Engineering Permit Form BLD2022-0260RIGHT OF WAY PERMIT
PERMIT NUMBER
City of Edmonds
-0260
www.cityofedmonds.gov
Description: ROW IMPROVEMENTS FOR 4 TOWNHOMES ISSUED: 10/06/2022
Address: 8029 238TH ST SW EDMONDS WA 98026-9265
EXPIRES: 10/06/2023
rmit Type: RIGHTOFWAY Permit Subtype: MULTIFAMILY Parcel Number: 00451900102000
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT RUOYUN ZHEN 1371 247TH PL SE, SAMMAMISH WA 98075 (425)533-1121
CONTACT GOOD NAME PROPERTIES LLC 15436 SE 38TH ST, BELLEVUE WA 98006 (206)387-8008
CONTRACTOR PACIFIC RED DOOR DEVELOPMENT 2415 130TH AVE NE, BELLEVUE WA 98005
INC
OWNER BETTER BELLEVUE INC 1371 247TH PL SE, SAMMAMISH WA 98075
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00
RIGHT OF WAY STANDARD PERMIT FEE $330.00 $330.00
REQUIREMENTS
REQUIREMENT TYPE
NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
Christ�v�'a g2rsov� 20/0/2022
RELEASED BY
DATE
Printed: Thursday, October 06, 2022 4:17:28 PM 1 of 3
RIGHT OF WAY PERMIT
PERMIT NUMBER
City of Edmonds
www.cityofedmonds.gov•
CONDITIONS
CONDITION TYPE
NOTES
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
INSP PRIOR TO BACKFILL
Call for all required inspections. All work shall be inspected prior to backfill.
Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. Asbuilt shall be
PROJECT CIVIL ASBUILT
submitted to Engineeringpermits@edmondswa.gov.
ROW COMPACTION TEST
Right of way compaction tests are required per City standards.
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROLS
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT NOTES
COMPLETE
X-2 ENGINEERING FINAL"
E-8 BOND RELEASE
A-1 ENGINEERING PRECON
A-1 TESC AND MOBILIZE
E-7 CONCRETE SIDEWALK
E-7 CURB GUTTER
E-7 DRY UTILITY LOCATION
E-7 DWY APPROACH
E-7 FH REFLECTOR
E-7 HYDRANT
E-7 MAILBOX LOCATION
E-7 PAVEMENT COMPACTION TEST
REPORT
E-7 PVMT SUBGRADE
E-7 RESTOR LIMITS
E-7 STORM CB
E-7 STORM MAIN
E-7 STRIPING
Printed: Thursday, October 06, 2022 4:17:28 PM 2 of 3
Printed: Thursday, October 06, 2022 4:17:28 PM 3 of 3