Permit_1207033CITY OF EDMONDS
Building Permit
My6uildingPermitxom
Permit Information
Permit Number
RI n7n77_17R4 Issued Date
9/26/2022
Expiration Date
3/25/2023
Job Address
7804 238TH ST SW Fee Paid
$146.50
EDMONDS, 98026 Order Confirmation
1175322
Floor
Related Permit#
Suite
Application ID
1207033
Contact Information
Contact Name
Michael Luckovich Contractor
addicott roofing inc
Phone Number
(425) 774-0806
Property Owner
Margaret Johnson LNI License#
ADDICI*219JT
Address
7804 238TH ST SW EDMONDS, WA Phone#
(425) 774-0806
City Bus. License #
600292967
Property Owner Phone
(425) 776-1674 Tenant Name
Job Description
A (Single Family Residential) (Re -Roof Replacement - Roofing & Sheathing) Residence project involving ( The height of
the building is not increasing.)
Conditions - Post Permit on site. Do not cover until inspected.
Do not start any work until the preconstruction meeting is completed.
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent, including an appropriately licensed contractor. I have furnished true and
correct information. I will comply with all provisions of law and ordinances governing this type of construction work, whether specific herein or not. By
submitting this application I give the jurisdiction permission to enter the property to perform inspections. I understand that failure to comply with the
above may result in revocation of the permit.
Applicant: Michael Luckovich
Page 1 of 2
t °F EDAf
0
1893
CITY OF EDMONDS
Building Permit
My6uildingPermitxom
Permit Information
Permit Number
RI n9n99_19R�
Issued Date
9/26/2022
Expiration Date
3/25/2023
Job Address
7804 238TH ST SW
Fee Paid
$146.50
EDMONDS, 98026
Order Confirmation
1175322
Floor
Related Permit#
Suite
Application ID
1207033
Inspections
Inspection IVR Inspector Date Inspection IVR Inspector Date
Tear Off or Sheathing
Building Final
Inspection Scheduling
The issuance of this permit in no way constitutes approval from any other agencies having regulatory authority over
the facility and this construction activity.
It is the responsibility of the property owner to obtain any and all such
required approvals.
Page 2 of 2