Loading...
ENG2022-0005 ROW PERMITOF WAY EUC PERMIT o PERMIT NU M City of Edmonds AveRIGHT 9:01 111 www.cityofedmonds.gov / i Description: PUD-INSTALL PRIMARY U.G. SERVICE TO SHORT PLAT PLN2012-0021 ISSUED: 09/29/2022 Address: 8344 OLYMPIC VIEW DR EDMONDS WA 98026 EXPIRES: 03/29/2023 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27041800109300 CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT MOE NAVE PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTACT ANDY TRAN PO BOX 1107, EVERETT WA 98206 (425)670-3208 CONTRACTOR SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 OWNER ONE VECTOR PO BOX 13377, EVERETT WA 98206 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $220.00 $220.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $110.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $220.00 $220.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. 77 INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 09/29/2022 RELEASED BY DATE Printed: Thursday, September 29, 2022 8:35:52 AM 1 of 2 oe e n,y RIGHT OF WAY EUC PERMIT PERMIT NU�M City of Edmonds Ad •:01 111 . -. •. i • • CONDITION TYPE NOTES ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND AND NOISE weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT NOTES COMPLETE A-1 JOB START E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL" E-7 RESTOR LIMITS Printed: Thursday, September 29, 2022 8:35:52 AM 2 of 2 ENG2022-0005 of EpMO4O� RIGHT OF WAY CONSTRUCTION RECEIVED PERMIT APPLICATION Jan 04 2022 Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS zDEVELOPMENT SERVICES /Iv . i s,)3 Requirements outlined in Right -of -Way permit Handout E6�. DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General Info I Project Name Residential Single PH UG LE for Vector One's 2-Lot Short Plat Site Address or if no site address use Property Address at NW corner of project area: 8344 Olympic View Dr Edmonds, WA 98026 Associated Permits: BLD PLN ENG Owner and Entity Holding Name of Company Snohomish County PUD Franchise Ordinance No: N/A Point of Contact Andy Tran Title Designer Address 21014 63rd Ave W City Lynnwood State WA Zip 98036 Phone425-670-3208 EmailAXTran@snopud.com &jointuse@snopud.com Contractor and Authorized Agent of Owner Name of Company Same info as above (see note below) Contractor Contacts During Construction Primary Name Same as above Agent Name Title Title Mobile Address Email City State Zip Secondary Name Phone Title Email Mobile City of Edmonds Business License No: Email State License No: 313-005-741 Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project m Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ❑ Traffic Control Only (no associated development) ❑ Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) PUD to instl primary UG service to feed Vector One, LLC's 2-lot Short Plat. No tree trimming required. Pedestrian escort required. TCP included. PUD will be installing primary wire on distribution pole on Olympic View Dr. Work not to exceed 72 hours. No disturbance of surface RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF Alley'72 hours + LF Ix I LF SF Parking 72 hours + LF Ix I LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable d power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes V No 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? If yes, describe: New underground transformer, vault and pedestal 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? 5. Does the work involve proposed additions to an aboveground utility stem? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Worl,, to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? xisting Overhead primaryl How many are to be added? 11 Primary Undergroun servic service to remain City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: V How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all per it fees. APPLICANT SIGNATURE: ^ i DATE: 12/17/2021 APPLICANT PRINTED NAME: Andy Tran APPLICANT TITLE: Designer NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 AT WA UTI • - IP.I%CENTERLINE SLOPE APPROVED VIA WAIVER DURING SHORT PLAT REVIEW/APPROVAL RATTER SP - LOT B SECTION 18, TOWNSHIP 27N, RANGE 4E, W.M. UTILI _ CONDPU j'-.�- 1E=2�.3 (T2 CP.£j REVISION TO STORM I/ SYSTEM, CHANGED v ELEc TO INFILTRATION. �/ PHONE _ 2• p,C !'' STORM DRAIN TO �/ SEWER SERVICE ` ,pLPTC REMAIN IN PLACE. TO BE INSTALLED / / AT TIMEy / STORM CROSSING SHORT P OF Ao$' S W -�-/ FOOTING DRAIN TOP-271.5 1 / �\ CDNS 7ION 00WNTOUT DRAINJE_272;5_,\ I I PROP. PERF. // 27040700404200 1 / (2) 1- CO SERNCE LI _ _ - _ _ _ _ / / / STUBOUT W/ 17 TERS / W / / CONNECT FOOTIyO _ CONNECTION E INSTALLED TIME/OF SDCO // �_f_,S - I'll STORM STua TM - (TYP.). SHORT PLAT STRUC `l � /' �_� T" ///EXISTING _ -1-�• POLY ACCE�~ LI: SE VICI SYA SE -`_-_'�� AND UTILITY. EASEMENT CEB 7 _ / AF( 20180813500L' TEDAW —37 kdA RYICE 1092 F IE-270.o 7*- / / - 55 LF 6' QVC -- / IE'270.0-5=4.37G 1� ` 12 F 6 — — SSC� _ i0P=274.0- _• SPACED t I I �-/ - _ 1.' _-S44.3x. \ 12• IE=275.Y15� E / � 4 -JE-276.75 VMT/ PROP. CTDNCT OR ASPH \ (W (SEE NOYE), (759 SF). l _ METER \j'ROP. SFR--- 'ELEC. /^ WATER (R�957 SF)METE Hn 1 / `\FR-279:25--� PHONE k�" TV 'X QM-279.0+ D _ I I r_ _ _ _�1 SPACED WOOD _ -^! \ \ \ �041800109300 _ - DECK. \ _ c 270418WI09400 \ \ \ \ \ LEAST 3' HORIZONTAL SEPARATION FROM ON -SITE TER, SEWER, AND STORM, AND AT LEAST 5' FROM CITY LITIES IN THE ROW. Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. 1 20 INGRESS. EGRESS k UTILITY ESM'T AF/16143BO h 1619753 / 27041800106000 011311300099900 _(SEE SOIL NO N ii 0 20 4 IIII�d IORIZONT& SCALE ENGINEERING DIVISION A A, A10TED OWN 19/28/2022 SOIL AMENDMENT NOTE: ANY AREAS CF THE STE THAT ARE GRADED OR COMPACTED DURING CONSTRUCTION THAT HILL BE LANDSCAPED FOR FINK STABILIZATION SHALL HAVE THE TOPSOIL AMENDED TO MEET EMP T5.13 IN CH. 5. VOL 5 OF THE DOE SVIMMWAV. DRIVEWAY NOTE- - MAX DRIVEWAY SLOPE SHALL NOT EXCEED 141E - GRADE ORVEWAY TO DIRECT RUNOFT TO SHORT PLAT ACCESS TO WEST N SHIRT PLAT DETENTION SYSTEM. UTILITY NOTE: ALL UCUW SERNCE LINES WEST OF THIS PARCEL WILL BE INSTALLED AS PART OF THE SHORT PLAT IMPNOYEMENTS W/ SIUSOUTS EXTENDED ONTO THIS PARCEL. T FOOT MINIMUM VERTICAL SEPARATIONTO BE PRONGED BETWEEN THE DRY UTILITIES A SEWER, WATER. AND STORM. 3 FOOT HORZONT& SPACING TO BE PROVIDED AS WELL. IV SEE SEWER PIPE DIAMETER MAY BE REDUCED TO ♦' ONCE THE PIPE ONLY SER HMS ONE RESIDENT& U.T. ANY STORM STRICTURE W/ A RM TO IE DIFFFIWCE OF MORE THAN 5' SHALL SE A TYPE 1 MANHOLE. 2' OF PIPE COVER REOUIRFD FOR ALL PIPES UNDER DPoVEABIE SURFACES k 1' LINDEN LANDSCAPE AREAS STORM DRAINAGE AREA SUMMARY TOT& IMP. APPROVED WHIN SP -6,050 SF IMPERVOUS CONSTRUCTED W/ SP -1,511 SF LOT A -APPROVED BUILDING PERMIT IMPERVOUS SURFACES -2.361 SF LOT B- BUILDING PERMIT PROPOSED IMPERVIOUS SURFACES -3.716 SF RECEIVED Jan 04 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT RECEIVED W3-4 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. Jan 04 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION r7TED Owv 19/28/2022 W3-4