Loading...
Permit_BLD2022-1315CITY OF EDMONDS Building Permit My6uildingPermitxom Permit Information Permit Number Ftl ni(li7-� Issued Date 9/30/2022 Expiration Date 3/29/2023 Job Address 1017 CAROL WAY Fee Paid $146.50 EDMONDS, 98020 Order Confirmation 1176580 Floor Related Permit# no Suite Application ID 1209572 Contact Information Contact Name Mike Grinberg Contractor PALM CONSTRUCTION & RMDLNG Phone Number 3107445675 INC Property Owner Linda L Probstfeld LNI License# PALMCCR806NE Address 1017 CAROL WAY EDMONDS, WA Phone# 3107445675 City Bus. License # 604-633-079 Property Owner Phone Tenant Name Job Description A (Single Family Residential) (Re -Roof Replacement - Roofing & Sheathing) Residence project involving ( The height of the building is not increasing.) Conditions - Post Permit on site. Do not cover until inspected. Do not start any work until the preconstruction meeting is completed. Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent, including an appropriately licensed contractor. I have furnished true and correct information. I will comply with all provisions of law and ordinances governing this type of construction work, whether specific herein or not. By submitting this application I give the jurisdiction permission to enter the property to perform inspections. I understand that failure to comply with the above may result in revocation of the permit. Applicant: Mike Grinberg Page 1 of 2 t °F EDAf 0 1 S93 CITY OF EDMONDS Building Permit My6uildingPermitxom Permit Information Permit Number RI n9ngg-vile Issued Date 9/30/2022 Expiration Date 3/29/2023 Job Address 1017 CAROL WAY Fee Paid $146.50 EDMONDS, 98020 Order Confirmation 1176580 Floor Related Permit# no Suite Application ID 1209572 Inspections Inspection IVR Inspector Date Inspection IVR Inspector Date Tear Off or Sheathing Building Final Inspection Scheduling The issuance of this permit in no way constitutes approval from any other agencies having regulatory authority over the facility and this construction activity. It is the responsibility of the property owner to obtain any and all such required approvals. Page 2 of 2