Building PermitType: COMMERCIAL BLDG Subtype: EXISTING TENANT REMODEL I Status: ISSUED
Parcel No: 27032300104500
Subdivision: 004548
Fire Sprinklers: Yes
Valuation: $75,000.00
Code Edition: 2018
Site Address: 184 SUNSET AVE S 225 EDMONDS,WA 98020-4134
Lot: 0
Lot Area:
Occupancy Type: B
No. Stories: 0
Scope of Work: FIRST FINANCIAL NW BANK - MINOR REMODEL
Zoning:
Construction Type: VB
# of Dwelling Units: 0
Applied: 3/31/2022
Issued:4/25/2022
Final:
Expiration Date: 4/20/2023
Issued by: JOK
I WA State Contractor L & I #: HIGHLD1981CL I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
PETER STRICKER
5415 SEWARD PARK AVE SO,
(206)999-7731
STRICKER7@ICLOUD.COM
SEATTLE WA 98118
CONTACT
PETER C. STRICKER
5415 SEWARD PARK AVE SO,
(206)999-7731
stricker7@icloud.com
ARCHITECT
SEATTLE WA 98118
CONTRACTOR
HIGHLAND DEVELOPMENT
24375 FJORD PL NW, POULSBO
(360)271-8570
T.Nicol@comcast.net
WA 98370-
OWNER
FORT WAYNE LIMA ROAD
940 EMMET AVE SO, BELMONT
(206)999-7731
ASSI EDMONDS RETAIL LLC
CA 98002
•' •
pir
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
4/1/22
R19168
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
4/25/22
R19721
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$1,090.00
$1,090.00
4/25/22
R19721
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$926.50
$926.50
4/1/22
R19168
TOTALS: $2,081.50
$2,081.50
CONDITION TYPE
STATUS
NOTES
Printed: Monday, April 25, 2022 11:39:21 AM 1 of 2
COMMERCIAL
111Fw
Permit
City PERMIT NUM
•Edmonds'
Edmonds 1 1 I 17
• • • • 1 1
&I
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
\r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary
FOR
construction sites as a result of construction activity are exempt from the noise limits of
ALL BUILDING PERMITS
INFORMATION
ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am
to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the
noise originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by
Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the
risks and potential monetary liability for work performed by unlicensed plumbing
contractors. For more information contact L&I Department of Licensing at 1-800-647-
0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
INSPECTIONS•• •nline
at: https://Inspection.MyBuildingPermit.co
COMPLETED RESULT
SEQID
INSPECTION TYPE INSPECTOR
NOTES
DATE
X-1 FIRE FINAL
B-4 FRAMING
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
B-4 CEILING GRID
Printed: Monday, April 25, 2022 11:39:21 AM 2 of 2