Loading...
Building Permit (3)Type: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED Parcel No: 00451900200500 Site Address: 23805 HIGHWAY 99 EDMONDS,WA 98026-9204 Subdivision: 007731, 004519, SP 15-86 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: SUBWAY -PLUMBING, ADDING HANDWASH SINK Applied: 9/15/2022 Issued:9/27/2022 Final: Expiration Date: 3/26/2023 Issued by: NED I WA State Contractor L & I #: INTERP1792MA I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KEL SADIKU 23805 SR-99 UNIT 102, (425)501-5795 SADIKUKEL00@GMAIL.COM EDMONDS WA 98026 CONTACT SUBWAY 23805 SR-99 UNIT 102, (425)501-5795 sadikuke100@gmail.com EDMONDS WA 98026 INTERNATIONAL PLUMBING 14307 109TH AVE CT E, CONTRACTOR INC PUYALLUP WA 98374 PO BOX 50046, BELLEVUE WA OWNER SUBWAY-EUNSUN CHO 98015-0046 DESCRIPTION ACCOUNT 7 AMOUNT PAID PAID DATE RECEIPT # 1 -BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 9/27/22 R23236 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 9/27/22 R23236 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $15.00 $15.00 9/27/22 R23236 TRAP PLUMBING - PLAN REVIEW FEE 001.000.322.10.000.00 $110.00 $110.00 9/27/22 R23236 HOURS PLUMBING - PLAN REVIEW FEE 001.000.322.10.000.00 $110.00 $110.00 9/27/22 R23236 HOURS TOTALS: $325.00 $325.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Tuesday, September 27, 2022 3:55:10 PM 1 of 2 PLUMBING Permit - City of • • • 98020 1 www.edmondswa.gov 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-3 PLUMB ROUGH IN X-0 PLUMBING FINAL" Printed: Tuesday, September 27, 2022 3:55:10 PM 2 of 2