Building Permit_1Type: FIRE ALARM Subtype: FIRE ALARM MODIFICATION I Status: ISSUED
Parcel No: 00434202200100
Subdivision: 004342
Fire Sprinklers:
Valuation: $5,000.00
Code Edition: 0
Site Address: 275 6TH AVE N EDMONDS,WA 98020
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: FIRE ALARM - AES RADIO INSTALL
Applied: 9/23/2022
Issued:9/23/2022
Final:
Expiration Date: 9/18/2023
Issued by: JOK
I WA State Contractor L & I #: ABSCOAI221BJ I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
JULIE ASPNES
19023 36TH AVENUE WEST,
(425)771-1166
JULIE.ASPNES@ABSCOSOLUTIONS.CO
LYNNWOOD WA 98036
M
CONTACT
ABSCO ALARMS INC
19023 36TH AVENUE WEST,
(425)771-1166
julie.aspnes@abscosolutions.com
LYNNWOOD WA 98036
CONTRACTOR
ABSCO ALARMS
19023 36TH AVE W,
(425)771-1166
JASPRIES@ABSCOALARMS.COM
LYNNWOOD WA 98036
250 5TH AVE N, EDMONDS WA
OWNER
EDMONDS CITY OF
98020-3146
•' •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
9/23/22
R23211
PER PERMIT
FIRE ALARM - BLDG BASE FEE
001.000.322.10.000.00
$100.00
$100.00
9/23/22
R23211
MODIFICATION FEE - NUMBER OF
001.000.342.40.000.00
$150.00
$150.00
9/23/22
R23211
HEADS OR DEVICES
TOTALS: $290.00
$290.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Friday, September 23, 2022 2:36:26 PM 1 of 2
FIRE ALARM Permit
PERMIT NUM
City of • • •
Edmonds WA 9801
• • • • 1 1
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
INSPECTIONS
- Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
F-0 FIRE ADDRESS VISIBLE
F-0 FIRE EXTINGUISH EXITS
F-1 FIRE ALARM ACCEPT
X-1 FIRE FINAL"
Printed: Friday, September 23, 2022 2:36:26 PM 2 of 2