Loading...
Building Permit (3)Type: FILL GRADE Subtype: COMMERCIAL AND GRADE I Status: ISSUED Parcel No: 00451900102000 Site Address: 8029 238TH ST SW EDMONDS,WA 98026-9265 Subdivision: 010230, 004519, SP S-2-86, SP S-15-87 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: FILL/GRADE FOR 4 UNIT TOWNHOME WA State Contractor L & I #: PACIFRD81903 Applied: 3/10/2021 Issued:10/6/2022 Final: Expiration Date: 10/6/2023 Issued by: BAC CONTACTSAd NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT JESSE MAYOR -TRINITY (206)387-8008 trinitylegacyfin@gmail.com LEGACY FINANCIAL CONTACT ATLAS ARCHITECTS 5280 HIGHAND DR., BELLEVUE (206)488-3688 gengtan@gmail.com WA 98006 PACIFIC RED DOOR 2415 130TH AVE NE, BELLEVUE CONTRACTOR DEVELOPMENT INC WA 98005 EDMONDS TOWNHOMES- 8029 238TH ST SW, EDMONDS OWNER BETTER BELLEVUE INC WA 98026-9265 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 10/5/22 R23521 PER PERMIT ENGINEERING INSPECTION FEE 3.3 001.000.341.82.000.00 $4,293.00 $4,293.00 10/5/22 R23521 PERCENT GRADING - PLAN REVIEW FEE 001.000.345.83.000.00 $55.00 $55.00 10/5/22 R23521 GRADING PERMIT BASE FEE 001.000.322.10.000.00 $35.00 $35.00 10/5/22 R23521 GRADING PERMIT FEE - CUBIC 001.000.322.10.000.00 $110.00 $110.00 10/5/22 R23521 YARDS TOTALS: $4,533.00 $4,533.00 CONDITIONS CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL FOR 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION FOR ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. NFORMATION It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION I REQUIREMENTS. Printed: Thursday, October 06, 2022 3:44:02 PM 1 of 3 GRADEFILL - PERMIT NUM City of Edmonds Edmondsrmit 98020BLD2021-03563516 ww.edmondswa.gov INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION DEFERRED SUBMITTAL: PRIOR TO RETAINING WALL CONSTRUCTION AT NE PROPERTY CORNER, SITE SPECIFIC CONSTRUCTION DETAILS SHALL BE SUBMITTED TO THE CITY FOR APPROVAL, INCLUDING: FOR 1) TOP AND BOTTOM OF WALL ELEVATIONS OTHER CONDITION INFORMATION 2) MAX WALL HEIGHT 3) TOP OF EXISTING SEWER ELEVATION 4) ELEVATION OF ADJACENT NORTH PARKING LOT 5) DISTANCE FROM PARKING LOT TO TOP OF WALL 6) USE OF GEOGRID AND STRUCTURAL CALCS AS APPLICABLE FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. ROW COMPACTION TEST FOR Right of way compaction tests are required per City standards. NFORMATION SEWER AND WATER FOR MAINTAIN 10 FEET OF SEPARATION BETWEEN THE SANITARY SIDE SEWER AND THE SEPARATION INFORMATION WATER SERVICE LINE. STORM COVENANT O A stormwater covenant shall be approved for recording prior to project final approval. ORMATION FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. 1910RI&V• •MFIV ilk I•- • • • •- • INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES A-1 TESC AND MOBILIZE E-1 CLEARING LIMITS E-3 STRM CONVEYANCE E-3 STRM COVENANT E-3 STRM FOOTING DRAIN E-4 ACCESS WIDTH SLOPE E-4 WATER SERVICE LINE E-7 DRY UTILITY LOCATION E-9 COMPOST AMEND E-9 PARKING STRIPING E-9 PROJECT ASBUILTS X-2 ENGINEERING FINAL" A-1 ENGINEERING PRECON NOTE TO INSPECTOR: SEE PRECON DOCUMENT E-5 ENG SPECIAL SPECIAL INSPECTIONS REQUIRED FOR: INSPECTION DETENTION PIPE ANCHORING E-3 STRM MGMT FACILITY NOTE TO INSPECTOR: SPECIAL INSPECTION REQUIRED FOR DETENTION PIPE ANCHORING. B-2 RETAINING WALL NOTE TO INSPECTOR: RETAINING WALL CONSTRUCTION DETAILS REQUIRED AS A DEFERRED SUBMITTAL. Printed: Thursday, October 06, 2022 3:44:02 PM 2 of 3 Printed: Thursday, October 06, 2022 3:44:02 PM 3 of 3