Loading...
Building Permit (3)Type: RESIDENTIAL BLDG Subtype: ADDITION I Status: ISSUED Parcel No: 27033600103700 Subdivision: SP S-05-57 Fire Sprinklers: Valuation: $296,500.00 Code Edition: 0 Site Address: 9403 232ND ST SW EDMONDS,WA 98020-5027 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: GIFFORD- LARGE ADITION/REMODEL/DECK M INCL P SEP Applied: 7/11/2022 Issued:9/26/2022 Final: Expiration Date: 9/21/2023 Issued by: NED I WA State Contractor L & I #: RICCOCL9301<2 I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT ALBERT COHEN 330 DAYTON ST. SUITE 6, (425)776-7373 ALCOHENDESIGN@GMAIL.COM EDMONDS WA 98020 CONTACT AL COHEN DESIGN COMPANY 330 DAYTON ST. SUITE 6, (425)776-7373 alcohendesign@gmail.com EDMONDS WA 98020 16907 72nd AVE NE, KENMORE CONTRACTOR RICCON CONSTRUCTION, LLC (206)271-3976 JEFF@RICCONCONSTRUCTION.COM WA 98028-4220 OWNER GRAHAM R & JENNIFER A 9403 232ND ST SW, EDMONDS (206)816-5682 JENNGIFFORD05@GMAIL.COM GIFFORD WA 98020-5027 EE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 9/26/22 R23215 PERMITS APPLIANCE VENTS 001.000.322.10.000.00 $30.00 $30.00 9/26/22 R23215 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 7/12/22 R21550 PER PERMIT ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $110.00 $110.00 9/26/22 R23215 FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $75.00 $75.00 9/26/22 R23215 FURNACE OR FIREPLACE 001.000.322.10.000.00 $60.00 $60.00 9/26/22 R23215 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $2,282.00 $2,282.00 9/26/22 R23215 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $1,939.70 $1,939.70 7/12/22 R21550 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 9/26/22 R23215 TOTALS: $4,593.20 $4,593.20 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Monday, September 26, 2022 11:06:43 AM 1 of 4 'RESIDENTIAL BLDG PermitCity - • • • • EL 98020 1 1 • www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at DEMOLITION REQUIREMENTS O property line. Water Service must be disconnected from Water Meter and or hose bib INFORMATION with AVB installed. Dump at approved dump site only. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-7720. NFORMATION Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. GAS PIPE TEST O Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted ORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. HOSE BIBBS FOR Hose Bibbs are required to have a permanently affixed anti -siphon device installed. NFORMATION FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS INFORMATION www.mybuildingpermit.com Printed: Monday, September 26, 2022 11:06:43 AM 2 of 4 'RESIDENTIAL BLDG PermitCity PERMIT NUM •Edmonds Edmonds98020 1 1 • www.edmondswa.gov• Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. Installer shall provide the manufacturer installation, operating instructions, and a whole WHOLE HOUSE FAN FOR house ventilation system operation description. A label shall be affixed to the whole INFORMATION house timer control that reads "Whole house ventilation, see operating instructions". INSPECTIONS - Schedule Online at https:Hinspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED NOTES RESULT A-1 BUILDING PRECON B-2 DEMO AMT VERIFICATION B-2 FOOTINGS B-2 FOUNDATION WALL B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 SHOWER PAN B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP Printed: Monday, September 26, 2022 11:06:43 AM 3 of 4 Printed: Monday, September 26, 2022 11:06:43 AM 4 of 4