILDING 21. CONTRACTOR AND SUCONTRACTORS SHALL ATTEND JOB MEETINGS 51. THE CONTRACTOR SHALL MAINTAIN AT THE SITE, ONE RECORD COPY / DBL DOUBLE M SUSP SUSPENDED
MANAGEMENT THE STORAGE OF MATERIALS AND SHALL PROVIDE REQUIRED BY THIS CONTRACT. OF ALL DRAWINGS, PERMITS, SUBMITTALS AND SAMPLES ON WHICH TO DEG DEGREES M HAL METAL HALIDE SW SOUTHWEST
PROTECTION AS NECESSARY TO PREVENT VANDALISM AND LOSS OF 22. CONTRACTOR AND SUBCONTRACTORS SHALL ATTEND JOB MEETINGS RECORD ALL CHANGES DURING CONSTRUCTION. ACCESS TO THESE 1 View Name MAINT MAINTENANCE SYMB SUMBOL
MATERIALS BY THEFT OR DAMAGE SUSTAINED DUE TO EXPOSURE TO REQUIRED BY THIS CONTRACT. THE CONTRACTOR SHALL OBTAIN ALL SHALL BE PROVIDED FOR THE USE OF ALL TRADES, CLIENT CENTERLINE LEADERS Al-1 1/8" - V-0" DEMO DEMOLISH ON or MAS MASONRY
- SYS SYSTEM
INAPPROPRIATE ENVIRONMENTAL CONDITIONS AND WILL REPAIR & PERMITS FOR ALL SITE DEVELOPMENT WORK, PAY ALL FEES FOR PERMITS REPRESENTATIVES AND THE ARCHITECT, DURING ALL PHASES OF NOTE &KEYNOTE DEPT DEPARTMENT MATL MATERIAL
REPLACE DAMAGE OR LOSSES AT THE CONTRACTOR'S EXPENSE AND CHECK ALL GOVERNING AUTHORITIES' SPECIFICATIONS FOR BUT NOT CONSTRUCTION. ICE -
WITHOUT CHARGE TO THE OWNER. LIMITED TO, GUTTERS, SIDEWALKS, POLES, AND OTHER STRUCTURES, 52. DURING THE COURSE OF CONSTRUCTION, ACTUAL LOCATIONS SHALL LEADER SCALE DF DRINKING FOUNTAIN MAX MAXIMUM T
7. WHERE ADJACENT AREAS BEYOND THE IMMEDIATE CONSTRUCTION INCLUDING THE REMOVAL OR RELOCATION OF EXISTING UTILITIES OR BE INDICATED TO SCALE IN RED INK ON THE OWNERS RECORD DH DOUBLE HUNG MECH MECHANICAL T TREAD(S) or TILE
AREA WILL BE OCCUPIED DURING THE CONSTRUCTION PERIOD, THE OTHER PHYSICAL OBJECTS SHOWN ON PLANS OR NOTED OTHERWISE. DRAWINGS FOR ALL RUNS OF MECHANICAL AND ELECTRICAL WORK AREA & EQUIPMENT DETAIL NUMBER DIAG DIAGONAL MED MEDIUM T&B TOP & BOTTOM
CONTRACTOR SHALL: 23. CREATE AND IMPLEMENT AN EROSION AND SEDIMENTATION CONTROL PLAN INCLUDING CONCEALED WORK WHICH DEVIATES FROM THE TAG LEADER SHEET NUMBER DIAM DIAMETER MEZZ MEZZANINE T&G TONGUE & GROOVE
A. CONFORM TO OWNERS AND TENANT REQUIREMENTS FOR HOURS FOR ALL SITE CONSTRUCTION ACTIVITIES ASSOCIATED WITH THE PROJECT. DRAWINGS. UPON COMPLETION OF THE PROJECT, INCLUDING ALL DISP DISPENSER MFR MANUFACTURER T'STAT THERMOSTAT
OF CONSTRUCTION OPERATIONS, ACCESS TO TENANT SPACES AND THE PLAN MUST CONFORM TO THE EROSION AND SEDIMENTATION PUNCHLIST ITEMS, THIS INFORMATION SHALL BE NEATLY DN DOWN MIN MINUMUM TB TILE BASE
ALLOWABLE NOISE LEVEL DURING TENANT BUSINESS HOURS. REQUIREMENTS OF THE 2003 EPA CONSTRUCTION GENERAL PERMIT OR TRANSFERRED BY THE CONTRACTOR TO A SET OF DRAWINGS, WHICH
B. CONSTRUCTION OPERATIONS SHALL NOT BLOCK HALLWAYS LOCAL STANDARDS AND CODES, WHICHEVER IS MORE STRINGENT. SHALL BE MARKED "AS BUILT SET" AND COPIES SHALL BE PROVIDED TO ROOM NAME AND NUMBER TAG PARTITION TAG WALL TYPE LEGEND DR DOOR(S) MISC MISCELLANEOUS TDB TO BE DETERMINED
ACCESSIBLE ROUTES OR MEANS OF EGRESS FOR TENANTS OF 24. ALL REQUIRED PERMITS MUST BE OBTAINED FROM THE MUNICIPAL BOTH THE OWNER AND THE ARCHITECT. WITHIN THREE (3) WEEKS (15 Room Name DS DOWN SPOUT MO MASONRY OPENING TEL TELEPHONE BUILDING. AUTHORITIES HAVING JURISDICTION PRIOR TO START OF CONSTRUCTION. BUSINESS DAYS) OF THE RECEIPT OF THE "AS BUILT SET." APPROVAL NOT IN CONTRACT (NIC) DTL DETAIL MTG MOUNTING TEMP TEMPORARY or
C. CONSTRUCTION OPERATIONS SHALL NOT CAUSE INTERRUPTIONS 25. ALL COSTS FOR INSPECTIONS AND/OR TESTS SHALL BE THE RESPONSIBILITY FOR FINAL PAYMENT TO THE CONTRACTOR SHALL BE GRANTED OR 101 2B 3 DWG DRAWING MTL METAL TEMPERATURE
OF ELECTRICAL SERVICES TO THE TENANTS OF THE BUILDING OF THE CONTRACTOR, LINO. REASONABLE CAUSE SHOWN WHY SUCH APPROVAL HAS BEEN DENIED. DWR DRAWER TERR TERRAZZO
WITHOUT PRIOR NOTIFICATION AND APPROVALS. PROPERLY 26. THE CONTRACTOR SHALL PAY THE EXPENSES FOR ALL TRANSPORTATION, 53. PRIOR TO THE COMPLETION OF THE WORK, THE CONTRACTOR SHALL EXISTING CONSTRUCTION TO REMAIN N THK THICK
PROTECT ALL FLOORS, MAIL CHUTES AND STAIR DOORS IN PUBLIC HOISTING AND ELEVATOR USE CHARGES ON ALL MATERIALS OR EQUIPMENT ASSEMBLE AND FURNISH THE CLIENT A COMPLETE SET OF FURNITURE TAG THRES THRESHOLD
AREAS SUBJECT TO CONSTRUCTION TRAFFIC. SHOE WIPING MATS TO THE POINT OF USE, AND SHALL BE RESPONSIBLE FOR ALL UNLOADING, MANUFACTURERS' CATALOG, OPERATING INSTRUCTIONS, START-UP E N NORTH
WILL BE INSTALLED AT ALL OPENINGS BETWEEN CONSTRUCTION CHECKING AND STORAGE OF THE SAME IN CONNECTION WITH THIS CHECK LISTS, MAINTENANCE INSTRUCTIONS AND SIMILAR DATA, AS E EAST N/A NOT APPLICABLE / NOT THRU THROUGH
AREAS AND ALL PUBLIC SPACES. ALL ACTIVE AREAS SHALL BE KEPT CONTRACT. WELL AS ALL GUARANTEE(S) FOR ALL EQUIPMENT AND OPERABLE 11 FURNITURE TAG NEW CONSTRUCTION EA EACH AVAILABLE TOC TOP OF CONCRETE/CURB
CLEAN AND FREE FROM DEBRIS. 27. OF THE INEVITABLE WASTE THAT IS GENERATED, AS MANY OF THE WASTE DEVICES FURNISHED OR INSTALLED BY THE CONTRACTOR UNDER THIS NE NORTHEAST TOS TOP OF STEEL
D. ERECT AND MAINTAIN TEMPORARY BRACING, LIGHTS, DUSTPROOF MATERIALS AS ECONOMICALLY FEASIBLE SHALL BE REUSED, SALVAGED, OR CONTRACT, AND SHALL ORIENT AND INSTRUCT THE PERSONNEL EF EXHAUST FAN
PARTITIONS, BARRICADES, FENCES AND WARNING SIGNS AS RECYCLED. WASTE DISPOSAL IN LANDFILLS SHALL BE MINIMIZED. DESIGNATED BY THE CLIENT IN THE OPERATION OF ALL SUCH EJ EXPANSION JOIN NEC NATIONAL ELECTRIC TOW TOP OF WALL
NECESSARY TO PREVENT INJURY, NOISE, DUST AND CONTRACTOR SHALL COORDINATE WASTE MATERIALS HANDLING AND EQUIPMENT. EQUIPMENT TAG WINDOW TYPE TAG - - - EXISTING CONSTRUCTION TO BE REMOVED EL ELEVATION CODE TRANSF TRANSFORMER
INCONVENIENCE TO OTHER TENANTS, THE PUBLIC, AND TO SEPARATION FOR ALL TRADES. CONTRACTOR SHALL PROVIDE SEPARATION, 54. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER IN THE ELEC ELECTRIC(CAL) NEG NEGATIVE TYP TYPICAL
PREVENT DAMAGE TO ADJACENT CONSTRUCTION WHICH IS TO BE HANDLING, TRANSPORTATION, RECYCLING, SALVAGE, AND LANDFILLING FOR EVENT THAT MOLD OR ASBESTOS IS UNCOVERED. THE OWNER SHALL XX99 EQUIPMENT TAG 1t ELEV ELEVATOR NIC NOT IN CONTRACT
LEFT IN PLACE. ALL DEMOLITION AND WASTE MATERIALS. RECYCLABLE MATERIALS CAN BE RETAIN A QUALIFIED CONSULTANT WHO SHALL ARRANGE FOR THE OVERHEAD SOFFIT/UPPER CABINET EMERG EMERGENCY NO NUMBER U
E. CONTRACTOR SHALL FOLLOW THE RECOMMENDED CONTROL COMMINGLED IN DUMPSTERS ON -SITE AS LONG AS PROVISION IS MADE FOR PROMPT IDENTIFICATION, TESTING, TREATMENT, REMEDIATION AND ENCL ENCLOSURE NOM NOMINAL UC UNDERCUT
MEASURES OF THE SHEET METAL AND AIR CONDITIONING HAULING TO A TRANSFER STATION WHERE SEPARATION WILL OCCUR. STORAGE OF THE MOLD OR ASBESTOS AS REQUIRED BY LAW AND NRC NOISE REDUCTION UL UNDERWRITER'S
NATIONAL CONTRACTORS ASSOCIATION (SMACNA) IAQ TRANSFER STATION MUST PROVIDE DOCUMENTATION REPORT TYPES OF GOOD CONSTRUCTION PRACTICES. THE ARCHITECT SHALL BEAR NO ENGR ENGINEER COEFFICIENT LABORATORY
GUIDELINES FOR OCCUPIED BUILDINGS UNDER CONSTRUCTION, MATERIALS SEPARATED BY LOAD AND PERCENTAGE OF EACH LOAD. FINAL RESPONSIBILITY FOR WORK RELATED TO THESE MATERIALS. KEYNOTE DRAWING REVISIONS T DEMOUNTABLE PARTITION (BY CONTRACTOR) ENTR ENTRANCE NTS NOT COEFFICIENT
SCALE UNEXCAV LABORUNEXCATORY
2ND EDITION 2007, ANSI/SMACNA 008-2008 (CHAPTER 3). DESTINATION OF SORTED MATERIALS MUST ALSO BE REPORTED. 55. THE CONTRACTOR IS ADVISED THAT THE PREMISE HAS NOT BEEN EQ EQUAL
VATED
PROTECT STORED ON -SITE AND INSTALLED ABSORPTIVE TESTED FOR LEAD PAINT OR OTHER POTENTIALLY HAZARDOUS EQUIP EQUIPMENT NW NORTHWEST LINO UNLESS NOTED
MATERIALS FROM MOISTURE DAMAGE. DIVERSION GOALS: A MINIMUM 75% OF TOTAL PROJECT WASTE SHALL BE MATERIALS. THE CONTRACTOR SHALL USE ALL APPROPRIATE OTHERWISE
F. IF PERMANENTLY INSTALLED AIR HANDLERS ARE USED DURING DIVERTED FROM LANDFILL. THE FOLLOWING WASTE CATEGORIES, AT A PRECAUTIONS IN THE CARRYING OUT OF ALL CONSTRUCTION � � x 100 � REVISION NUMBER DEMOUNTABLE PARTITION (BY VENDOR) EW EACH WAY 0 /fix UPS UNINTERRUPTABLE
CONSTRUCTION, FILTRATION MEDIA WITH A MINIMUM EFFICIENCY MINIMUM, SHALL BE DIVERTED FROM LANDFILL. OPERATIONS WHICH MIGHT DISTURB SUCH MATERIALS. Lc OC ON CENTER
EWC ELECTRIC WATER COOLER POWER SUPPLY
�
REPORTING VALUE (MERV 8) MUST BE USED AT EACH RETURN AIR a. CLEAN DIMENSIONED WOOD, PALLET WOOD 56. ALL CONTRACTORS SHALL CARRY PROPERTY DAMAGE AND PUBLIC TAG NUMBER REVISION DELTA EXH EXHAUST UR URINAL
GRILLE. b. PLYWOOD, OSB, AND PARTICLEBOARD LIABILITY INSURANCE AS REQUIRED BY ANY GOVERNING AGENCIES ® GLAZING EXIST EXISTING OCC OCCUPANCY or OCCUPIED
OFF OFFICE USF USABLE SQUARE FOOTAGE
8. ALL CUTTING, CHASING, DRILLING OR DEMOLITION OF WALLS, SLABS, C. CONCRETE HAVING JURISDICTION AND COMPLYING WITH STATUTORY EXP EXPANSION UTIL UTILITY
ETC. REQUIRING THE USE OF JACKHAMMERS OR OTHER HEAVY HAND d. CARDBOARD, PAPER, PACKAGING REQUIREMENTS FOR DISABILITY AND WORKMEN'S COMPENSATION. EXT EXTERNAL or EXTERIOR OH OVERHEAD
OR POWER TOOLS SHALL BE PERFORMED AFTER REGULAR BUSINESS e. METALS 57. GENERAL CONTRACTOR SHALL PROVIDE WEEKLY PHOTOS ALIGNMENT PARTIAL HEIGHT WALL OPG OPENING
HOURS ON AN OVERTIME BASIS IF NECESSARY, UNLESS THE BUILDING f. GYPSUM DRYWALL (UNPAINTED) DOCUMENTING PROJECT PROGRESS. COORDINATE WITH PROJECT OPP OPPOSITE V
MANAGEMENT AND ANY AFFECTED TENANTS PROVIDE A WRITTEN g. ACOUSTIC TILE MANAGER FOR DISTRIBUTION. IN ADDITION TO SHOWING GENERAL ALIGN F OZ OUNCE(S) V VOLT or VENT
WAIVER EXPRESSLY PERMITTING OTHERWISE. h. PAINT PROGRESS, GC SHALL PHOTOGRAPH HIDDEN CONDITIONS PRIOR TO NEW CONSTRUCTION TO FC FOOT CANDLES VAP RET VAPOR RETARDER
9. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE i. GLASS CLOSE-UP INCLUDING BUT NOT LIMITED TO SOUND INSULATION AND ALIGN OR FLUSH WITH RAISED FLOORING FCO FLOOR CLEAN OUT VAR VARIES
RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF j. PLASTICS SOUND CAULKING WITHIN WALLS, IN -WALL BLOCKING, RETURN AIR EXISTING CONSTRUCTION FD FLOOR DRAIN P VB VINYL BASE
CONSTRUCTION OF THIS PROJECT INCLUDING SAFETY OF ALL PERSONS k. CARPET AND PAD SOUND BOOTS, INSULATION ABOVE CEILING, FULL -HEIGHT WALLS. # lb POUND
AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND I. BEVERAGE CONTAINERS FDN FOUNDATION % PERCENT VCT VINYL COMPOSITION TILE
NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR 28. THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS, MAINTAIN AND PAY ALL FE FIRE EXTINGUISHER PART PARTIAL VENT VENTILITATION
SHALL PROVIDE PUBLIC PROTECTION, AS NECESSARY AND REQUIRED COSTS FOR TEMPORARY WATER, PLUMBING, POWER, LIGHTING, HEATING OR FEC FIRE EXTINGUISHER PASS PASSAGE VERT VERTICAL
BY GOVERNING AGENCIES HAVING JURISDICTION, UNTIL CLIENT VENTILATION REQUIRED TO PROPERLY CONDUCT THE WORK. CABINET
OBJECT STATE FIRE EXTINGUISHER PC PRECAST VEST VESTIBULE
ACCEPTANCE OF THE PREMISES. 29. DO NOT SCALE THESE DRAWINGS; WRITTEN DIMENSIONS SHALL GOVERN. FF FINISH FLOOR VIF VERIFY IN FIELD
FEC SURFACE MOUNTED CABINET FHC FIRE HOSE CABINET PED PEDESTAL
10. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR THE
SHOULD ANY DIMENSIONAL DISCREPANCIES BE ENCOUNTERED, E EXISTING TO REMAIN VOL VOLUME
PROVISION AND MAINTENANCE OF ALL BRACING, SHORING, CLARIFICATIONS SHALL BE OBTAINED FROM THE OFFICE OF THE ARCHITECT. FIG FIGURE PERF PERFORATED
ENCLOSURES, BARRIERS OR SCAFFOLDING REQUIRED TO PROVIDE A 30. LARGE SCALE DETAILS SHALL GOVERN OVER SMALLER SCALE PLANS AND FIN FINISH PERP PERPENDICULAR VTR VENT THROUGH ROOF
SAFE WORKING ENVIRONMENT AS DICTATED BY SITE CONDITIONS AND ELEVATIONS. PL PROPERTY LINE VWC VINYL WALL COVERING
THE PROGRESS OF WORK. 31. INSTALL ALL EQUIPMENT AND MATERIALS PER MANUFACTURERS' N NEW FIXT FIXTURE
11. DURING THE ENTIRE CONSTRUCTION PERIOD, ALL EXITS, EXIT RECOMMENDATIONSANY DIFFICULTIES ARE TO BE REPORTED TO THE FEC FLEX FLEXIBLE PLAM PLASTIC LAMINATE
.
LIGHTING, FIRE PROTECTION DEVICES AND ALARMS SHALL BE ARCHITECT IMMEDIATELY. FLOUR FLOURESCENT W WEST or WATT
CODE AND OTHER GOVERNING ENTITY REQUIREMENTS. LINO, ALL RECESSED CABINET PLAS PLASTIC W
CONTINUOUSLY MAINTAINED IN CONFORMANCE WITH LOCAL BUILDING 32. THE CONTRACTOR AND EACH SUBCONTRACTOR SHALL WARRANTEE ALL R RELOCATED FLR FLOOR PLT PLATE
PLYWD PLYWOOD W/ WITH
WORK PERFORMED BY HIM DIRECTLY FOR A MINIMUM PERIOD OF ONE (1) FOM FACE OF MASONRY EXISTING, SERVICES AND DEVICES SHALL REMAIN ACTIVE. YEAR AS SPECIFIED IN THE CONSTRUCTION CONTRACT. ALL DEFECTS FE POS POSITIVE W/0 WITHOUT
OCCURRING IN THE GUARANTEED PERIOD SHALL BE CORRECTED AT NO X EXISTING TO BE REMOVED WALL MOUNTED W/O CABINET
12. THE CONTRACTOR SHALL PROTECT THE PROPERTY OF THE CLIENT AND FOS FACE R STUD
PR PAIR WB WOOD BASE
THE BUILDING OWNER. INCLUDING, BUT IS NOT LIMITED TO, ADDITIONAL COST. FP FIRE PROTECTIONS WC WATER CLOSET (TOILET)
WINDOWS, FLOOR AND CEILING FINISHES, PUBLIC TOILETS, 33. THE CLIENT, ARCHITECT, CONSULTANTS AND ALL INSPECTORS FROM FPL FABRIC PANEL PREFAB PREFABRICATED
ELEVATORS, DOORS & BUCKS, ELECTRICAL AND AIR-CONDITIONING PROD PROJECT or PROJECTED WD WOOD (SOFTWOOD)
PERTINENT AGENCIES SHALL BE PERMITTED ACCESS TO THE JOB SITE AT ALL FRTWD FIRE RETARDENT
EQUIPMENT. THE CONTRACTOR SHALL PROTECT ADJOINING TIMES DURING NORMAL WORKING HOURS. DOORS PLUMBING FIXTURES TREATED WOOD PROP PROPERTY or PROPOSAL WF WIDE FLANGE
PROPERTY. DAMAGE CAUSED BY THE CONTRACTOR'S WORK OR 34. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT PSF POUNDS PER SQUARE WH WATER HEATER
Q FT FOOT or FEET Q
WORKMEN MUST BE MADE GOOD, IN A TIMELY FASHION. PATCHING NECESSARY TO EXECUTE ALL WORK, EXCEPT WHERE NOTED AS NOT IN TOILET \ MOP_ FOOT WP WATERPROOF
AND REPLACEMENT OF DAMAGED WORK SHALL BE PERFORMED AT THE CONTRACT (NIC). / FTG FOOTING WPT WORKING POINT
COST OF THE CONTRACTOR. THE CONTRACTOR SHALL BE FULLY aT UTILITY SINK FURR FURRING PSI POUNDS PER SQUARE
35. MINOR DETAILS NOT SHOWN OR SPECIFIED, BUT NECESSARY FOR PROPER INCH WT WEIGHT
RESPONSIBLE FOR ALL SUB -CONTRACTORS. IF THE CONTRACTOR FAILS CONSTRUCTION OF ANY PART OF THE WORK, SHALL BE INCLUDED AS IF THEY EXISTING DOOR TO REMAIN URINAL FWC FABRIC WALLCOVERING
TO COMPLETE THE REPAIRS IN A TIMELY FASHION, SAID REPAIRS WILL WERE INDICATED IN THE DRAWINGS, UNLESS OTHERWISE AGREED UPON. PT PAINT WWF WELDED WIRE FABRIC
BE MADE BY A CONTRACTOR SELECTED BY THE OWNER'S WHERE THE CONTRACT, CONSTRUCTION NOTES OR DRAWINGS CALL FOR SINK - x SHOWER G PTN PARTITION
REPRESENTATIVE AND BACK CHARGED ACCORDINGLY. ANY WORK OF A MORE STRINGENT NATURE THAN THAT REQUIRED BY THE Y
BUILDING CODE, OR ANY OTHER ENTITY HAVING JURISDICTION OVER THE COUNTER GALV GALVANIZED Q YD YARD or YARD DRAIN
WORK, THE WORK OF THE MORE STRINGENT NATURE CALLED SHALL BE MOUNTED GC GENERAL CONTRACTOR
FURNISHED IN ALL CASES. A!!FN NEW /RELOCATED /MODIFIED DOOR GEN GENERAL QT QUARRY TILE
36. FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH
MATERIALS WHICH YIELD THE HIGHEST PERCENT OF PRE -CONSUMER (POST-
INDUSTRIAL) AND POST -CONSUMER RECYCLED CONTENT. THE CONTRACTOR
SHALL FURNISH THESE MATERIALS WITHIN THE PARAMETERS OF THE
BUDGET AND SHALL NOT PURCHASE ANY COST -ADDING MATERIAL OR PAY A
PREMIUM (MORE THAN FAIR MARKET VALUE) WITHOUT PROJECT MANAGER
AND OWNER ACKNOWLEDGEMENT AND APPROVAL.
37. FOR ALL MATERIALS PURCHASED THE CONTRACTOR SHALL FURNISH
MATERIALS MANUFACTURED WITHIN A 500 MILE RADIUS OF THE PROJECT
SITE WHERE AVAILABLE, WITHIN BUDGET, WITHIN FAIR MARKET VALUE AND
DO NOT PRESENT RISK TO THE PROJECT SCHEDULE.
Q
� II
� II
d h EXISTING DOOR TO BE REMOVED
SINK -WALL
MOUNTED
TOILET
PARTITION
BI-LEVEL
WATER COOLER
GENR
GENERATOR
GFI
GROUND FAULT
INTERRUPTER
GL
GLASS or GLAZING
GRD
GROUND
GWB
GYPSUM WALL BOARD
GYP
GYPSUM
NELSON
Nelco Architecture, Inc.
1201 Marquette Avenue South,
Suite 200
Minneapolis, MN. 55403
Phone: (612) 822-1211
WWW.NELSONWORLDWIDE.COM
RBC WEALTH
MANAGEMENT
RBC PLAZA
60 SOUTH SIXTH STREET
MINNEAPOLIS, MN 55402
MINOR RENOVATION
303 5TH AVENUE SOUTH
SUITE 100
EDMONDS, WA 98020
Issue:
ISSUE FOR LL REVIEW
ISSUE FOR BID
ISSUE FOR PERMIT
No: Date:
01/31/2022
01/31/2022
03/31/2022
RECEIVED
May 04 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
GENERAL NOTES
9459 Ru.us.1ERv )-
rilt('l l! I Ia' I
1•
STATE OF WASI IIN( ON
Proj #: 21.0004413.000 Reviewed By:
AN-2
ME
NELSON
Nelco Architecture, Inc.
DEMOLITION PLAN LEGEND
EXISTING GLAZING TO BE REMOVED
EXISTING MILLWORK TO BE REMOVED
F
DEMOLITION PLAN KEYNOTES O
000 NO DEMOLITION WORK THIS AREA.
001 REMOVE EXISTING CARPET. GRIND GLUE AND PREPARE FLOOR FOR
NEW SPECIFIED FINISH. EXISTING CARPET ON STAIRS TO REMAIN.
002 REMOVE EXISTING LIGHT FIXTURES SHOWN.
1 DEMOLITION PLAN
AO-1 1/8" = V-0"
10'-93/4" L 10'-93/4" CONSTRUCTION PLAN LEGEND
102 102
OFFICE OFFICE a EXISTING PARTITION TO REMAIN
Ln 202 2B 203
d-
101 101 NEW PARTITION
G N M G
0 0
EXISTING DOOR
o HALLWAY
201 103
in
DN
NEW DOOR
100,
1 i PARTITION TYPE
0
2 CONSTRUCTION PLAN
AO-1 1/8" = V-0"
EXIST
EXIST
-
EX
202
203
FX
2FX
201
201
LL
ALLWA
�,
201
0 0
L'' 200 -
0
EX
❑ ❑
REFLECTED CEILING PLAN
1/8" = V-0"
100 KEYNOTE
CONSTRUCTION PLAN KEYNOTES O
100 NO CONSTRUCTION WORK THIS AREA.
101 PROVIDE NEW T WIDE DOOR TO MATCH EXISTING HEIGHT, FINISH,
AND SPECIES. HARDWARE TO MATCH EXISTING SUITE LEVERS (OFFICE
FUNCTION).
102 PROVIDE FIRE TREATED PLYWOOD BLOCKING IN -WALL FOR RBC
PROVIDED AND INSTALLED FLAT PANEL TV. BLOCKING TO SPAN A
MINIMUM OF 3 STUD SPACES AND BE T-0" HIGH AT ALL LOCATIONS.
SEE POWER PLAN FOR DEVICE HEIGHT.
103 EXISTING GUARDRAIL MEETS ALL GOVERNING REQUIREMENTS NOT
LIMITED TO HEIGHT, CLEAR OPENING, STRENGTH ETC.
RCP LEGEND
CEILING
TYPE
HEIGHT XX CELING TAG
A.F.F. X-X
ACT (2' X 4')
GWB - PAINT PT-1
UNLESS
OTHERWISE NOTED
CEILING FINISH -
REFER TO FINISH
PLANS FOR
ADDITIONAL NOTES
AND INFORMATION
N NEW FIXTURE TO MATCH EXISTING
RE RELOCATED FIXTURE
EX EXISTING FIXTURE TO REMAIN
SWITCH
RCP KEYNOTES O
200 NO WORK THIS AREA.
201 EXISTING GRID, TILE AND LIGHT FIXTURES TO REMAIN. PROVIDE NEW
TILES AS REQUIRED.
202 RE -CIRCUIT EXISTING LIGHT FIXTURE WITHIN ROOM TO BE
CONTROLLED BY NEW SWITCH.
203 REDISTRIBUTE HVAC SYSTEMS AS NECESSARY FOR NEW LAYOUT.
COORDINATE LOCATION OF THERMOSTAT WITH RBC.
RCP GENERAL NOTES
1. THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF
CEILING HEIGHTS, LIGHT FIXTURES, SWITCH LOCATIONS, AND
ASSOCIATED ITEMS. REFER TO DESIGN/BUILD ENGINEERING
DRAWINGS FOR CIRCUITING, WIRING LAYOUT, AND ADDITIONAL
INFORMATION. ALL MEP -FP DEVICE LOCATIONS NOT SHOWN ON
DRAWINGS, OR IN CONFLICT WITH MEP/FP DRAWINGS, ARE TO
BE COORDINATED WITH ARCHITECT PRIOR TO INSTALLATION. IN
THE EVENT OF DISCREPANCIES BETWEEN THE ARCHITECT'S
REFLECTED CEILING PLAN AND THE ENGINEERS' PLANS,
IMMEDIATELY NOTIFY THE ARCHITECT IN WRITING BEFORE
ORDERING MATERIALS OR PROCEEDING WITH THE WORK.
2. VERIFY FIELD CONDITIONS AND LOCATIONS OF ALL MEP/FP AND
STRUCTURAL ELEMENTS. CONTRACTOR TO COORDINATE THE
WORK OF ALL TRADES NECESSARY TO MAINTAIN THE FINISHED
CEILING HEIGHTS INDICATED. INSTALL DUCTWORK TIGHT TO
UNDERSIDE OF BEAMS. WITH A SMALL SPACE TO AVOID
VIBRATION. INSTALLATION AND/OR ALTERATION OF DUCTWORK,
PIPING OR OTHER EQUIPMENT THAT WILL REQUIRE FASCIAS,
SOFFITS AND OTHER TRANSITIONS IN CEILING HEIGHT SHALL BE
REVIEWED WITH THE ARCHITECT PRIOR TO PROCEEDING.
CONTRACTOR TO PROVIDE COMPLETE COORDINATION
DRAWINGS FOR THE ARCHITECT'S REVIEW.
3. MULTIPLE SWITCHES AT ONE LOCATION SHALL BE GANGED
TOGETHER WITHIN ONE COVER PLATE U.N.O.
4. ALL FIXTURES AND DEVICES TO BE UNDERWRITERS
LABORATORIES INC. (UL) LABELED.
5. LIGHT FIXTURES, REGISTERS, SPEAKERS, RECESSED FIXTURES
AND SIMILAR CEILING ELEMENTS, AND LIFE -SAFETY DEVICES
SHALL BE LOCATED IN THE CENTER OF CEILING TILE IN BOTH
DIRECTIONS AND SHALL ALIGN WITH ADJACENT FIXTURES,
DEVICES OR HEADS IN A RUN OR ROW, U.N.O.
6. FURNISH AND INSTALL ALL FIXTURES, ASSOCIATED TRIM, LAMPS,
AND SEISMIC BRACING.
7. INSTALL LIGHT FIXTURES WITH PROTECTIVE FILM OR SIMILAR
COVER OVER LOUVER, LENS, BAFFLE, AND EXPOSED SURFACES,
TO AVOID FIXTURE SOILING OR DAMAGE DURING
CONSTRUCTION. FIXTURES SHALL BE MAINTAINED CLEAN AND AS
NEW.
8. CONTRACTOR SHALL REPAIR AND/OR REPLACE CEILINGS WHICH
ARE REMOVED TO FACILITATE PLENUM SYSTEMS INSTALLATION.
9. PROVIDE CEILING ACCESS REQUIRED FOR EQUIPMENT AND
SYSTEM MAINTENANCE. MATCH ADJACENT CEILING FINISH U.N.O.
SYSTEMS AND EQUIPMENT REQUIRING ACCESS SHALL BE
LOCATED AT ACCESSIBLE CEILINGS - ACCESS PANELS NOT
SHOWN ON DRAWINGS SHALL NOT BE INSTALLED IN GYPSUM
BOARD CEILINGS WITHOUT PRIOR APPROVAL.
10. COORDINATE SCHEDULING OF WORK WITH DATA/TELEPHONE
INSTALLER. INSTALL CEILING TILES AFTER FINISH PAINTING TO
MINIMIZE VOC ABSORPTION INTO THE CELING TILES. INSTALL
CEILING TILES AFTER DATA/TELEPHONE CABLES HAVE BEEN
INSTALLED.
11. ALL LIGHT FIXTURES FURNISHED BY OWNER SHALL BE U.L.
APPROVED AND WHERE APPLICABLE, APPROVED BY LOCAL
AUTHORITIES FOR SPECIFIED USE.
12. CEILING GRID AND TILE SHALL MATCH EXISTING
13. SWITCHES AND PLATES SHALL MATCH EXISTING. COLOR TO
MATCH EXISTING.
14. ALL LIGHT FIXTURES SHALL MATCH EXISTING.
15. REPAIR AND/OR REPLACE COMPONENTS NECCESSARY TO INSURE
ALL EXISTING AND OR RELOCATED LIGHT FIXTURES ARE
FUNCTIONING, INCLUDING BUT NOT LIMITED TO LAMPS,
BALLASTS, AND LENSES.
16. ALL LAMP COLOR TEMPERATURES TO BE CONSISTENT.
CONSTRUCTION GENERAL NOTES
1. CONFLICTS BETWEEN SITE CONDITIONS AND DRAWINGS SHALL BE
BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT.
2. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE
AND TRUE AND IN PROPER ALIGNMENT, U.N.O.
3. ALL DIMENSIONS ARE TO FINISH CONSTRUCTION, U.N.O. DIMENSIONS
NOTED "HOLD" MUST BE ACCURATELY MAINTAINED, AND SHALL NOT
VARY MORE THAN t 1/8" WITHOUT WRITTEN INSTRUCTION FROM
ARCHITECT. "ALIGN" MEANS TO ACCURATELY LOCATE FINISHED FACES
IN THE SAME PLANE. DIMENSIONS NOTED "CLEAR" ARE MINIMUM
DIMENSIONS WHICH MUST BE MAINTAINED WITHOUT EXCEPTION.
DIMENSIONS MARKED f MEAN A VARIANCE NOT GREATER THAN 1
INCH, VERIFY DIMENSIONS EXCEEDING TOLERANCE WITH THE
ARCHITECT. ALL DIMENSIONS TO THE EXTERIOR WINDOW WALL ARE
TO THE FINISH FACE OF WALL BELOW SILL, U.N.O.
4. ALL EXISTING FLOORS, PARTITIONS, DEMISING WALLS, AND
CORRIDOR WALLS TO REMAIN ARE TO BE PATCHED AND REPAIRED TO
MATCH ADJACENT SURFACES.
5. PATCH AT ALL NEW AND EXISTING PENETRATIONS AT FLOOR AND
CEILING SLABS, WALLS AND SHAFTS, SEAL ABANDONDED
PENETRATIONS AT FLOORS, WALLS AND SHAFTS TO MAINTAIN
FIRE/SMOKE AND ACOUSTICAL RATINGS. PATCH FIREPROOFING AT ALL
NEW AND EXISTING LOCATIONS WITH EXPOSED STRUCTURAL STEEL.
6. ALL GLASS SHALL BE CLEAR TEMPERED. GLAZING TONG MARKS SHALL
NOT BE VISIBLE. CLEAN & POLISH ALL GLASS PRIOR TO PROJECT
DELIVERY.
7. ALL PARTITIONS ARE TYPE 2B U.N.O. ALL INFILL OF
DOORS/WALLS/OPENINGS SHALL MATCH AND BE FLUSH WITH
EXISTING ADJACENT PARTITION CONSTRUCTION.
8. WHERE NEW PARTITIONS ABUT EXISTING SURFACES, REMOVE
EXISTING CORNER BEAD AND PROVIDE SMOOTH FINISH AT
INTERSECTION.
9. ALL GYPSUM BOARD PARTITIONS SHALL BE TAPED AND SANDED
SMOOTH WITH NO VISIBLE JOINTS. PROVIDE LEVEL 4 FINISH, U.N.O. -
REFER TO MATERIAL SCHEDULE & FINISH PLAN FOR MATERIALS &
LOCATIONS THAT REQUIRE A LEVEL 5 FINISH, U.N.O.
10. ALL EXPOSED GYPSUM BOARD EDGES TO HAVE VINYL OF METAL EDGE
TRIM.
11. REFER TO THE PARTITION TYPES FOR PARTITION THICKNESS.
12. CONSTRUCTION OF FIRE -RATED PARTITIONS, INCLUDING TAPING AND
FINISHING OF GYPSUM WALLBOARD FOR FULL HEIGHT TO STRUCTURE
ABOVE, SHALL BE IN ACCORDANCE WITH UL SPECIFICATIONS TO
ACHIEVE RATING INDICATED.
13. ACOUSTICAL (SOUND -ISOLATION) PARTITIONS SHALL BE SEALED FOR
FULL HEIGHT TO PREVENT PASSAGE OF AIRBORNE SOUND. TAPE AND
FINISH ALL GYPSUM WALLBOARD JOINTS AND FASTENERS (INCLUDING
ABOVE SUSPENDED CEILING). CAULK AT PERIMETER AND SEAL AT ALL
PENETRATIONS.
14. WHERE PARTITIONS EXTEND ONLY TO UNDERSIDE OF SUSPENDED
CEILING, SECURE THE TOP TRACK TO THE EXPOSED CEILING GRID.
PROVIDE A COMPRESSIBLE GASKET BETWEEN THE TOP TRACK AND
THE CEILING GRID. PROVIDE TAPABLE METAL ]-BEAD AT TOP OF
GYPSUM WALLBOARD, WITH NO JOINTS VARYING MORE THAN 1/8"
OVER 6-0" AND NO JOINTS GREATER THAN 3/16", U.N.O. CAULK
PERIMETER AT TOP OF GWB.
15. PROVIDE GROUNDS AND BLOCKING IN METAL STUD WALL FRAMING
FOR SUPPORT OF CASEWORK, SHELF -STANDARDS, A/V DEVICES,
FURNITURE, ETC. ALL CONCEALED LUMBER AND BLOCKING TO BE FIRE
TREATED. COORDINATE BLOCKING REQUIREMENTS WITH FURNITURE
& AV INSTALLERS. WHERE BLOCKING OR ADDITIONAL STUDS ARE
REQUIRED AT EXISTING PARTITIONS, THEY ARE TO BE PATCHED AND
REPAIRED. SEE CONSTRUCTION PLANS FOR WALL -MOUNTED
MARKERBOARD, MONITORS & PROJECTION SCREENS; PROVIDE
BLOCKING PER MANUFACTURERS' REQUIREMENTS.
16. ALL HINGED DOORS TO BE 4" FROM NEAREST PERPENDICULAR
PARTITION, U.N.O. DIMENSIONS LOCATING DOORS ARE TO THE INSIDE
EDGE OF JAMB. ALL DOORS SHALL HAVE V-6" CLEAR ON THE
STRIKE/PULL SIDE OF DOOR AND 1'-0 CLEAR ON THE STRIKE/PUSH
SIDE (IF THEY HAVE BOTH A LATCH AND A CLOSER) VERIFY AND
ADVISE ARCHITECT OF EXCEPTIONS PRIOR TO CLOSING OUT
PARTITIONS.
17. THE CONTRACTOR SHALL ESTABLISH A SINGLE FLOOR ELEVATION
THAT IS TO BE USED TO SET THE TOP OF ALL DOORS SUCH THAT THE
TOP OF ALL DOORS OF THE SAME HEIGHT WILL ALIGN REGARDLESS OF
VARIATIONS IN THE FLOOR SLAB OR FINISHED FLOOR THICKNESS.
18. PROVIDE DOUBLE STUDS AT DOOR JAMBS. INSTALL ADDITIONAL
STUDS IN EXISTING PARTITIONS AT NEW DOOR OPENINGS IN ORDER
TO PROVIDE DOUBLE STUDS AT JAMBS.
19. PROVIDE DIAGONAL STUD BRACING TO SLAB ABOVE @ 48" O.C. AT
DROP ARCHES/BULKHEADS.
20. PROVIDE VERTICAL CONTROL JOINTS 30' O.C. MAX. IN ALL GWB
PARTITIONS LONGER THAN 30'. WHEN POSSIBLE CONTROL JOINTS
SHOULD BE LOCATED ABOVE THE CORNER OF A DOOR.
DEMOLITION GENERAL NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REMOVAL OF
EXISTING CONSTRUCTION AND THE STORAGE AND REMOVAL OF SAID
CONSTRUCTION, AND SHALL MAINTAIN THE AREA OF CONSTRUCTION
IN A CLEAN AND ORDERLY CONDITION WITH DAILY REMOVAL OF
DEBRIS. COORDINATE REMOVALS OF OTHER TRADES.
2. COORDINATE SCOPE OF DEMOLITION/REMOVAL WITH THE SCOPE OF
NEW WORK.
3. THE CONTRACTOR SHALL DO ALL CUTTING, PATCHING AND REPAIRING
REQUIRED TO PERFORM THE WORK INDICATED ON THE DRAWINGS.
ALL CUTTING AND REMOVALS SHALL BE DONE NEATLY.
4. ALL ITEMS TO BE REMOVED AND SCHEDULED FOR REINSTALLATION OR
TO BE RETURNED TO THE BUILDING SHALL BE PROTECTED, CLEAN AND
FREE OF DEFECTS. FOR ITEMS SCHEDULED FOR REMOVAL AND
REINSTALLATION, CONTRACTOR SHALL VERIFY AND DOCUMENT, IN
WRITING, THE CONDITION AND FUNCTIONALITY OF THE ITEM(S)
PRIOR TO REMOVAL. ANY DAMAGE TO ITEM(S) NOT DOCUMENTED
SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST
TO THE OWNER.
5. ALL EXISTING SURFACES AND EQUIPMENT TO REMAIN SHALL BE FULLY
PROTECTED FROM DAMAGE. THE CONTRACTOR SHALL ASSUME FULL
RESPONSIBILITY FOR DAMAGE AND SHALL MAKE REPAIRS REQUIRED
AT NO ADDITIONAL COST TO THE OWNER.
6. NO DEBRIS SHALL BE ALLOWED TO ACCUMULATE ON THE SITE.
DEBRIS SHALL BE REMOVED BY THE CONTRACTOR AS THE JOB
PROCEEDS. THE SITE SHALL BE LEFT BROOM CLEAN AT THE
COMPLETION OF REMOVALS.
7. ERECT AND MAINTAIN DUSTPROOF BARRIERS TO PREVENT THE
SPREAD OF DUST, FUMES, SMOKE, ETC. TO OTHER PARTS OF THE
FLOOR OR BUILDING. UPON COMPLETION OF WORK, REMOVE
BARRIERS AND REPAIR DAMAGED SURFACES TO MATCH ADJACENT.
PROTECT HVAC SYSTEM FROM DUST & DEBRIS. CONTRACTOR TO
PROVIDE FILTER MEDIA TO COVER THE MAIN RETURN AIR GRILLES.
PROVIDE NEW AIR FILTERS AT MECHANICAL UNITS AT THE
COMPLETION OF CONSTRUCTION.
8. COMPLY WITH APPLICABLE LOCAL, STATE AND FEDERAL CODES AND
REGULATIONS PERTAINING TO SAFETY OF PERSONS, PROPERTY AND
ENVIRONMENTAL PROTECTION. ANNOYANCES AND DISTURBANCES TO
OTHER OCCUPANTS, PERSONNEL AND EMPLOYEES SHALL BE KEPT TO
THE MINIMUM NECESSARY FOR THE PERFORMANCE OF THE WORK.
9. CONTRACTOR TO COORDINATE SHUTDOWN OF BUILDING SYSTEMS
WITH THE BUILDING PRIOR TO IMPLEMENTATION.
10. REMOVE EXISTING FLOOR FINISH MATERIALS THROUGHOUT, U.N.O.
PREPARE SURFACES FOR NEW FINISHES.
11. REMOVE AND DISCARD ALL FLOOR FINISHES, FLASH PATCH, MASTIC
AND ADHESIVES DOWN TO THE FLOOR STRUCTURE.
12. REMOVE ALL EXISTING MATERIALS WHICH CAUSE RISES OR
DEPRESSIONS IN FLOORING SURFACE, SUCH AS FASTENERS, OUTLET
CORES, COVER PLATES, RESILIENT FLOOR COVERINGS, CARPET PAD,
FLASH PATCH, ADHESIVES, CONCRETE FILL, PLYWOOD, ETC.
13. EXISTING CEILING GRID TO REMAIN, U.N.O. MODIFY TO
ACCOMMODATE NEW PARTITIONS.
SALVAGE FIRE ALARM DEVICES, EXIT SIGNS, LIGHTING AND HVAC
DEVICES THAT ARE SCHEDULED FOR REMOVAL FOR REUSE, U.N.O.
14. REMOVE ALL EXISTING LIGHT FIXTURES AND LENSES WHERE NOTED
AND STORE FOR FUTURE USE. ALL RELOCATED FIXTURES TO BE IN
FULL OPERATING ORDER.
15. PROTECT EXISTING WINDOW TREATMENTS. CONTRACTOR TO REPLACE
ANY BLINDS/DRAPES DAMAGED DURING DEMOLITION/CONSTRUCTION.
16. NO STRUCTURAL ELEMENTS SHALL BE REMOVED.
17. REMOVE ALL ABANDONED TELEPHONE AND DATA CABLING.
C�
0
0 0 d-
L o 0
Key Plan:
0 4' 8' 16'
NORTH
1201 Marquette Avenue South,
Suite 200
Minneapolis, MN. 55403
Phone: (612) 822-1211
WWW.NELSONWORLDWIDE.COM
RBC WEALTH
MANAGEMENT
RBC PLAZA
60 SOUTH SIXTH STREET
MINNEAPOLIS, MN 55402
MINOR RENOVATION
303 5TH AVENUE SOUTH
SUITE 100
EDMONDS, WA 98020
Issue:
ISSUE FOR LL REVIEW
ISSUE FOR BID
ISSUE FOR PERMIT
No: Date:
01/31/2022
01/31/2022
03/31/2022
RECEIVED
May 04 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
DEMOLITION,
CONSTRUCTION &
REFLECTED CEILING PLANS
9459 Rl:liltiJ'Lti1=1Y
0t
STA'I'IF OF WASI IINO I'ON
Proj #: 21.0004413.000 Reviewed By: ME
AO-1
Scale:
FINISH GENERAL NOTES
NELSON
POWER AND
-1 1/8" = V-0"
I751u1 ]0114It WON6 a R.113 1 I
POWER AND COMM. PLAN LEGEND
TI
CRC
DUPLEX OUTLET
QUAD OUTLET
220V OUTLET
FLOOR MOUNTED DUPLEX OUTLET
FLOOR MOUNTED QUAD OUTLET
VOICE/DATA DEVICE
FLOOR MOUNTED VOICE/DATA DEVICE
COAX
]-BOX
CARD READER
POWER AND COMM. PLAN
KEYNOTES O
300 NO ELECTRICAL OR CABLING WORK THIS AREA.
FURNITURE GENERAL NOTES
OFFICE OFFICE
202 203 1. FURNITURE SHOWN FOR REFERENCE ONLY. FURNITURE TO BE
SUPPLIED AND INSTALLED BY RBC FURNITURE VENDOR.
2. GENERAL CONTRACTOR TO COORDINATE SITE ACCESS AND
INSTALLATION WITH RBC FURNITURE VENDOR.
3. ELECTRICAL CONTRACTOR TO COORDINATE ]-BOX LOCATIONS, CORE
DRILL LOCATIONS AND HOOK UP OF ELECTRIFIED SYSTEMS
FURNITURE WITH RBC FURNITURE VENDOR. FURNITURE VENDOR TO
ISSUE FINAL FURNITURE PLAN WITH DIMENSIONS FOR
POWER/DATA/CORE DRILL LOCATIONS THAT WILL WORK WITH
HALLWAY THEIR PRODUCT.
201 4. G.C. AND FURNITURE VENDOR TO COORDINATE FURNITURE
DN MOVING/DISASSEMBLY, ETC. FOR NEW FLOORING, PAINTING AS
NEEDED.
500
[a
MEZZANINE FURNITURE PLAN
1/8" = V-0"
402
OFFICE
202
w PT-1/EX
B-1 EX
CPT-1
402
OFFICE
A
w
401 HALLWAY PT-1/EX
402 201 B-1 EX
DN CPT-1
07
400
MEZZANINE AND FIRST FLOOR FINISH PLAN
1/8" = V-0"
SEALANTS VOC LIMIT (G/L LESS WATER)
INDOOR CARPET ADHESIVES
50
PVC WELDING
510
CARPET PAD ADHESIVES
50
CPVC WELDING
490
WOOD FLOORING ADHESIVES
100
ABS WELDING
325
RUBBER FLOOR ADHESIVES
60
PLASTIC CEMENT WELDING
250
SUBFLOOR ADHESIVES
50
ADHESIVE PRIMER FOR PLASTIC
550
CERAMIC TILE ADHESIVES
65
CONTACT ADHESIVE
80
VCT AND ASPHALT ADHESIVES
50
SPECIAL PURPOSE CONTACT ADHESIVE
250
DRYWALL AND PANEL ADHESIVES
50
STRUCTURAL WOOD MEMBER ADHESIVE
140
COVE BASE ADHESIVES
50
SHEET APPLIED RUBBER LINING OPERATIONS 850
MULTIPURPOSE CONSTRUCTION ADHESIVES 70
TOP AND TRIM ADHESIVE
250
STRUCTURAL GLAZING ADHESIVES
100
SUBSTRATE SPECIFIC APPLICATIONS
VOC LIMIT (G/L LESS WATER)
METAL TO METAL
30
ARCHITECTURAL
250
PLASTIC FOAMS
50
NONMEMBRANE ROOF
300
POROUS MATERIAL (EXCEPT WOOD)
50
ROADWAY
250
WOOD
30
SINGLE -PLY ROOF MEMBRANE
450
FIBERGLASS
80
OTHER
420
SEALANT PRIMERS
VOC LIMIT (G/L LESS WATER)
ARCHITECTURAL, NONPOROUS
250
ARCHITECTURAL, POROUS
775
OTHER
750
AEROSOL ADHESIVES: AEROSOL ADHESIVES MUST COMPLY WITH GREEN
SEAL STANDARD FOR COMMERCIAL ADHESIVES GS-36 REQUIREMENTS IN
EFFECT ON OCTOBER 19, 2000.
AEROSOL ADHESIVES VOC LIMIT
GENERAL PURPOSE MIST SPRAY: 65% VOCS BY WEIGHT
GENERAL PURPOSE WEB SPRAY: 55% VOCS BY WEIGHT
SPECIAL PURPOSE AEROSOL ADHESIVES (ALL TYPES): 70% VOCS BY WEIGHT
MATERIAL LEGEND
MARK
DESCRIPTION
PT-1
MANUF: SHERWIN WILLIAMS
STYLE: EGGSHELL
FINISH: PAINT
COLOR:OYSTER WHITE
REMARKS:GENERAL PAINT
B-1
MANUF: JOHNSONITE
STYLE: 4" HIGH
FINISH:VINYL BASE
COLOR:TO MATCH EXISTING VINYL BASE
INSTALLATION METHOD:STRAIGHT BASE AT CARPET
REMARKS:BASE TO MATCH EXISTING
CPT-1
MANUF: INTERFACE
STYLE: WW880 WORLD WOVEN
FINISH:CARPET TILE
COLOR:RAFFIA LOOM
INSTALLATION METHOD:ASHLAR
CONTACT: MAREN.IDSO@INTERFACE.COM
FINISH PLAN LEGEND
X-21"+X-1 FLOOR FINISH TRANSITION
WALL FINISH
P1
B1 WALL BASE
F1
FLOOR FINISH
PT-1 INDICATES EXTENT OF FINISH
WALL FINISH
FINISH PLAN KEYNOTES O
400 NO NEW FINISH WORK THIS AREA.
401 PROVIDE SEAMLESS TRANSITION FROM NEW SPECIFIED CARPET TO
EXISTING CARPET AT STAIR.
402 EXISTING WALLCOVERING AND WALL BASE TO REMAIN. PROVIDE NEW
PAINT AND WALL BASE AT NEW PARTITIONS.
403 GENERAL CONTRACTOR TO PROVIDE SEPARATE ADD ALTERNATE
PRICING FOR CARPET ON FIRST FLOOR AND STAIRS.
404 CARPET ON STAIRS TO BE CPT-1 ORDERED UNBACKED FOR STAIRS.
1. ALL FINISH SELECTIONS IDENTIFIED IN LEGENDS, SCHEDULES, AND
SPECIFICATIONS ARE NOT SUBJECT TO 'OR EQUAL' SUBSTITUTIONS
U.N.O. THE CONTRACTOR AND SUBCONTRACTORS SHALL SUBMIT
PRODUCTS AND FINISHES AS INDICATED IN THE DOCUMENTS.
2. NOTIFY ARCHITECT OF SCHEDULED FINISHES THAT ARE UNAVAILABLE
OR DISCONTINUED AT THE EARLIEST OPPORTUNITY SUCH THAT A
SUBSTITUTION CAN BE SELECTED WITHOUT JEOPARDIZING THE
CONSTRUCTION SCHEDULE.
3. REFER TO THE MATERIAL SCHEDULE FOR MANUFACTURER,
PRODUCT/STYLE NAME, COLOR SPECIFICATION.
4. INSTALL ALL FINISH MATERIALS IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDED SPECIFICATIONS, SURFACE
PREPARATION, ADHESIVES AND BACKINGS: INCLUDING
WALLCOVERINGS, COATINGS, FLOORING MATERIALS, LAMINATES, ETC.
5. THE CONTRACTOR SHALL REPAIR ALL ROUGH FLOOR SLAB UNEVENNESS
SUITABLE FOR PROPER FLOOR COVERING INSTALLATION.
6. FLOOR MATERIAL TRANSITIONS AT DOOR OPENINGS ARE TO BE
CENTERED BELOW THE DOOR IN THE CLOSED POSITION, U.N.O.
7. ELECTRICAL SWITCH AND OUTLET COVER PLATES, SURFACE
HARDWARE, ETC. SHALL BE INSTALLED AFTER PAINTING AND/OR
APPLICATION OF WALL COVERINGS AND SPECIFIED CARPET.
8. STAINED AND PAINTED SURFACES SHALL BE FINISHED SUCH THAT
JOINTS/IMPERFECTIONS ARE NOT VISIBLE.
9. CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES IN THE FIELD. GC TO GET CLARIFICATION FROM
ARCHITECT BEFORE CONTINUING WITH ANY WORK.
10. PROVIDE VINYL TRANSITION STRIPS AT ALL FLOORING MATERIAL
CHANGES, U.N.O. TRANSISTION STRIPS TO MATCH CARPET COLOR
U.N.O. REFER TO PLAN FOR DETAIL LOCATIONS.
11. RUBBER/VINYL BASE SHALL BE STRAIGHT BASE AT ALL LOCATIONS
FOR CARPET AND COVE BASE AT RESILIENT FLOORS.
12. REFER TO DOOR SCHEDULE FOR PAINT COLOR SPECIFICATIONS.
13. ALL ELECTRICAL PANELS IN THE CORRIDORS SHALL BE PAINTED TO
MATCH THE ADJACENT WALL FINISH.
14. FINISH FLOORING TO EXTEND FROM WALL TO WALL INCLUDING UNDER
CABINETS AND UNDERCABINET EQUIPMENT.
15. ALL INTERIOR WALL & CEILING FINISHES AND TRIM OF PUBLIC AREAS
TO COMPLY WITH CLASS A MATERIAL CLASSIFICATION; FLAME SPREAD
RATING 0 TO 25, SMOKE DEVELOPED 200. ALL INTERIOR WALL AND
CEILING FINISHES AND TRIM IN NON PUBLIC AREAS TO COMPLY
WITHCLASS B MATERIAL CLASSIFICATION; FLAME SPREAD RATING
26-75, SMOKE DEVELOPED 450.
16. ALL PAINTED SURFACES ARE TO RECEIVE A PRIME COAT AND A
MINIMUM OF TWO COATS FINAL COLOR, U.N.O.
17. ALL PAINTED DOORS AND DOOR FRAMES SHALL BE PAINTED WITH AN
ALKYD BASED SEMI -GLOSS FINISH U.N.O.
18. ALL CONVECTOR COVERS SHALL BE PAINTED WITH AN ALKYD BASED
SEMI -GLOSS FINISH U.N.O.
19. CARPET CONTRACTOR SHALL VERIFY THAT ALL CARPET OF EACH
VARIETY IS TO BE SHIPPED FROM THE SAME DYE -LOT.
20. ALL WALLS PAINTED WITH A LATEX PAINT TO HAVE AN EGGSHELL
FINISH, U.N.O. REFER TO THE MATERIAL SCHEDULE AND FINISH
LEGEND FOR MANUFACTURER'S PRODUCT NAME.
21. PROVIDE ARCHITECT WITH A MINIMUM OF (3) 8" X 10" BRUSH -OUTS OF
EACH COLOR AND FINISH FOR ARCHITECT'S APPROVAL
22. ARCHITECTURAL ADHESIVES, SEALANTS AND SEALANT PRIMERS MUST
COMPLY WITH SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
(SCAQMD) RULE #1168. VOLATILE ORGANIC COMPOUND (VOC) LIMITS
LISTED IN THE TABLE BELOW CORRESPOND TO RULE AMENDMENT
DATE OF JANUARY 7, 2005.
23. PAINTS AND COATINGS : APPLIED TO INTERIOR WALLS AND CEILINGS
MUST NOT EXCEED THE VOLATILE ORGANIC COMPOUND (VOC)
CONTENT LIMITS ESTABLISHED IN GREEN SEAL STANDARD GS-11,
PAINTS, 1ST EDITION, MAY 20, 1993.
24. ANTI -CORROSIVE AND ANTI -RUST PAINTS: APPLIED TO INTERIOR
FERROUS METAL SUBSTRATES MUST NOT EXCEED THE VOC CONTENT
LIMIT OF 250 G/L ESTABLISHED IN GREEN SEAL STANDARD GC-03,
ANTI -CORROSIVE PAINTS, 2ND EDITION, JANUARY 7, 1997.
25. CLEAR WOOD FINISHES, FLOOR COATINGS, STAINS, PRIMERS, SEALERS,
AND SHELLACS: APPLIED TO INTERIOR ELEMENTS MUST NOT EXCEED
THE VOC CONTENT LIMITS ESTABLISHED FOR THOSE COATING TYPES
IN SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
RULE 1113, ARCHITECTURAL COATINGS, AMENDED FEBRUARY 5, 2016.
POWER AND COMM. GENERAL NOTES
1. MOUNTING HEIGHTS OF DEVICES ARE SHOWN ON DEVICE ELEVATION
DETAIL, U.N.O.
2. MULTIPLE SWITCH OR OUTLET DEVICES IN ONE LOCATION SHALL BE
INSTALLED IN A COMMON MULTI -GANG BOX WITH A COMMON
FACEPLATE, WHERE POSSIBLE. MOUNT MULTIPLE CONTROLS AS
CLOSE TOGETHER AS POSSIBLE AND IN -LINE WITH EACH OTHER.
3. THERMOSTAT, FIRE ALARM, SPEAKER/STROBE, AND PULL STATION
LOCATIONS AND REQUIREMENTS BY DESIGN BUILD CONTRACTOR.
SUBMIT LAYOUT TO ARCHITECT FOR REVIEW AND NOTIFY
ARCHITECT OF DISCREPANCIES PRIOR TO INSTALLATION.
4. WHERE SWITCHES FOR DEVICES OTHER THAN LIGHTS (I.E. EXHAUST
FAN, PROJECTION SCREEN) ARE ADJACENT TO LIGHT SWITCHES,
LOCATE LIGHT SWITCHES CLOSEST TO THE DOOR.
5. OUTLETS TO BE LOCATED AS INDICATED ON PLANS, U.N.O. PROVIDE
BRIDGE RACKS AS NEEDED TO ACHIEVE INDICATED LOCATIONS.
DIMENSIONS OF WALL OUTLETS INDICATED ON DRAWINGS ARE
FROM FACE OF WALL SURFACE OR FINISHED FLOOR TO CENTER LINE
OF OUTLET OR GROUP OF OUTLETS. CENTER OUTLET ON WALL IF
NO DIMENSION IS INDICATED. STAGGER ALL DEVICES SHOWN BACK
TO BACK ON OPPOSITE SIDES OF SHARED PARTITIONS. DEVICES IN
OPPOSITE SIDES OF PARTITION SHALL NOT OCCUPY THE SAME STUD
CAVITY.
6. PRIOR TO CORING, CONFIRM THAT THERE ARE NO OBSTRUCTIONS
IN SLAB. ALL CORING TO BE DONE PER BUILDING REGULATIONS.
CONFIRM FLOOR CORE LOCATIONS WITH ARCHITECT, FURNITURE
VENDOR, AND OWNER PRIOR TO CORING. CONTRACTOR TO PATCH
AND FIRESTOP ALL SLAB PENETRATIONS.
7. ALL OUTLETS LOCATED ABOVE OR BELOW THE COUNTER TOPS IN
WET OR DAMP AREAS SHALL BE GFIC.
8. DEVICE COLOR: MATCH EXISTING COVER PLATE FINISH: MATCH
EXISTING
9. FURNITURE LAYOUT IS SHOWN FOR REFERENCE ONLY.
10. WHERE EXISTING DEVICES HAVE BEEN REMOVED, PATCH AND
REPAIR WALLS, CEILINGS AND FLOORS.
11. LINE & LOW VOLTAGE WIRING CONDUIT TO BE CONCEALED U.N.O.
12. CONTRACTOR TO UPDATE LABELS AT ELECTRICAL PANELS.
CI
0
Key Plan: o E o
0 4' 8' 16'
NORTH
Nelco Architecture, Inc.
1201 Marquette Avenue South,
Suite 200
Minneapolis, MN. 55403
Phone: (612) 822-1211
WWW.NELSONWORLDWIDE.COM
RBC WEALTH
MANAGEMENT
RBC PLAZA
60 SOUTH SIXTH STREET
MINNEAPOLIS, MN 55402
MINOR RENOVATION
303 5TH AVENUE SOUTH
SUITE 100
EDMONDS, WA 98020
Issue:
ISSUE FOR LL REVIEW
ISSUE FOR BID
ISSUE FOR PERMIT
No: Date:
01/31/2022
01/31/2022
03/31/2022
RECEIVED
May 04 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
POWER, FINISH &
FURNITURE PLANS
9451)
ItG[iISJ;G6Gl�1) --"--
STA'1'1:01' WASIIIN(i'ION
Proj #: 21.0004413.000 Reviewed By: ME
Al-1
Scale:
NELSON
EXISTING STRUCTURAL
DECK
3 5/8" 20 GAUGE STEEL STUD DIAGONAL
BRACING TO DECK AS SHOWN - MAX
SPACING 8'-0" O.C.
SOUND ATTENUATING BATT INSULATION ABOVE
CEILING EXTENDED 3'-0" ON EACH SIDE OF WALL,
TYP.
LINE OF FINISH CEILING. REFER TO RCP FOR
VARIOUS CEILING HEIGHTS.
3 5/8" MTL STUDS, 16" O.C. MAX, L/240 MAX.
(2 1/2" MTL STUD AT WALL TYPE 13C)
1 LAYER, 5/8" GWB, BOTH SIDES. EXTEND 6"
ABOVE CEILING.
SOUND ATTENUATION BLANKET (FULL STUD
DEPTH), REQ'D @ ACOUSTICAL PARTITION.
BASE, REFER TO FINISH SCHEDULE
SEALANT AT BOTTOM TRACK
FINISH FLOORING, REFER TO FINISH SCHEDULE
�c
METAL STUD KICKERS AT 4'-0" O.C. EACH WAY
METAL STUDS TO STRUCTURE FRICTION FIT
INSULATION TO 6" ABOVE CEILING
CEILING AS SPECIFIED AT 9'-6" TYP. (VERIFY TO MATCH EXISTING)
FIRE TREATED WOOD BLOCKING ABOVE CEILING
GYP. BD. BULKHEAD AT 9'-0" ( COORDINATE
HEIGHT W/ ARCH AND FIELD CONDITONS)
2" RECESSED CHANNEL FASTENED TO FIRE
TREATED WOOD BLOCKING.
1/2" CLEAR TEMPERED BUTT -JOINTED GLASS SET
IN TOP AND BOTTOM CHANNEL. GLASS PANES AND
THICKNESS REQUIRED TO BE VERIFIED BY GLASS
MANUFACTURER DURING SHOP DRAWING PHASE.
ALL JOINTS TO BE SILICONED, CLEAR.
1" STAINLESS STEEL CHANNEL FASTENED TO
CONCRETE SLAB AS REQUIRED, TYPICAL
FINISH FLOORING, REFER TO FINISH SCHEDULE
2B NON -RATED ACOUSTICAL PARTITION 6" ABOVE ACT G1 GLASS PARTITION 6" ABOVE CEILING
EXTEND STUDS TO STRUCTURE
ABOVE AT EACH DOOR JAMB
AND BRACE EACH SIDE AT 45
DEGREES
SCHEDULED CEILING
FIRE TREATED
WOOD BLOCKING
3/4" HDWD. STOPS AND FRAME
WOOD DOOR AS SCHEDULED
0
Ln
N
M
N
N
CD
N
M
M
3/4" HARDWOOD TRIM STAIN, TYP.
STEEL STUD W/ 5/8" GYP. BD
EA. SIDE
WOOD DOOR AS SCHEDULED
HARDWOOD STOP
FIRE TREATEDWOOD BLOCKING
ON AT WOOD DOOR JAMB
1 1/2" = V-0"
CEILING AS
PROVIDE J-
FINISHED E
GLASS PARTITION G1 - HEAD
3" = V-0"
SCHEDULED
FLOOR FINISH
CONC. FLOOR SL,,L,
3" = V-0"
1/4" 1' - 0"
PLAN DETAIL
-
1 1/2" = V-0"
1010
FLOOR DECK ABOVE
.157" DRIVE PINS @ 2'-0", 3/4"
MIN PENETRATION (ICC ESR 2269)
3 5/8" 20 GAUGE STEEL STUD
DIAGONAL BRACING TO DECK
AS SHOWN - MAX SPACING 4'-0"
O.C.
15/8" MTL STUDS, 16" O.C. MAX
5/8" GYP. BD. 6" ABOVE CEILING
#8 WAFERHEAD FRAMING
SCREWS (TYP.)
PROVIDE FIRE RETARDANT
TREATED BLOCKING AS REQUIRED
FOR GLASS INSTALLATION.
IETAL STUD BOX BEAM HEADER
RECESSED 2"H METAL CHANNEL,
PROVIDE FRT BLOCKING AND
BRACING TO STRUCTURE AS
SHOWN.
CLEAR GLAZING VINYL
'LEAR TEMPERED SAFETY GLAZING
SUPPLIER TO VERIFY REQUIRED
-HICKNESS)
CLEAR TEMPERED SAFETY GLASS
W/ POLISHED PENCIL EDGES -
FILL VERTICAL BUTT JOINTS WITH
CLEAR SILICONE SEALER.
STANDARD GLAZING VINYLS
STYLMARK 1"x 1" POLISHED
STAINLESS GLAZING CHANNEL
GLAZING NEOPRENE
SETTING BLOCK
COORDINATE MAXIMUM
DEPTH ALLOWED WITH
EXISTING FLOOR SLAB
■���1�1���
rs
c:
4
V
U
x
LL
2
C..
H
Q
WOOD DOOR AS SCHEDULED
3' - 0" 1' - 0" EQUAL PANELS
SCHEDULE MAX WIDTH
TYPE F1 - 2" CASED WOOD W/ GLASS
FINISH: PLAIN SLICED CHERRY TO MATCH EXISTING
GLASS: 1/2" CLEAR TEMPERED GLASS
SEE PLAN FOR WIDTHS, EQ PANELS AS LARGE AS POSSIBLE
NOTE: SILICONE BUTT -JOINTS CLEAR 1/4" PREFERRED, 3/8" MAX ALLOWED
BEVEL POLISH VERTICAL EDGES
3/4" HARDWOOD TRIM STAIN, TYP
PROVIDE FIRE TREATED BLOCKING FOR
RIGIDITY AT DOOR JAMB
1/2" CLEAR TEMPERED SAFETY GLASS, TYP
SET IN CHANNEL AT TOP AND BOTTOM
PARTITION AS SCHEDULED
BASE AS SCHEDULED, TYP
CLEAR SILICONE, TYP
Nelco Architecture, Inc.
1201 Marquette Avenue South,
Suite 200
Minneapolis, MN. 55403
Phone: (612) 822-1211
WWW.NELSONWORLDWIDE.COM
RBC WEALTH
MANAGEMENT
RBC PLAZA
60 SOUTH SIXTH STREET
MINNEAPOLIS, MN 55402
MINOR RENOVATION
303 5TH AVENUE SOUTH
SUITE 100
EDMONDS, WA 98020
Issue:
ISSUE FOR LL REVIEW
ISSUE FOR BID
ISSUE FOR PERMIT
No: Date:
01/31/2022
01/31/2022
03/31/2022
RECEIVED
May 04 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
PARTITIONS & DETAILS
9459
41116.
ntti'i t! rl:c
STATr•.ur• WASIuNc mN
Proj #: 21.0004413.000 Reviewed By:
A2-1
ME