Loading...
APPROVED BLD BLD2021-1360+Architectural_Plan+10.4.2021_10.49.56_AM+2442561PROJECT INFORMATION: PROJECT CONTACT: Selena Fitch Fitch Design Company 425-481-8190 Selena@FitchDesignCompany.com OWNER: Ellen Blackstone & Chris Altwegg 523 Maple St. Unit 101 Edmonds, WA 98020 PARCEL NUMBER: 00642900000100 LEGAL DESCRIPTION: THE LAURINTINE, A CONDOMINIUM - UNIT 101 (FKA LOT 1) TGW ASSIGNED PARKING & STORAGE & TGW EQ & UND 10.10% INT IN COM AREAS & FACS AS DESC IN DECL REC AFN2382880 CORR BY REC AFN 2384SSS & AMD REC AFN 8202040070,8701120163, 200003210132,200111080486, 200611160581,201210020694 & 20131112OS41 PLAT BLOCK: 00 PLAT LOT: 00 ZONING: RM-1.5 JURISDICTION: CITY OF EDMONDS SCOPE OF WORK: INTERIOR REMODEL - NO CHANGE IN ENVELOPE OR LOT COVERAGE GENERAL NOTES: 1. All work to comply with 2018 International Building Code and 2018 international Residential Code with local amendments. 2. Verify all dimensions and field conditions before beginning work and notify designer of any discrepancies. 3. Provide solid wood blocking for support at all wall mounted fixtures. 4. Provide approved draftstopping in concealed space between ceiling and floor; and approved firestopping in walls per code. S. Flash all openings with minimum 26 gauge steel (galvanized or factory finish). 6. All wood in contact with concrete or masonry to be pressure a K treated. LIFE SAFETY NOTES: v 1. Stairways to meet minimum requirements of 2018 IRC R311.7; - Minimum stair width: 36" - Minimum headroom: 80" - Maximum riser height: 7 3/4" - Minimum tread depth: 10" - Rise or run dimensions shall not vary more than 3/8" - Minimum landing length: 36" - Handrail height: 34-38" above stair nosing 2. Stairways with four or more risers shall have a handrail. 3. Handrails shall be continuous and terminate at a wall or newel post. 4. Guards shall be provided for porches, balconies or raised floor surfaces located more than 30" above the floor or grade below. 5. Guards shall be 36" in height and designed to resist a 200 lb. concentrated load on the top rail and 50 psf on all guardrail infill components. 6. Required guards shall have a maximum opening such that a 4" diameter sphere can not pass through. 7. All new smoke and carbon monoxide detectors to be hardwired with a battery back-up. ENERGY NOTES: 1. All new fenestration U-values and insulation R-values shall satisfy the prescriptive path of the 2018 Washington State Energy Code. 2. Prescriptive Requirements (Climate zone 4C); - Vertical glazing: U = 0.30 - Overhead glazing: U = 0.50 - Doors: U = 0.20 - Ceilings: R-49 - Single rafter ceilings: R-38 - Walls (above grade): R-21 (w/ headers insulated R-10) - Walls (below grade): 10/15/21 int +TB - Floors: R-30 - Slab on grade: R-10 (24" perimeter) 3. When insulation is installed in a cavity which is less than the label or design thickness of the insulation, the compressed R-value of the insulation shall not be less than specified above. 4. Builder shall complete and post an insulation "Certificate for Residential Construction" within three feet of the electrical panel prior to final inspection. 5. Blower door testing: air leakage shall not exceed three air changes per hour. A written report of blower door test results shall be signed by the testing party and provided to the building inspector prior to call for final inspection. 6. A minimum of 75% of permanantly installed lamps in lighting fixtures shall be high efficacy lamps. 7. Kitchen, Bathroom and Laundry exhaust fans shall terminate outdoors and not in attics, soffits, ridge vents or crawl spaces. 8. A whole house mechanical ventilation system shall be designed in accordance with IRC section MlS07.3. The ventilation system shall provide outdoor air at a rate not less than specified in tables M1507.3.3(1) or M1507.3.3(2). TT EXISTING/DEMO FLOOR PLAN lV SCALE: 1/4" = P-0" DISCLOSURE: ALL DIMENSIONS & SIZE DESIGNATIONS GIVEN ARE SUBJECT TO VERIFICATION ON JOBSITE & ADJUSTMENT TO FIT UNFORESEEN JOB CONDITIONS. DESIGN PLANS ARE NOT PROVIDED FOR ARCHITECTURAL OR ENGINEERING USE. 26'-3 1 /B" Approved by Fire 10/18/2021 AFM /CFI tterer Any alterations to the fire alarm system or components will require a separate permit. I-- - ----- -- Penetr shall b City Of Edmoi Building Department Work INTERIOR REMODEL Address 523 MAPLE ST 101 Owner BLACLSTONELIALTL Eu Approved Date 10/14/2021 Building Official Err & Cv- 2 Permit Number BLD2021 ❑ 13 ❑ 0 25'-3 1 /R" TT NEW FLOOR PLAN 1V SCALE: 1/4" = 1'-0" APPROVED PLANS MUST BE ON JOB SITE ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE WALL LEGEND - NEW FRAMED WALLS 0 EXISTING WALLS REMOVE EXISTING IILIIYDIOR] M0fell 0:61 ® DIMENSIONS ARE FROM FINISHED DRYWALL TO FINISHED DRYWALL, UNLESS NOTED OTHERWISE ® ALL DRAWINGS & NOTES CROSS-REFERENCE EACH OTHER. SEE SPECIFICATION SHEETS FOR ADDITIONAL SPEC'D PRODUCT INFORMATION. ® CABINET DETAILS & DIMENSIONS ARE SUBJECT TO VARIATION BASED ON ON -SITE FRAMING & CABINET MANUFACTURER & MAY VARY FROM DRAWINGS. ® CABINET SUPPLIER TO VERIFY ACTUAL THICKNESS OF SELECTED SLAB COUNTERTOPS IN RELATION TO CABINET HEIGHTS, ADJUST AS NEEDED (SELECTIONS MAY VARY FROM DRAWINGS & SPECS) ® RECOMMENDATION: A CABINET CONTROL SAMPLE SHOULD BE SEEN AND APPROVED BY CLIENT PRIOR TO CABINET ORDER ® ALL NATURAL STONE (TILE & SLABS) CAN VARY FROM SAMPLES USED IN THE DESIGN PROCESS. IT IS STRONGLY RECOMMENDED THAT CLIENTS SEE AND APPROVE ACTUAL SLABS PRIOR TO FABRICATION. ® TILE LAYOUTS CAN VARY FROM DRAWINGS BASED ON ON -SITE CONDITIONS ® FIELD VERIFY ALL SHWR PLUMBING HEIGHTS & BATHROOM ACCESSORY LOCATIONS W/ HOMEOWNER PRIOR TO INSTALLATION PAGE REFERENCE: 1.0 - EXISTING/DEMO & NEW FLOOR PLANS 2.0 - KITCHEN PLAN & ELEVATIONS 2.1 - KITCHEN ELEVATIONS 2.2 - MASTER BATH PLAN & ELEVATIONS 2.3 - MASTER BATH ELEVATIONS 2.4 - POWDER BATH PLAN & ELEVATIONS 2.5 - LAUNDRY ROOM PLAN & ELEVATIONS 3.0 - ELECTRICAL PLAN Maintain required rated of entry door. RECEIVED Oct 05 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT FIXED SCALE 1 TO 1 IN FT. Z V LU 0 V LL } Z a a 0 V E 0 C a 0 V U � z00 cn ❑ ❑ W 0 0 N Ca cn cn dN DATE: 10/1/2021 JOB NO. 478 Ix 0 w 0 W z U Ln W Q 100 ALL IZE DESIGNATIONS GIVEN ARE SUBJECT TO VERIFICATION ON JOBSITE & UNFORESEEN JOB CONDITIONS. DESIGN PLANS ARE NOT PROVIDED FOR ARCHITECTURAL OR ENGINEERING USE.