APPROVED ENG PLN BLD2022ALL UNITS+Site_Plan+6.6.2022_2.05.34_PM+2914501M :EPEW
10
NORTH
A , SITE MAP
101 % 1/16"= 1'-0"
xI `-;TINS D C/<SI
Install catch basin protection per Edmonds standard detail ER 902
wherever catch basins are downstream of construction.
APPROVED BY PLANNING
b/22/2022
x
ENGINEERING DIVISION
APPROVED.
06/09/2022
BLD2{}22-0698
BLD2022-0699
BLa2022-07001
B LD2022-07Q1
B LD2022-0702
B LD2022-0729
B LD2022-07301
B LD2022-0731
B L D2022-0732
B L D2022-0733
RLD 0 -0735
no ground disturbance
Zone
RM-2.4 Corner
N Flag N
Setbacks: Required
Actual
Front
--15'
-Nc
Sides
--=1-0; -;
-----------
-IVC-
Rear
; 15;
NCB
Other
'-----------
Height
'----------
DEPEW, Inc.
1834 SW 152nd St.
Burien, WA 98166
steve@depewinc.com
STAMP
THE UNDERSIGNED HAS PROVIDED BUILDING ENCLOSURE
DOCUMENT THAT IN MY PROFESSIONAL JUDGEMENT ARE
APPROPRIATE TO SATISFY THE REQUIREMENTS OF
RCW 64.55.005 THROUGH 64.55.090.
STEVEN K. DEPEW, PE
V )
0
U)
Q
W z
z0
W Q
0 z
0 0
2 U
SHEET TITLE
PRINCIPAL IN CHARGE
STEVEN K. DEPEW
PROJECT TEAM
DEPEW,
REVIEWED
STEVEN K. DEPEW
DRAWN
STEVEN K. DEPEW
No dimensions should be scaled from
drawings and all dimensions and values
should be checked and verified against
field conditions. If any dimensions are
found to be incorrect or invalid, then it is
the responsibility of the user to inform the
Architect, and to obtain the correct
dimensions prior to acting upon anything
contained in these drawings. Contractor
to verify all dimensions, conditions, etc.
pertaining to the Work on site before
proceeding with the Work. Copyright
2015 DEPEW, INC. All rights reserved.
REVISION DATE
PERMIT 03.25.2022
RECEIVED
Jun 07 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
PROJECT NUMBER I SHEET NUMBER
101