Loading...
APPROVED ENG PLN BLD2022ALL UNITS+Site_Plan+6.6.2022_2.05.34_PM+2914501M :EPEW 10 NORTH A , SITE MAP 101 % 1/16"= 1'-0" xI `-;TINS D C/<SI Install catch basin protection per Edmonds standard detail ER 902 wherever catch basins are downstream of construction. APPROVED BY PLANNING b/22/2022 x ENGINEERING DIVISION APPROVED. 06/09/2022 BLD2{}22-0698 BLD2022-0699 BLa2022-07001 B LD2022-07Q1 B LD2022-0702 B LD2022-0729 B LD2022-07301 B LD2022-0731 B L D2022-0732 B L D2022-0733 RLD 0 -0735 no ground disturbance Zone RM-2.4 Corner N Flag N Setbacks: Required Actual Front --15' -Nc Sides --=1-0; -; ----------- -IVC- Rear ; 15; NCB Other '----------- Height '---------- DEPEW, Inc. 1834 SW 152nd St. Burien, WA 98166 steve@depewinc.com STAMP THE UNDERSIGNED HAS PROVIDED BUILDING ENCLOSURE DOCUMENT THAT IN MY PROFESSIONAL JUDGEMENT ARE APPROPRIATE TO SATISFY THE REQUIREMENTS OF RCW 64.55.005 THROUGH 64.55.090. STEVEN K. DEPEW, PE V ) 0 U) Q W z z0 W Q 0 z 0 0 2 U SHEET TITLE PRINCIPAL IN CHARGE STEVEN K. DEPEW PROJECT TEAM DEPEW, REVIEWED STEVEN K. DEPEW DRAWN STEVEN K. DEPEW No dimensions should be scaled from drawings and all dimensions and values should be checked and verified against field conditions. If any dimensions are found to be incorrect or invalid, then it is the responsibility of the user to inform the Architect, and to obtain the correct dimensions prior to acting upon anything contained in these drawings. Contractor to verify all dimensions, conditions, etc. pertaining to the Work on site before proceeding with the Work. Copyright 2015 DEPEW, INC. All rights reserved. REVISION DATE PERMIT 03.25.2022 RECEIVED Jun 07 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PROJECT NUMBER I SHEET NUMBER 101