Loading...
ENG2022-0442 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NUMBER City of Edmonds ..• • 1 1442] www.cityofedmonds.gov• • Description: PUD-REPLACE CAPACITOR ON EXISTING POLE ISSUED: 10/04/2022 Address: 721 9TH AVE S EDMONDS WA 98020-3311 EXPIRES: 04/04/2023 rmit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 27032500114700 i NAME TYPE NAME ADDRESS PHONE APPLICANT MOE NAVE PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTACT SNOHOMISH COUNTY PUD 75TH ST SW, EVERETT WA 98203 (425)783-8559 CONTRACTOR SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-4353 OWNER MARGARET KENNY 7219TH AVE S, EDMONDS WA 98020 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $110.00 $110.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $110.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 10/04/2022 DATE Printed: Tuesday, October 04, 2022 8:45:11 AM 1 of 2 -KRWOF WAY EUC PERMIT ER PERMITNUMBER, City of Edmonds www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND AND NOISE weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL** Printed: Tuesday, October 04, 2022 8:45:11 AM 2 of 2 RECEIVED III GHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E6S. AUG 31 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A •- ral Info Project Name` �! t� L_. �[ ( S 4'1 ^i C u {D 'I L'�!r �/�� it i C T/ rat jOd Site Address or if no site address use Property Ad ess at NW corner of project area: S , 721 9th Ave S Associated Permits: BLD PLN ENG Owner and Entity Holdingapplicable) Name of Company Franchise Ordinance No: N/A c4a 1 Point of Contact sry Z�� / J int Use Title St Address • _ City �� � State 6,—)4__ Zip 3 Phone 425-783-8559 Email iointuse@snopud.com • Name of Company 1 Primary Name Agent Name �i f Title �� t Title .� Mobile -i z 5 _ 22— 6 Address Z 3 2,) (� Email As (1.4C® . City Za2 Qom. StateLA4 � Zip �� Secondary Name Phone _-2 Zr 3 r Y SS Title Emaila I,� �C Mobile City of Edmonds Business License No: Email State License No: 311 a �— _ l<.A j 313-005-741 Ja Contractor verifies it is currently bonded g Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. Type of D• ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) raffic Control Only (no associated development) ility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 a Prqject Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) L� fcvp- 1� ��1� ex � #"Y'^t e�.��� � U1 ySo /Cohn RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF Alley 72 hours + LF x LF SF CD Parking 72 hours + LF x LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTIONC. T1,pe of Utility Facilities 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable power ❑ gas ❑ water ❑ sewer ❑ storm Details of • to be CompletedNo 1. 1 Does the utility owner have existing overhead infrastructure in the area of work? 2. 1 Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? 5. Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details 6. of Workto be Completed Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: _>t- 6a. Does your project involve wires/cables/lines? If yes: How many are existing? How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. I Does your project involve poles? If yes: y /\ How many poles are existing in the Project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior tc any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, .employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible forallpermit fees. APPLICANT SIGNATURE: G,�c� u�-l`� DATE: fl / .?(j Z APPLICANT PRINTED NAME: APPLICANT TITLE: Senior Designer NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 uwamullm PUBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY LOCATION 721 9TH AVE S LYNNWOODAREA POLE No. 279432 NE1/4S 25 T 27 R 05 DATE 07/16/22 ORDER 100098380 REASON FOR WORK REPLACE 450KVAR CAP/BANK ENGINEER A. RIFE OPERATION 0030 W/300 KVAR CAP/BANK DRAFTER U.G. No. SP&P 22-037 — SCALE 1"=100' APPROVED & 8/8/2022 DATE PRINTED DATE WORK COMPLETED DATE 8/9/22 DH FOREMAN FEES REQ'D ❑ YES ■ NO PRIMARY OVERHEAD ❑ RESIDENTIAL 13 LEO Wl1wV-3d0N1a 1neAw Hono 1 'Qs =s SECONDARY OVERHEAD NESC VIOLATIONS BASIC FEE i ■ NO ❑ YES (SEE NOTES) PERMITS (DATE GRANTED) ❑ TREE TRIM ❑ STATE 'es '=s METER/CONV. POLE i PRIMARY UNDERGROUND ❑ RESIDENTIAL ❑ COUNTY ❑ COMMERCIAL ■ CITY EDMONDS BASIC FEE i ❑ EASEMENTS LEU NO. 'os '=s ❑ REQUIRED ■ NOT REQUIRED SECONDARY UNDERGROUND BASIC FEE s DATE RELEASED 'of I=s UNDERGROUND PLAT REIGN CONTACTS Sc ❑ J BASIC FEE i q FT.VS =s ❑ JOINT ENCH ZIPLY & CATV ❑ JOINT BOR [PLY & CATV STREET LIGHTING ❑ q FT.QS '=s POLE STENCILIN WORK IN RIGHT OF WAY FROM TO ❑ PRIMARY TAKE OFF POLE ❑ SECONDARY PRE-CONTT. REQUIRMENTS ❑ TREE TRIM ❑ PUD LOCATOR rt. FT.VS '=s MISCELLANEOUS FEES ❑ BACKHOE ■ FLAGGING VAULT i ❑ ONE CALL DATE PERMIT i No. STREET LIGHTING i i ❑ YES ■ NO i M&R AS -BUILT GIs TOTAL DUE i SUBSTATION WSG CIRCUIT NO. 12-404 PHASE 231 ENGR'S TEL. • ENGR'S CELL N 425-239-8210 CAP#� CONSTRUCTION NOTES: A-PLI-279432 REFER TO T&D GUIDELIN 4-12-2.0 FOR PROPER DISCHARGE AND HANDLING INFO RMV EXISTING 450KVA FIXED CAP BANK CAP#4874 INSTALL NEW 300KVAR FIXED CAP BANK CAP# 40042 POLE FRAMED W/ 13' ALLEY ARM FOR 3PH PRIMARY CAPACITOR TO HANG ON BACKSIDE OF POLE REUSE EXISTING CUTOUTS ON13' BUCK ARM FUSE NEW CAP BANK AT 15 AMPS i�na3HOs N 2 3 1 WSG 12-404 2 3 1 AP# 40042 37-1117711— 716 WSG 12-404 DATE PAID RECEIPT N. GIs QC GIs PhUS M&R NT BEFORE AFTER SERVICE ORDER NO. LOCATION MAP PAGE'454GE6 LEGEND: o EXISTING POLE RECEIVED AUG 312022 SCHEMATICX EXISTING POLE -TO BE REMOVED • NEW POLE ^ I T 0 NEW POLE TO REPLACE EXISTING POLE CITY EMONDS DEVELOPMENT I V I S loefoid pal wied ay} buianp sin000 ao pasneo sl leul spiepuels Allo aad AeM-;0-ly6u Alp ul sluauaanoadual abeluoi; ao saillllln of 96ewep Ile eoeldaa/aledaa peas lueollddV ZZOZ/0£/60 GDi0N SV G3IAO iddV 5 QISIAIG ON4DDNIOND 11J rFU401 1341 1352 CAP 4874 2!'4:I2 PLAN VIEW: ----------- SPRUCE ST 721 A LE-245 12 00 404 ti SL-121097-H 25-24587 ;1163 = U E 47114 A-42962 ' A-19282 25-24615 _803 SHEET OF �l SN011O3dSNl lib' 31f143HIRUCE ST LANE CLOSURE ON A LOW VOLUME ROAD (NO FLAGGER, TRAFFIC SELF-REGULATING, 35 MPH OR LESS) ROAD W20-1 WORK 9w AHEAD X ONE LANE if W20-4 ROAD 'r AHEAD X ZZOZ/0£/60 n 4�s 9 14O MOM 2J�]A3MIHM a3�1n0�� ivis OIlO�IdSNI _]W2JINOC 0I=IJb2Jl I O O 0 i— O LL) 0 LLl O ch �-- 0 m O w z I. LoO �u � X ONE LANE i ROAD W 2 0- 4 X AHEAD ROAD + WORK>W20-1 AHEAD RECEIVED AUG 31 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT THIS TRAFFIC CONTROL PLAN IS APPROVED FOR SHOULDER/PARKING LANE WORK ONLY. IF THE TRAVELING LANE OF TRAFFIC IS AFFECTED THAN A SINGLE LANE CLOSUER WITH FLAGGERS SHALL BE REQUIRED. 031ON SV a3AObddV NOISIA10 ONI?J33NISN3 IK� 6 r 4-121 RECEIVED AUG 31 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT RECEIVED CITY OF EDMONDS Right -of -Way Application #1195580 - WO 100098380 AUG 31 2022 MyBui ldi ngPermi t. com CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Applicant First Name Last Name Company Name Moe Nave Snohomish County PUD Number Street Apartment or Suite Number E-mail Address PO Box 1107 jointuse@snopud.com City State Zip Phone Number Extension Everett WA 98206 (425) 783-5681 Contractor Company Name Owner Number Street Apartment or Suite Number City State Zip Phone Number Extension State License Number License Expiration Date UBI # E-mail Address Project Location Number Street Floor Number Suite or Room Number 721 9TH AVE S City Zip Code County Parcel Number EDMONDS 98020 27032500114700 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Margaret Kenny Number Street Apartment or Suite Number 721 9TH AVE S City State Zip EDMONDS WA 98020 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 8/31/2022 Submitted By: Moe Nave Page 1 of 2 i CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1195580 - WO 100098380 Project Contact Company Name: Snohomish County PUD Name: Andrew Rife Email: asrife@snopud.com Address: 75th St SW Phone #: (425) 783-8559 Everett WA 98203 Project Type Activity Type Scope of Work Utility Purveyor Utility Work No Disturbance of Surface Project Name: WO 100098380 Description of PUD to replace existing capacitor with new 450 kva capacitor on existing pole (PLI Work: 279432). No tree work and no impact to pedestrian traffic. Crew will set up facing North. Work should take approximately 6 hours to complete. Project Details Project Information Job Number WO 100098380 Page 2 of 2