Loading...
Re BLD2021-0094 RE Building permit for townhome in EdmondFrom: Geng Tan <gengtan@gmail.com> Sent: Friday, January 29, 2021 2:41 PM To: McConnell, Jeanie Cc: Bjorback, Leif; JE; Richardson, Zachary; Ruoyun Zhen; Scott Heegler; Shipley, Brad; Wayland, Christina Subject: Re: BLD2021-0094 RE: Building permit for townhome in Edmond Follow Up Flag: Follow up Flag Status: Flagged Jeanie, We really appreciate you and city are flexible to work with us and let us vested in before code change! This really helps my client a lot at this difficult time we all experiencing. Yes, my civil engineer will work with comments and we will provide the revised drawing with time frame you listed. Thanks again and have a great weekend! Geng On Fri, Jan 29, 2021 at 1:21 PM McConnell, Jeanie<Jeanie.McConnell@edmondswa.gov> wrote: Good afternoon Geng, I agree that the comments provided by the Engineering Division are extensive on this project. We use the intake review process to work with the applicant on submitting a set of plans that will allow for a productive plan review when the time comes to commence a full review. We have found this upfront effort to be in the best interest of both the City and the applicant. This eliminates the scenario where a project sits in the review queue for an extended period only to discover at that point that we're not even able to perform a complete review of the project. The Building Official and I have reviewed your email and in light of the upcoming building code changes we are willing to work through this project a little differently. The City could accept the permit application and documents as submitted, which would allow for vesting to the current building codes, as long as the applicant agrees to one of the following: 1. Submit revised civil construction plans within 2-weeks of City acceptance of the permit application; or 2. Acknowledge that if civil construction plans are not revised within this timeframe, the first round of comments produced by the Engineering Division will be limited to those comments provided to you during the intake review. Please let me know if find these options acceptable prior to the close of business today. If we receive an affirmative response we will proceed with intake of the permit application and the project will vest accordingly. In addition, I am happy to meet with you and your team at an agreeable time next week if you would like. Please let me know and we can work together outside this larger group discussion to set a meeting date and time. Regards, Jeanie Jeanie McConnell I Engineering Program Manager City of Edmonds 425-771-0220, ext 1338 0eanie.mcconnell@edmondswa.gov From: Wayland, Christina <Christina.Wayland@edmondswa.gov> Sent: Friday, January 29, 2021 12:21 PM To: McConnell, Jeanie<Jeanie.McConnell@edmondswa.gov> Subject: FW: Building permit for townhome in Edmond Geng Tan, 206 488-3688 From: Nelson, Denise <Denise.Nelson @edmondswa.gov> Sent: Friday, January 29, 2021 11:57 AM To: Geng Tan <gengtan@gmail.com>; JE <iason@lasonengineering.com>; Wayland, Christina <Christina.Wayland@edmondswa.gov> Cc: Shipley, Brad <Brad.Shiplev@edmondswa.gov>; Scott Heegler <Scott@heeglereng.com>; Ruoyun Zhen <ruovunzhen@gmail.com> Subject: RE: Building permit for townhome in Edmond Hello, I m actually not your permit coordinator on this project. Christina Wayland is. I am including her on this email so she can respond. -Denise From: Geng Tan <gengtan@gmail.com> Sent: Friday, January 29, 2021 11:49 AM To: Nelson, Denise <Denise.Nelson @edmondswa.gov>; JE <iason@lasonengineering.com> Cc: Shipley, Brad <Brad.Shiplev@edmondswa.gov>; Scott Heegler <Scott@heeglereng.com>; Ruoyun Zhen <ruovunzhen@gmail.com> Subject: Re: Building permit for townhome in Edmond Nelson, It is very frustrating without any clear explanation the city sent enclosed comments. I asked my civil engineer to talk with Reviewer. But all these comments could be part of reviews. Is it possible to set up a online meeting with JMacConnel and to find out what exactly he needs, so we can get our permit in before code changes? I discussed this with my civil engineer, he never encountered this before. He will call Zac to discuss, he has discussed with him before during the design. I wonder if it is covid effect, everyone gets nuts with all the frustrations. All things can be resolved with plan review and we have permitted two townhomes in Seattle and SeaTac just before this. Let me know how we can resolve this? Any detailed review can be happening after they take in the permit. It is unbelievable, the first time I encountered these unclear comments at screening, not sure what we do with this? Geng On Tue, Jan 26, 2021 at 3:46 PM Geng Tan <gengtan@gmail.com> wrote: Denise, I filled the info as much as I could and submitted it online again. I hope it works. Thanks! Geng On Tue, Jan 26, 2021 at 2:24 PM Nelson, Denise <Denise.Nelson @edmondswa.gov> wrote: Hello, You can actually complete the form, it does not require a professional. -Denise From: Geng Tan <gengtan@gmail.com> Sent: Tuesday, January 26, 2021 2:22 PM To: Nelson, Denise <Denise.Nelson @edmondswa.gov>; Shipley, Brad <Brad.Shipley@edmondswa.gov> Cc: Scott Heegler <Scott@heeglereng.com>; Ruoyun Zhen <ruoyunzhen@gmail.com> Subject: Re: Building permit for townhome in Edmond Denise, Thanks very much! I wonder if it seems no other city requires a traffic impact form for such small 4 units townhome projects. We have done townhomes in Seattle and SeaTac recently. We had no idea it was required and since it was not mentioned in the city website or previous design review either until the last minute submit online. Also with change of code soon on Feb 1st, we try to submit before the code change. Is it possible to waive it for such a small project or just delay it, so we can get traffic engineers to prepare it and submit in the next round? Please let me know. Thanks! Geng On Mon, Jan 25, 2021 at 1:44 PM Nelson, Denise <Denise.Nelson@edmondswa.gov> wrote: Here ya go From: Geng Tan <gengtan@gmail.com> Sent: Monday, January 25, 2021 1:41 PM To: Nelson, Denise <Denise.Nelson @edmondswa.gov>; Scott Heegler <Scott@heeglereng.com> Cc: Ruoyun Zhen <ruovunzhen@gmail.com> Subject: Re: Building permit for townhome in Edmond Denise, We are ready to submit permits for my client's townhome project. But when we submit, the online permit requires a Transportation Impact form. I can't find that form on the city web site. Can you help to direct me? Thanks! Geng It you believe that a required submittal document does not apply to your project. please upla reviewer may require you to submit a document that was orginafiy waived at submittal to ev< Please review the Requirements for Electronic Plans pnor to uploading documents Required Documents • Architectural Plan • Storm Drainage Analysis (Technical information Report) • Structural Calculations • Structural Plan , • Survey - Boundary and Topographic • Traffic Control Plan • Transportation Impact Form Please review the Requirements for Electronic Plans prior to uploading documents Required Supplementals • Authorization Statement - Budding • Critical Area Determination - Clearing and Grading • Electronic Submittals - Building • Commercial Project Information View Supplementats On Thu, Jan 14, 2021 at 8:48 AM Nelson, Denise <Denise.Nelson @edmondswa.gov> wrote: Hello, We are now on MYBUILDINGPERMIT.COM, so the application will be made through that site. Once you apply, we will take about 48hrs to review documents. If we feel a first review can be done we will accept the plans and invoice you. If not, we will send you back comments for corrections. We are not sure if the new codes will take effect. Its up to the state, and the governor has not approved a new date yet. I have attached our handout for the submittal requirements, and a few other items you will need. Looking forward to this permit, Devise Nelsow Permit Coordinator City of Edmonds 121 5th Ave North, 2nd floor Edmonds, WA 98020 (425)771-0220 ext 1336 CITY HALL IS CURRENTLY CLOSED TO THE PUBLIC Services will continue to be provided by email and phone. To apply for a permit, check status of a permit or schedule inspections please visit MYBUILDINGPERMIT. COM Please visit www.edmondswa.gov for up-to-date information For building permit inquiries: onlinepermits(aD-edmondswa.gov For all other permit inquiries please email: devserv.admin(cDedmondswa.gov From: Geng Tan <gengtan@gmail.com> Sent: Wednesday, January 13, 2021 1:54 PM To: Wayland, Christina <Christina.Wayland@edmondswa.gov>; Nelson, Denise <Denise.Nelson @edmondswa.gov>; Johns, Kristin <Kristin.Johns@edmondswa.gov>; Ruoyun Zhen <ruoyunzhen@gmail.com>; Shipley, Brad <Brad.Shipley@edmondswa.gov> Subject: Re: Building permit for townhome in Edmond Forgot to mention our project file No is PLN20180058 just for your reference. Thanks! Geng On Wed, Jan 13, 2021 at 1:53 PM Geng Tan <gengtan@gmail.com> wrote: Dear Permit Coordinators, We are applying for a building permit soon for my client's townhome project. It has been a while since we applied for preapp and then Design review. We plan to submit before the end of the month since I know many cities will change to new building codes after 2/1. Is that the case with Edmonds? It's good to learn that the city is moving to mybuilding permit.com. I noticed the city website changed quite a bit. I wonder for townhome projects besides city application, any other forms are needed? Any master list for applications form required for townhome projects in Edmond? Please give me some advice. Thanks! Regards Geng Geng Tan, RA, LEED AP, NCARB M S www.atlascreate.com Ph:206.488.3688 Linked in Profile `.A Please consider the environment before printing this e-mail Geng Tan, RA, LEED AP, NCARB www.atlascreate.com Ph: 206.488.3688 Linked in Profile `.A Please consider the environment before printing this e-mail Geng Tan, RA, LEED AP, NCARB www.atlascreate.com Ph: 206.488.3688 Linked in Profile A Please consider the environment before printing this e-mail Geng Tan, RA, LEED AP, NCARB www.atlascreate.com Ph: 206.488.3688 Linked in Profile NA Please consider the environment before printing this e-mail Geng Tan, RA, LEED AP, NCARB IL11as www.atlascreate.com Ph: 206.488.3688 Linked in Profile `.A Please consider the environment before printing this e-mail Geng Tan, RA, LEED AP, NCARB www.atlascreate.com Ph: 206.488.3688 Linked in Profile NA Please consider the environment before printing this e-mail Geng Tan, RA, LEED AP, NCARB www.atlascreate.com Ph: 206.488.3688 Linked in Profile A Please consider the environment before printing this e-mail