Building Permit (3)Type: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED
Parcel No: 00451900200500 Site Address: 23805 HIGHWAY 99 EDMONDS,WA 98026-9204
Subdivision: 007731, 004519, SP 15-86 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: SUBWAY -PLUMBING, ADDING HANDWASH SINK
Applied: 9/15/2022
Issued:9/27/2022
Final:
Expiration Date: 3/26/2023
Issued by: NED
I WA State Contractor L & I #: INTERP1792MA I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
KEL SADIKU
23805 SR-99 UNIT 102,
(425)501-5795
SADIKUKEL00@GMAIL.COM
EDMONDS WA 98026
CONTACT
SUBWAY
23805 SR-99 UNIT 102,
(425)501-5795
sadikuke100@gmail.com
EDMONDS WA 98026
INTERNATIONAL PLUMBING
14307 109TH AVE CT E,
CONTRACTOR
INC
PUYALLUP WA 98374
PO BOX 50046, BELLEVUE WA
OWNER
SUBWAY-EUNSUN
CHO
98015-0046
DESCRIPTION
ACCOUNT
7
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
9/27/22
R23236
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
9/27/22
R23236
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$15.00
$15.00
9/27/22
R23236
TRAP
PLUMBING - PLAN REVIEW FEE
001.000.322.10.000.00
$110.00
$110.00
9/27/22
R23236
HOURS
PLUMBING - PLAN REVIEW FEE
001.000.322.10.000.00
$110.00
$110.00
9/27/22
R23236
HOURS
TOTALS: $325.00
$325.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, September 27, 2022 3:55:10 PM 1 of 2
PLUMBING Permit
-
City of • • •
98020 1
www.edmondswa.gov
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED RESULT
NOTES
B-3 PLUMB ROUGH IN
X-0 PLUMBING FINAL"
Printed: Tuesday, September 27, 2022 3:55:10 PM 2 of 2