2022-10-12 Planning Board PacketC)p E 04
� O
Planning Board
Remote Zoom Meeting
Agenda
121 5th Ave. N.
Edmonds, WA 98020
www.edmondswa.gov
Michelle Martin
425-771-0220
Wednesday, October 12, 2022 7:00 PM Virtual Online Meeting
1.
2.
A.
Remote Meeting Information
Join Zoom Meeting: https://edmondswa-
gov.zoom.us/j/88526558062?pwd=YUtoNGFFQ210Q2U5SDdwRUFadX15dz09
Meeting ID: 885 2655 8062. Passcode: 598700
Call into the meeting by dialing: 253-215-8782
Phyiscal Location
The Planning Board members will be meeting remotely for this meeting and the public may as well at
the zoom information above. However, given the expiration of Gov. Inslee's proclamation on open
public meetings, a physical location to participate in the meeting must be provided. For this meeting
the physical location provide is Edmonds Waterfront Center Community Room B located at 220
Railroad Avenue.
Land Acknowledgement for Indigenous Peoples
We acknowledge the original inhabitants of this place, the Sdohobsh (Snohomish) people and their
successors the Tulalip Tribes, who since time immemorial have hunted, fished, gathered, and taken
care of these lands. We respect their sovereignty, their right to self-determination, and we honor their
sacred spiritual connection with the land and water.
Call to Order
Attendee Name Present Absent Late Arrived
Approval of Minutes
Generic Agenda Item (ID # 6893)
Approval of Minutes
Background/History
N/A
Staff Recommendation
Approve minutes from the September 14th and September 28th meetings.
Planning Board Page 1 Printed 101712022
Remote Zoom Meeting Agenda October 12, 2022
3.
4.
5.
A.
ATTACHMENTS:
• Draft Revised September 14, 2022 Minutes
• Draft September 28, 2022 Minutes (PDF)
Announcement of Agenda
Audience Comments
Administrative Reports
Generic Agenda Item (ID # 6874)
(PDF)
Parks, Recreation & Human Services Department - Q3 Update
Narrative
This is the 2022 third quarter update of the Parks, Recreation & Human Services (PRHS)
Department's accomplishments for the months of July through September to the Parks &
Planning Board. Attached is a more detailed list of the department's work for the three months.
In addition, a PowerPoint presentation is planned for the October 12th Board meeting to
provide additional information and answer questions.
Highlights for 2022 3rd Quarter (additional items found in attached Accomplishment List)
1. Administration: Agreements for concessionaires (6) and special events (1) completed.
Oversight for 5 special events plus Summer Market, supporting Library renovation and
operating and capital budget preparation and submittal. Salmon Safe certification draft
report reviewed by city council. Continued work on possible parkland acquisitions
2. Civic Playfield Park Project: Construction continuing with amenities being installed such
as athletic field turf and lights, inclusive playground, shade structure, concrete path,
restroom foundation, and site underground utilities. All benches and tables adoptions
sold (21 total).
3. Park Planning: Parks Maintenance greenhouse permit submittal completed and using
new Job Order Contracting services for installation. New Parks Planner/Project Manager
position started July 18th. Yost Park bridge #6 closed indefinitely. Off -site stormwater
mitigation project (96t" Ave Infiltration) is out to bid with construction slated for winter.
4. Parks Maintenance: Memorial bench replacements at Marina Beach Park, supported 5
special events plus both Summer and Uptown Markets. Replenished safety fall material
at all city playgrounds. Yost pool and Spray Park operations at 7 days/week and Spray
Park had seasonal closure mid -September.
5. Recreation and Cultural Services Programs: Q3 Permits - 46 shelter permits, 560 field
rental hours and 50 gym rental hours. Programming included new weekly Summer Day
Planning Board Page 2 Printed 101712022
Remote Zoom Meeting Agenda October 12, 2022
Camp and 24 contracted youth camps; Adult Softball (63 teams) and Pickleball (18
teams) Leagues and new fitness classes. Supported public access for all city board and
commission meetings at the Waterfront Center. Five Discovery Programs week-long
outdoor summer camps, 8 Discovery Interpretive Tables at Olympic Beach, City Park,
and Mathay-Bal linger Park (first City program there) and Beach Rangers patrolled the
waterfront every day from Memorial Day through Labor Day weekend.
6. Arts & Cultural Division Effective September 1, 2022 this division was transferred to the
Community Services/Economic Development Department. Our department will still
manage the division's budget through the end of the year to support an easier
transition. Currently the staff will remain at the Frances Anderson Center although the
remainder of their new department is housed at City Hall.
7. Human Services Division: Supported Snohomish County's efforts to purchase America's
Best Value Inn for an enhanced shelter. Provided Social Services support at each
Edmonds Community Court. Accepted over 50 referrals and have 38 engaged clients.
Completed integration of contracted service provider (social worker) with Police. Began
outreach from City Hall Neighborhood Office to individuals along the Hwy 99 corridor.
Provided ongoing support for distribution of ARPA funding through Household Support
Grant program. Coordinated with Council Legislative Aide on Suicide Awareness and
Prevention website. Coordinated with the Food Bank and Municipal Court to provide
food to clients attending Community Court; procured refrigerator for perishable food.
Coordinated with Snohomish County to relocate 5 motel voucher recipients to different
motels while America's Best Value Inn is being purchased.
ATTACHMENTS:
• PRHS 2022 Q3 Accomplishments (PDF)
6. Public Hearings
7. New Business
A. Generic Agenda Item (ID # 6888)
Presentation of Proposed 2023-2028 Capital Facilities Plan & Capital Improvement Program
Background/History
The City's Capital Facilities Plan (CFP) Element is updated annually and identifies capital projects for at
least the next six years, which support the City's Comprehensive Plan. CFP projects are capital
improvement projects that expand existing facilities/infrastructure or provide new capital facilities in
order to accommodate the City's projected population growth in accordance with the Growth
Management Act. Thus, capital projects that preserve existing capital facilities are not CFP projects.
These preservation projects are part of the six -year capital improvement program (CIP) along with
capital facility plan projects that encompass the projected expenditure needs for all city capital related
projects.
Planning Board Page 3 Printed 101712022
Remote Zoom Meeting Agenda October 12, 2022
Staff Recommendation
Hold public hearing on October 26, 2022.
ATTACHMENTS:
• Parks CIP_CFP 2023-2028 (PDF)
• 2023-2028 Public Works CIP-CFP (PDF)
8. Unfinished Business
A. Generic Agenda Item (ID # 6897)
Tree Code Amendments AMD2022-0004
Background/History
Edmonds' tree code, Chapter 23.10 ECDC<https://www.codepublishing.com/\NA/Edmonds/>
primarily focuses on tree retention related to development. During its adoption last year, the City
Council and the Planning Board directed staff to further amend the code to limit property owner
tree removals under a second phase of tree code amendments. Note that new code
requirements resulting in significant changes to procedures or additional cost to permit
applicants are `Major' code amendments.
The City Council and Planning Board provided general feedback for improvements to the
current tree code and confirmed the project scope at the June 21 and July 13 meetings,
respectively. Staff was directed to expand the scope of "Phase 2" tree code amendments to
consider minor changes to the existing code that:
• Clarify, simplify, and provide greater code consistency.
• Streamline the development review or tree removal process.
• Align with industry standards.
• Address situations that have required a code interpretation, when the code is difficult or
unclear in its application, or as trends in code enforcement merit code clarification.
Staff developed an initial list of preliminary tree code amendments that follows this scope and
general direction. At the September 14 Planning Board meeting, the Board provided feedback
on preliminary code amendments #1-11, indicating a few clarifications were needed but that
overall, the preliminary code changes would achieve the scope and direction of the Phase 2 tree
code amendments. The Planning board raised one Major code amendment consideration that
has been added to the Major code amendment list, to be discussed later.
The list has been revised (Attachment 1) to show proposed code changes grouped by three
primary code amendment classifications, according to the impact of code modifications:
Minor - amendments do not change the meaning of the code. They clarify/simplify or further
define something already in the code, address redundancies, address typos or result in simple
reformatting or removal of outdated references, including industry standards, Best Management
Practices, etc. without resulting in increased requirements.
Moderate - amendments are relatively uncontroversial restructuring of code sections, and any of
the above Minor amendments that result in new, increased or eliminated requirements.
Major - amendments add a substantial prohibition/ban on something currently allowed or add
substantial new requirements. This category would include any amendments that result in
significant changes to existing procedures or significant additional cost to permit applicants,
and/or change the intent of the code.
Staff is expecting that several additional code amendments will be identified at subsequent
Planning Board Page 4 Printed 101712022
Remote Zoom Meeting Agenda October 12, 2022
Planning Board, Tree Board, City Council, and stakeholder meetings and from public feedback.
Staff Recommendation
Confirm that the remaining preliminary `Minor' code amendments to Chapter 23.10 ECDC, #12-
19 are appropriate in achieving the scope and direction of the Phase 2 tree code amendments.
ATTACHMENTS:
• Minor Tree Code Amend List (PDF)
• Packet PB Meeting PPT 10122022 (PDF)
B. City Council Joint Meeting
9. Planning Board Extended Agenda
A. Generic Agenda Item (ID # 6895)
Extended Agenda
Background/History
N/A
Staff Recommendation
Review Extended Agenda
ATTACHMENTS:
• 10.07.2022 Extended Agenda (PDF)
10. Planning Board Chair Comments
11. Planning Board Member Comments
12. Adjournment
Planning Board Page 5 Printed 101712022
2.A
Planning Board Agenda Item
Meeting Date: 10/12/2022
Approval of Minutes
Staff Lead: Kernen Lien
Department: Planning Division
Prepared By: Kernen Lien
Background/History
N/A
Staff Recommendation
Approve minutes from the September 14th and September 28th meetings.
Narrative
Draft meeting minutes attached.
Attachments:
Draft Revised September 14, 2022 Minutes
Draft September 28, 2022 Minutes
Packet Pg. 6
2.A.a
CITY OF EDMONDS PLANNING BOARD
Minutes of Webinar Meeting
September 14, 2022
Vice Chair Pence called the virtual meeting of the Edmonds Planning Board to order at 7:00 p.m. and announced
Chair Crank would be joining later.
LAND ACKNOWLEDGEMENT FOR INDIGENOUS PEOPLES
Board Member Campbell read the Land Acknowledgement.
Board Members Present
Alicia Crank, Chair'
Roger Pence, Vice Chair
Todd Cloutier
Judi Gladstone
Richard Kuehn
Mike Rosen
Beth Tragus-Campbell (alternate)
Lily Distelhorst (student rep)
Board Members Absent
Matt Cheung (excused)
Staff Present
Kernen Lien, Planning Division Manager
Susan McLaughlin, Development Services Director
Deb Powers, Urban Forest Planner
READING/APPROVAL OF MINUTES
MOTION MADE BY BOARD MEMBER ROSEN, SECONDED BY BOARD MEMBER
GLADSTONE, TO APPROVE THE MINUTES OF AUGUST 10, 2022 AS PRESENTED.
Vice Chair Pence noted a correction to the name of Michelle Dotsch under Audience Comments on page 1.
MOTION PASSED UNANIMOUSLY TO APPROVE THE MINUTES AS CORRECTED.
ANNOUNCEMENT OF AGENDA
THERE WAS UNANIMOUS CONSENT TO APPROVE THE AGENDA AS PRESENTED.
AUDIENCE COMMENTS
None
' Chair Crank joined the meeting late. Vice Chair Pence chaired the entire meeting.
d
c
0
0
a
a
Planning Board Meeting Minutes
September 14, 2022 Page 1 of 7
Packet Pg. 7
2.A.a
ADNUMSTRATIVE REPORTS
A. Reimagining Neighborhoods and Streets
Director McLaughlin made an informational presentation regarding Reimagining Neighborhoods Streets +
Creating Community Spaces Together. The project objectives are to develop new street and public space
typologies that will guide how streets are built in the future and allow for more spontaneous use of public space.
The scope of work will include developing new street typologies (sidewalk code update, street map update,
update of pedestrian prioritization investment network); developing new public space typologies (how streets
can be reallocated to expand public space, design standards to shape public space in the right of way); and
N
creating a public space activation strategies toolkit (empowering communities to utilize streets for people needs
beyond mobility, permitting structure to enable each strategy). The new street typologies will consider vehicle
movement and ensure that street design serves social, environmental, and economic needs and functions. She
o
reviewed an example of a draft street typology cross-section and map.
0
Public Space Activation refers to making the best use of streets we already have. This could be for certain parts
L
a
of the street and/or certain times, days, and special events. Six in -person neighborhood meetings were held to
Q
raise awareness about this topic. Participants voted on activation strategies that would be best suited to their
neighborhoods. Staff tallied those responses and mailed postcards to the broader neighborhood to confirm those
activation ideas. Director McLaughlin explained that the City is committed to funding and supporting one pilot
project in each neighborhood district (Downtown, Five Corners, Firdale, Westgate, Highway 99Ballinger, and
N
Perrinville).
N
A Public Space Activation Toolkit provides critical information for each activation strategy to reduce barriers
for community -led design and implementation. It also offers ideas to neighborhoods to promote social
gathering/community building. Director McLaughlin reviewed a tentative timeline for this project with
anticipated Council adoption in Q 1 of 2023.
Board Member Cloutier said he loved the layout and the systematic approach.
Board Member Campbell agreed with Board Member Cloutier. She was disappointed with the poor response
in the Highway 99Ballinger area. She asked if there are plans to do additional outreach to get more people
involved. Director McLaughlin noted that the purpose is to raise awareness so even if there is a smaller core
group it can still be effective. The City will be doing more outreach before the package gets adopted, but for the
public space activation portion, they do not have the resources to do more outreach.
Board Member Rosen agreed that the presentation was very helpful and informative. He asked if there is a
Council directive to advance streateries. Director McLaughlin commented that there is controversy around
streateries. She noted that the public space typologies just provide a menu of tools for where they could expand
public space in the right of way for people needs and not just mobility. Streateries is just one example of what
could happen. Board Member Rosen expressed appreciation for the context and encouraged staff to share it that
way. Director McLaughlin agreed and noted the need to have these conversations for all neighborhood districts
and not just the downtown area.
Planning Board Meeting Minutes
September 14, 2022 Page 2 of 7
Packet Pg. 8
2.A.a
Board Member Kuehn agreed with Board Member Rosen. He encouraged staff to have clear context and
language so it is not steering one way or another on any topic. This will help to keep minds open and get better
public engagement.
Vice Chair Pence commented that the project timeline on the website needs to be updated with current
information. There also needs to be more substance. He asked whatever happened to equitable engagement
framework. In the public meetings he has attended he hasn't seen much of a difference. Director McLaughlin
explained that it takes time to build trust and relationships. Staff believes that the framework will work and over
time this will yield results. Vice Chair Pence asked for an update on the tasks and strategies that they expect
will yield results over time.
Chair Crank2 agreed that just because they extend an invitation to a group that has been routinely left out doesn't
mean that they will just show up. It will take time and advocacy from the non -minority members of the
community to encourage others to participate. o
PUBLIC HEARINGS c
L
Q.
None Q
A. Tree Code Amendments
Urban Forest Planner Deb Powers made a PowerPoint presentation regarding Phase II Tree Code Amendments.
She stated tonight's focus was on the low-level policy code amendments and that staff will be asking if this
general direction is appropriate. The current tree code was adopted in response to the Urban Forest Management
Plan Goal IA: Update tree regulations to reduce clearcutting or other development impacts on the urban forest
and consider changes to tree replacement requirements and penalties for code violations. Both the Planning
Board and the Council directed staff to do the Phase II Tree Code Amendments in 2022. The project scope for
the Phase II Tree Code Amendments is to limit property owner tree removal (major) and consider minor
amendments to the current code that would simplify, match industry standardsBMPs, streamline the review
process, and address code interpretation issues.
She started by reviewing preliminary code amendments that would have no policy level impact. She invited
board members to give feedback on their attempts to work through development scenarios she had provided.
Vice Chair Pence brought up a project at 240t' and 87t' and noted that developers routinely clearcut the entire
lot of trees and replant trees. He asked if this would no longer be possible. Ms. Powers explained that the current
code strives to retain as many viable trees as possible while letting the development move ahead in a timely
manner. The code requires a certain threshold for tree retention depending on what type of development it is.
From there the code acts to prioritize how and what they are retaining. Developers are not able to just pay the
fees right off the bat; they are required to show infeasibility if they are unable to retain the required trees. Vice
Chair Pence commented that the project site had a cluster of very significant trees that were removed. He
wondered if the project could have been worked out in a way to preserve the trees.
2 Chair Crank arrived prior to 7:30 p.m.
Planning Board Meeting Minutes
September 14, 2022 Page 3 of 7
Packet Pg. 9
Board Member Gladstone asked about the development scenarios provided by staff. Ms. Powers explained
these are examples of what the Planning Division reviews. They help to illustrate issues with the current Tree
Code. Vice Chair Pence asked about flexibility to allow developers to have sub -minimum setbacks if that will
allow the saving of trees. Ms. Powers explained that setbacks are a requirement separate from the Tree Code.
The Tree Code does not focus on saving trees in setbacks, but this could be one way to simplify the code. She
explained that the Conservation Subdivision Design has incentives to give leeway in development standards if
they commit to greater tree retention right from the beginning.
Board Member Campbell stated she is also concerned about developers that are able to clearcut. Because of
negative examples of this she is opposed to allowing fees in -lieu -of. She is also somewhat against replanting
and prefers focusing on saving as many trees as possible upfront with code amendments because replanting
often results in poorly maintained plantings. She noted that if developers are paying fees -in -lieu of they will just
pass it on to the property owner/renter thereby increasing housing costs in addition to destroying the c
environment. She would like to see every possible barrier to using fees in -lieu -of. She asked why they want to 0
focus on no impact policy amendments. She thinks the big clearcutting examples would be more important.
0
L
Ms. Powers explained that ultimately the Tree Code is trying to establish a healthy urban forest 20 years from a
now. It is a balance between growth/development and tree retention. Not every tree should be retained on a Q
development site if it can't sustain development impacts and is not the kind of tree in 20 years that will be part
of a healthy urban forest. She agrees with the prioritization of retention, replanting, and then fees -in -lieu as the
lowest priority. Finally, she referred to the no -impact policy amendments are just a start to create a basic
framework before they move up to the other code amendments. Board Member Campbell expressed concern N
about the time it will take to address these small things while damage is allowed to continue. She is looking N
forward to addressing the prioritization aspect.
T
Ms. Powers explained that there are 11 preliminary amendments which fall into the categories of:
• Definitions — hazard tree, Limits of Disturbance (LOD), nuisance, qualified professional
• Property owner tree removal — clarify emergency tree removal process
• Tree retention with development — show development types that require tree retention, add "viable",
allow silt fence, strike "must", replace "developer" with "applicant".
Board Member Rosen commented that the City needs to reconcile the tension between the desire to have
additional housing and the desire to save habitat and trees. They also have to be aware of unintended impacts
such as increasing housing costs which conflicts with other goals. He asked if they are looking at legal liability
risks related to tree codes. He heard that Kirkland was being sued over their tree code, and a Michigan township
went to federal court that said having people who remove trees pay into a tree fund was unconstitutional. He
asked for clarification about what constitutes risk (for "tree at risk"). He asked if the City is certifying arborists
so they maintain a level of excellence. He wondered about using the phrase, "The director may ..." since it
seems subjective.
Ms. Powers acknowledged the tension between cost of housing, development, and growth and the loss of
canopy cover and habitat. Reconciling this is the purpose of the Tree Code. She commented that Kirkland is not
being sued, but the Master Builders of King and Snohomish County have filed a petition with the Growth
Management Act Hearings Board on the constitutionality of Kirkland's tree code. Mr. Lien commented that
staff has been in consultation with the City Attorney as part of the code development process.
Planning Board Meeting Minutes
September 14, 2022 Page 4 of 7
Packet Pg. 10
2.A.a
Ms. Powers stated that there is a methodology described by the International Society of Arboriculture to come
up with a score for the risk of a given tree. The code would refer to this methodology to determine risk.
Regarding having certified arborists, she noted that the City requires one of two of five different credentials.
She referred to the "director may" verbiage and acknowledged that this is subjective, but it also provides
flexibility. This is another point of balance — between predictability and flexibility.
Board Member Gladstone commented that in the scenarios the trees had to be planned around the buildings.
She recommended looking at this more holistically. For, example, she suggested that maybe the building
requirements need to be reconsidered so that the buildings have a smaller footprint to preserve more trees.
Perhaps this would result in a smaller, lower -priced building with more trees. Ms. Powers explained that would
be a major code amendment, but it could be looked at. Director McLaughlin agreed with looking at the
symbiotic relationship between these things. Board Member Gladstone recommending thinking about how they
balance the tree code requirements with existing homeowners so they don't end up with disparate impacts.
0
Board Member Campbell said that after listening to the various concerns raised in the discussion tonight, she
understood the justification of addressing the "low hanging fruit" first and is supportive of trying to get these 0
minor amendments resolved. a
B. Climate Action Plan Update
Mr. Lien presented an update on the Climate Action Plan Update process. He gave some background on the
Climate Action Plan development process. Highlights of the plan include a Call to Action, a new section on
equity, a Greenhouse Gas (GHG) Inventory, how the plan is presented in different target sectors, and metrics
and tracking.
The Call to Action:
The Edmonds community has not kept pace with its goals to reduce GHG emissions. Mr. Lien reviewed action
the City can take to reduce GHG emissions:
• Adopt regulations to require new multifamily and commercial buildings to be 100% electric by 2023.
• Require charging infrastructure with new development.
• Support mixed -use and transit -oriented development in neighborhood commercial centers.
• Coordinate with transit agencies to increase service and improve access to new light rail connections.
• Develop an action plan to adapt to sea level rise in Edmonds.
The most effective actions that individuals and businesses in Edmonds can take are to:
• Replace fossil -fuel burning heating systems, hot water heaters, and cooking equipment powers with
electric appliances.
• Replace fossil fuel -burning vehicles with electric vehicles.
• Reduce vehicle trips by using transit, telecommuting, biking, or walking.
• Conserve energy wherever possible, especially energy from fossil fuels.
Mr. Lien explained that the since the CAP adoption, the City has upgraded the energy efficiency of city facilities;
upgraded the wastewater treatment plant; installed public electric vehicle charging stations; upgraded the city's
vehicle fleet; and completed a tree canopy assessment to track coverage and identify gaps.
Planning Board Meeting Minutes
September 14, 2022 Page 5 of 7
Packet Pg. 11
2.A.a
Equity is a new section in the CAP. Climate change impacts frontline communities the most. They often live in
denser settings, use transit, conserve energy, and consume less. National studies show that affluent households
(above $120,000) produce GHG emissions that are double those of households with income between $40,000
and $80,000. He pointed out on a map that areas with less trees have higher heat impacts than other areas.
A key takeaway of the GHG inventory is that Edmonds has not kept to its goals since the 2011 CAP. Two of
the biggest causes of GHG emissions remain buildings (50%) and transportation (40%). Most of the strategies
in the CAP address these two sectors.
There are four main target sectors with strategies, actions, and metrics associated with them. The target sectors
are Buildings and Energy; Transportation and Land Use; Environment; and Lifestyles and Consumption.
Tracking progress will be an important part of the CAP.
c
Next steps include refining CAP feedback from July and August workshops. The draft CAP will be available o
for review by the end of September. This will be followed by review by the Planning Board and adoption by
the City Council. After this, staff will implement actions and likely incorporate elements into the 0
Comprehensive Plan update. Mike Clugston is working on the schedule for different code amendments coming a
up. He will be giving a presentation to Council on this next week. Q
Vice Chair Pence asked about plans to expedite retrofitting existing multifamily buildings with charging
stations. Mr. Lien explained there are some provisions in the electric vehicle standards that were adopted. Vice
Chair Pence recommended finding a way to give a little incentive to do this.
Board Member Rosen asked for confirmation that they are looking at a goal of a 40% reduction in GHG. Mr.
Lien concurred and added that they have a goal of being carbon neutral with local emissions by 2050. Director
McLaughlin agreed that it is a colossal goal considering they have made no progress yet, but she is encouraged
by advances in technology. Board Member Rosen suggested they can get a massive reduction in a year by
simply outlawing gas leaf blowers. There was some discussion about his calculations and the feasibility of this.
Board Member Gladstone encouraged the City to have coordination with the PUD to make sure they are able
to provide alternative sources for the increased demand for electricity. Mr. Lien agreed and noted they would
need to do this anyway because of state regulations. There was discussion about needed code amendments to
support homeowners and businesses in making desired changes.
Board Member Campbell referred to the requirements for new commercial and residential buildings to be fully
electric by 2023 and recommended education and outreach for homeowners and businesses who are remodeling
or upgrading. Mr. Lien agreed and stated there are action items specifically related to this. Director McLaughlin
agreed. Board Member Gladstone noted that education only goes so far, but financial incentives have been very
effective with water issues. Director McLaughlin concurred that incentives are effective; development of a green
building incentive program is expected to be part of the 2023 work plan. Mr. Lien added that there is an action
item related to providing financial assistance, grants, or low -interest loans for installation of solar projects or
energy efficient projects, particularly with affordable housing.
Board Member Campbell commended staff on the amount of work and detail on this draft and presentation.
PLANNING BOARD EXTENDED AGENDA
Planning Board Meeting Minutes
September 14, 2022 Page 6 of 7
Packet Pg. 12
2.A.a
Staff reviewed the extended agenda and noted tonight was Chair Crank's last meeting.
PLANNING BOARD CHAIR COMMENTS
Chair Crank stated it has been a very educational 6t/2 years. She is excited about her new role, but it is taking a
lot of time and focus that make it time for her to retire her position on the Planning Board. She thanked everyone
for the support and education. She is pleased with the increased diversity on the board (renters, homeowners,
age). She hopes it continues to diversify and to promote equity in the conversations around land use, zoning,
and planning.
PLANNING BOARD MEMBER COMMENTS
c
Vice Chair Pence thanked Chair Crank and stated she has been a good chair to work with and runs a good o
meeting. He thanked her for her advice and support and stated he will miss her.
0
L
Board Member Gladstone wished Chair Crank the best in her next journey. She appreciates her work on the a
board and the welcome Chair Crank gave to her when she started on the board. Q
Board Member Rosen thanked Chair Crank for her service to the City, for serving as chair, and for her consistent
and gentle voice reminding them to consider impacts to all members of the community. He thanked her for her
easy laugh. He stated he knows they will continue to benefit through her work at the CityClub, with the Airport
Commission, with the Hazel Miller Foundation, with the Edmonds International Women's Day, and her efforts
to bring professional women's hockey to the area. He stated that she will be missed.
Student Representative Distelhorst thanked Chair Crank for teaching her about leadership. She is glad to have
served with her on the Planning Board.
Board Member Campbell thanked Chair Crank for helping her get started and established. She is sorry she
didn't get a chance to work with her longer. She congratulated Chair Crank on her new role and stated she
makes a big impact on people's lives.
Board Member Cloutier thanked Chair Crank for her service and stated she was an outstanding representative
for the city's neighborhoods.
Board Member Kuehn congratulated Chair Crank on her new endeavor. He stated she has been a great partner
on the Planning Board. He knows she will continue to be a great citizen for everyone in Edmonds. He thanked
her for her service and said he looks forward to seeing her around.
ADJOURNMENT:
The meeting was adjourned at 9:45 p.m.
Planning Board Meeting Minutes
September 14, 2022 Page 7 of 7
Packet Pg. 13
2.A.b
CITY OF EDMONDS PLANNING BOARD
Minutes of Webinar Meeting
September 28, 2022
Chair Pence called the virtual meeting of the Edmonds Planning Board to order at 7:00 p.m.
LAND ACKNOWLEDGEMENT FOR INDIGENOUS PEOPLES
Board Member Rosen read the Land Acknowledgement.
Board Members Present
Roger Pence, Chair
Matt Cheung
Richard Kuehn
Mike Rosen
Lily Distelhorst (student rep)
Board Members Absent
Beth Tragus-Campbell (excused)
Judi Gladstone (excused) (newly
elected Vice Chair)
Todd Cloutier
Staff Present
Kernen Lien, Planning Division Manager
Susan McLaughlin, Development Services Director
Mike Clugston, Senior Planner
Brad Shipley, Senior Planner
READING/APPROVAL OF MINUTES
SEPTEMBER 14, 2022 MINUTES
a
Chair Pence noted that board members had been mis-titled as commissioners in some places. He also requested
more detail about the nice comments that had been made regarding Alicia Crank's service. There was consensus
to send the minutes back for correction.
ANNOUNCEMENT OF AGENDA
THERE WAS UNANIMOUS CONSENT TO APPROVE THE AGENDA AS PRESENTED.
AUDIENCE COMMENTS
Mr. Williamson referred to the Reimagining Neighborhoods and Streets presentation at the September 14
meeting. During the presentation Development Services Director McLaughlin had presented a draft map and
nine new street types. He stated that Director McLaughlin had said the land use and zoning of the adjacent areas
would need to correspond to the new street types. This seems to mean that there will be a significant amount of
rezoning in Edmonds. He requested clarification on this at some point.
Planning Board Meeting Minutes
September 28, 2022 Page 1 of 6
Packet Pg. 14
2.A.b
Chair Pence responded that any change to the zoning code would need to come through the Planning Board. It
would also have to be consistent with the Comprehensive Plan which is just at the beginning phase of a major
rewrite. There are a lot of steps that would have to happen before they get to anything like the changes Mr.
Williamson was talking about.
PUBLIC HEARING
A. Public Hearing on BD Designated Street Front
Senior Planner Mike Clugston made a presentation regarding the BD2 designated street front (DSF). He stated
the meeting objectives would be to discuss the proposed permanent BD2 DSF map and updated use table,
discuss market demand analysis and recommendations from the consultant, take public comment, and make a
r
recommendation to Council.
He compared maps showing the Council's interim extended DSF map and the proposed permanent BD2 DSF
o
map which would extend "the blue line" to all BD2 parcels to be consistent with the Downtown Mixed
Commercial designation in the Comprehensive Plan. This was the consensus that came out of the Planning
Q
Board/EDC meeting in August. He recapped requirements for DSF which include commercial use within the
Q
first 45 feet of the "blue line", 12-foot minimum ground floor height (15 feet in BDI), and specific design
y
standards.
He reviewed the consultant Otak's market demand analysis takeaways. They concluded that one floor of
residential over ground floor commercial is not economically feasible for most boutique developers. Two floors
residential over ground floor commercial is economically feasible but exceeds the 30' height limit. The
consultant recommended a zoning change of a minor increase in building height (2'-5') to allow "two over one"
development. This would make a three-story development feasible in those locations. The Planning Board and
EDC had previously recommended extending the ground floor requirements but also taking a look at zoning
changes that would be needed to implement the extended "blue line".
Along with the changes to the map was the changes to the BD Uses table to clarify ambiguities, fill in blanks in
uses created by Ordinance 3955, and reference ground floor in ECDC 16.43.030.13 for locational requirements.
Mr. Clugston concluded that if they are fully extending DSF to all BD2 parcels, staff recommends future work
on a code amendment to increase height limits to allow three stories to feasibly work in the BD2 zone.
Public Comments:
Mr. Williamson referred to the recommendation to increase heights 2'-5'. He noted there is a big difference
between two feet and five feet and asked what was really necessary to meet the goal of three stories. Mr.
Clugston replied that the recommendation from the consultant was a range. He thought that this might depend
on the typography of the site but noted they could check with the consultant to see if there is a more specific
number.
Discussion:
Planning Board Meeting Minutes
September 28, 2022 Page 2 of 6
Packet Pg. 15
2.A.b
MOTION MADE BY BOARD MEMBER ROSEN TO RECOMMEND TO THE COUNCIL THAT
THEY MAKE PERMANENT THE FULLY EXTENDED DSF TO ALL BD2 PARCELS, APPROVE
THE UPDATED USE TABLE, AND THAT THEY CONSIDER CODE AMENDMENTS DURING
THE COMPREHENSIVE PLAN UPDATE TO INCREASE HEIGHT LIMITS. THE MOTION WAS
SECONDED BY BOARD MEMBER CHEUNG.
Board Member Rosen emphasized that he intentionally was not bundling the motion for the extended DSF to
all BD2 parcels with the increased height limits but that he was just recommending that Council consider it.
Board Member Cheung agreed with Board Member Rosen's recommendation to not bundle the two issues
because the increased height limits will likely be a hot topic.
Chair Pence added that when they get to the point of detailed rewriting of the zoning code, they will probably
r
want to look at other sites within the Downtown Business zones. This will be after the Comprehensive Plan
update process is complete.
0
Board Member Kuehn spoke in support of the motion. He agreed that more work needs to be done before he is
ready to recommend a height increase. 0
0.
Q.
a
THE MOTION PASSED UNANIMOUSLY.
UNFINISHED BUSINESS
A. 2024 Comprehensive Plan Update
Planning Manager Lien gave an update on the Comprehensive Plan Update.
Comprehensive Plan Branding: PRR was the consultant selected to help with the branding and came up with
the "Everyone's Edmonds" branding. They also developed some templates and mini surveys. They provided
some translation services and looked through past outreach materials.
Six -week Themed Visioning Outreach: The work with PRR led into a community -guided visioning process
which was a six -week themed outreach on key topics. These key topics included Identity, Quality of Life,
Economic Growth, Environment, Culture, and Livability and Land Use. The approach involved tabling at local
events, coffee chats in various neighborhood centers, some walk and talks, a panel discussion, and a community
survey. One of the most successful parts of the outreach was the yard signs. These greatly increased the number
of comments on the survey. The overall outreach goal was to solicit 3,500 comments from the community and
over 8,500 comments were received. Over 600 comments were received from events and nearly 7,900 were
received from the community survey.
Visioning Next Steps: The next step will be to organize the comments by theme and evaluate the results. A draft
vision statement and community values will be developed based on the outreach results. There will be a
presentation to the Planning Board and Council followed by a public reveal of the draft on November 5.
Feedback will be collected on the draft visioning and it will again be presented to the Planning Board and to the
Council for final adoption.
Planning Board Meeting Minutes
September 28, 2022 Page 3 of 6
Packet Pg. 16
2.A.b
Comprehensive Plan Update Workplan Overview: Over the next couple months there will be a lot of work
behind the scenes getting ready for Comprehensive Plan Update. The Core Project Team will be a multi-
disciplinary team of key staff involved with review and development of various elements. There will also be a
Community Champions Advisory Committee which is one of the suggestions that came out of the Equitable
Engagement Framework as a way to get some of the underrepresented communities involved in the process.
They are also looking at establishing a Boards & Commissions Advisory Committee which would include
representatives from all the city boards and commissions who would participate in development of the
Comprehensive Plan and report back to the various boards and commissions. There will still be detailed briefs
back to the Planning Board, Economic Development Commission, and other boards, but the Boards &
Commissions Advisory Committee would be one way to keep boards and commissions involved throughout
the process. There will be more consultants involved as needed for various tasks related to development of the
Comprehensive Plan.
Mr. Lien reviewed the project timeline. Adoption is due at the end of 2024. Visioning will be wrapping up this
year, and scoping will begin this winter. Neighborhood scenario development and concurrency reviews will be
happening this winter. 2023 will be spent developing the draft documents to have them ready for early 2024.
Comments and Questions:
Chair Pence referred to the comments received and asked how many unique individuals that represented. Senior
Planner Brad Shipley replied they did not always measure individual persons. He clarified that they received
8,500 comments; this did not represent 8,500 individuals. There were close to 600 responses to the full survey
which only allowed one individual per survey. The mini surveys had around 100 responses each week, but some
people may have answered multiple surveys so it is hard to know how many people this represents.
Board Member Rosen commented there is value in knowing the number of responses even though they don't
know the exact number of people who responded. He cautioned against leading people to believe there were
8,500 participants. He then questioned the order of the project timeline which seems to show neighborhood
scenario development before the Comprehensive Plan development. Mr. Shipley explained that the citywide
visioning is what they are doing first. This will be overarching and broad and should guide the rest of the work
on the Comprehensive Plan. Getting into the neighborhood level planning is just talking to neighborhoods about
what they would like to see in the future. Director McLaughlin agreed with comments to be clear about
characterizing the number of comments. She spoke to the value of neighborhood planning but stressed the
importance of linking back to a citywide conversation about where we are accommodating growth.
Board Member Cheung referred to the number of comments and suggested adding an estimated number of
individuals to clarify that the number of responses is different than the number of individuals.
Chair Pence referred to the City's website for Comprehensive Plan Updates and noted that under Initial Steps
there are two sections — one on waterfront issues and one on gap analysis regarding equity and climate. He noted
there is no information under the second item and asked for an update. Mr. Lien explained that ECONorthwest
had been hired to review the current Comprehensive Plan for equity issues in policies and implementation. They
identified a number of policies to be looked at in more detail. As part of that work, they also looked at public
engagement. There was some overlap with this and the work that was done on the Equitable Engagement
Framework. He indicated he would get those up on the website or at least distribute them to the Planning Board.
Chair Pence asked how there will be a community conversation after November 5 when they unveil the draft
Planning Board Meeting Minutes
September 28, 2022 Page 4 of 6
Packet Pg. 17
2.A.b
visioning statement. Director McLaughlin explained they are looking at ways that can help to validate whether
they got the community vision right. They will substantiate the vision with documentation and data that will be
robust from PRR. It will be a defensible and transparent process. Chair Pence said he hopes that once the draft
visioning statement is revealed there is a chance for some good, robust civic conversation. Director McLaughlin
pointed out that the community vision won't require a public hearing process but she hopes the Planning Board
will provide feedback, especially through the survey. Chair Pence said he thinks the process ought to allow for
residents to hear responses from each other.
Board Member Rosen said he liked the idea of creating a group of representatives from all the boards and
commissions. This is a great way to get feedback.
ELECTION OF OFFICERS
N
N
r
Chair Pence explained that with the loss of Alicia Crank they are down one member. He has defaulted into the
position of Chair. They also need to elect a Vice Chair.
0
Mr. Lien said he couldn't find any rules or procedures for the Planning Board but recommended confmningcc
>
Roger Pence as Chair and electing a Vice Chair through the end of the year. They will have another election of Q
officers in December. He noted that Beth Campbell moved from the alternate position to Alicia Crank's Q
position. fit
MOTION MADE BY BOARD MEMBER ROSEN, SECONDED BY BOARD MEMBER CHEUNG,
TO ELECT ROGER PENCE AS CHAIR, FILLING OUT THE REST OF THE TERM VACATED
BY ALICIA CRANK.
There were no other nominations.
MOTION PASSED UNANIMOUSLY TO ELECT ROGER PENCE AS CHAIR.
Chair Pence said he had a conversation with Board Member Gladstone about serving as Vice Chair. She was
interested in doing the job but wasn't able to attend tonight's meeting. He solicited any other nominations or
volunteers.
MOTION MADE BY BOARD MEMBER ROSEN, SECONDED BY BOARD MEMBER CHEUNG,
TO NOMINATE JUDI GLADSTONE TO SERVE AS VICE CHAIR, FILLING OUT THE TERM
PREVIOUSLY HELD BY ROGER PENCE.
There were no other nominations.
MOTION PASSED UNANIMOUSLY TO ELECT JUDI GLADSTONE AS VICE CHAIR.
PLANNING BOARD EXTENDED AGENDA
Chair Pence reviewed the extended agenda. There is a joint meeting with the City Council planned for October
4; however, there is a chance that the Board may be bumped to a different date because the Council has a packed
meeting. He will let the Board know as soon as possible. He discussed possible topics of conversation. Board
Planning Board Meeting Minutes
September 28, 2022 Page 5 of 6
Packet Pg. 18
Member Rosen encouraged Chair Pence to reach out to the Council President to see what topics they would
like to hear about. Chair Pence concurred. He commented that the Council President had expressed an interest
in having a member of the Planning Board present when staff presents Planning Board recommendations to the
Council. He recapped a situation that happened with staff last year regarding a recommendation they disagreed
with and thought this might be a good solution.
Chair Pence said he would like to see a topic on the extended agenda for the Five Corners Plaza which is for
sale. The zoning for this is Neighborhood Business which he believes needs to be updated. Mr. Lien agreed but
wasn't sure about the timing of updating this.
Mr. Lien asked about the Board's preference to have a special meeting on November 30. All board members
indicated a willingness to hold the meeting if it is needed. Mr. Lien said he would come back with more
information on this at the next meeting.
r
c
PLANNING BOARD CHAIR COMMENTS
0
None `°
0
L
Q
PLANNING BOARD MEMBER COMMENTS a
None
ADJOURNMENT:
The meeting was adjourned at 8:37 p.m.
Planning Board Meeting Minutes
September 28, 2022 Page 6 of 6
Packet Pg. 19
5.A
Planning Board Agenda Item
Meeting Date: 10/12/2022
Parks, Recreation & Human Services Department - Q3 Update
Staff Lead: Angie Feser
Department: Parks, Recreation & Human Services
Prepared By: Angie Feser
Narrative
This is the 2022 third quarter update of the Parks, Recreation & Human Services (PRHS) Department's
accomplishments for the months of July through September to the Parks & Planning Board. Attached is a
more detailed list of the department's work for the three months. In addition, a PowerPoint
presentation is planned for the October 121h Board meeting to provide additional information and
answer questions.
Highlights for 2022 3rd Quarter (additional items found in attached Accomplishment List)
1. Administration: Agreements for concessionaires (6) and special events (1) completed. Oversight
for 5 special events plus Summer Market, supporting Library renovation and operating and
capital budget preparation and submittal. Salmon Safe certification draft report reviewed by city
council. Continued work on possible parkland acquisitions
2. Civic Playfield Park Protect: Construction continuing with amenities being installed such as
athletic field turf and lights, inclusive playground, shade structure, concrete path, restroom
foundation, and site underground utilities. All benches and tables adoptions sold (21 total).
3. Park Planning: Parks Maintenance greenhouse permit submittal completed and using new Job
Order Contracting services for installation. New Parks Planner/Project Manager position started
July 18th. Yost Park bridge #6 closed indefinitely. Off -site stormwater mitigation project (96th
Ave Infiltration) is out to bid with construction slated for winter.
4. Parks Maintenance: Memorial bench replacements at Marina Beach Park, supported 5 special
events plus both Summer and Uptown Markets. Replenished safety fall material at all city
playgrounds. Yost pool and Spray Park operations at 7 days/week and Spray Park had seasonal
closure mid -September.
5. Recreation and Cultural Services Programs: Q3 Permits - 46 shelter permits, 560 field rental
hours and 50 gym rental hours. Programming included new weekly Summer Day Camp and 24
contracted youth camps; Adult Softball (63 teams) and Pickleball (18 teams) Leagues and new
fitness classes. Supported public access for all city board and commission meetings at the
Waterfront Center. Five Discovery Programs week-long outdoor summer camps, 8 Discovery
Interpretive Tables at Olympic Beach, City Park, and Mathay-Ballinger Park (first City program
Packet Pg. 20
5.A
there) and Beach Rangers patrolled the waterfront every day from Memorial Day through Labor
Day weekend.
6. Arts & Cultural Division Effective September 1, 2022 this division was transferred to the
Community Services/Economic Development Department. Our department will still manage the
division's budget through the end of the year to support an easier transition. Currently the staff
will remain at the Frances Anderson Center although the remainder of their new department is
housed at City Hall.
7. Human Services Division: Supported Snohomish County's efforts to purchase America's Best
Value Inn for an enhanced shelter. Provided Social Services support at each Edmonds
Community Court. Accepted over 50 referrals and have 38 engaged clients. Completed
integration of contracted service provider (social worker) with Police. Began outreach from City
Hall Neighborhood Office to individuals along the Hwy 99 corridor. Provided ongoing support for
distribution of ARPA funding through Household Support Grant program. Coordinated with
Council Legislative Aide on Suicide Awareness and Prevention website. Coordinated with the
Food Bank and Municipal Court to provide food to clients attending Community Court; procured
refrigerator for perishable food. Coordinated with Snohomish County to relocate 5 motel
voucher recipients to different motels while America's Best Value Inn is being purchased.
Recommendation
This agenda item is for informational purposes, there is no need for a formal recommendation or action.
Attachments:
PRHS 2022 Q3 Accomplishments
Packet Pg. 21
5.A.a
Parks, Recreation & Human Services Department
2022 Quarter 3 Accomplishments
July 1 - September 30, 2022
Administration
1. Effective September 1, 2022 the Arts & Cultural Division transferred to the
Community Services/Economic Development Department. Our department will still
manage the division's budget through the end of the year to support an easier
transition.
2. New Parks Planner/Project Manager, Kyle Woods, started on July 18tn
3. Completed sale and contracts for all Civic Park memorial benches and picnic tables
(17 benches & 5 picnic tables) and 4 additional benches citywide.
4. Facilitated and provided oversight of 6 concessions agreements (Kool Kids Ice
Cream, Magnolia Forest Preschool, Quiet Heart Wilderness School; Rowlee Shaved
Ice and Pedalheads, and Cascade Swim Club)
5. Finalized special event agreement for 2022 Oktoberfest. Contract authorized by City
Council.
6. Facilitated and provided City oversight for the Summer Market, 41n of July
Celebration, Taste Edmonds, Classic Car Show, Safety and Disaster Event and
Oktoberfest events.
7. Working with Development Services and Facilities on Library flood restoration.
8. Submitted 2023 budget decision packages (operating & capital); updated year end
estimates and completed 2023-2027 CIP/CFP to reflect recently adopted Parks,
Recreation & Open Space (PROS) Plan update.
9. Identified a missing link in online feedback forms; resolved the issue and replied to
300 feedback forms.
10. Completed the build out of a recreation coordinator office in the Anderson Center.
11. Working with Development Services Department on Hwy 99 Revitalization,
Redefining Streets & Public Spaces Design and Green Streets projects.
Parks Planning & Projects
1. Civic Center Playfield construction project is still proceeding well with sod
installation of athletic fields and open turf area, progress of the inclusive
playground, (pre -fabricated) restroom foundation and utilities (delivery scheduled
for October 18, 2022), shade structure frame, irrigation system, concrete walkway,
rubberized track base and painting and striping of multipurpose courts.
2. Parks Maintenance Greenhouse variance approved by Hearings Examiner. Permit
documents are being routed to the City planning department for building permit
approval. Construction is anticipated to occur December 2022 —January 2023.
Packet Pg. 22
5.A.a
3. 961h Ave Infiltration project went out to bid late September with related bid opening
scheduled for October 11, 2022. This project will mitigate the stormwater impacts
for the Civic Center Playfield project. America Rescue Plan Act funding for was
approved for this project.
4. The draft Salmon Safe Certification report was to City Council. Initial approval was
given to negotiate certification conditions and provide additional information about
estimated impacts to city resources.
5. Yost Park bridge #6 was closed indefinitely on October 1, 2022.
6. Identified pedestrian improvements landscape beds for Dayton Street, Walnut
Street, Main Street, and 196th ST SW for planting design and installation.
7. Started development of a parks asset inventory to assist with inventory control and
management, asset life cycle management, strategic planning, and parks
maintenance scheduling and planning.
8. A comprehensive project tracking sheet is being produced to better track capital,
small works, and maintenance projects.
9. Final step of the SR 104 Downtown Edmonds sign was completed including fall
hydroseeding to disturbed area as required by WSDOT for permit.
10. With Rich Lindsay's announced intent to retire, work is beginning to document his
50+ year experience and knowledge the Edmonds park system history.
Park Maintenance
1. Continued operations of Yost Pool and Hazel Miller Spray Park 7 days a week. Yost
Pool hot tub opened for use.
2. ADA parking stall improvements at Mathay Ballinger and Pine Street Parks.
3. Replaced 6 memorial benches at Marina Beach Park, work includes re -powder
coating and plaque refurbishment.
4. Replenished safety fall material at city playgrounds.
5. Hydroseed around SR-104 Welcome to Edmonds sign.
6. Supported special events including Uptown Markets, Summer Market, 411 of July
Celebration, Taste Edmonds, Classic Car Show, Safety and Disaster Event and
Oktoberfest
7. Supported the installation of new art work for Floretum Garden club at 6th & Bell
8. Assisted in the planning for security fence at Public Safety building and parking lot
Recreation Division
1. Rentals —
o Q3 had 46 shelter rental permits; 446 permits year to date. (100 more than
2021)
o Q3 had 560 hours of field rental permits; 3,810 hours year to date.
o Q3 had 50 hours in gym rental reservations; 510 hours year to date.
2. Designed and published the digital Fall 2022 CRAZE Recreation Guide.
2
Packet Pg. 23
5.A.a
3. Completed the re -instated Edmonds Day Camp Program, running for 10 weeks and with
312 registrations of children entering grades 2-6. Through funding from the SEEK Grant,
a total of 105 full and 24 wrap -around care ($21,250) scholarships were provided.
4. Managed 21 contracted youth camps at the Frances Anderson Center and local parks
serving more than 180 youth over 10 weeks of summer programming.
5. Started the school year at the Meadowdale Preschool program with full enrollment in
both the morning and afternoon classes.
6. Adult Athletics program completion
o Summer Adult Softball leagues (54 teams)
o Senior Softball leagues (9 teams)
o Summer Pickleball leagues (18 teams)
o (After a 2-year pause) Volleyball leagues (14 teams)
o (After a 2-year pause) 3 on 3 Basketball league (6 teams)
7. Staff set up and monitored nearly 30 city Board and Commission zoom meetings along
with scheduling 21 non-profit organization meetings at Edmonds Waterfront Center.
8. Offered four Outdoor Movie Nights and for the first time, located them at different
Edmonds parks. Expanding into various neighborhoods was very well received many
requests to repeat for next year. Locations and approximate attendance included
Frances Anderson Center (500), Hickman Park 375, Seaview Park (250) and City Park
(250). Sponsorships totaled $3,050 and $734 was raised for program scholarships
through concession stand sales.
9. Several new fitness classes were added to fall offerings. Mama Barre has grown rapidly,
and added a second class due to its popularity. lyengar Yoga is adding three classes and
a new program of Zumba/Zumba Moms classes beginning in October.
10. Utilizing Constant Contact to send regular monthly emails with registration information,
new programs, special events, park updates and more. Customer email list size: 7,039
with a 52% average open rate.
11. Facebook engagement: 1,342 followers (177 new from Q2), reach is up 217%, page
visits up 39%
12. Instagram engagement: 867 followers (67 new from Q2), reach is down 6.4%, profile
visits down 40.9%
13. Cemetery Advisory Board has recruited 2 new members and now have a full panel of 7
community board members.
Environmental Education
1. Five Discovery Programs week-long outdoor summer camps. 61 kids served
2. Hosted a total of 8 Discovery Interpretive Tables at Olympic Beach, City Park, and
Mathay-Bal linger Park (first City program there).
3. Beach Rangers patrolled the waterfront everyday Memorial Day weekend through Labor
Day weekend for a total of 99 days.
3
Packet Pg. 24
5.A.a
Human Services Division
1. Supported Snohomish County's efforts to purchase an enhanced shelter in South County
utilizing ARPA funding. Acquisition of America's Best Value Inn was accepted by County
Council in August 2022.
2. Provided Social Services support at each Edmonds Community Court.
3. Accepted over 50 referrals and currently have 38 clients that are engaged, or outreach is
in process; engaged individuals have presented with 40 identified needs and 26 of those
needs have had a closed loop referral (need met).
4. Completed integration of contracted service provider (social worker) with Police to
include call outs, ride-alongs, attendance in staff meetings and inclusion in staff emails.
5. Secured city vehicle to ensure social worker is identifiable during outreach and EPD
callouts.
6. Established relationship with City Hall Neighborhood Office and began outreach from
that location to individuals along the HWY 99 corridor.
7. Provided ongoing support for distribution of ARPA funding through Household Support
Grant program.
8. Updated supply of items needed for the Urgent Needs Program to include non-
perishable food and essential needs care items which are distributed by Edmonds Police
Department, City Hall Neighborhood Office and Social Worker.
9. Coordinated with Council Legislative Aide on Suicide Awareness and Prevention website.
10. Coordinated with the Food Bank and Municipal Court to provide food to clients
attending Community Court; procured refrigerator for perishable food.
11. Coordinated with Snohomish County to relocate 5 motel voucher recipients to different
motels while America's Best Value Inn is being purchased.
Youth Commission
1. Held a summer retreat at Hutt Park and pulled invasive plant species while getting to
know each other and discussing potential projects for the upcoming year.
2. Recruited 13 applicants for the 8 Commission vacancies.
3. Held first two meetings of the year in -person with full attendance and excitement about
no longer meeting via Zoom.
4
Packet Pg. 25
7.A
Planning Board Agenda Item
Meeting Date: 10/12/2022
Presentation of Proposed 2023-2028 Capital Facilities Plan & Capital Improvement Program
Staff Lead: Rob English
Department: Parks, Recreation & Human Services
Prepared By: Angie Feser
Background/History
The City's Capital Facilities Plan (CFP) Element is updated annually and identifies capital projects for at
least the next six years, which support the City's Comprehensive Plan. CFP projects are capital
improvement projects that expand existing facilities/infrastructure or provide new capital facilities in
order to accommodate the City's projected population growth in accordance with the Growth
Management Act. Thus, capital projects that preserve existing capital facilities are not CFP projects.
These preservation projects are part of the six -year capital improvement program (CIP) along with
capital facility plan projects that encompass the projected expenditure needs for all city capital related
projects.
Staff Recommendation
Hold public hearing on October 26, 2022.
Narrative
The 2022-2027 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) are being presented
in one document with project lists that identify Capital Facility projects and project information sheets
for all projects and programs.
The Public Works and Utilities Department proposed 2023-2028 CFP/CIP is included as Attachment 1.
The Parks, Recreation & Cultural Services Department proposed 2023-2028 CFP/CIP is included as
Attachment 2.
Following the Planning Board's Public Hearing and recommendation, the City Council will also hold a
Public Hearing prior to final approval.
Attachments:
Parks CIP—CFP 2023-2028
2023-2028 Public Works CIP-CFP
Packet Pg. 26
1
EDMOND
��- PARKS, RECREATION & HUMAN SERVICES
2023-2028 PROPOSED
CAPITAL FACILITIES PLAN &
CAPITAL IMPROVEMENT PROGRAM
�fe r �1 t�r��r•
..'��. ff�'. ram_.•.' �ti
lw
1 � f
� � � ` t �,• bpi `�r � l - � ..:
,.,._. of - ,:. .. ;.w:,. �}•"-
f LAP' rlAlln�lY - 9
.i. N 1• � p � ,__q
J -yt. •R
t
6
EDMONDS
PARKS, RECREATION & HUMAN SERVICES
Table of Contents
Director's Letter................................................................ 2
CIP/CFP Worksheets.......................................................3-6
Project Descriptions......................................................7-27
Program Descriptions...................................................28-31
Acquisition Descriptions...............................................32-34
FundDetail.....................................................................
35
Fund 332 Detail............................................................36-37
Fund 125 Detail..............................................................
38
Fund 126 Detail..............................................................
39
Fund 143 Detail..............................................................
40
Fund 137 Detail..............................................................
41
Project Comparison........................................................
42
7.A.a
EDMONDS
PARKS, RECREATION & HUMAN SERVICES
October 12, 2022
Members of the City Council, Parks & Planning Board, Staff and Citizens of Edmonds,
It is an honor to present the 6-year Parks Capital Improvement Program (CIP) & Capital Facilities Plan (CFP). The
CIP/CFP serve as a long-range planning guide identifying parks capital projects and related funding sources, both
secured and unsecured. The CIP/CFP is updated each year and presented in conjunction with the operating
budget.
In 2022 the Parks, Recreation and Human Services Department completed the 2022 Parks, Recreation and Open
Space (PROS) Plan based largely on citizens priorities and multiple rounds of review prior to adoption.
The 2022 PROS Plan goals are:
1. Encourage and facilitate meaningful public involvement in park and recreation planning.
2. Decrease barriers and provide increased opportunities for participation and representative cultural,
heritage and art programs, events representing the diversity of Edmonds demographics.
3. Provide an interconnected park system that offers a wide variety of year-round recreation opportunities
and experiences which support and enhance Edmonds' cultural identity and the natural environment.
4. Preserve and pursue opportunities to expand public access and enjoyment of Edmonds' waterfront.
5. Conserve and provide access to natural resource lands for habitat conservation, recreation, and
environmental education.
6. Adapt to climate change and increase local park system resiliency by improving environmental conditions,
stewardship and sustainability in parks, trails, open spaces and recreation facilities within planning,
development, maintenance, and operations.
7. Provide a varied and inclusive suite of recreation opportunities and experiences to promote health and
wellness, year-round activity and social engagement.
The adopted 2022 PROS plan included a CIP document which is consistent with this 2023-28 CIP/CFP. In 2023 the
Parks, Recreation and Human Services Department will focus on completion of the largest ever City of Edmonds
Parks Capital project, the redevelopment of the 8-acre Civic Center Playfields. In addition, the department will
continue to focus on deferred maintenance of existing parks and recreation facilities and playground renovations
and acquisition of additional parkland to fill system gaps in park services and to address inequities in parkland
distribution.
Your Parks, Recreation and Human Services Department is proud to serve the citizens of Edmonds and we look
forward keeping the Edmonds Parks safe and enjoyable for all.
Sincerely,
Angie Feser
Edmonds Parks, Recreation & Human Services Director
425-771-0256
Angie. Feser@ EdmondsWA.gov
Page 2
Packet Pg. 29
2023-2028 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN
7.A.a
Costs inflated at 3% per year
Project
CFP
Project Site & Description
2023
2024
2025
2026
2027
2028
6-Year Tot<
#
Johnson Property
R2
Demolition and securing existing site, Master plan for park use. Site
$ 200,000
$
$ 82,000
$
$
$
$ 282,0(
P5
development not included in estimate.
Meadowdale Playfields
R3
Renovations as suggested by the City of Lynnwood and consistent with
TBD
TBD
TBD
$
$
$
$
existing ILA. To include addition of dugout roofs, light replacement and
playground upgrade.
D5
Mathay Ballinger Park
D6
Park improvements to include a new paved loop pathway, permanent
$ 499,300
$
$
$
$
$
$ 499,3(
D7
restrooms and a small shelter with picnic tables.
R9
Yost Park & Pool
R4
Park enhancements, repair and maintenance to include a playground
$ 257,500
$ 154,300
$ 546,400
$
$
$
$ 958,2(
R6
replacement, resurface of tennis courts, pool upgrades and trail, bridge
R11
and boardwalk repairs/replacement.
Columbarium Expansion - Phase II
D8
Expansion of the current columbarium. Funding provided through the Cemetery
$
$ 159,100
$
$
$
$
$ 159,1(
Trust Fund 137.
R7
Olympic Beach Park
$
$ 53,000
$
$
$
$
$ 53,0(
Renovation of existing restrooms.
D10
Pine Street Park
D11
Park enhancements to include the addition of a small shelter with picnic tables,
$
$ 164,400
$
$
$
$
$ 164,4(
D12
canopy shade trees and a paved connecting pathway.
R8
Sierra Park
$
$ 185,700
$
$
$
$
$ 185,7(
Playground replacement.
Neighborhood Park SE 1
X
D13
Master plan and development of a new neighborhood park in South Edmonds.
$
$ 79,600
$ 819,500
$
$
$
$ 899,1(
$1.5M parkland acquisition listed below.
Waterfront Walkway
P3
Connecting the waterfront walkway from Brackett's Landing North to
$
$ 515,000
$ 819,500
$
$
$
$ 1,334,5(
D14
Marina Beach Park by adding missing section in front of the Ebb Tide
Condominiums, to provide ADA improvements.
a_
U
a
ILL
U
00
N
O
N
A
N
O
N
d
N
O
O_
O
a`
O
c
O
M
c
CD
N
d
L
a
00
N
O
N
A
N
O
N
a
LL
U
I
a_
U
N
R
a
c
d
t
U
ca
r
Q
Packet Pg. 30
2023-2028 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN
7.A.a
Costs inflated at 3% per year
Project
CFP
Project Site & Description
2023
2024
2025
2026
2027
2028
6-Year Tot<
#
R12
Maplewood Hill Park
$
$
$ 144,900
$
$
$
$ 144,9(
Playground replacement.
Edmonds Marsh Estuary Restoration (Willow Creek Daylighting)
Master Plan and Master Plan implementation of the Marsh to daylight the
P4
connection of Puget Sound to the Edmonds Marsh and two fresh water creeks
X
D9
providing restoration of fresh water/salt water estuary and natural tidal
$
$
$ 5,900,700
$
$
$
$ 5,900,7(
D1
exchange.
Restoration expenses are not included in this estimate. ($8M Acquisition expense
listed below).
D16
Elm Street Park
D17
Park enhancements to include the addition of a nature playground,
$
$
$
$ 225,100
$
$
$ 225,1(
R14
small shelter with picnic tables and habitat restoration.
Neighborhood Park SR99
X
D15
Master plan and development of a new neighborhood park in Southeast
$
$
$
$ 928,500
$
$
$ 928,5(
Edmonds. ($1.5M parkland acquisition listed below).
Neighborhood Park SE 2
X
Master plan and development of a new neighborhood park in Southeast
$
$
$
$ 84,400
$ 869,500
$
$ 953,9(
D18
Edmonds. ($2M parkland acquisition listed below).
4th Avenue Cultural Corridor
Prioritized in the 2014 Community Cultural Plan and State certified
P8
Creative District. Improvements encourage pedestrian traffic and provide
$
$
$
$ 2,251,000
$ 6,955,600
$
$ 9,206,6(
D19
visual connection between ECA and downtown contributing to economic vitality.
Funding TBD.
X
P1
Parks & Facilities Maintenance and Operations Building
$
$
$
$ 1,125,500
$ 4,637,100
$
$ 5,762,6(
D2
Replace and/or renovate deteriorating building in City Park.
R16
Seaview Park
$
$
$
$
$ 417,900
$
$ 417,9(
Replacement of permanent restroom to provide ADA upgrades.
X
R15
Pool Replacement
$
$
$
$
$
$ 23,881,000
$ 23,881,0(
Replacement of the existing pool. Location, design and funding TBD.
a_
U
IL
IL
U
w
N
O
N
M
N
O
N
O
N
O
IZ
O
L
a
O
C
O
to
c
O
N
d
a`
00
N
O
N
M
N
O
N
IL
u_
U
I
a_
U
rn
L
R
a
C
m
E
t
U
ca
r
Q
Packet Pg. 31
2023-2028 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN
7.A.a
(A) SUBTOTAL PARKS CIP/CFP PROJECTS
$ 956,800 $ 1,311,100 1 $ 8,313,000 1 $ 4,614,500 1 $ 12,880,100 $ 23,881,000
$ 51,956,5(
Costs inflated at 3% per year
PARKS CIP PROGRAMS
Citywide Park Improvements / Capital Replacement Program
R17
This ongoing program allocates funds for the regular and deferred maintenance,
$ 450,000
$ 450,000
$ 450,000
$ 450,000
$ 450,000
$ 450,000
$ 2,700,0(
repair and replacement of parks amenities, structures and equipment.
Signage & Wayfinding
R10
Replacement of aging signage to improve accuracy and provide a
$
$ 51,500
$
$
$
$
$ 51,5(
consistent City of Edmonds Parks visual identification system.
Playground Upgrade Program
R13
Annual upgrades of playground equipment and fall surfacing to provide
$
$
$
$ 197,000
$ 202,900
$ 209,000
$ 608,9(
additional inclusive playgrounds/facilities providing access for children
of all ages and abilities.
Debt Service and Interfund Transfers
Debt service on Civic Park $1.6M bond (2021) and Interfund transfers to
$ 123,000
$ 148,000
$ 198,000
$ 198,000
$ 198,000
$ 148,000
$ 1,013,0(
Engineering for Capital Project Support.
(B) SUBTOTAL - PARKS CIP PROGRAMS
$ 123,000
$ 148,000
$ 198,000
1 $ 395,000
$ 400,900
$ 357,000
$ 1,621,9(
PARKLAND
ACQUISITION
X
A2
Neighborhood Park SE 1
$ 1,500,000
$
$
$
$
$
$ 1,500,0(
Acquisition of parkland in South Edmonds.
X
A3
Neighborhood Park SR99
$
$ 1,545,000
$
$
$
$
$ 1,545,0(
Acquisition of parkland in near SR 99.
X
A4
Neighborhood Park SE 2
$
$
$ 2,185,500
$
$
$
$ 2,185,5(
Acquisition of parkland in South Edmonds.
Edmonds Marsh Estuary Restoration (Willow Creek Daylighting)
X
Al
Acquisition of the Unocal property in support of greater Edmonds Marsh
$
$
$ 8,741,800
$
$
$
$ 8,741,8(
restoration.
A5
Interurban Trail
$
$
$
$
$
$ 895,585
$ 895,5f
Extension and acquisition
(C) SUBTOTAL - PARKLAND ACQUISITION
$ 1,500,000
$ 1,545,000
$ 10,927,300
$
$
$ 895,585
$ 14,867,81
a
V
IL
LL
U
00
N
O
N
M
N
O
N
d
N
O
IZ
O
L
a
O
c
O
M
C
ry
to
d
L
IL
00
N
O
N
M
N
O
N
a
LL
U
I
a_
U
rn
R
a
c
ry
E
t
U
ca
r
Q
Packet Pg. 32
2023-2028 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN
7.A.a
(D) TOTAL PARKS CIP/CFP EXPENDITURES (A+B+C)
$ 2,579,800
$ 3,004,100
$ 19,438,300
$ 5,009,500
$ 13,281,000
$ 25,133,585
$ 68,446,21
PARKS CIP REVENUE
2023
2024
2025
2026
2027
2028
6-Year Toti
Real Estate Excise Tax (REET) I Fund 126
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 1,200,01
Real Estate Excise Tax (REET) II Fund 125
$ 2,000,000
$ 2,000,000
$ 1,500,000
$ 1,500,000
$ 1,500,000
$ 1,500,000
$ 10,000,0(
Park Impact Fees Fund 332 100
$ 848,350
$ 450,000
$ 450,000
$ 450,000
$ 450,000
$ 450,000
$ 3,098,3.
Tree Fund 143 Land Acquisition
$ 199,000
$ 199,000
$ 199,000
$ 199,000
$ 199,000
$ 199,000
$ 1!194,01
Cemetery Trust Fund 137 Columbarium Expansion
$ 70,971
$ 73,270
$ 67,728
$ 69,864
$ 72,108
$ 74,463
$ 428,4(
Operating Contribution General Fund
$
$
$
$
$
$
$
Investment Interest (3%)
$ 42,255
$ 54,144
$ 64,828
$ 74,243
$ 84,030
$ 94,111
$ 413,6:
Donations
$
$
$
$
$
$
$
Bond Proceeds
$
$
$
$
$
$
$
Secured Grants
$
$
$
$
$
$
$
Unsecured Grants/Funding
$
$
$ 7,263,500
$ 41276,900
$ 12,462,200
$ 23,881,000
$ 47,883,6(
(E) TOTAL PARKS CIP REVENUE
$ 3,360,576
$ 2,976,413
$ 9,745,056
$ 6,770,007
$ 14,967,338
$ 26,398,574
$ 64,217,9E
Parks Fund 6-Year Overview
2022
2023
2024
2025
2026
2027
(F) Beginning Fund Balance (Funds 332 + 332 100)
$ 2,383,820
$ 2,444,625
$ 1,802,269
$ (8,689,703)
$ (7,563,660)
$ (6,598,430)
(E) Revenue
$ 3,360,576
$ 2,976,413
$ 9,745,056
$ 6,770,007
$ 14,967,338
$ 26,398,574
(D) Expenditures
$ 2,579,800
$ 3,004,100
$ 19,438,300
$ 5,009,500
$ 13,281,000
$ 25,133,585
(G) Ending Fund Balance (F+E-D)
$ 3,164,596
$ 2,416,938
$ (7,890,975)
$ (6,929,196)
$ (5,877,322)
$ (5,333,440)
Project Type:
A Acquisition
P Master Planning
D Development New
R Replacement / Upgrade
a_
U
a
LL
U
0
N
0
N
M
N
0
N
O
N
O
O_
O
a
O
C
O
Id
C
O
N
d
a`
6
Packet Pg. 33
2023-2028
Parks Capital Improvement & Capital Facilities Plan
PROJECTS
h �' mot,`_ �• n�
EDMONDS
PARKS, RECREATION & HUMAN SERVICES
Page 7
Packet Pg. 34
7.A.a
Parks & Recreation
Johnson Property - R2 & PS
9309 Bowdoin Way
Project Summary: This project is the demolition and securing of the 1-acre property donated by Shirley Johnson in
2021. There is a small uninhabitable house, several small outbuildings and historic fruit and nut trees which have all
been neglected for years. The site is becoming overrun with invasive plant species including Holly trees and
blackberries. By removing the structures and clearing invasives, the city will be able to better start restoration on the
many fruit and nut trees.
Project Justification: The overgrown vegetation and abandoned buildings create an environment that can attract
unwanted visitors and activity to the site which is currently not open to the public. This work aligns with the following
2022 Parks, Recreation & Open Space (PROS) Plan Goals and Objectives: Goal 3, Objective 3.7 & 3.10; Goal 5, Objective
5.1; Goal 6, Objectives 6.1, 6.4 and 6.5; and Goal 9, Objectives 9.1, 9.3 and 9.5.
2022 PROS Plan Recommendation #3.1 — Maintain, renovate, or replace aging or damaged infrastructure in
existing City properties to ensure public accessibility, use and safety.
Estimated Cost: $282,000
Construction (112) — site demo
$200,000
$200,000
Planning & Design (P5)
$82,000
$82,000
Total Expenses
$200,000
$82,000
$282,000
Real Estate Excise Tax II - Fund 125
$200,000
$82,000
$282,000
Total Revenue
Unsecured Funding
$200,000
i
$82,000
i
$282,000
i
a
U
IL
u_
U
0
N
O
N
M
N
O
N
N
N
O
am
O
L
a
4-
0
c
0
:r
M
c
a�
L
a
0
N
0
N
M
N
0
N
IL
u_
U
I
IL_
U
M
IL
c
d
E
z
a
Page 8
Packet Pg. 35
7.A.a
Parks & Recreation
Meadowdale Playfields - R3
168`h ST SW, Lynnwood
Project Summary: The City of Lynnwood is replacing the existing playground and upgrading to a fully inclusive level
of the play structure, will be adding dugout roofs and replacing the light fixtures within a 6-year planning horizon.
Project Justification: The cities of Lynnwood and Edmonds and Edmonds School District currently have an Interlocal
Agreement (ILA) for Meadowdale Park for shared cost of capital improvements, renovations and ongoing
maintenance. The ILA states "The District and Cities agree to jointly plan for additional capital expenditures for
maintenance and replacement costs for the Playfields."
Estimated Cost: TBD, negotiations are ongoing with the City of Lynnwood.
2023
2024
2025 2026Total
Construction (113)
TBD
TBD
TBD
TBD
Total Expenses
TBD
TBD
TBD
TBD
Ending Fund Balance/Impact Fees - 332
TBD
TBD
TBD
TBD
Real Estate Excise Tax II - Fund 125
TBD
TBD
TBD
TBD
Total Revenue
TBD I
TBD
TBD I
TBD
U
d
u_
U
00
N
O
N
M
N
O
N
N
N
O
Q
O
L
a
O
c
0
c�
c
a�
a
Go
N
0
N
M
N
0
N
a
u_
U
I
IL
U
N
Y
L
IL
c
am
E
z
r
Q
Page 9
Packet Pg. 36
7.A.a
Parks & Recreation
Mathay Ballinger Park - D51 D6 & D7
24100 78th Place West
Project Summary: Park improvements to Mathay Ballinger Park to include the addition of a permanent restroom, a
small shelter with picnic tables and a paved loop pathway to provide ADA accessibility to the playground and connect
the paved Interurban Trail to 78t" Place West street.
Project Justification: The 2022 Parks, Recreation & Open Space (PROS) Plan Recommendation #3.3 is to prioritize
improvements to Mathay Ballinger Park and upgrade, enhance or replace park amenities, specifically the play
amenities. Recommendation 3.5 is to add amenities to existing parks, such as picnic shelters to Mathay Ballinger Park
... and paved pathway connections in Mathay Ballinger Park. Recommendation 6.4 is to install permanent restrooms
at Marina Beach Park and Mathay Ballinger Park. PROS Plan Goal 2, Objective 2.6 and Goal 3 Objectives 3.2, 3.3, 3.4,
3.5, 3.6, 3.8 and 3.9 also align with these upgrades.
Estimated Cost: $499,300
Construction (D5) — Paved Loop Pathway $53,000
$53,000
Construction (D7) — Shelter w/Picnic Tables $75,000
$75,000
Construction (D6) — Permanent Restroom $371,300
$371,000
Total Expenses $499,300
$499,300
Ending Fund Balance/Impact Fees - 332 $371,300
$371,300
Real Estate Excise Tax II - Fund 125 $128,000
$128,000
Total Revenue 1 $499,300
Funding $0
499,300
$Unsecured
E
U
d
u_
U
00
N
O
N
M
N
O
N
N
N
O
Q
O
L
a
4-
0
c
0
c�
c
a�
m
L
a
00
N
O
N
CM
N
O
N
a
u_
U
i
a
U
N
L
IL
c
m
E
z
U
a
r
r
Q
Page 10
Packet Pg. 37
7.A.a
Parks & Recreation
Yost Park & Pool - R91 R41 R6 & R11
96th Ave W & Bowdoin Way, Yost Park
Project Summary: Park enhancements, repair and maintenance to include a playground replacement, resurface of
tennis courts, pool upgrades and trail, bridge and boardwalk repairs / replacement. The playground at Yost Park
installed in 1995, is 27 years old, has reached the end of its lifecycle, is not ADA accessible and is scheduled to be
replaced in 2023.
Project Justification: The playground, tennis courts, pool, trails, bridges, and boardwalks are near or at the end of
their useful life; ongoing maintenance of these amenities is increasing. To maintain safety amenities should be
repaired and/or replaced as supported in the 2022 PROS Plan recommendation 3.1 which is to maintain, renovate or
replace aging or damaged infrastructure in existing City properties to ensure public accessibility, use and safety; Goal
3.4 replace the playgrounds at ... Yost Memorial Park and 6.2 to implement upgrades and improvements to park
facilities to conform with the American with Disabilities Act (ADA) and ensure universal accessibility to include
required parking, providing ramped entrances and site furnishings.
Estimated Cost: $958,200
Construction (R4)—Trail/Bridge
Repair
$80,000
Total
$80,000
Construction (R6) —
Playground Replacement
$257,500
$257,500
Construction (R9)—Tennis
Court Resurface
$74,300
$74,300
Construction (R11)
— Pool Upgrades
$546,400
$546,400
Total Expenses
$257,500
$154,300
$546,400
$958,200
Real Estate Excise Tax II - Fund 125
$257,500
$154,300
$546,400
$958,200
Total Revenue
Unsecured Funding
$257,500
$154,300
$546,400
$958,200
i
a
U
a
u_
U
ao
N
O
N
M
N
O
N
N
N
O
am
O
L
(L
4-
0
c
0
:r
M
c
a)
0)
a)
a`
w
N
O
N
M
N
O
N
a
u_
UI
a_
U
L
M
a
c
d
E
z
a
Page 11
Packet Pg. 38
7.A.a
Parks & Recreation
Columbarium Expansion Phase II — D8
820 15th St SW, Edmonds Memorial Cemetery
Project Summary: Expansion of the Edmonds Memorial Cemetery Columbarium. Funding provided through the
Cemetery Trust Fund 137 which accumulates fund balance based on Cemetery usage and revenue generated.
Project Justification: As the existing columbarium continues to fill up, it is appropriate to begin planning for the Phase
II expansion. The design is complete and since it is continuation of phase improvements, should be relatively simple
to implement.
Estimated Cost: $159,100
2023
0-
Construction (D8) — Columbarium Expansion
$159,100
$159,100
Total Expenses
$159,100
$159,100
Fund Balance Cemetery Trust — Fund 137
$159,100
$159,100
Total Revenue
Unsecured Funding
$159,100
$0
$159,100
$0
U
IL
u_
U
0
N
O
N
M
N
O
N
N
N
O
am
O
L
a
4-
0
c
0
:r
M
c
a�
m
a`
0
N
O
N
M
N
0
N
IL
u.
U
a_
U
L
M
a
c
as
E
z
M
a
Page 12
Packet Pg. 39
7.A.a
Parks & Recreation
Olympic Beach Park - R7
- "
200 Admiral Way, Entrance of the Fishing Pier
Project Summary: Renovation of existing restroom.
Project Justification: 2022 PROS Plan Recommendation #6 is to make improvements to existing parks as needed to
ensure proper maintenance, usability and quality of park features and grounds to remove barriers and improve
universal access. Recommendation 6.3 is to replace or renovate restrooms at Olympic Beach, Seaview Park and
Brackett's Landing North.
Estimated Cost: $53,000
Page 13
Packet Pg. 40
Parks & Recreation
Pine Street Park - D10, D11 & D12
6th and Pine Street
Project Summary: Park improvements to include the addition of a small shelter with picnic tables, canopy shade trees
and a paved connecting pathway.
Project Justification: The 2022 Parks, Recreation and Open Space Plan Recommendation #3.1 is to add amenities to
existing parks, such as picnic shelters to Mathay Ballinger Park, Elm Street Park and Pine Street Park and paved
pathway connections in Mathay Ballinger Park and Pine Street Park.
Estimated Cost: $159,100
2023
0-
Construction (D10) — Shelter w/Picnic Tables
$79,600
$79,600
Construction (D11) — Paved Pathway
$58,300
$58,300
Construction (D12) — Canopy Shade Trees
$26,500
$26,500
Total Expenses
$164,400
$164,400
Real Estate Excise Tax II - Fund 125
$164,400
$164,400
Total Revenue
Unsecured Funding
$164,400
so
$164,400
so
FL
a-
u_
U
00
N
O
N
M
N
O
N
N
N
O
Q
O
L
a
4-
0
c
0
c�
c
a�
a
Go
N
0
N
M
N
0
N
a
u_
U
I
IL
U
N
Y
IL
c
m
E
t
U
M
r
Q
Page 14
Packet Pg. 41
7.A.a
Parks & Recreation
Sierra Park — R8
81st Ave W & 190th St SW
Project Summary: Replacement of the playground and fall surfacing at Sierra Park. The playground is 27 years old and
is currently the smallest playground in the park system.
Project Justification: The 2022 Parks, Recreation and Open Space Plan Recommendation #3.4 is to replace the
playgrounds at Maplewood Hill Park, Sierra Park and Yost Memorial Park.
Estimated Cost: $164,400
FL
U
d
LL
U
Go
N
O
N
M
N
O
N
N
N
O
a
O
L
a
4.
O
c
0
c�
c
a�
m
a
Go
N
O
N
CM
N
0
N
a
LL
U
I
IL
U
N
Y
L
cc
IL
c
m
E
z
U
a
r
r
Q
Page 15
Packet Pg. 42
7.A.a
Parks & Recreation
Neighborhood Park SE 1— P2, D13
Project Summary: Acquire and develop an additional neighborhood park in the SE Edmonds area to address an
existing gap in park services and inequities in parkland distribution. Once an acquisition has been authorized a Master
Plan will be developed in collaboration with the surrounding community. Development of the park will be based on
the Master Plan.
Project Justification: The 2022 Parks, Recreation & Open Space (PROS) Plan Recommendation #1 is to fill the park
system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and
the SR 99 corridor.
Estimated Cost: $899,100 + Parkland Acquisition
2023 0-
Planning— Neighborhood Park SE 1 (132) $79,600
$79,600
Construction — Neighborhood Park SE 1 (D13) $819,500
$819,500
Total Expenses $79,600 $819,500
$899,100
Real Estate Excise Tax II - Fund 125 $79,600
$79,600
Total Revenue $79,600
Unsecured Funding $0 00
$79,600
00
Capital Facilities Plan (CFP) & Capital Improvement Program (CIP)
a
U
a-
u_
U
00
N
O
N
M
N
O
N
N
N
O
Q
O
L
11
4-
0
c
0
c�
c
W
CA
m
L
Q_
Go
N
O
N
M
N
O
N
d
u_
U
I
a
U
N
Y
L
IL
c
m
E
z
U
O
r
r
Q
Page 16
Packet Pg. 43
7.A.a
Parks & Recreation
Waterfront Walkway Completion — Ebb Tide Section - P3 & D14
Beachfront in front of Ebb Tide Condominiums (200 Beach Place)
Project Summary: This would connect the waterfront walkway from Brackett's Landing North to Marina Beach Park
ensuring all individuals, including those with mobility challenges and those pushing strollers can safely enjoy the
waterfront. The final missing piece would be constructed in front of the Ebb Tide condominiums in the easement
owned by the City of Edmonds. The easement and walkway design are currently under legal review.
Project Justification: To provide public access along the waterfront for all individuals. Completion of the walkway
would meet ADA requirements, support efforts to keep dogs off of the beaches and was recognized as a high priority
by residents participating in the development of the 2022 PROS plan.
Estimated Cost: $1,250,000
2023
0-
Planning & Design $515,000
$515,000
Construction
$819,500
$819,500
Total Expenses $515,000
$819,500
$1,334,500
Real Estate Excise Tax II - Fund 125 $515,000
$515,000
Total Revenue $515,000
Unsecured Funding
00
$515,000
$819,500
a
U
a-
LL
U
00
N
O
N
M
N
O
N
N
N
O
Q
O
L
a
4-
0
c
0
c�
c
a�
m
a
Go
N
O
N
M
N
O
N
d
LL
U
i
a
U
N
Y
L
IL
c
m
E
z
U
M
r
r
Q
Page 17
Packet Pg. 44
7.A.a
Parks & Recreation
Maplewood Hill Park — R12
19800 89th PI W
Project Summary: Replacement of the existing playground installed in 1985. This playground is 38 years old and is
the oldest in the park system.
Project Justification: The 2022 Parks, Recreation and Opens Space Plan Recommendation #3.4 is to replace the
playgrounds at Maplewood Hill Park, Sierra Park and Yost Memorial Park.
Estimated Cost: $144,900
FL
U
d
U-
U
Go
N
O
N
M
N
O
N
N
N
O
a
O
L
a
4-
0
c
0
c�
c
a�
m
L
Go
N
0
N
CM
N
O
N
a
e_
U
I
IL
U
N
Y
cc
IL
c
m
E
z
U
a
r
r
Q
Page 18
Packet Pg. 45
7.A.a
Parks & Recreation
Marsh Estuary Restoration (Willow Creek Daylighting) - Al, P4, D9 & D1
Edmonds Marsh - City of Edmonds Marsh and property owned by Unocal (Chevron Services Co.)
Project Summary: Reconnect the Puget Sound with the Edmonds Marsh restoring the natural tidal exchange. This
project will impact the existing Marina Beach Park and its proposed renovation including daylighting of Willow Creek
within the park.
Project Justification: This project will support the 2022 PROS plan recommendation #2.2 — Expand the Edmonds
Marsh/Estuary to include the Unocal property. Develop funding strategy for purchase of the Unocal property or
negotiate with the State of Washington to have the property become part of the Edmonds Marsh/Estuary. The marsh
estuary restoration project will allow for and provide a natural tidal exchange, allow Chinook salmon to again migrate
into Willow Creek, support migratory birds and waterfowl, provide a natural redistribution of saltwater -freshwater
flora and fauna and address sea level rise impacts
Estimated Cost: $14,642,500 + Restoration + Marina Beach Park renovation
Continued on next page.
a
c�
IL
u_
c)
00
N
O
N
M
N
O
N
N
N
0
am
0
L
IL
4-
0
c
0
M
c
d
m
a`
00
N
O
N
M
N
O
N
a
U.
t�
i
a_
U
L
M
a
c
d
E
z
0
a
Page 19
Packet Pg. 46
7.A.a
Marsh Estuary Restoration (Willow Creek Daylighting) — continued.
Land Acquisition (Al)
$8,741,800
Total
$8,741,800
Master Plan (P4)
$273,200
$273,200
Master Plan Implementation (D9)
$5,627,500
$5,627,500
Restoration (D1) - TBD
TBD
TBD
Total Expenses
$14,642,500
$14,642,500
Real Estate Excise Tax II - Fund 125
$273,200
$273,200
Real Estate Excise Tax I — Fund 126
Fund 332 Balance + Park Impact Fee's
Bond Proceeds
Secured Grants
Tree Fund 143 — Land Acquisition
Park Donations
Operating Contribution — General Fund
Stormwater — Fund 422
Total Revenue
Unsecured Funding
$273,200
00
$273,200
00
Project Accounting #M070
Capital Facilities Plan (CFP) & Capital Improvement Program (CIP)
d
U
a
u_
U
00
N
O
N
A
N
O
N
a�
0
0.
0
IL
4-
0
c
0
c�
c
a�
m
L
Q_
Page 20
Packet Pg. 47
7.A.a
Parks & Recreation
Elm Street Park - D16, D17 & R14
a
- a
t• u_
N
O
M
N
4 E
.$5+t�E',�.',xh
O
.r
7t" & Elm Street
m
Project Summary: Park enhancements to include the addition of a nature playground, small shelter with picnic tables a
and habitat restoration. 00
N
O
Project Justification: The 2022 Parks, Recreation and Open Space Plan Recommendation #3.1 is to add amenities to M
existing parks, such as picnic shelters to Mathay Ballinger Park, Elm Street Park and Pine Street Park. N
a
u_
t�
i
a
Estimated Cost: $225,100 v
2023
Construction (1114) — Habitat Restoration
2024 2025
$56,300
$56,300
Construction (D16) — Nature Playground
$84,400
$84,400
Construction (D17) — Shelter w/Picnic Tables
$84,400
$84,400
Total Expenses
$225,100
$225,100
Real Estate Excise Tax II - Fund 125
$168,800
$168,800
Total Revenue
Unsecured Funding
$168,800
ii
$168,800
00
a
Page 21
Packet Pg. 48
7.A.a
Parks & Recreation
Neighborhood Park SR 99 — P6 & D15
Project Summary: Design and development of an additional neighborhood park in the SR 99 area to address an
existing gap in park services and inequities in parkland distribution. Once an acquisition has been authorized a Master
Plan will be developed in collaboration with the surrounding community. Development of the park will be based on
the Master Plan.
Project Justification: The 2022 Parks, Recreation & Open Space (PROS) Plan Recommendation #1 is to fill the park
system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and
the SR 99 corridor.
Estimated Cost: $926,100 + Parkland Acquisition
• 2027 2028
Total
Planning— Neighborhood Park SR99 (136)
$82,000
$82,000
Construction — Neighborhood Park SR 99 (D15)
$844,100
$844,100
Total Expenses
$82,000 $844,100
$926,100
Real Estate Excise Tax II - Fund 125
$82,000
$82,000
Total Revenue
Unsecured Funding
$82,000
$0 00
$82,000
00
Capital Facilities Plan (CFP) & Capital Improvement Program (CIP)
ii
U
a-
LL
U
00
N
O
N
M
N
O
N
N
N
O
Q
O
L
a
4-
0
c
O
c
W
a
Go
N
0
N
•
A
N
O
N
d
LL
U
I
d
U
N
Y
L
a
c
N
E
t
v
R
r
r
Q
Page 22
Packet Pg. 49
7.A.a
Parks & Recreation
Neighborhood Park SE 2 — P7, D18
Project Summary: Design and development of an additional neighborhood park in the SE Edmonds area to address
an existing gap in park services and inequities in parkland distribution. Once an acquisition has been authorized a
Master Plan will be developed in collaboration with the surrounding community. Development of the park will be
based on the Master Plan.
Project Justification: The 2022 Parks, Recreation & Open Space (PROS) Plan recommendation #1 is to fill the park
system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and
the SR 99 corridor.
Estimated Cost: $953,900 + Parkland Acquisition
Planning— Neighborhood Park SE 2 (P7)
$84,400
$84,400
Construction — Neighborhood Park SE 2 (D18)
$869,500
$869,500
Total Expenses
$84,400 $869,500
$953,900
Real Estate Excise Tax II - Fund 125
$84,400
$84,500
Total Revenue
Unsecured Funding
$84,400 $0
i 00
$84,500
00
Capital Facilities Plan (CFP) & Capital Improvement Program (CIP)
00
N
0
N
A
N
O
N
d
LL
U
I
IL
U
N
Y
L
a
c
N
E
t
v
R
r
r
Q
Page 23
Packet Pg. 50
7.A.a
Parks & Recreation
4th Avenue Cultural Corridor - P8 & D19
41h Avenue from Main St. to the Edmonds Center for the Arts, Downtown
Project Summary: Final design of 4th Avenue Cultural Corridor to include site design and construction documents for
a safe, pedestrian friendly, and art enhanced corridor in the public right of way which provides a strong visual
connection along 4th Avenue N between Main Street and Edmonds Center for the Arts. Interim work on this project
since the concept was developed includes a 2015 temporary light artwork "Luminous Forest", as well as preliminary
design development through 2020-21. Funding for this project has not been secured at this time.
Project Justification: The corridor improvements in the public right of way will encourage pedestrian traffic and
provide a strong visual connection between the ECA and downtown retail. Improvements will enhance connectivity
as an attractive walking corridor and contribute to the economic vitality in downtown. The project has been supported
by the community in the 2014 Community Cultural Plan and in the goals and priorities for the State certified Creative
District.
Estimated Cost: $9,206,600
Planning & Design (138)
2023
2024
2025
2026
$2,251,000
2027
$2,251,000
Construction (D19)
$6,955,600
$6,955,600
Total Expenses
$2,251,000
$6,955,600
$9,206,600
Real Estate Excise Tax II - Fund 125
Park Impact Fees - Fund 332-100
Operating contribution — general fund
Secured Grants
Total Revenue
$0
$0
$0
Project Accounting #C538
FL
U
a-
u_
U
00
N
O
N
M
N
O
N
N
N
O
Q
O
L
a
4-
0
c
0
c�
c
a�
m
L
Q_
Go
N
O
N
M
N
O
N
a
u_
U
i
a
U
N
Y
L
a
c
m
E
z
U
M
r
r
Q
Page 24
Packet Pg. 51
7.A.a
Parks & Recreation
Parks & Facilities Maintenance Building - P1 & D2
600 3rd Avenue South, City Park
Project Summary: The 40+ year old maintenance building in City Park is reaching the end of its useful life and
needs major renovation or replacement and is too small to accommodate current staff and needed work areas.
Project Justification: Parks and Facilities Divisions have long outgrown this existing facility and need additional
work areas and fixed equipment in order to more efficiently maintain City parks and capital facilities. The city's
small equipment repair garage is used as the Park Maintenance locker room, daily meeting room, computer access
(one for 11 FTEs) and work preparation space. It is insufficient for work efficiency and due to small size, inadequate
for expansion of staffing with upcoming additional park and street landscape work requirements.
Estimated Cost: $6,955,600
2023
0-
Planning & Design (131)
$1,125,500
$1,125,500
Construction (D2)
$4,637,100
$4,637,100
Total Expenses
$1,125,500
$4,637,100
$6,955,600
Real Estate Excise Tax II - Fund 125
Park Impact Fee's — Fund 332-100
Bond Proceeds
Operating Contribution — General Fund
Park Donations
Total Revenue
Unsecured Funding
00
00
.00
Capital Facilities Plan (CFP) & Capital Improvement Program (CIP)
a
U
a-
u_
U
00
N
O
N
M
N
O
N
N
N
O
Q
O
L
a
4-
0
c
0
c�
c
W
m
L
a
Go
N
O
N
M
N
0
N
a
u_
U
i
a
U
N
Y
L
IL
c
m
E
z
U
M
r
r
Q
Page 25
Packet Pg. 52
7.A.a
Parks & Recreation
Seaview Park Restroom — R16
80th Ave W & 186th St SW
Project Summary: ADA improvements to include renovation or replacement of the permanent restroom
Project Justification: 2022 PROS Plan Recommendation #6 is to make improvements to existing parks as needed to
ensure proper maintenance, usability and quality of park features and grounds to remove barriers and improve
universal access. Recommendation 6.3 is to replace or renovate restrooms at Olympic Beach, Seaview Park and
Brackett's Landing North.
Estimated Cost: $417,900
Page 26
Packet Pg. 53
7.A.a
Parks & Recreation
Yost Pool Replacement — R15
96th Ave W & Bowdoin Way, Yost Park
Project Summary: Yost Pool was built nearly 50 years ago and continues to provide recreational opportunities for
many residents. In addition to teaching our youth water safety, the pool serves as an opportunity for community
members of all ages to lead healthy and active lifestyles. Funding for this project has not been identified and would
likely require voter approval.
Project Justification: While continuing to manage the existing infrastructure to keep Yost Pool open to the
community, the 2022 PROS plan recommendation #4 is to replace Yost Pool.
Estimated Cost: $23,881,000
Planning & Construction (R15)
$23,881,000 $23,881,000
Total Expenses
$23,881,000 $23,881,000
Real Estate Excise Tax II - Fund 125
Fund 332 Balance + Park Impact Fee's
Secured Grants
Bonds
Total Revenue
Unsecured Funding
$0 $0
000000
Capital Facilities Plan (CFP) & Capital Improvement Program (CIP)
a
U
a-
u_
U
00
N
O
N
M
N
O
N
N
N
O
Q
O
L
a
4-
0
c
O
c
a�
m
a
Go
N
0
N
M
N
O
N
a
u_
U
a
U
N
Y
a
c
m
E
t
U
r
r
Q
Page 27
Packet Pg. 54
I 7.A.a I
2023-2028
Parks Capital Improvement & Capital Facilities Plan
PROGRAMS
EDMONDS
PARKS, RECREATION & HUMAN SERVICES
Page 28
Packet Pg. 55
7.A.a
Parks & Recreation
Citywide Park Improvements / Capital Replacement Program - R17
Project Summary: The 2022 Parks, Recreation & Open Space (PROS) plan identified a significant list of deferred park
maintenance projects. With the addition of a Parks Capital Project Manager, hired in 2022 and the Job Order
Contracting program, the Parks Department will begin to make progress on the needed system -wide repairs,
renovations and replacements of an aging parks infrastructure.
Project Justification: Insufficiently maintained parks and related assets lead to higher deferred maintenance costs,
increased city liability and decreased level of service and community satisfaction. The 2022 PROS Plan
Recommendation #3.1 is to Maintain, renovate, or replace aging or damaged infrastructure in existing City properties
to ensure public accessibility, use and safety.
Estimated Cost: $2,700,000 (6-year total)
Repair & Maintenance
$300,000
$300,000
$300,000
$300,000
$300,000
$300,000
$1,800,000
Professional Services
$150,000
$150,000
$150,000
$150,000
$150,000
$150,000
$900,000
Total Expenses
$450,000
$450,000
$450,000
$450,000
$450,000
$450,000
$2,700,000
Real Estate Excise Tax II - Fund 125
$450,000
$450,000
$450,000
$450,000
$450,000
$450,000
$2,700,000
Total Revenue
$450,000
$450,000
$450,000
$450,000
$450,000
$450,000
$2,700,000
a
U
a
u_
U
00
N
O
N
M
N
O
N
N
N
O
Q
O
L
a.
4-
0
c
0
c�
c
a�
m
L
Q.
Go
N
O
N
M
N
O
N
d
u_
U
i
a
U
N
L
IL
c
m
E
z
U
a
r
r
Q
Page 29
Packet Pg. 56
7.A.a
Parks & Recreation
Signage & Wayfinding — R10
• VIEW POINT PLAY STRUCTURE
NATURAL AREA 81DOG WALK
PARK OPEN DAWN TO DUSK
Project Summary: Update signage system wide to include uniform and accurate trail identification information,
orientation markers, safety and regulatory messaging, park hours, park rules and etiquette, interpretive information
and warning signs.
Project Justification: A comprehensive and consistent signage system is necessary to inform, orient and educate
park users. The 2022 PROS plan recommendation #6.5 is to develop and provide consistent graphics and citywide
signage to improve communication on access, usability and "branding" of the city's park and open space system.
Estimated Cost: $51,500
Planning & Construction (R10)
$51,500
$51,500
Total Expenses
$51,500
$51,500
Real Estate Excise Tax II - Fund 125
$51,500
$51,500
Total Revenue
Unsecured Funding
$51,500
$51,500
i
a
U
a-
u_
U
00
N
O
N
M
N
O
N
N
N
O
Q
O
IL
4-
0
C
O
a_.
cC
a-.
C
N
N
a
ro
N
O
N
A
N
O
N
IL
u_
U
I
d
U
N
L
IL
c
m
E
t
r
r
Q
Page 30
Packet Pg. 57
7.A.a
Parks & Recreation
Playground Replacement / Inclusive Upgrades — R13
Project Summary: City of Edmonds owns, operates and maintains 15 playgrounds and only two of them are
considered fully inclusive and accessible (Seaview and Civic Park). One of the Parks, Recreation and Human Services
Department initiatives is to continually update playgrounds which range in installation dates from 1985 - 2019. As
part of these scheduled updates the department will work to enhance playgrounds to be inclusive versus merely
meeting ADA standards. In many cases this includes enhanced play surfacing and play equipment that provide for
users of all abilities.
Elm Street Park, Maplewood Hill Park, Sierra Park and Yost Park playgrounds have been identified as priority in the
PROS Plan and will be addressed in the first three years of this capital improvement plan.
Project Justification: Playground upgrades are a necessary part of maintaining a safe play environment. With
playgrounds that are 35+ years old many are scheduled for upgrades. Further, it is the goal of the City to ensure that
those upgrades include considerations for children of all physical and mental abilities and that these play amenities
are designed to be a welcoming and healthy experience for all.
Estimated Cost: $197,000
Construction (R13)
$197,000 $202,900
$209,00
$608,900
Total Expenses
$197,000 $202,900
$209,00
$608,900
Real Estate Excise Tax II — Fund 125
$197,000 $202,900
$209,00
$608,900
Total Revenue
Unsecured Funding
$197,000 $202,900
$209,00
i
$608,900
a
c�
a
u_
0
ao
N
O
N
M
N
O
N
N
N
O
am
O
L
a
O
c
0
:r
M
c
a)
0)
a)
L
a
ao
N
O
N
CO)
N
O
N
a
u_
0
i
a_
U
L
M
a
c
d
z
a
Page 31
Packet Pg. 58
UA K04 IN FAI Ll I I
AKOIIJLIIIFO
Ar
Z. w
II J F
1
j`
F5j K
1 I
j 1 �
7.A.a
Parks & Recreation
Parkland Acquisition — Neighborhood Park SE 1, SR 99 & SE 2 - A2, A3 & A4
Project Summary: Acquisition of parkland when feasible that will benefit citizens and support the priorities identified
in the PROS Plan. Currently, $900,000 is reserved for parkland and open space acquisition. These funds were
accumulated in 2019, 2020, 2021 and 2022. There is no request to purchase a specific property at this time as
opportunities are somewhat limited in a mostly built -out city, but staff continues to search for, develop and negotiate
opportunities.
Project Justification: The 2022 Parks, Recreation & Open Space (PROS) Plan recommendation #1 is to fill the park
system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and
the SR 99 corridor.
Estimated Cost: $5,230,500
Acquisition — Neighborhood Park SE 1 (A2)
2023 0-
$1,500,000
$1,500,000
Acquisition — Neighborhood Park SR99 (A3)
$1,545,000
$1,545,000
Acquisition — Neighborhood Park SE 2 (A4)
$2,185,500
$2,185,500
Total Expenses
$1,500,000 $1,545,000
$2,185,500
$5,230,500
Real Estate Excise Tax I - Fund 126
$1,100,000 $200,000
$200,000
$1,500,000
Tree Fund 143 - land acquisition - TBD
Total Revenue
$1,100,000 $200,000
$200,000
$1,500,000
Capital Facilities Plan (CFP) & Capital Improvement Program (CIP)
a
U
a-
u_
U
00
N
O
N
M
N
O
N
N
N
O
Q
O
L
11
4-
0
c
O
c
a�
a
Go
N
O
N
.
M
N
O
N
d
u_
U
I
d
U
N
L
IL
c
N
E
M
v
R
r
r
Q
Page 33
Packet Pg. 60
7.A.a
Parks & Recreation
Interurban Trail Expansion — A5
.�
r'7�=�
()
U_
Go
o
N
g.
M
N
O
-_
N
0
0
24100 78th Place West
a
Project Summary: Acquisition of additional lands, easements and/or right-of-ways to continue the Interurban Trail,
c
including more off -road segments.
M
Project Justification: The 2022 PROS Plan Recommendation #5 is to improve trail connections including sidewalks
N
N
and bike lanes to help link destinations across the community. Recommendation 5.1 suggests the City peruse
LL
opportunities to acquire additional lands, easements and/or right of way to continue the Interurban Trail.
i
a
U
N
Y
Estimated Cost: $895,585
L
a
Land Acquisition — Park Facilities (A5)
$895,585 $895,585
Total Expenses
$895,585 $895,585
Real Estate Excise Tax I - Fund 126
Tree Fund 143 - Land Acquisition
Total Revenue
MMM
Unsecured Funding
m
E
M
U
a
r
r
Q
Page 34
Packet Pg. 61
2023-2028
Parks Capital Improvement & Capital Facilities Plan
FUND DETAIL
4EDMONDS
PARKS, RECREATION & HUMAN SERVICES
U
d
u-
U
Go
N
O
N
M
N
O
N
N
N
O
Q
O
L.
a
4-
0
c
0
c�
c
a�
m
L
00
N
O
N
CM
N
O
N
d
LL
U
I
d
U
N
Y
L
a
c
m
E
z
u
a
r
r
Q
Page 35
Packet Pg. 62
Fund 332
7.A.a
Costs inflated at 3% per year
Fund 332 Expenditures
2023
2024
2025
2026
2027
2028
6-Year Total
D9
Edmonds Marsh Estuary Restoration (Master Plan Implementation)
$ 5,627,500
$ 5,627,500
D1
Edmonds Marsh Estuary Restoration (Restoration)
$
R14
Elm Street Park Habitat Restoration
$ 56,300
$ 56,300
R3
Meadowdale Playfields (Renovations, City of Lynnwood ILA)
$
D6
Mathay Ballinger Park Permanent Restrooms
$ 371,300
$ 371,300
D13
Neighborhood Park SE1 (Park Development)
$ 819,500
$ 819,500
D15
Neighborhood Park SR99 (Park Development)
$ 844,100
$ 844,100
D18
Neighborhood Park SE2 (Park Development)
$ 869,500
$ 869,500
R15
Pool Replacement
$23,881,000
$ 23,881,000
D14
Waterfront Walkway (Construction)
$ 819,500
$ 819,500
P8
4th Avenue Cultural Corridor (Design Completion)
$ 2,251,000
$ 2,251,000
D19
4th Avenue Cultural Corridor (Construction)
$ 6,955,600
$ 6,955,600
P1
Parks Facilities M&O Building (Design)
$ 1,125,500
$ 1,125,500
D2
Parks Facilities M&O Building (Construction)
$ 4,637,100
$ 4,637,100
Interfund Services
$ 25,000
$ 50,000
$ 100,000
$ 100,000
$ 100,000
$ 50,000
$ 425,000
Debt Service Civic Park $1.6M (2021)
$ 98,000
$ 98,000
$ 98,000
$ 98,000
$ 98,000
$ 98,000
$ 588,000
(C) TOTAL Fund 332 Expenditures
$ 494,300
$ 148,000
$ 7,464,500
$ 4,474,900
$12,660,200
$24,029,000
$49,270,900
Fund 332 Revenue
2023
2024
2025
2026
2027
2028
6-Year Total
Park Impact Fee's (Fund 332 100)
$ 848,350
$ 450,000
$ 450,000
$ 450,000
$ 450,000
$ 450,000
$ 3,098,350
Investment Interest (3%)
$ 42,255
$ 54,144
$ 64,828
$ 74,243
$ 84,030
$ 94,111
$ 413,612
Miscellaneous Park Donations
$
Bond Proceeds
$
General Fund Transfer
$
Unsecured Grants Marsh Estuary Restoration
$ 5,624,500
$ 5,624,500
Unsecured Grants Elm Street Park Habitat Restoration
$ 56,300
$ 56,300
Unsecured Grants Neighborhood Park SE 1 (Development)
$ 819,500
$ 819,500
Unsecured Grants Neighborhood Park SR99 (Development)
$ 844,100
$ 844,100
Unsecured Grants Neighborhood Park SE 2 (Development)
$ 869,500
$ 869,500
Unsecured Grants Waterfront Walkway (Construction)
$ 819,500
$ 819,500
Unsecured Grants 4th Avenue Cultural Corridor
$ 2,251,000
$ 6,955,600
$ 9,206,600
Unsecured Funding (Bonds, Levy, Misc) Pool Replacement
$ 23,881,000
$ 23,881,000
Unsecured Funding Park Facilities M&O Building
$ 1,125,500
$ 4,637,100
$ 5,762,600
(D) TOTAL Fund 332 Revenue
$ 890,605
$ 504,144
$ 7,778,328
$ 4,801,143
$12,996,230
$24,425,111
$51,395,562
a
U
a
ILL
U
0
N
0
N
M
N
0
N
d
N
O
O_
O
a`
0
C
O
C
O
N
d
L
a
0
N
0
N
M
N
O
N
a
LL
U
I
a_
U
N
Y
L
to
a
C
d
E
t
U
ca
r
Q
Page 36 Packet Pg. 63
Fund 332
7.A.a
Fund 332 Parks Fund 6-Year Overview
2023
2024
2025
2026
2027
2028
(E) Beginning Fund Balance (332 + 332 100)
$ 1,408,492
$ 1,804,797
$ 2,160,941
$ 2,474,769
$ 2,801,012
$ 3,137,042
(D) Revenue
$ 890,605
$ 504,144
$ 7,778,328
$ 4,801,143
$12,996,230
$24,425,111
(C) Expenditures
$ 494,300
$ 148,000
$ 7,464,500
$ 4,474,900
$12,660,200
$24,029,000
(G) Ending Fund Balance (E+D-C)
$ 1,804,797
$ 2,160,941
1 $ 2,474,769
$ 2,801,012
$ 3,137,042
$ 3,533,154
Project Type:
A Acquisition
P Master Planning
D Development New
R Replacement / Upgrade
Page 37
Packet Pg. 64
REET II Fund 125
7.A.a
Costs inflated at 3% per year
REET II (Fund 125) Expenditures
2023
2024
2025
2026
2027
2028
6-Year Total
P4
Edmonds Marsh Estuary Restoration (Master Plan)
$ 273,200
$ 273,200
D16
Elm Street Park (Nature Playground)
$ 84,400
$ 84,400
D17
Elm Street Park (Shelter w/Picnic Tables)
$ 84,400
$ 84,400
R2
Johnson Property (Demo & Secure Site)
$ 200,000
$ 200,000
P5
Johnson Property (Master Plan)
$ 82,000
$ 82,000
R12
Maplewood Hill Park (Playground Replacement)
$ 144,900
$ 144,900
D5
Mathay Ballinger Park (Paved Loop Pathway)
$ 53,000
$ 53,000
D7
Mathay Ballinger Park (Shelter w/Picnic Tables)
$ 75,000
$ 75,000
P2
Neighborhood Park SE1 (Master Plan)
$ 79,600
$ 79,600
P6
Neighborhood Park SR99 (Master Plan)
$ 82,000
$ 82,000
P7
Neighborhood Park SE2 (Master Plan)
$ 84,400
$ 84,400
R7
Olympic Beach Park (Restroom Upgrade)
$ 53,000
$ 53,000
D10
Pine Street Park (Shelter w/Picnic Tables)
$ 79,600
$ 79,600
D11
Pine Street Park (Paved Connecting Pathway)
$ 58,300
$ 58,300
D12
Pine Street Park (Canopy Shade Trees)
$ 26,500
$ 26,500
R16
Seaview Park (Restroom Replacement)
$ 417,900
$ 417,900
R8
Sierra Park (Playground Replacement)
$ 185,700
$ 185,700
P3
Waterfront Walkway Design Completion
$ 515,000
$ 515,000
R11
Yost Pool Upgrades & Renovation
$ 546,400
$ 546,400
R9
Yost Park (Tennis Court Resurface)
$ 74,300
$ 74,300
R4
Yost Park (Trail, Bridge & Boardwalk Repairs)
$ 80,000
$ 80,000
R6
Yost Park (Playground Replacement)
$ 257,500
$ 257,500
R13
Playground Replacement / Inclusive Upgrades
$ 197,000
$ 202,900
$ 209,000
$ 608,900
R10
Signage and Wayfinding
$ 51,500
1
1
1
1
1 $ 51,500
R17
lCitywide Park improvements/ Capital Replacement Program
$ 450,000
$ 450,000
$ 450,000
$ 450,000
$ 450,000
$ 450,000
$ 2,700,000
(C) TOTAL PARKS REET II (Fund 125) Expenditures
$ 1,035,500
$ 1,653,500
$ 1,578,500
$ 900,200
$ 1,070,800
$ 659,000
$ 6,897,500
REET II(Fund 125)Revenue
2023
2024
2025
2026
2027
2028
6-Year Total
Real Estate Excise Tax (REET) II Fund 125
$ 2,000,000
$ 2,000,000
$ 1,500,000
$ 1,500,000
$ 1,500,000
$ 1,500,000
$ 10,000,000
(D) TOTAL PARKS REET I (Fund 126) Revenue
$ 2,000,000
$ 2,000,000
$ 1,500,000
$ 1,500,000
$ 1,500,000
$ 1,500,000
$10,000,000
REET II (Fund 125) Parks Fund 6-Year Overview
2023
2024
2025
2026
2027
2028
(E) Beginning Fund Balance
$ 75,328
$
1,039,828
$ 1,386,328
$ 1,307,828
$ 1,907,628
$
2,336,828
(D) Revenue
$ 2,000,000
$
2,000,000
$ 1,500,000
$ 1,500,000
$ 1,500,000
$
1,500,000
(C) Expenditures
$ 1,035,500
$
1,653,500
$ 1,578,500
$ 900,200
$ 1,070,800
$
659,000
(G) Ending Fund Balance (E+D-C)
$ 1,039,828
$
1,386,328
$ 1,307,828
$ 1,907,628
$ 2,336,828
$
3,177,828
a
V
a
u_
U
Go
N
O
N
M
N
O
N
d
N
O
O_
O
a
4-
0
c
O
Id
C
O
N
d
a`
00
N
O
N
M
N
O
N
a
u_
U
I
a_
U
N
Y
R
a
c
d
E
t
U
ca
Q
Page 38 Packet Pg. 65
REET I Fund 126
7.A.a
Costs inflated at 3% per year
REET I (Fund 126) Expenditures
2023
2024
2025
2026
2027
2028
6-Year Total
Al
Edmonds Marsh Estuary Restoration (Acquisition)
$ 8,741,800
$ 8,741,800
A5
Interurban Trail (Expansion/Acquisition)
$ 895,585
$ 895,585
A2
Neighborhood Park SE1 (Acquisition)
$ 1,500,000
$ 1,500,000
A3
Neighborhood Park SR99 (Acquisition)
$ 1,545,000
$ 1,545,000
A4
Neighborhood Park SE2 (Acquisition)
$ 2,185,500
$ 2,185,500
(C) TOTAL PARKS REET I (Fund 126) Expenditures
$ 1,500,000
$ 1,545,000
$ 10,927,300
$
$
$ 895,585
$14,867,885
REET I (Fund 126) Revenue
2023
2024
2025
2026
2027
2028
6-Year Total
Real Estate Excise Tax (REET) I Fund 126
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 1,200,000
(D) TOTAL PARKS REET I (Fund 126) Revenue
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 1,200,000
REET I (Fund 126) Parks Fund 6-Year Overview
2023
2024
2025
2026
2027
2028
(E) Beginning Fund Balance
$ 900,000
$ (400,000)
$ (1,745,000)
$(12,472,300)
$(12,272,300)
$(12,072,300)
(D) Revenue
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
$ 200,000
(C) Expenditures
$ 1,500,000
$ 1,545,000
$ 10,927,300
$
$
(G) Ending Fund Balance (E+D-C)
1 $ (400,000)
$ (1,745,000)
$(12,472,300)
$(12,272,300)
$(12,072,300)
$(11,872,300)
U
a
LL
U
O
N
O
N
M
N
O
N
d
N
O
O_
O
L
a
O
c
O
C
O
N
d
L
a
00
N
O
N
M
N
O
N
a
LL
U
I
a_
U
N
Y
L
M
a
c
m
E
M
U
�a
r
a
Page 39 Packet Pg. 66
TREE Fund 143
7.A.a
Costs inflated at 3% per year
TREE (Fund 143)Expenditures
2023
2024
2025
2026
2027
2028
1 6-Year Total
Park and Open Space Acquisition Program
Is
(C) TOTAL TREE (Fund 143) Expenditures
$ -
$
$ -
$
$
$
$
TREE (Fund 143)Revenue
2023
2024
2025
2026
2027
2028
6-Year Total
Tree Fund 143
$ 199,000
$ 199,000
$ 199,000
$ 199,000
$ 199,000
$ 199,000
$ 1,194,000
(D) TOTAL TREE (Fund 143) Revenue
$ 199,000
$ 199,000
$ 199,000
$ 199,000
$ 199,000
$ 199,000
$ 1,194,000
TREE (Fund 143) 6-Year Overview
2023
2024
2025
2026
2027
2028
(E) Beginning Fund Balance
$ 199,000
$
398,000
$ 597,000
$
796,000
$
995,000
$ 1,194,000
(D) Revenue
$ 199,000
$
199,000
$ 199,000
$
199,000
$
199,000
$ 199,000
(C) Expenditures
$
$
$
$
$
$
(G) Ending Fund Balance (E+D-C)
$ 398,000
$
597,000
1 $ 796,000
1 $
995,000
1 $
1,194,000
1 $ 1,393,000
U
IL
u_
U
w
N
O
N
M
N
O
N
d
N
O
O_
O
L
a
O
c
O
C
O
N
d
L
a
00
N
O
N
M
N
O
N
IL
u_
U
I
a_
U
N
Y
L
a
c
m
E
U
�a
r
a
Page 40 Packet Pg. 67
CEMETERY Trust Fund 137
7.A.a
Costs inflated at 3% per year
CEMETERY Trust (Fund 137) Expenditures
2023
2024
2025
2026
2027
2028
6-Year Total
D8
Columbarium Expansion Phase II
$ 159,100
$ 159,100
Repair & Maintenance
$ 25,000
$ 25,000
$ 25,000
$ 25,000
$ 25,000
$ 25,000
$ 150,000
(C) TOTAL CEMETERY Trust(Fund 137) Expenditures
$ 25,000
$ 184,100
$ 25,000
$ 25,000
$ 25,000
$ 25,000
$ 309,100
CEMETERY Trust (Fund 137) Revenue
2023
2024
2025
2026
2027
2028
6-Year Total
Cemetery Trust Fund 137 Investment Interest (@5%)
$ 55,971
$
58,270
$
52,728
$ 54,864
$
57,108
$
59,463
$ 338,404
Cemetery Trust Fund 137 Sales Revenue
$ 15,000
$
15,000
$
15,000
$ 15,000
$
15,000
$
15,000
$ 90,000
(D) TOTAL CEMETERY Trust (Fund 137) Revenue
$ 70,971
$
73,270
$
67,728
$ 69,864
$
72,108
$
74,463
$ 428,404
CEMETERY Trust (Fund 137) 6-Year Overview
2023
2024
2025
2026
2027
2028
(E) Beginning Fund Balance
$ 1,119,420
$ 1,165,391
$ 1,054,561
$ 1,097,289
$ 1,142,153
$ 1,189,261
(D) Revenue
$ 70,971
$ 73,270
$ 67,728
$ 69,864
$ 72,108
$ 74,463
(C)Expenditures
$ 25,000
$ 184,100
$ 25,000
$ 25,000
$ 25,000
$ 25,000
(G) Ending Fund Balance (E+D-C)
$ 1,165,391
1 $ 1,054,561
$ 1,097,289
$ 1,142,153
$ 1,189,261
$ 1,238,724
a
U
IL
u_
U
00
N
O
N
M
N
O
N
d
N
O
O_
O
a`
O
C
O
to
C
O
N
d
L
a
00
N
O
N
M
N
O
N
IL
u_
U
I
a_
U
N
Y
L
a
C
m
E
U
�a
r
a
Page 41 Packet Pg. 68
7.A.a
UP / CIP COMPARISON (2022 TO 2023)
PROJECTS ADDED
Type
PROJECT NAME
CFP
DESCRIPTION
Parks
Johnson Property Demolition & Master Plan
Demolition scheduled for 2023, master plan in 2025
Parks
Meadowdale Playfields
Renovations consistent with City of Lynnwood ILA
Parks
Mathay Ballinger Park Improvements
Addition of paved loop pathway, permanent restrooms, shelter and picnic tables - 2023
Parks
Yost Park & Pool Improvements
Playground replacement (2023); Tennis court resurface, pool upgrades, trail/bridge repairs
Parks
Columbarium Expansion - Phase II
Funded through Cemetery Trust Fund 137 - 2024
Parks
Olympic Beach Park Improvements
Renovation of existing restroom - 2024
Parks
Pine Street Park Improvements
jAddition of small shelter, picnic tables, shade trees and paved pathway - 2024 project
Parks
Neighborhood Park SE1
X
Master plan and construction of new park in SE Edmonds
Parks
Maplewood Hill Park
Playground replacement - 2025
Parks
Elm Street Park Improvements
Addition of nature playground, small shelter, picnic tables and habitat restoration - 2026
Parks
Neighborhood Park SR99
Master Plan and construction of new park along SR99
Parks
Neighborhood Park SE2
X
Master Plan and construction of new park in SE Edmonds
Parks
Seaview Park Improvements
I Replacement of permanent restroom and ADA upgrades - 2027
Parks
Yost Pool Replacement
X
Replacement of existing pool - 2028
Parks
Si na a and Wayfinding
Standardization of park si na e - 2024
CFP / CIP COMPARISON (2022 TO 2023)
PROJECTS REMOVED
Type
PROJECT NAME
CFP
DESCRIPTION
Parks
Civic Center Playfield
X
2022 project
Parks
Marina Beach Park Improvements
X
Council declined grant and put project on hold
Parks
Yost Pool Repair (plaster)
2022 project - completed
Parks
Community Park & Athletic Complex - Phase II
X
Not identified as priority in 2022 PROS plan
Parks
Beautification Program
Pro ram moved to Gift Catalog based on large donation
CFP / CIP COMPARISON (2022 TO 2023)
Type
PROJECT NAME
CFP
CHANGE
Parks
4th Avenue Cultural Corridor
Moved back one year from 2025 to 2026
Parks
Waterfront Walkway Completion
Expense increase $84,500 due to inflation
Parks
Edmonds Marsh Estuary Restoration
X
Estimate for Master Plan added, acquisition and restoration expense still TBD
Parks
Orks & Facilities Maintenance and Operations Buildir,
X
Cost estimate for design and construction added
Parks
I Parkland Acquisition
I X
lExpanded to include 3 neighborhood parks, marsh and Interurban trail
a
U
a
u_
U
w
N
O
N
M
N
O
N
d
N
0
0_
0
a
0
c
0
a
c
a�
N
d
L
a
00
N
O
N
M
N
O
N
a
u_
U
I
a_
U
N
Y
R
a
c
m
E
t
U
�a
r
Q
Page 42 Packet Pg. 69
M
J
■� 1� � 1 1� � �'
L , �5
J I ,t.
t j'r
V I 7Packet Pg. 70
7.A.b
TRANSPORTATION & UTILITY PROJECT MAP.............................................................iii
FACILITIES & WWTP P OJECT MAP............................................................................iv
TRANSPORTATION ................................................................................................1
PRESERVAT MAINT NCE PROJECTS............................................................4
SAFETY PACITY ANAL S....................................................................................12
NO TORIZED TRA ORT ON PROJECTS.........................................36
FERRYP CTS... .......... ...................................................................61
TRAFFICCALM ......... ........................................................................63
TRAFFIC PLANNING ....... ..............................................................65
GREENSTREETS.................................................................................................68
WATER........................................ ............................................................
71
STORMWATER.................................. ... .................................................
76
EDMONDS MARSH ESTUARY RESTORATION ED PROJE
..................78
PERRINVILLE CREEK BASIN PROJECTS ................. ...............
............ ..........80
STORM DRAINAGE IMPROVEMENT PROJE ........ ...
............... ..85
ANNUALLY FUNDED PROJECTS ........................... ..................
...............
COMPLIANCE RELATED PROJECTS.........................................................
.....9
SEWER.........................................................................................................
............ 94
FACILITIES.............................................................................................
.................. 101
WASTEWATER TREATMENT PLANT.........................................................................1
26
CIP-CFP COMPARISON(2023-2028)....................................................................132
. •
7
T
a-
u_
U
00
N
0
N
M
N
O
N
m
0
a
0
L
a
4-
0
c
0
r
r
c
m
a�
L
a
Packet Pg. 71
7.A.b
U
PWT-17
•
4PWT-07
• F
PWT-65 7•
PWT-04
PWT-51
0 WT-28 �-` P: T
re WO 0- 1 qh,.
PWT-24
•
PWT-03
i PWT-09
PWT-12
Ci
-35 4WT-16
1 RAW
PWT-19
1 �WT-55 •
PWT-11
PWT-25
PWT-15
rPWT-20
PWT-22
PWT-08
PWT-21
PWT-�29 P•
PWT-47 PW�3O�j � WT2O PWT-13 PWT-14
I
GG77� PWT-31
PWT-06 PWT-23 PWTi64 PWT-50
PWT-06 PWS-1�
' PWD-0:
'� = 4p, W0 06PWT-26 P
PWT-10
* Site specific projects only. Citywide/annual citywide projects not shown. PWT-43 racket Pg. 72
T
a
u-
U
CO
N
O
N
M
N
O
N
d
N
O
Q.
O
L
a.
4-
0
C
O
r
r
L
7.A.b
1
o PWF-13
ra, o �i r
0 0 ° M
CO ° . Aldet .
' 11111l
1z f '
O
W T
'U . ■ St
Walnut
... It■if SEEM M
0
114111 I 41'
igueSt Sprague Si
71pplw�
;WF-01
F-07 ,fir
a I Edmonds St_
� ' ir M.
PWF-16 �
0 Z f1�;��1M1 a;�i�
_ Bell St L
w
n
� �_°�.�iil■y■�L11 or
Maple St
_
s 1
c=R fir■■ doa
Ider St
PWF-09 01
04 PWF-03 • PWI
PWF-10 I•
° ' 8Fuff,@,F-23;+
•u • .0 PIWF 1id
1,1
PWF-1
a
LL
U
00
N
O
N
M
N
O
N
d
u°
O
0.
O
l
O
c
r
c�
c
m
rn
d
IW
It
A
AL
AW .t j
' r
14Pr�
r '
7.A.b
•
•
U
d
U-
U
00
N
O
N
II M
-•g.;
Nx:
� � Packet Pg. 74
7.A.b
#P v 2024' 2025 2026 2027 2028 AL TOTAL I(20203T 028) (2 29 43) I TOTALCostojec
Preservation / Maintenance Proiects
PWT-01
Annual Street Preservation Program
$1,500,000
$1,500,000
$1,500,000
$1,650,000
$1,650,000
$1,650,000
$9,450,000
$24,750,000
$34,200,0(
PWT-03
76th Ave. W Overlay from 196th St. SW to Olympic View Dr.
$15,000
$0
$0
$0
$0
$0
$15,000
$0
$15,0(
PWT-04
Main St. Overlay from 6th Ave. to 9th Ave.
$157,000
$780,500
$0
$0
$0
$0
$937,500
$0
$937,5(
PWT-05
Puget Dr. @ OVD Signal Upgrades
$0
$0
$0
$86,000
$480,000
$0
$566,000
$0
$566,0(
PWT-06
Signal Upgrades - 100th Ave @ 238th St. SW
$0
$0
$0
$160,000
$750,000
$0
$910,000
$0
$910,0(
PWT-07
Main St. @ 3rd Si nal Upgrades
$0
$0
$0
$0
$106,000
$371,000
$477,000
$0
$477,0(
PWT-61
Olympic View Or Overlay - 196th / SR-524 to Talbot Rd AF
$0
$0
$200,000
$1,300,000
$0
$0
$1,500,000
$0
$1,500,0(
Safety / Capacity Analysis Ar it
PWT-08
I X
228th St. SW from Hwy 99 to 95th PI. W Corridor
$0
$0
$0
$1,000,000
$1,862,000
$6,360,000
$9,222,000
$0
$9,222,0(
PWT-09
X
Hwy 99 Revitalization & Gateway Project - Stage 2
$2,646,000
$0
$0
$0
$0
$0
$2,646,000
$0
$2,646,0(
PWT-10
X
Hwy 99 Revitalization & Gateway Project - Stage 3
$1,11fill
$2.608,000
$1,500,000
$15,000,000
$11,752,000
$0
$32,040,000
$0
$32,040,0(
PWT-11
X
Hwy 99 Revitalization & GatewayProject - Stage 4
4
$2,100,000
$3,710,000
$2,262,000
$11,000,000
$11,000,000
$30,812,000
$0
$30,812,0(
PWT-12
X
Hwy 99 Revitalization & Gateway Project - Stage 5
$
$0
$0
$2,080,000
$4,964,000
$0
$7,044,000
$37,971,000
$45101510(
PWT-13
X
Hwy 99 Revitalization & Gateway Project - Stage 6
$0
$0
$0
$0
$0
$0
$0
$20,217,000
$20,217,0(
PWT-14
X
I Hwy 99 Revitalization & Gateway Project - Stage 7
$0
$0
$0
$0
$0
$0
$0
$38,142,000
$38,142,0(
PWT-15
X
Hwy 99 Revitalization & Gateway Project - Stage 8
$0
$0
$0
$0
$0
$0
$35,242,000
$35,242,0(
PWT-16
X
Hwy 99 Revitalization & Gateway Project - Stage 9
0
$0
$0
$0
$0
$0
$0
$20,072,000
$20,072,0(
PWT-17
X
SR 524 196th St. SW / 88th Ave. W - Intersection Improvements
$0
$0
$0
$255,000
$230,000
$765,000
$1,250,000
$0
$1,250,0(
PWT-18
X
Main St. @ 9th Ave. Intersection Improvements
$0It
$0
$190,000
$1,060,000
$0
$1,250,000
$0
$1,250,0(
PWT-19
X
76th Ave. W @ 220th St. SW - Intersection Improvements
$761,250
$462,750
$6,673,000
$0
$0
$8,697,000
$0
$8,697,0(
PWT-20
SR-104 Adaptive System - 236th to 226th
$
$0
$1,984,000
$0
$0
$0
$2,227,440
$0
$2,227,41
PWT-21
X
SR-104 @100th Ave W. Intersection Improvements
$0
$
$0
$170,000
$987,000
$0
$1,157,000
$0
$1,157,0(
PWT-22
X
SR-104 @ 95th PI. W Intersection Improvements
$0
$0
85,000
$478,000
$0
$563,000
$0
$563,0(
PWT-23
X
SR-104 @ 238th St. SW Intersection Improvements
$0
$0
00
$1,219,000
$0
$1,433,000
$0
$1,433,0(
PWT-24
X
Olympic View Dr. @ 76th Ave. W Intersection Improvements
$0
$0
$0
$0
$1,266,000
$1,266,0(
PWT-25
X
84th Ave. W 212th St. SW to 238th St. SW
$0
0
$0
$0
$0
$16,622,000
$16,622,0(
PWT-26
I X
SR-104 @ 76th Ave. W Intersection Improvements
$0
$0
low $
&I $)
$0
$0
$0
$3,231,000
$3,231,0(
PWT-27
X
1 Olympic View Dr. 174th St. SW Intersection Improvements
$0
$0
off$0
$0
$0
$0
$0
$671,000
$671,0(
PWT-28
175th St SW Sloe Repair
$0
$
$0
1,000,000
$0
$1,000,000
$0
$1,000,0(
PWT-63
2023 Guardrail Program
$20,190
$0
$0
$0,
$0
$20,190
$0
$20,1(
PWT-59
2023 Traffic Signal and Safety Upgrades
$30,280
$0
$0
$0
$0
$30,280
$0
$30,2E
Non -motorized transportation projects AF
a
0
d
ILL
U
00
N
O
N
M
N
O
N
d
N
O
0.
O
L.
d
4-
0
C
O
r+
C
d
N
G1
L
d
a
LL
V
d
c.i
fn
Y
L
O
t,1
7
IL
00
N
O
N
PWT-29
X
232nd St. SW Walkway from 100th Ave. to SR-104
$0
$0
$0
off$0
$276,000
$1,526,000
$1,802,000
$0
$1,802,0( N
PWT-30
X
236th St. SW Walkway from Madrona Elementary to 97th Ave. W
$0
$0
$0
$286,000
$1,642,000
$0
$1,928,000
$0
$1,928,0( N
PWT-31
PWT-32
X
X
236th St. SW Walkway from Hwy. 99 to 76th Ave. W
84th Ave. W Walkway from 238th St. SW to 234th St. SW
$0
$0
$0
$0
$0
$0
$0
$160,000
$0
$680,000
$0
$0
$0
$840,000
$1,831,000
$0
$1,831,0( C
$840,0(
PWT-33
X
80th Ave. W Walkway from 212th St. SW to 206th St. SW
$0
$0
$0
$250,000
$250,000
$2,500,000
$3,000,000
$0
$3,000,0( S
PWT-34
I X
180th Ave. W Walkway from 188th St. SW to Olympic View Dr.
$0
$0
$0
$633,000
$2,374,000
$0
$3,007,0001
$0
$3,007,0( V
PWT-35
X
218th St. SW Walkway from 76th Ave. W to 84th Ave. W
$0
$0
$0
$0
$256,000
$1,431,000
$1,687,000
$0
$1,687,0( +�+
PWT-36
X
Walnut St. Walkway from 6th Ave. S to 7th Ave S
$0
$0
$0
$281,000
$0
$0
$281,000
$0
$281,0( Q
PWT-37
X
216th St. SW Walkway from Hwy. 99 to 72nd Ave W
$0
$0
$0
$213,000
$0
$0
$213,000
$0
$213,0(
PWT-39
X
Citywide Bicycle Improvements Project
$1,771,847
$0
$0
$0
$0
$0
$1,771,847
$0
$1,771,8&
PWT-40
X
Maplewood Dr. Walkway from Main St. to 200th St. SW
$0
$0
$0
$213,0001
$213,000
$2,438,000
$2,864,000
$0
$2,864,000
PWT-41
X
95th PI. W Walkwa from 224th St. SW to 220th St. SW
$0
$0
$0
$127,000
$710,000
$0
$837,000
PWT-42
I X
Railroad St. Walkway from Dayton St. to Main St. / SR-104
$0
$0
$0
$180,000
$800,000
I $0
$980,000
Packet Pg. 75
2023-2028 CIP-CFP v0.3
7.A.b
PWT-43
X
SR-104 @ 76th Ave. W Non -Motorized Trans Improvements
$0
$0
$0
$200,000
$200,000
$1,600,000
$2,000,000
$0
$2,000,000
PWT-44
X
Downtown Lighting Improvements
$0
$0
$0
$300,000
$1,200,000
$0
$1,500,000
$0
$1,500,0(
PWT-45
X
SR-104 Walkway: HAWK to Pine / Pine from SR-104 to 9th
$0
$0
$0
$265,000
$265,000
$2,650,000
$3,180,000
$0
$3,180,0(
PWT-46
X
191st St. SW Walkway from 80th Ave. W to 76th Ave. W
$0
$0
$0
$0
$0
$0
$0
$678,000
$678,0(
PWT-47
X
104th Ave. W / Robinhood Lane Walkway from 238th St. SW to 106th Ave. W
$0
$0
$0
$0
$0
$0
$0
$1,060,000
$1,060,0(
PWT-48
X
80th Ave. W Walkway from 218th St. SW to 220th St. SW
$0
$0
$0
$0
$0
$0
$0
$324,000
$324,0(
PWT-49
PWT-50
X
X
84th Ave. W Walkway from 188th St. SW to 186th St. SW
238th St. SW Walkway from Hwy. 99 to 76th Ave. W
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$328,000
$1,285,000
$328,0(
$1,285,0(
PWT-55
X
Elm Way Walkway from 8th Ave. S to 9th Ave. S
$901,974
$0
$0
$0
$0
$0
$901,974
$0
$901,9i
PWT-60
2023 Pedestrian Safety Program link,
$20,195
$0
$0
$0
$0
$0
$20,195
$0
$20,1E
PWT-62
Citywide Lighting Study
$60,000
$0
$0
$0
$01
$0
$60,0001
$0
$60,0(
Ferry Projects Ad
in
I PWT-52 I (Traffic Calmino Program 1 1 - 1 M&l301 $18.0001 $18.0001 $18.0001 $18.0001 $18.00011 $123.13011 $01 $123.1:
PWT-53 I ICitvwide ADA Transition Plan
Green Streets
PWT-64
Green Streets 236th St SW - 84th Ave W to Hi hwa 99
$204,717 $3,500,000
$0
$0
$0
$0
$3,704,717
$0
$3,704,71
PWT-65
Green Streets Dayton St - Highway 104 to 2nd Ave S-7
$78,027 $0
,600,000
$0
$0
$0
$1,678,027
$0
$1,678,0:
Total Projects
$10,533,050 $1 0,974,750 $35,631,000 $45,422,000 $32,309,000 $146,281,300 $203,690,000 $349,971,3(
Funding Source
2026
2027
2028
TOTAL
(2023-2028)
TOTAL
(2029-43)
TOTAL
OEM -
Street Fund 112 - Gas Tax & Multi -modal revenue
$670,000
$0
IMQOO
$150,000
$150,000
$1,120,000
$2,250,000
$3,370,0(
REET Fund 125
$1,217,277
$65
$600
$8
$500,000
$500,000
$4,273,277
$7,500,000
$11,773,2i
REET Fund 126
$1,169,492
$5 0
$818,0
$518,000
$518,000
$4,159,492
$7,500,000
$11,659,4�
Transportation Imact Fees
$629,226
$1, 644
"8,89131011h,
$1,056,000
$0
$0
$5,140,760
$0
$5,140,7(
General Fund
$0
$605,00099W$500,000
7%500,0001,000
$500,000
$2,605,000
$7,500,000
$10,105,0(
Water Utility Fund 421
$17,500
$10,00
$5,000
$600,000
$665,000
$2,535,5001
$0
$2,535,5(
Stormwater Utility Fund 422
$367,427
$10,000
$5,000
$
$0
$382,427
$0
$382,4:
Sewer Utility Fund 423
$0
$0
$0
$12
$270,000
$149,000
$545,000
$0
$545,0(
Federal Grants
$1,173,199
$2,067,856
$2,143,860
$ 0
$0
$0
$7,290,915
$0
$7,290,91
State Grants
$3,756,685
$2,608,000
$1,500,000
4,000
$6,742,000
$0
$28,880,685
$0
$28,880,6(
Other Sound Transit Grant
$1,249,500
$0
$0
$0
$0
01
1,249,500
$0
$1,249,5(
ARPA
$282,744
$0
$0
$0
$0
$0
$282,744
$0
$282,7z
Unsecured Funding
$0
$3,500,000
$3,584,000
$15,401,000
$35,504,000
$29,827,000
$87,816,000
$178,940,000
$266,756,0(
Total Revenue $10,533,050 $11,411,500 $10,974,750 $35,631,000 $45,422,000 $32,309,000 $146,281,300 $203,690,000 $349,971,3(
d
LL
U
00
N
O
N
M
N
Packet-Pg. 76
2023-2028 CIP-CFP v0.3
2023-2028 CIP-CFP v0.3
Project Description 14440opp�
Annual pavement preservation progra
Project Benefit
Maintains the City's pavement infrastructu
steets.
Estimated Project Cost
$1,500,000 to $1,650,000/ year
rger capital investment to rebuild City
Design
$50,000
$50,000
$5W00
$60,00
Right of Way
Construction
$1,450,000
$1,450,000
$1,450,000
$1,590,00
Expense Total
$1,500,000
$1,500,000
$1,500,000
$1,650
Street Fund 112 - Gas Tax & Multi -modal
$500,000
$150, 00
REET Fund 125
$500,000
$500,000
$500,000
$500,000
REET Fund 126
$500,000
$500,000
$500,000
$500,000
Transportation Impact Fees
a
U
d
u_
U
00
N
O
N
M
N
O
N
d
to
O
IZ
O
L
w-
O
c
O
r
r
c
as
as
L
a
$900,00
pr,590,000 $1,590,000 $23,850,00 i
$1,650,000 $1,650,000 $24,750,00 i
$150,000 $150,000 $2,250,00 i
$500,000 $500,000 $7,500,00
$500,000 $500,000 $7,500,00
General Fund $500,000 $500,000 $500,000 $500,000 $500,000 $7,500,00
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total $1,500,000 $1,500,000 $1,500,000 $1,650,000 $1,650,000 $1,650,000 $24,750,00
2023-2028 CIP-CFP v0.3
5
Packet Pg. 78
i BoI Il PI SlH'
�Al PI SN!
i
1861h St SW
y Q
s
"
,ennalsv
187th
St SW
m
Jill
187thP1 SN1
a'
W
188th
St SW ¢
a
Q
2
N
a,
T
189th PI00 S
SOP
00
a
a'19oth St SW"
1 v, G PI
7 9151 P
i
v
�
191st St SW
192nd St SW
s� SOV,
192nd Pi SW
6
193rd PI SW
na•.b s:a q
�^
a
194th St
a ,
ap
19S1h St
196th
St SW —
�_S—
�196TH_ST-:S
oQo`c
�
Project Description
Pavement overlay of 76th Ave. W from
and addition of a bike lane for then 0 OOU
and Lynnwood, since the west half of the sti
Project Benefit
11
y63r a .
asC1
1�
�.� -
,a
Q
- -��.y-�
o 3
a
y :
185tn-St=Sw
�
,185th-
-St_SW
185thPP.SW
tiiPicy
}
°'
¢
t
'�
m r
r
y e6txstsw
I
a I� 86th-Sp
W
187th-PI=SW: 1. >
�
--i �=168th=Pi:SW F_188TH-ST-SW �
c
¢'==190tl
C
04191s1 PtSW,
Q 192nd-PI-SW—_----�,
2 Q
v _ 193rd:Pf SW_
n n
SW 19q�h Pl SW
Penny Ln 4
h-P_i-Syl, 1e9thpls� 891ha O�
I- d
-st-sw�' ➢.190tn-st-sw , U
C
'mil 92nd
1.91st-st-SW
L
date
u-
f;
19211dPark=Way
W
O
=190r WSW--�
'1g3rd St SW
N
M
194ttrst 3W.
N
N
N
L
a
�
0
0
FF
0
c
to pic View Dr. with pedestrian curb ramp upgrades °
r
to t. This is a joint project funded by the Cities of Edmonds c
r
is in the City of Es and the east half is in the City of u°',
a
Improve pavement condition and upgrade pedesiYRR curblill
existing southbound bike lane, the project may add a new no
Transportation Comprehensive Plan.
Estimated Project Cost
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REST Fund 125
REST Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Other
Unsecured Funding
Funding Source Total
$15,000
$15,000
$3,315
$11, 685
$15,000
Fmeet ADA
nd bike Ian
ndards. In addition to the
kutlined in the City's
2023-2028 CIP-CFP v0.3 6
Packet Pg. 79
Edmonds Police and Civic Playfield
Municipal Court
Veteran's z
z
z
Plaza ¢
¢
Bell St a
W
Bell St
Q
00
F—
aN
MAIN ESiT a
U
Yo
a
Sno-Isle Frances Anderson
Pa
LL
U
Lib r Anderson Center
N
00
'
ion
Center Field
y
W
CN
Q
- -
Q
N
M
-
Dayton St
Q,
N
-
— -
=� ;
N
Christian
¢'
N
Science
0%
Map,
0
Church
0
L
Project Description
Pavement overlay along Main St. froIltCv
Rapid Flashing Beacons (RRFB's) at t Istin
federal grant (funds available in 2023) and Cit
Jthwith
0
c pedestrian curb ramps upgrades and Rectangular °
rosswalk at 8th Ave. The project will be funded with a
nds fora local match. u,
a)
L
Expense Total
$157,000
$780,500
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
$31,400
$156,000
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
$125,600
$624,500
State Grants
Unsecured Funding
Funding Source Total
$157,000
$780,500
Packet Pg. 80
2023-2028 CIP-CFP v0.3 7
z
)ri��ood C a
h
rn
Puget <�
Puget Way Z
W f
_ AL Ia
=I
� Pu
ON
Project Descripti
cr QQ'
Sr Q�G
PUGET [
Edmonds
Elementary
a'
u Excelsior PI
n
E
7,
O
The project consists of a complete sign h t moval of all vehicle head currently on Spam wire and
conversion to standard traffic signal a s. Vehicle detention will also be upgraded as part of this
project.
Project Benefit
This upgrade will provide safer roadway conditiolMR11—ce thA
wires. The new vehicle detection will guarantee that all vehic
Estimated Project Cost
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
while handing on those
$480,000
$86,000 $480,000
$86,000 $480,000
$86,000 $480,000
a
U
d
u_
tU
0
N
z N
d N
0
2023-2028 CIP-CFP v0.3 8
Packet Pg. 81
N
O
Faith
Community
Church
a
O
238th St SW
Project Descriptio
Install new traffic signal and vehicle de n
Project Benefit
The existing traffic signal is near the end of it nticipated s
Estimated Project Cost
$910,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
rn
SW
238th St SW
$160,002W$750,000
$160,000 $750,000
$160,000 $750,000
a
n
i
237th PI
a
U
d
u_
U
00
N
O
N
M
N
O
N N
0
SW o
L
0
c
0
r
0
r
c
as
a�
L
a
2023-2028 CIP-CFP v0.3 9
Packet Pg. 82
B racketts
Landing �a
South -
Railroad
Station
Post
am Office
IT
a
Cc
es & Mini Parke
St��' Q 4,
a
Project Descriptioi
Install new traffic signal and vehicle del
_�qw
0,
Project Benefit
The existing traffic signal is near the end of
Estimated Project Cost
$477,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
Edmonds Polic
Est and Municipal
p Court
Veteran' i
Edmonds Centennial Plaz V
City Mall Plaza Bell
LL
00
N
N
N
O
N N
Fountain MAIN ST n
0
a
0
L
a
0
$106,000 $371,000
$106,000 $371,000
_
0
c�
d
N
L
a
2023-2028 CIP-CFP v0.3
Packet Pg. 83
10
Project Descripti
Pavement overlay along Olympic View
upgrades. 4
Project Benefit
Improve pavement condition and improve a
Estimated Project Cost
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Grants
Funding Source Total
/ SR-524 to Talbot Road, along with ADA curb ramp
$100,000 $300,000
$100,000 $300,000
$700,000
$200,000 $1,300,000
2023-2028 CIP-CFP v0.3
Packet Pg. 84
2023-2028 CIP-CFP v0.3
Packet Pg. 85
12
Sti 5i
\�O
�O
a a
Y
232nd St SW
Project Descripti
J L ti r.dr ram_-- t. ESPERANCE L � .7.
224th Si SW , 22btr �i_�ry - r!
ar■ *■- �w•■'r.b+ r�J w� M 224ih 5t=5W- 3
zxa,h P1 SW r' f wr�1 i 7 w
i I J,i Il�dl ■ *r a m qi,7
16 LJ r+ l i °' l w • 224th PI Syy f a n 1 �>
Q @.li II■ f��l, ■ 0K.; t7 't�i zzstT�sw am^wsw ■ 7 If +'��-...3, M am
i n ■. .
r,'; 1,°ILr •� a V° l■ 'f 225cn PfSW www www.-
Isla +� tea' ,���� _�
N f 226th St SW3 226th St 5W-a l �!
11
ldt.
M.�*w�ro
'.
of
"o
Ltr
i "pl
'_.,�♦ rJ tf
M.
yrpjl
swy �L �
111► +?a w ..a.r l
■' N r =
: '
3
All
s
'+�,_7. � c,■�
11M
+ ■ •. is
-�
� ■I # w a Qi-
m �► _Eco
`�°+t+A a :.f fit s� Y, •�+'�
a co
Mw
L
<' i■■iFii � � J w ■�
d
228TH Si SV V
dr ti rr
IMF ■ drl
22C St g i, A s
IV LU
:ffi _ 7 .% 4_a
r m 2301th St SW -r—
. oa "Ro=
a:
Q
Cq ! i 0_®
mt s�-i■ts� t
' .230th St SW,�,-
M
t�
• Vir
N
N
d
ORE mid A
--
O
Q.
O
c
Widen 228th St. SW from Hwy. 99 to� hre es (with center two-way left turn lane), with curb and °
gutter, sidewalk, and bike lanes.
m
to
Project Benefit lW
This project would improve active transportat n sa affic s along this corridor. Community Transit a
will evaluate the possibility of creating a new eas st bu to ng 228th St. SW, if this project moves v
forward (connecting Edmonds Transit Station to Mountlake Te Transit St4 a
Estimated Project Cost
$9,222,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
$1,000,000 862,000
Y$1, 000,000
$6,360,000
$1,000,000 $1,862,000 $6,360,000
$1,000,000 $1,862,000 $6,360,000
$1,000,000 $1,862,000 $6,360,000
2023-2028 CIP-CFP v0.3
13
Packet Pg. 86
m
7 212TH-Sr'T SW -:Y—
>
FLLPn
x ' 610 w
220THSTSW. �] a
w
a r r Q[�r L
o 228TH ST SW O H I�
In LLI
zsI6T I� .srLIJ
- / 244TH
Project Descriptio
Installation of raised landscaped mediarec
rthe
corridor from 244th St. SW to 212th St. SW, addition
of "Gateway" signage on both ends ew pedestrian HAWK signal just north of 234th St. SW
The project is funded from state funds provinecting Washington Transportation program, as well
as REET funds.
Project Benefit
The conversion of the center two-way left turn lane to a lands raised me ill improve corridor safety
along this Highway of Regional Significance (HRS), with an Aver Daily Tr A 35,000 vehicles per
day. The new HAWK signal will provide a signalized pedestrian ossing en the ing traffic signals at
238th St and 228th St.
Estimated Project Cost
Design
Right of Way
Construction
$2,646,000
Expense Total
$2,646,000
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
$81,000
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
$2,565,000
Unsecured Funding
Funding Source Total
$2,646,000
2023-2028 CIP-CFP v0.3
14
d
U
ii
LL
U
00
N
O
N
M
N
O
N N
d
0
Q.
0
L
0
Packet Pg. 87
c
0
c
m
rn
W
a
2381h Si SW
2401h Si SW
CLCL
242nd St SW
ro
, 238TH ST SW
238th St SW m 3 w
(t'ek
240th St SWCOy6, 79th
b'�qw 55 O"r"" 0nf31
d*" it
W
``'T
a' Z
n
S
240th P! SW 241 st St SN d
V
a
LL
242nd St SW - - pp
a a 242nd PI S4V N
m 04
-.. r 243rd PI S C;
0
N C*4
4Y WAY LAKE BALLINGEA a
0
a
Project DescriptionOIV o
c
The Stage 3 Highway 99 project limits a o h S to 238th St. SW. The project will add a planter strip
c�
on both sides of the street, new stre htin m stormwater facilities, targeted utility replacements, _
potential undergrounding of overhead utiliti landscaping and other softscape treatments. The Design and right
of way phases are funded through secured C nectI g Washing ds. a
Project Benefit
Improve aesthetics, safety, and user experience along this s
Estimated Project Cost
$32,970,000
the HwvAllkrridor.
Design
$945,000
$1,425,000
$500,000
Right of Way
$235,000
$1,183,000
$1,000,000
Construction
$15,00 0 $11,752,000
Expense Total
$1,180,000
$2,608,000
$1,500,000 $15,000,000 $11,752,000
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Water Utility Fund 421
$600,000 $638,000
Stormwater Utility Fund 422
Sewer Utility Fund 423
$126,000 $130,000
Federal Grants
State Grants
$1,180,000
$2,608,000
$1,500,000 $14,274,000 $6,742,000
Unsecured Funding
$4,242,000
Funding Source Total
$1,180,000
$2,608,000
$1,500,000 $15,000,000 $11,752,000
Packet Pg. 88
2023-2028 CIP-CFP v0.3 15
Project Descriptio
The Stage 4 Highway 99 project limits a orare
to approximately 500 feet north of 220th St. SW. The
project will add a planter strip on bo des
targeted utility replacements, potential uncle
treatments. The intersection of Highway 99
of service. The Design and right of way phas
federal grant and local traffic impact fees.
Project Benefit
Improve aesthetics, safety, and user experience. In additionYfe con
Estimated Project Cost
$30,812,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
Water Utility Fund 421
Stormwater Utility Fund 422
Sewer Utility Fund 423
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
2023-2028 CIP-CFP v0.3
224th
20THSTa S'
r,q
J
71 224th St SW'
� II
Ln
�w
z~
Ow a
Y
❑ J
w ~
,new street lighting, improved stormwater facilities,
g of overhead utilities, landscaping and other softscape
St. will b ed to add capacity and improve the level
ured Connecting Washington funds, a
develop nt would be improved.
$740,000 $1,600,000 $710,000 $161W0
$500,000 $3,000,000 $2,100,000
$11,000,000 $11,000,000
$740,000 $2,100,000 $3,710,000 $2,262,000 $11,000,000 $11,000,000
$376,000 $1,044,540 $1,752,009 $1,056,000
$600,000 $665,000
$140,000 $149,000
$364,000 $1,055,460 $1,957,991 $1,206,000
$10,260,000 $10,186,000
$740,000 $2,100,000 $3,710,000 $2,262,000 $11,000,000 $11,00
Packet Pg. 89
16
a
U
iL
LL
U
00
N
O
N
M
N
O
N
d
to
0
Q.
0
a
0
c
0
r
0
c
m
U)
W
a
213th pl SW
215th St SW h
216th
Project Description �
Along Hwy 99 from 216th St SW to 21
new street lighting, better stormwat4
overhead utilities, landscaping and of
Project Benefit
a
Improve aesthetics, safety, and user experience.
along the corridor.
Estimated Project Cost
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
212TH ST 8W'
Aft
LLI
a a
z S
w �-
�
a' 214fhJsr SW �IC G��P U
r� r
��
p, `001�00
N
/ V
M
/ N
N N
to
_ 21 bth St SW 216th S 0
/ — C
F d
0
c
pr t will add a planter strip on both sides of the street,
Ie eted utility replacements, potential undergrounding of
r
pe treatmentst� identify the area as being in Edmonds. W
a
lopment will be improved
$2,080,000 $4,964,000
$2,080,000 $4,964,000
$2,080,000 $4,964,000
$1, 000,00
$1, 000,00
$35,971,00
$37,971,00
$37,971,00
$37,971,00
2023-2028 CIP-CFP v0.3 17
Packet Pg. 90
Madrona Ln
3 235th P1 SW
s
236th Si SW x Q
m
341h
236th St SW
Project Description
Along Hwy 99 from 238th St. S7and
23
new street lighting, better stot ana
overhead utilities, landscapingother soft
Project Benefit
Improve aesthetics, safety, and user experience.
along the corridor.
Estimated Project Cost
$20,217,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
234th St SW
a'
236th St SW
4
n a
a'
w
v
e p ct will add a planter strip on both sides of the street,
Ie eted utility replacements, potential undergrounding of
pe treatments to identify the area as being in Edmonds.
lopment would be improved
d
00
N
O
N
M
N
O
N N
d
N
Q
0
d
0
$2,146,00 cc
$1,433,00 C
$16,638,00 cc
$20,217,00 y
$20,217,00
$20,217,00
2023-2028 CIP-CFP v0.3 18
Packet Pg. 91
F �1� POF -■01■ 41
V i . ■71
I�y� ��t�rn�■A
Holly Ln
. T
228 Tti ST SW m - -
14MaoJ■ it �! p, ii -
.
229th St —SW'- i_
i 140 iyer i �1161r
1 � 22kh PISW
i .t��Ml� ■ � al s � i
e= r j 230th St SW
230th St SW ' rig:,•,
1 Cq v / N
4V 16jo;-n F. plop
r 1k
13ro 3 SW •� dj }
Project Description
2341h St SW
Along Hwy 99 from 234th St. SW to 2;
new street lighting, better stormwatq
overhead utilities, landscaping and of
Project Benefit
ana
Improve aesthetics, safety, and user experience.
along the corridor.
Estimated Project Cost
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
234th Si SW
3
w
a
n
232nd St SIN
I
229th St SVV / 4
v ,230th S1 SW
�W w
23D� Sr} W
Q s
4r
Q b �
O
r
e p ct will add a planter strip on both sides of the street,
Ie eted utility replacements, potential undergrounding of
pe treatments to identify the area as being in Edmonds.
lopment would be improved
os
La
W
Y
a
J
N
A
$4,013,00
$5,354,00
$28,775,00
$38,142,00
$38,142,00
$38,142,00
♦L
U
a
tL
U
O
N
O
N
M
N
O
N
d
to
O
M
O
L
4-
0
c
O
M
c
m
a
2023-2028 CIP-CFP v0.3 19
Packet Pg. 92
-0 dF gr oil
16611
-22atn�5t yw
��
• ■
I&
n i
n
r
F.
225tha Pl SW
o
225th PI SW.
3M
226th St SWN -r.
ago
8fsi 1
-
1• IL
U
a.
�
228TH
ST
w
Project Description
' 224th St 3W L = —
—224thr St SW —
— —�
zzscn s sr. _2
C
N
a n
a
--
EDMONDS
!„ °
�AOUNTLAKE
a
v
U.
W
0
226TH PL SW_
--—
Ci
N
r
N
N
4 N
O
N
b
n�
rn
0
0
M
0
a
4-
0
c
Along Hwy 99 from 228th St. SW to 22re
e p ct will add a planter strip on both sides of the street,
new street lighting, better stormwat ana eted utility replacements, potential undergrounding of =
overhead utilities, landscaping and other sofreatments to identify the area as being in Edmonds. w
Project Benefit ,
Improve aesthetics, safety, and user experience.
along the corridor.
Estimated Project Cost
$35,242,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
lopment would be improved
$3,596,00 i
$2,439,00 i
$29,207,00
$35,242,00
$35,242,00
$35,242,00
2023-2028 CIP-CFP v0.3 20
Packet Pg. 93
216th St SW & 216th St SW
F
St SW
d
220TH-ST SW ---
-- . n�
Project Descriptio
Along Hwy 99 from approximately 500 n 22 t. SW to 216th St. SW, the project will add a planter
strip on both sides of the street, ne et li in , er stormwater management, targeted utility
replacements, potential undergrounding of o head utilities, landscaping and other softscape treatments to
identify the area as being in Edmonds.
Project Benefit 4004
Improve aesthetics, safety, and user experience. In addition,
along the corridor.
a
Estimated Project Cost
$20,072,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
ao
N
O
N
M
N
O
N N
a)
0
CL
0
a
4-
0
ment would be improved
$1,866,00 i
$2,036,00
$16,170, 00 .
$20,072,00
$20,072,00
$20,072,00
2023-2028 CIP-CFP v0.3 21
Packet Pg. 94
196th St 5W
rwlow
PUD
�Q ub
4n
Maplewood Ir
Hill Park
W
n Q
00
00
v
Seventh Day Q
Adventist
Church
co
196TH ST SW
Project Descriptio
Install traffic signal at the intersection W th Ave. W. The modeling in the 2009 Transportation
Plan indicated that restricting north d an)ou d traffic to right -turn -only (prohibiting left -turn and
through movements) would also address theiciency identified at this location through 2025. This is same
alternative as one concluded by consultant i07 study enmencled by City Council. This could be
implemented as an alternate solution, or asnterimffic signal warrants are met. The existing
LOS is F (below City Standards: LOS D). This proj a Roadway Project Priority in the 2015
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
$255,000
$230,000
$765,000
$255,000 $230,000 $765,000
$255,000 $230,000
$255,000 $230,000
a
U
a -
ILL
U
00
N
O
N
M
N
N� N
m
0
s M
0
a
0
c
0
r
0
c
m
a�
a
$765,000
$765 non
Packet Pg. 95
2023-2028 CIP-CFP v0.3 22
Anderson
Center
Field
Bell St
z
a
s
00
v
Q
co
Bell
MAIN STLL
_ a
— a
00
� V
W o
> Yost Park N
a M
N
O
N N
Olt
Dayton St
0
O
CL
O
L
Project Description
Installation of a traffic signal or mini-ro b
2015 Transportation Plan.
Project Benefit Uff
The existing intersection is stop -controlled fo II a
(below the City's concurrency standards: LOS D)A
delay to LOS B.
Estimaooject Cost
$1,250,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
IL
4-
0
c
ranked #4 in the Roadway Project Priority of the
c�
m
N
O
L
a
(projected intersection LOS in 2035 is LOS F
traffic signal would improve the intersection
$1,060,000
$190,000 $1,060,000
$190,000 $1,060,000
$190,000 $1,060,000
2023-2028 CIP-CFP v0.3 23
Packet Pg. 96
WINCO
219th St SW
LO
N_ }�
T IW
00 Q
a r~` 21919 STARBUCKS
220TH ST SWUJ
a
a
..
o�
7514 Q N
M
d
■ o
ER 221st PI SW LYNWOOD a
0
L
IL
Project Description o
c
Reconfigure eastbound lanes to a left t n thr / right turn lane. Add eastbound and westbound °
r
dedicated left turn lanes with a prot d-per tt se. Provide right turn overlap for westbound movement
r
during southbound left turn phase. (Addition mprovements include wider sidewalk, bike lanes, and various
utilityimprovements (including potential co rsion over es to underground). ROADWAY PROJECT aL
� p (� gpa
PRIORITY #1 in 2015 Transportation Plan
Project Benefit
Reduce the intersection delay and improve the LOS. The proj(
LOS D. Improve active transportation conditions for pedestria
Estimated Project Cost
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Water Utility Fund 421
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
2023-2028 CIP-CFP v0.3
$606,250
$155,000
$300,000
$500,000
$64,750
$398,000
$6,673,000
$761,250 $800,000 $462,750 $6,673,000
$253,226
$392,104
$266,881
$17,500
$10,000
$5,000
$17,500
$10,000
$5,000
$473,024
$387,896
$185,869
$6,673,000
$761,250 $800,000 $462,750 $6,673,000
24
improved from LOS F to
Packet Pg. 97
Aigong, a 5tt 226th St SW 4St SSW
228th St SW
a
m
s 231st St SyG
C
N Om
� O 9
7772 c�
chusett=Rd' "' _;O
a
Nottinghafr Rd'
❑ °o
Z 235th PI SW
C0C
_ ❑ v
W
Project Description
Installation of an Adaptive System alon -1 2 St. SW to 226th St. SW (total of five traffic signals
along this stretch / spaced —1, mile f eac h signal communication currently exists between any o
the existing traffic signals. (SR-104 @ 236th S W, SR-104 @ 232nd St. SW, SR-104 @ 95th PI. W, SR-104 @
100th Ave. W, and SR-104 @ 226th St. SW)
Project Benefit 49004
a
2 �
1- C,
T
C%
II
.z�elis
z ne Pu,;
a
LLJ
O
.o
a
II
�
n PI5P:
n 4
m Q�5
z231s a
232nd St SW
7
a
m �
.3: }�LL, 2fI -223th P1SVV i
a ■; 1 u4_226th St SW -
:=.1
L'�.1L�� `n :.,!.■ }.
,e.
� ,:r soe AY --`� ,e irMw.a .� �t♦ e�:
228TH ST SW
g # P-11 r■ A.A. •■
'rroA .,14. 1� 229th:StS`o..
r �ai« �,Ay . F■ �3a...■�
■m■■ ■ 4,230th-St-
i ai Y i d
231'st St SW
00 ... •. 7.s a � _
f 1■iaHT.ri�d
'� �,L D ��■■iu ul 41. _!7 �Tl i.. �♦
232nd PISW.1 K7 fr1, a V
�r L 44ol,ly,
._ .. a 00
=�R Maple Ln ��■� O
IN
2341h St SW
a
�=
Madrona Ln
N
>
N
O
N
-a
4dsl�L
—236th St SW
1f:
236th St SW 236th it
N
Improve traffic flows along this regional corridor with a curre
per day.
Estimated Project Cost
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
$1,984,000
$243,440 $1,984,000
$32,865
$210,575
$243,440
$1,984,000
$1,984,000
DT) of — 25,000 vehicles
O
Q
c
O
r
f
c
m
to
W
a
2023-2028 CIP-CFP v0.3 25
Packet Pg. 98
Project Descriptioi
Implement Westgate Circulation Acces
safety to access the driveways withi xim
potential addition of bike lanes. This project
(completed in 2015).
PCC NATURAL
MARKET
0
Z
Y
K
a
W
> BANK
a
'S O
Ir—
WALGREEN'S
PARKING
76 GA:
BANK
EDMONDS WAY 4AW Ave. IL
c0 O OG W
N O d' N O
Vi
V
O O
O CMT M M
N O
co0000co
cor`r- r<r-
to
N
nn
N
CD
IVAR'S
D
N
N
O
N
N
d
N
`
O
M
O
� a
0
c
mi ck pedestrian crossing along 100th Ave. W, improve
ersection, and re -striping of 100th Ave. W with the =
M
identified in the Completed Streets Corridor Analysis
L
IL
Improve access and safety at the intersection and improve act nsporta
EstimlMoject Cost V
$1,157,000
Design
$170,000
Right of Way
Construction
$987,000
Expense Total
$170,000
$987,000
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
$170,000
$987,000
Funding Source Total
$170,000
$987,000
Packet Pg. 99
2023-2028 CIP-CFP v0.3 26
i
27th St
<
M �
228th St , tiw - 228TH ST SW �
S
Project Descriptio
Upgrade all ADA Curb Ramps; and add rl
Complete Streets Corridor Analysis ( pletc
Project Benefit I
Improve intersection safety for pedestrians a
Estimated Project Cost
$563,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
Westgate
Chapel
nagement. This project was identified in the SR-104
$85
5478,000
$478,000
$85,000 $478,000
$85,000 $478,000
W
ov a
Z V
OLL
W tU
rU V) N
ww o
N
M
N
O
N N
d
N
O
O
L
4-
0
c
O
r
c
m
a�
a
2023-2028 CIP-CFP v0.3 27
Packet Pg. 100
a
o
rn
238th st sw 238TH ST SW�,,
o,�
o�
CO
� Q �
y
q
Project Description �
Install traffic signal. This project was
2015).
Project Benefit V
Improve vehicular and pedestrian safety.
Estimated Project Cost
$1,433,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
a
U
a-
u_
U
00
N
0
N
M
N
N
O
N
Korean
Presbyter
o
Church
0.
0
0
L
0
c
Complete Street Corridor Analysis (completed in °
r
$214,000 $1,219,000
$214,000 $1,219,000
2023-2028 CIP-CFP v0.3 28
Packet Pg. 101
3
184th St SVv
i
Seaview Park Post Office
184th PI SW
2
�.
N/UwOO
IL
w
0
�60 a
- - _
OLYMPIC UfEwDR \
N
M
N
N
O
N
Lynndale Park
? Rhth St G1Ad.
C
CL
O
L
Project Descriptioi
Install traffic signal (the intersection cu
2015 Transportation Plan: #11). A
Project Benefit
The improvement will reduce the intersection ela
below the City's concurrency standards (LOS D). roje
Estimated Project Cost
$1,266,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REST Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
a
0
_
for all movements). (ROADWAY ROJECT PRIORITY in
m
N
L
a
ed el of Service is LOS F in 2035, which is
i ove the Level of Service to LOS B.
$213,00
$1,053,00
$1,266,00
$1,266,00
$1,266,00
2023-2028 CIP-CFP v0.3 29
Packet Pg. 102
y
sLU
Q j gpwDOIQ�
a
220TWST=SN
On
g
a
3 C3228TH ST Sti_ �000 �a�l
°�a1P
Project Descriptio
Widen 84th Ave. W to (3) lanes with cu ut e I
project was ranked #6 in the Long W ay li f
Project Benefit
Improve traffic flow, access and active transp rtatio
bike lanes and street lighting.
Estimated Project Cost
$16,622,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
IPL IL
LL
o
N
ff �M N
O
n�ry N
ST 0N
O
O.
O
IL
4-
0
F, and sidewalk on each side of the street. (part of this
5 Transportation Plan).
nstajffg a center two way left turn lane, sidewalks,
$2,122,00 c
c
c
c
$14,500,00 c
c
$16,622,00 le
$16,622,00
$16,622,00
2023-2028 CIP-CFP v0.3
Packet Pg. 103
30
� s
Seattle
*� Baptist
CO
Q r- n Church
40 .F
°s �o-
N 205TH ST
N 20�
Project Descripti
Add a second westbound left turn lane
Corridor Analysis (completed in 20! 14
Project Benefit
Improve access, safety and delay at the intersIcti
Estimated Project Cost
$3,231,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
j
LU ?nor.{ r'I SW
f=-
iTH ST
a
U
ect was identified in the SR-104 Complete Street
$481,00
$2,750,00
$3,231,00
$3,231,00
$3,231,00
2023-2028 CIP-CFP v0.3 31
Packet Pg. 104
'��., WDALE BEq_C
174th St SW
69
Project Descripti
% -NO 3rd St SW
a°
rd PI sw
174th St SW
St. Thomas
Moore School
Widen Olympic View Dr. to add a noror
d rn for 50' storage length. Shift the northbound lanes to
the east to provide an acceleration Ie o tturns. Install traffic signal to increase the LOS and
reduce intersection delay. (ROADWAY PROJE PRIORITY in 2015 Tran�portation Plan: #13)
Project Benefit
Improve intersection efficiency and safety of
Estimated Project Cost
$671,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
street.
A
$109, 00
$562,00
$671,00
$671,00
$671,00
a
U
d
u_
U
0
N
O
N
M
N
0
N
d
N
O
M
O
L
IL
4-
0
c
0
c
m
a�
L
2023-2028 CIP-CFP v0.3 32
Packet Pg. 105
0
Snohomish
-ouuALPark
Project Descriptioi
The project will stabilize the roadwa,
St. SW.
Project Benefit I
Repair roadway and stabilize slope embankm
Estimated Project Cost
$1,000,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
T
I
175th St SW
ment and rebuild the damaged pavement on 175th
$1,000,000
$1,000,000
= U
H LL
�C L)
r00
N
O
N
M
N
O
N N
d
0
Q.
0
L
4-
0
c
0
r
0
c
m
a
2023-2028 CIP-CFP v0.3 33
Packet Pg. 106
Project Descriptio
Upgrade traffic signal equipment at
new vehicular detection, new vehic
Project Benefit
Improve reliability of traffic signal operation.
Estimated Project Cost
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Grants
Funding Source Total
$30,280
$30,280
Frsections with new equipment within signal cabinet,
edestrian heads.
a
v
a
U.
0
00
N
O
N
M
N
O
N
d
to
O
O.
O
L
a
4-
0
c
0
m
N
O
L
a
2023-2028 CIP-CFP v0.3
34
Packet Pg. 107
Project Description
Install guardrails along selected st
Project Benefit
Improve safety of City transportation syste
Estimated Project Cost
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Grants
Funding Source Total
$ 20,190
$20,190
ty with steep drop-offs and other safety issues
ii
v
a
u_
0
00
N
O
N
M
N
O
N
d
N
O
O.
O
L
a
4-
0
_
0
d
N
O
L
a
2023-2028 CIP-CFP v0.3 35
Packet Pg. 108
Packet Pg. 109
2023-2028 CIP-CFP v0.3
EDMONDS WAY
231 st St S W
a zst 5t Pr
E a,
rn
9�
2327St V.,
a �
L
65 7
7
a
233rd St SW
� N
m Q'
L A
4
� L
234th Si SW
Project Descripti
Install sidewalk along 232nd St. SW
of 2015 Transportation Plan.
Project Benefit
This project would improve pedestrian safety
Estimated Project Cost
$1,802,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
-104. This project ranked #3 in the Long Walkway List
$276,000 $1,526,000
$276,000 $1,526,000
d
U
d
tL
U
00
N
O
N
M
N
O
N
d
to
O
M
O
d
4-
0
c
0
r
c
m
rn
a�
a
2023-2028 CIP-CFP v0.3 37
Packet Pg. 110
234th St S W
r
7
rn
Project Descriptio
Install sidewalk with curb and gutter al
ranked #4 in Long Walkway list of th 5 T
Project Benefit
This project would improve pedestrian safety.
Estimated Project Cost
$1,928,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
�H.
35th St SW
d
s
LO
rn
s�
Sth PI SW
Woodway
lementary
FL
U
rn
d
u_
tU
00
N
O
N
M
N
O
N N
Madrona
236th St 5VA o
School
0.
o
d
0
c
m Madrona Elementary to 97th Ave. W. This project °
r
Plan.
c
m
U)
642,000
$286 $1,642,000
$286,000 $1,642,000
$286,000 $1,642,000
0
a
2023-2028 CIP—CFP v0.3
38
Packet Pg. 111
W
a Q
CO H
n
St SVtiI
a.
236tb
a.
0
rs
_
a.
U
L
,r v
N
O
CO Q N
f`
N
M
CO
N
N N
n
d
O
O
L
Project Descriptio
0
Install sidewalk along 236th St. SW fro
y 6t
e. W. This project ranked #10 in Long Walkway List of
c
°
r
the 2015 Transportation Plan.
r
Project Benefit
m
a
-agaw
This project would improve pedestrian safety
Estimated Project Cost
$1,831,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
$1,831,00
$1,831,00
2023-2028 CIP-CFP v0.3 39
Packet Pg. 112
ZriisIIco
t' e��
01=r 0 0
a,
�2
dN
Bi-10
OLYMPIC
m EDMONDS WATER r
00 CRE ST
U 4
8901 m
Madrona LIT
sY `�
2361h St SW
TH ST SW
Project Description
Install sidewalk along 84th Ave. W from
#5 in the Long Walkway List of the 2 ran,
Project Benefit I
This project would improve pedestrian safety
Estimated Project Cost
$840,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
_ 234th-St
SW -
_ 234th St SW
I!
PARK
EDMONOS
WHIRLr
Am
PTS
BALL
Christ
W
"LL
Lutheran
m °
NORTH
m HAVEN z v
MANOR t
CHRIST LUTHERAN
Church
C5 o,
CHURCH
aRi°E
TRAILER ¢
Park and Ride 236th
OFFICE ��
St SW
COURT S
i1
236th St SN!
23601
23603 SAFEWAY
@ ;
23606 L KJIHG
F F
U
23607 M N
SUNSET
23619 O
00
P
WILLOW
N
Q
BROOK
L- R AURORA
-
2O00 12
N
7 S MARKETPLACE
M
T
_ 04
`- $L
N
= U
FAMILY PANCAKE
09
N
N
V
�
238th St SW
0
Q.
SEO UL
0
4th St. SW, with curb and gutter. This project ranked
n.
$160,000 $680,000
$160,000 $680,000
2023-2028 CIP-CFP vO.3 40
Packet Pg. 113
L
W
a
207th st S
MA
2G_lh St=S
3
iv
Q
a
c
N
20att,-s'stiv _
lb 208th Pl SW
m
7
a N
i
a
� w o
Project Description
Install sidewalk along 80th Ave. W fro th
#1 in Long Walkway List of the 2015 spor i
Project Benefit
The improvements will improve active transp rtz
schools).
Estimated Project Cost
$3,000,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
1 th Pf S Pl
a'
85
h
CL
n
EDM.DNDS
2osTH sT sw
ui
d
a
v
_:
a
0
210th Si SW
N
> �
a
N
�
N
I
�
N
�
N
I �
O
Q
0
d
0
c
th St. SW with curb and gutter. This project ranked °
r
0
c
m
to
cluc& for school kids due to proximity of several
$250,000
$2,500,000
$25 00 $250,000 $2,500,000
$250,000 $250,000 $2,500,000
$250,000 $250,000 $2,500,000
2023-2028 CIP-CFP v0.3
Packet Pg. 114
41
}
OLYO
o
PI SW a
a �
v kJ y
84th St SW Q °0 184th St SW
z
CO
a cone
a I185th PI SW -
m
g SW
_7871h PI III� a 187th S �
co
rh It SW 1881h St SW,
� x
Project Description
Install sidewalk along 80th A, ... ,.
2015 Transportation Plan.
Project Benefit
This project would improve pedestrian safety
Estimated Project Cost
$3,007,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
I
r -
amh 51-s-
i
`180th St SW
w
aoth si
181st Pl SW
Q�
82rd pl .
782nd IT SW
Q
�p ,e'tridPismr
ip
e Way a
_E00
Q
\�ONO4 � 6'
'csn asvd
cm
N
LYNkW00D
W `
o
CM
-F.a
m m
� a
o
N
7th PI SW
'a
-187th`PI
A
O
188th-P1_Syy
M
O
d
4-
0
c
This project ranked #13 in Long Walkway List of the °
r
$633,000 $2,374,000
$633,000 $2,374,000
2023-2028 CIP-CFP v0.3 42
Packet Pg. 115
218th St
Chase Lake Elementary 216th St SW3:
a
a a'
N L
Chase Lake
School
CO
T
TQ
W N CL
CL q
a eEdmonds
219th St SW
CO
ESPERANCEof Go�"�
Project Description
Install sidewalk along 218th St. SW fro ?rtat
in Long Walkway List of the 2015 Tra
Project Benefit I
The improvements will improve pedestrian sz
Estimated Project Cost
$1,687,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
Edmonds Woodway High
School Swedis
a
Y
3: Edmonc
W
a
27 $th St
a
V
a
H:
a
u.
V
n
n
N
219th St S'
O
M
�
N
O
3: N N
d
0
CO
SW__ r-
r o
a
4-
0
c
Ave. W with curb and gutter. This project ranked #2
m
N
L
a
$1,431,000
$256,000 $1,431,000
$256,000 $1,431,000
$256,000 $1,431,000
2023-2028 CIP-CFP v0.3
Packet Pg. 116
43
BECK'S
GREGORY
THE MARINER
0)
W COMMODORE
C7
aU
�y
>
a
W O
s�
xx
Walnut Sf
Project Descriptio
Install sidewalk on the south side of W
Project Benefit
This project will improve pedestrian safety a
Estimated Project Cost
$281,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
Alder St
cn --
a�
n
Q
w n
7
a
t
this st
S to 7th Ave. S.
$236,000
$281,001
$281,000
$281,000
Cedar St
00
N
O
N
M
N
O
N N
am
U)
0
L
4-
0
2023-2028 CIP-CFP v0.3 44
Packet Pg. 117
Q MCDONALD'S
ANT 3 w
>
'2 STEVENS T k
n COURT AEGIS
VALUE O
Swedish
VILLAGEO=
Edmonds 216th St SW
EDMONDS
MEDICAL
21605 PAVILION R R �T
CLI `C?�
EN'S
TH
ER
Project Descriptio
Install 150' sidewalk on north side of 2 t.
north side of 216th St. SW). This proj ank
Project Benefit
To provide a safe and desirable walking route.
Estimated Project Cost
$213,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
216th St SW
Fy. 99 to 72nd Ave. W (completing a missing link on
hort Walkway List (from 2015 Transportation Plan).
$25
$213,000
$213,000
a
U
d
LL
U
ao
N
0
N
M
N
O
N N
as
0
Q.
0
a
4-
0
2023-2028 CIP-CFP v0.3 45
Packet Pg. 118
IL
v
IL
LL
0
00
N
O
N
M
N
N
d
to
O
M
O
L
Nubia, IL
Project Description o
c
Installation of bike lanes or sharrows al a tre gments as identified on the Proposed Bike Facilities
ma of 2015 Transportation Plan. Bi nes sh will be added along 100th St. SW / 9th Ave. from 244th c°
p p g c
St. SW to Walnut St, Bowdoin Way from 9th to 84th Av., 228th St. SW from 80th Ave. to 78th Ave., and 80th
Ave. from 228th St. SW to 220th St. SW. RRF will be added a crossings along the Bowdoin and 9th Ave. a`
/ 100th St. SW corridors. ..
Design
$12,652
Right of Way
Construction
$1,759,195
Expense Total
$1,771,847
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
$522,347
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Other (Sound Transit Grant)
$1,249,500
Funding Source Total
$1,771,847
2023-2028 CIP-CFP v0.3
46
Packet Pg. 119
'h a S
nds S
Mountain Ln z
I �
t Z Carol Way
W
a
Z Glen St
H
6+
Daley St� Daley Sty
I a
SWague �i Sprague St
Edmonds St
Vista PI
Sierra PI
W
a
Glen St U Q\
D ales
J
O
i I PI N
Edmonds stI F ds
Bell St B
11
Z
N
0
sr,n s
-
200th-St-SW
'
—
—y
a
a
a'
3�
a
201 st FI SW
>
y
3
202nd Si SW,
a
v
a
w
202rd PI SW <'
t
�
CO
St SW w
cc
203rd s
1 29�,-�04th
St SW
_
a
0
a
V
205th PI SW
a
° 00
r
w
` N
wh206th
51-5W-
a
N
a
�
��
M
207th PI SW
Q
¢
N
N
207th St
alloi
N
�I
d
o
208th
PI sw
Q-
Y
` \
P
d
Project Descriptio o
c
Construct sidewalk on Maplewood Dr. f ra
th St. SW (^ 2,700'). A sidewalk currently exists on
200th St. SW from Main St. to 76th , aplewood Elementary School (rated #18 in the Long =
Walkway list of the 2015 Transportation Plan
� a
Project Benefit
Create pedestrian connection between Maplewo eme
encouraging kids to use non -motorized transportation to wal
Estimated Project Cost
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
$213,000
SW and Main St., by
$2,438,000
$213,000 $2,438,000
$213,000 $213,000 $2,438,000
$213,000 $213,000 $2,438,000
2023-2028 CIP-CFP v0.3
47
Packet Pg. 120
I
'
i
�
al
F.;
a
01
01
II
�
Project Description
Install sidewalk along 95th PI. W from
the Long Walkway List of the 2015 Tr4
Project Benefit
This project would improve pedestrian safety'
Estimated Project Cost
$837,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
LU
EL
0 �' 1 ■
zz01 s ■
O W I �
�,
w w z2i
wt 9 1l1'�1� 221 s[ PI
�' a r ' u_
CO
1 !� If �• rti € o
W N
+ N
2241h St SW
d O
L
O
c
St. SW with curb and gutter. This project ranked #8 in °
r
c
m
rn
a
$127
$127r710,000
710,000
$127,000 $710,000
$127,000 $710,000
2023-2028 CIP-CFP v0.3 48
Packet Pg. 121
Washington State Ferry
Bracketts Terminal
Landing
South
_ram a
Post Office
��N S
T
Puget Sound
Fishing Pier SMini Park -�
i� d
V
LL
Olym is V
Railroad Q` a ✓ 00
Bea k cm
Station W `�'� awes St 4 N
Restroo �jj > M
z ¢ N
N N
Nlo City of Edmonds —_ M _ 0
Treatment Plant Dayton St Dayton 5t 0
Project Description
Install new and wider sidewalk alongrC�ente
Project Benefit
Improve active transportation safety along R
various destination points (such as Waterfro
Terminal...).
Estimated Project Cost
$980,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
on St. to SR-104.
IL
4-
0
_
0
d
N
L
�. to SR-104, key stretch since connects to a
s, Downtown Edmonds, WSDOT Ferry a
$180,000
$18 F$800,000
OO $800,000
$180,000 $800,000
$180,000 $800,000
2023-2028 CIP-CFP v0.3 49
Packet Pg. 122
� : Seattle 243 rd PI SW
s Baptist W Lake
�QkO COn Church 'Q Ballinger
�q 7 n
N 205TH ST
�Z�.
4 �� w
N 204TH P Doi 1�4� Q
Z
K.
N P4
w cWc
I � � y G
a
} Yw ST
Project Descripti
Extend bike lanes within proximity of t
corners and new ADA curb ramps. 4
Project Benefit
Improve active transportation safety along th
Estimated Project Cost
$2,000,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
N 205TH ST
hbound and southbound directions. Install APS on all
terMan Trail and across SR-104.
$
$1,600,000
$200je$200,000 $1,600,000
$200,000 $200,000 $1,600,000
$200,000 $200,000 $1,600,000
a
U
d
U_
W U
'Z G
W CV
�M
Q N
0
2023-2028 CIP-CFP v0.3 50
Packet Pg. 123
Project Description
Installation of street lights along vari
Project Benefit
This project will add new street lighting in D
Estimated Project Cost
$75,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
town Edmonds.
an safety at night.
$300,000 $1,200,000
$300,000 $1,200,000
a
v
a
a_
0
ao
N
O
N
M
N
O
N
d
0
O
M
O
L
(L
4-
0
c
0
M
a)
N
O
L
a
2023-2028 CIP-CFP v0.3
51
Packet Pg. 124
Edmonds
Holly Dr
TW+r_,`
Cedar
St
Marsh
r
I^ �f
4
Howell Way Ma ndia
z
G
N
0
ii Homeland 9s
Spruce St
Z
0
r =7 r
Spruce Fri
Q
`
Hemlock Way-5
z �= t 10
Hemlock St
�
Laurel Waf
> Erben Dr v j
m
Q iQ Seamont Ln
L Laurel St
w
s7 a T
>
<
i'INt S 1
v;
Pine 5t Pine St
CO
to
Q;
Q
Forsyth Ln ° a'
Q w %
a'
Z
> a
rJ
g
Fir PI
Fir St
k
W
Project Description
Installation of sidewalk with ADA curb r-
from SR-104 to 9th Ave S
Project Benefit
This project will improve pedestrian con
Edmonds and City Park.
Estimated Project Cost
$3,180,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
m the HAWK signal to Pine St and along Pine St
Cedar St
Spruce St
N
w
a
2
H
rn
d
U_
Pine Sr
d
V
0
N
O
N
A
N
0
N
N
m
O
O
L
4-
0
c
O
c
m
to
a�
a
resicfftial areas along 3rd Ave. S to Downtown
$265,000 W,000
$2,650,000
$26 FOO $265,000 $2,650,000
$265,000 $265,000 $2,650,000
$265,000 $265,000 $2,650,000
2023-2028 CIP-CFP v0.3
Packet Pg. 125
52
i r
Sierra
Park m
CO O
2OF Q O
Z
z
�9 L J
W
� a
192nd Pi SW w
Project Descriptio
Install sidewalk along 191th St. SW
Long Walkway List of the 2015 Trw
Project Benefit
This project would improve pedestrian safety.
Estimated Project Cost
$678,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
a rr
Ave., with curb and gutter. This project ranked #8 in
$100,00
$578,00
$678,00
$678,00
$678,00
2023-2028 CIP-CFP v0.3 53
Packet Pg. 126
0.'
I
--=wadKv5L-rt-Ra—�
232nd St Sv1
Salem
pabin Hood Dr Edmonds
Lutheran
Heights Church
K-12
v
� Friar P
E G
= Or
<LnNottingham Rd Scribe4io
In
High S
O� 235th PI SW
O w
�W Q
2
236th PI SW
105th,c Hickman o
Park a v
a a >
� a
_ o � 23A S W
Edmonds
Faith
237th P
%�� Memorial Community 238th St SW
-
emetery Church
Project Descriptio
Install sidewalk along 104th Ave. W fro R
#10 in the Long Walkway List of the
Project Benefit I
This project would improve pedestrian safety
Estimated Project Cost
$1,060,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
I
d
tL
tU
00
N
O
N
M
N
O
N N
m
rn
0
Q.
0
L
4-
0
c
6th Ave. W, with curb and gutter. This project ranked °
r
Ian.
c
m
to
4)
a
$1,060,00
$1,060,00
2023-2028 CIP-CFP v0.3 54
Packet Pg. 127
219th st sW
w_
ST SW
Edmonds Church of God
Project Description
Install sidewalk along 80th Ave. W fro eratn
#7 in the Short Walkway List of the 2
Project Benefit I
This project would improve pedestrian safety
Estimated Project Cost
$324,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
n.
,JW
CO
- - ro
ESPERANCE
ST. SW, with curb and gutter. This project ranked
00
N
O
N
M
N
O
N N
d
0
Q.
0
a
0
$324,00
$324,00
2023-2028 CIP-CFP v0.3 55
Packet Pg. 128
Ak 1861h St SW
187th St SW
4'
00
.0
u7
Seaview
ementary
Project Description qqmmw
Install sidewalk along 84th Ave. W fror
#5 in Short Walkway List of the 201- 4
Project Benefit
This project would improve pedestrian safety
Estimated Project Cost
$328,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
1881h St SW
- a
St. SW., with curb and gutter. This project ranked
FL
U
a-
U_
U
O
N
O
N
M
N
O
N N
d
0
CL
0
L
0
$328,00
$328,00
2023-2028 CIP-CFP v0.3
56
Packet Pg. 129
L
,G
may. O O00 jl00
o
2381h St SW
:57.
o ON
00 r`
PFCO CO
O p
h S1 SW s Mathay
Ballinger
� Park
Project AdPWOOV
Install sidewalk along 236th St. SW fro y
the 2015 Transportation Plan.
Project Benefit I
This project would improve pedestrian safety
Estimated Project Cost
$1,285,000
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
W. This project ranked #10 in Long Walkway List of
a
a
U.
0
00
N
O
N
M
N
O
N N
m
0
a
0
a
4-
0
$1,285,00
$1,285,00
2023-2028 CIP-CFP v0.3 57
Packet Pg. 130
7th and
Elm Park
' IL
00
Sea Vista P+
``►sta PI,
220TH ST SW
!,�\, �aYL , � a _` —
t1J
01 rn rn
O
p°A/dr GoY° r
dy
Project Descriptio
The walkway project is ranked #6 on th tlix
a
install approximately 700 feet of ne ewasystemon Elm Wav between 8th Ave. S ande. S.
Expense Total
$901,974
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
$552,047
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
$349,927
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
$901,974
Prom the 2015 Transportation Plan. The project will
rian curb ramps and modify the existing stormwater
U
d
u_
U
00
N
O
N
M
N
O
N N
d
0
Q.
0
L
0
2023-2028 CIP-CFP v0.3 58
Packet Pg. 131
Project Description qqmlw
Addition of Rectangular Rapid Flashing
selected locations throughout the Cit4
Project Benefit
Improve safety at pedestrian crossings.
Estimated Project Cost
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Grants
Funding Source Total
$20,195
$20,195
7
a
v
a
d v
00
N
O
N
or flashing LED lights around regulatory signs at
2023-2028 CIP-CFP v0.3
59
Packet Pg. 132
Project Description
The study will evaluate and inventory the City's existing street lighting system and identify gaps in service. The
study will also develop a priority list of improvements and cost estimates, standard details for street and
pedestrian lighting and policies for the addition of street lights on private developments and addition of street
lights within residential neighborhoods.
Project Benefit
Improve night-time safety of the entire transportation system throughout the City
Estimated Project Cost
$60,000
Design
$60,000
Right of Way
Construction
Expense Total
$60,000
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
$60,000
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Grants
Funding Source Total
$60,000
2023-2028 CIP-CFP v0.3
60
Packet Pg. 133
Packet Pg. 134
2023-2028 CIP-CFP v0.3 61
Puget Sound
.7
aA
Edmonds Marsh
0
LLi
R
Dayton_ St -- Dayton Sf ay, _St
- - -- -- - - D a on -
m i li
N a Maple St
c
Alder St�
a'
N N r
a Q walru1_s1
a =
M Ln Holly Dr
I
Alder St
Howell Way none ;a
Hone\and Dr a
a' �o
c Hemlock Way
10
Project Descriptioll1qQq1NNIl
Modify existing lane channelization on 4 ve storage for ferry users.
Project Benefit
Reduce conflicts between ferry storage and ess to local
Estimated Project Cost
$380,000
Design
Right of Way
Construction
$380,000
Expense Total
$380,00
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
$380,000
Funding Source Total
$380,000
Seamont Ln
a
U
ii
LL
U
00
N
O
N
M
N
O
N N
d
to
O
rL
O
L
4—
O
2023-2028 CIP-CFP v0.3 62
Packet Pg. 135
Packet Pg. 136
2023-2028 CIP-CFP v0.3 63
Project Descriptio
Install traffic calming devices (such as R
Project Benefit
Reduce vehicle speeds on City streets that q
Estimated Project Cost
$33,130 (for 2023)
Design
Right of Way
Construction
Expense Total
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
$3,000
►�i
.'
LL
tL
00
i
O
N
M
N
O
N
-
G1
0
O
C.
O
L
a
0
speed cushions, or other elements).
_
d
N
L
under the is Calming Policy.
a
$30,130 $18,000 $18,000 $18,000 8,000 1 $18,000 $270,00 -
$33,130 $18,000 $18,000 $18,00 $18,000 $18,000 $270,00
$33,130 $18,000 $18,000 $18,000 $18,000 $18,000
$270,00
$33,130 $18,000 $18,000 $18,000 $18,000 $18,000 $270,00
2023-2028 CIP-CFP v0.3
64
Packet Pg. 137
Packet Pg. 138
2023-2028 CIP-CFP v0.3 65
Project Description
The Plan identifies all existing ADA clef' in t ity Right of Way (such as non -compliant ADA curb
ramps, tripping hazards within side m DA driveways, and signalized intersection without
Audible Pedestrian Signals (APS).
Project Benefit
Inventories and prioritizes ADA issues in the City of w
Estimated Project Cost
$105,000 4e�Ah�
Design
$105,000
Right of Way
Construction
Expense Total
$105,000
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
$105,000
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
$105,000
Packet Pg. 139
2023-2028 CIP-CFP v0.3 66
Project Description
Update the City's long range transp,.
Project Benefit
The Transportation Plan serves as the transpfation eleme
Transportation Plan is being updated in coor atio
existing and projected future land use and trave erns,
bicycle and transit infrastructure and services and or
an
transportation needs. The Plan will establish the transportation
year Transportation Improvement Program (TIP), Capital Impr�
(CFP).
Estimated Project Cost
Design
$170,000
Right of Way
Construction
Expense Total
$170,000
Street Fund 112 - Gas Tax & Multi -modal
$170,000
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
$170,000
a
U
a-
LL
U
00
N
O
N
M
N
�Y d
O
M
_ O
d
O
c
O
r
r
c
as
U)
W
L
y's Comprehensive Plan. The a
mprehensive Plan Update. Based upon
ortation Plan describes roadway pedestrian,
f
me^eand projected future
tiedevelopment of the six-
ment Capital Facilities Plan
Packet Pg. 140
2023-2028 CIP-CFP v0.3 67
Packet Pg. 141
2023-2028 CIP-CFP v0.3
land use and transportation patterns on appropriate street rights -of -way. These projects
are intended to increase the livability of a diverse, growing city.
Estimated Project Cost -T
$3,704,717
Design
Right of Way
Construction
Expense Total
ARPA
Unsecured Funding
Funding Source Total
$204,717
$3,500,000
$204,717 $3,500,000
$204,717
$3,500,000
$204,717 $3,500,000
Packet Pg. 142
2023-2028 CIP-CFP v0.3 69
i
# f
Project DescriptioM�
The City of Edmonds proposes the devi
infrastructure can both address storm
neighborhood and the downtown core
1prototypical sites to demonstrate how green
ance the streetscapes to benefit the Hwy 99
This project includes the following elements -IN
*Roadway narrow (vehicular capacity retained) 401
*Sidewalks and plan. ng strips expanded
•Bioretention planter collecting runoff from the road
•Standard landscape beds adjacent bioretention planter picki
planter.
Project Benefit
Incorporating green streets into the urban fabric of the City of Edmonds is intended t
demonstrate how trees, vegetation, engineered green stormwater solutions, phys'
and visual narrowing of vehicular lane widths, and shortening pedestrian crossi ith
curb bulbs help to slow traffic, ameliorate climate change impacts, and reinfor desired
land use and transportation patterns on appropriate street rights -of -way. These projects
are intended to increase the livability of a diverse, growing city.
Estimated Project Cost 7
$1,678,027
Design
$78,027
Right of Way
Construction
$1,600,000
Expense Total
$78,027
$1,600,000
ARPA
$78,027
Unsecured Funding
$1,600,000
Funding Source Total
$78,027
$1,600,000
2023-2028 CIP-CFP v0.3
70
s to bioretention
FL
U
a-
U_
U
00
N
O
N
M
N
O
N
d
N
O
0.
O
L
O
c
O
r
c
m
a�
L
Packet Pg. 143
7.A.b
Water Prniects
#
UPPROJECT
DP
#
2023
2024
2025
2026
2028
TOTAL
(2023-2028)
TOTAL
(2029-43)
TOTAL Project
Cost
PWW-01
Phase 12 Annual Replacement Program 2022
$10,000
$0
$0
$0
$0
$0
$10,000
$10,000
PWW-02
Phase 13 Annual Replacement Program 2023
$1,700,000
$0
$0
$0
$0
$0
$1,700,000
$1,700,000
PWW-03
Phase 14 Annual Replacement Program 2024
$506,128
$3,525,379
$0
$0
$0
$0
$4,031,507
$4,031,507
PWW-04
Phase 15 Annual Replacement Program 2025
$0
$526,373
$3,666,379
$0
$0
$0
$4,192,752
$4,192,752
PWW-05
Phase 16 Annual Replacement Program 2026
$0
$0
$547,428
$3,813,034
$0
$0
$4,360,462
1 $4,360,462
PWW-06
Phase 17 Annual Replacement Program 2027
$0
$0
$0
$569,325
$3,965,555
$0
$4,534,880
$4,534,880
PWW-07
Phase 18 Annual Replacement Program 2028
$0
$0
$0
$0
$592,098
$4,124,177
$4,716,275
$4,716,275
PWW-10
2023 Waterline Overlays
$50,000
$0
$0
$0
$0
$0
$50,000
$50,000
PW W-11
Yost & Seaview Reservoir Repairs & Upgrades
$805,000
$0
$0
$0
$0
$0
$805,000
$805,000
PWW-12
Phase 19 Annual Replacement Program 2029
$0
$0
$0
$0
$0
$615,782
$615,782
$615,782
Total Projects I& f $3,0;&!8 $4,051,752 $4,213,807 $4,382,359 $4,557,653 $4,739,959 $25,016,658 $0 $25,016,658
Funding Source 3 2024
2025
2026 2027
2028
TOTAL
TOTAL
TOTAL
(2023.2028)
(2029.431
Water Fund -421 $3,071,198 ,051,752
$4,213,807
$4,382,359 $4,557,653
$4,739,959
$25.016,658
$25,016,658
Total Revenue
1,1110,
051,752 $4,213,807 $4,382,359 $4,557,653 $4,739,959 $25,016,658
$0 $25,016,658
a_
U
IL
LL
U
00
N
O
04
M
N
O
N
0
N
0
Q
0
L
a
0
C
O
m
C
0
N
d
i
a
2023-2028 CIP-CFP v0.3
72
Packet Pg. 145
Project Description 'q4NOW
Per the approved 2017 Water Compre
appurtenances at various locations t4
pressure, or more prone to breakage c
Nthe jects will replace/maintain pipe and related
e ue to old age, being undersized, need to increase flow or
aterial properties. _
Project Benefit ,
Maintain a high level of drinking water quality, ire (
breakages and leakage, improve fire flows, and decrease
Estimated Project Cost
$1.7 to $4.1 million/year
Design
Right of Way
Construction
Expense Total
Water Fund 421
Funding Source Total
m reliability, decrease probability of
to day mgAwnce costs.
$1,710,000
$3,525,379
$3,666,379
$3,81M4
$3,965,555
$4,124,177
$2,216,128
$4,051,752
$4,213,807
$4,382,359
$4,557,653
$4,739,959
$2,216,128
$4,051,752
$4,213,807
$4,382,359
$4,557,653
$4,739,959
$2,216,128
$4,051,752
$4,213,807
$4,382,359
$4,557,653
$4,739,959
a
U
d
u_
U
00
N
O
N
M
N
O
N
d
N
O
CL
O
L
4-
0
c
O
M
c
m
a�
L
2023-2028 CIP-CFP v0.3
73
Packet Pg. 146
Project Description
Road pavement overlays to cover area
the Waterline Replacement Projects.
Project Benefit
Improve overall pavement condition in locati
Projects.
Estimated Project Cost
Expense Total
Water Fund 421
Funding Source Total
$50,000
$50,000
$50,000
$50,000
re excavated and patched in previous years as part of
and patched due to Waterline Replacement
2023-2028 CIP-CFP v0.3 74
Packet Pg. 147
v
i85th PI SW
0
Yost Farr
Project Descriptioi
This work is being done to provide strrin
potable water storage reservoirs. Pr
magnitude/preliminary costs and next steps f
report for the Yost Reservoir, which is comp)
plus repairs to address leakage from the res
process of being finalized, shows similar issues
186th PI SW Seeaaview
Water Tank
es, Ir leakages, and upgrades to our two underground
n mpleted in early 2022 were used to determine order of
the now planned repairs and upgrades project. Preliminary
shows that it a major structural and seismic retrofit,
sir. Pre' p for the Seaview Reservoir, which is in the
I ery but to a somewhat lesser scale.
Proiect Benefit
Maintain a high level of drinking water quality, improve overaIm
em
retrofit structures so that they meet current structural codes
decrease overall day to day maintenance costs.
Estimated Project Cost
'®�
Design
$805,000
Right of Way
Construction
Expense Total
$805,000
Water Fund 421
$805,000
Funding Source Total
$805,000
decr'We probability of leakage,
, iliency 0#469 earthquakes, and
W
a
r a
00 a 00
tU
00
N
O
N
M
N
O
N
d
2023-2028 CIP-CFP v0.3
75
Packet Pg. 148
#fi
�' -. R� �1 • . Y ��11 Y..
+` � `(47,( �{�+ ��y�_ ttiR�.,
Al
Jam— •.
•
�.
�.` �.� r� fix+ ;...
t&I
a •;
jr
7.A.b
m
00
fV
O
N
M
N
O
N
O
0.
O
a`
O
f_
O
CO
fy
a
Packet Pg. 149
7.A.b
Stormwater Projects
HCFP
PROJECT
DP
2023
2024
2025
2026
2027
Y028
TOTAL
TOTAL
TOTAL Proj
#
(2023-2028)
(2029-43)
Cost
Edmonds Marsh tuary Restoration Related Projects .-.
PWD-01 I X I Edmonds Marsh Water Quality Improvements Phase 1) 1 $366,843 $0 $0 $0 $0 $0 $366,843 $366,£ d
V
Perrinville Creek Basin Projects d
PWD-03
Perrinville Creek Flow Management Projects
$120,000
$100,000
$100,000
$100,000
$100,000
$100,000
$620,000
$620,(
PWD-04
X
Lower Perrinville Creek Restoration Phase 1
$750,000
$500,000
$2,800,000
$3,000,000
$0
$0
$7,050,000
$7,050,(
PWD-05
X
Seaview Park Infiltration Facility Phase 2
$10,000
$150,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$10,000
$150,000
$10,(
$150,(
PWD-23
Perrinville Creek Basin Analysis Update
L,L
U
00
N
O
N
r
M
N
Storm Drainage Improvement Projects O
N
PWD-06 Lake Ballinger Re ional Facility Design PhaseAir $0 $200,000 $0 $0 $0 $0 $200,000 $200,( 70
d
PWD-07 I X Balinger Regional acility Construction Phase Aff $0 $0 $3,000,000 $0 $0 $0 $3,000,000 $3,000,( N
PWD-22 1 7317 Lake Ballin er Way Flood lain Purchase & Structure Re AW,000 $0 $0 $0 $0 $0 $750,000 $750,( 00.
O
L
Annually Funded Projects d
PWD-11
Phase 4 Annual Storm Replacement Project 2023 $290,00 $1,622,400
$0
$0
$0
$0
$1,912,400
$1,912 ,
PWD-12
Phase 5 Annual Storm Replacement Project 2024 $0 $324,480
$1,687,296
$337,460
$0
$1,754,786
$0
$0
$0
$0
$2,011,776
$2,092,246
$2,011,i
$2,092,:
PWD-13
Phase 6 Annual Storm Replacement Project (2025) $ $0
PWD-14
Phase 7 Annual Storm Replacement Project 2026 $0
$0
$350,958
$1,824,977
$0
$2,175,935
$2,175,£
PWD-15
Phase 8 Annual Storm Replacement Project (2027) $0 $0
$0
$0
$364,996
$1,897,976
$2,262,972
1 $2,262,t
PWD-16
Phase 9 Annual Storm Replacement Project 2029 $0 $0
$0
$0
$0
$379,596
$379,596
PWD-19
2023 SD Overlays $200,000 $0
$0
$0
$0
$200,000
$200,(
4-
0
C
O
r
r
C
d
to
d
L
a
Compliance Related Projects
PWD-17 Storm and Surface Water Comprehensive Plan $ $0 $0 $0 $0 $600,00011
$600,( LL
ci
Total Projects $3,236,843 $7,924, 756 ,205,744 $2,289,973 $2,377,572 $23,781,768 $0 $23,781,7 d
U
Funding Source 77=
2023
202 20 2026% 2027
2028
TOTAL
(2023-2028)
TOTAL
(2029-43)
TOTAL
Stormwater Utility Fund -422
$ 1,834,220
$ 2,2 ,776 ,672,693
IqMkk2,955,744 $ 9,973
$ 2,377,572
$ 15,422,978
$ 15,422,9
ARPA Funds
$ 681,116
$ 454,1 2,002,063
$ V -
$ -
$ 3,137,283
$ 3,137,2
Secured Grants
$ 721,507
$ - $ -
$
$ -
$ 721,507
$ 721,5
Unsecured Grants
$ -
$ - $ 2,250,000
$ 2,250 -
$ -
1
$ 4,500,000
is 4,500,0
Total Revenue
$ 3,236,843
$ 2,746,880 $ 7,924,756
$ 5 4 $ 2,289,973
$ 2,377,572
$ 23,781,768 jr-$
23,781,7
#or
to
Y
O
3.1
B
3
a
00
N
O
N
M
N
O
N
C
G1
E
s
w
Q
2023-2028 CIP-CFP v0.3 77
Packet Pg. 150
2023-2028 CIP-CFP v0.3 78
Edmonds Marsh �.
Q
vn�ori �
0�,;, N
00,h'ad� OZ
.yea 0
W
Project Descripti
The project will be improving water jrEdr
side of SR-104, along the frontage of
include water quality filter cartridges. Staff p
discharges that directly enter the marsh fron
1 replacing the catch basins on the west side
side of SR-104.
Wildlife
Refuge
Walnut St-
�I
I
Q
Howell V
Ifl
M,
I
�
City Park
ay a
V
m
0
a
o
a
4-
0
a
aunoff by replacing existing catch basins along the west
dshe catch basins will be replaced with catch basins that =
loses this effort in order to provide water quality mitigation for all w
L
Iese locations. T ct will be divided into phases, with phase a
SR-104 r ase replacing the catch basins on the east ft
Project Benefit AV
Improve water quality of stormwater discharging into the Ed
located near the marsh. The improvements will provide betl
Estimated Project Cost
Design
Right of Way
Construction
$366,843
Expense Total
$366,843
Stormwater Utility Fund 422
$152,836
ARPA Funds
Secured Grants
$214,007
Unsecured Grants
Funding Source Total
$366,843
rtions of SR-104
on to the marsh
2023-2028 CIP-CFP v0.3 79
Packet Pg. 152
Packet Pg. 153
2023-2028 CIP-CFP v0.3 80
Ilt►1
Project Description
Reducing scouring flows to reduce sedOfFre
s Pe ille Creek was identified in a previous basin report
completed in 2015 as a critical elems in reek which has been significantly impacted by urban
development. The projects funded by this pr am are incremental ste s toward recovering this stream run as
adequate fish habitat. These efforts have be a even more cr' ' en recent challenges around the
Perrinville Creek outfall area. This program i fund for ' ti projects within the Perrinville Creek basin
to reduce scour flows in the creek. It allows staff esp to ad -hoc opportunities such as rain garden
cluster projects, or ensure matching funds are available for c rant applicA&ns for flow reductions projects.
Project Benefit
The project will reduce peak flows in Perrinville creek, im
peak flow events.
Estimated Project Cost
$100,000/year
Design
Right of Way
Construction
Expense Total
Stormwater Utility Fund 422
ARPA Funds
Secured Grants
Unsecured Grants
Funding Source Total
$10,000
$10,000
$10,000
$10,000
$10,000
$110,000
$90,000
$90,000
$90,000
$90,000
$120,000
$100,000
$100,000
$100,000
$100,000
$120,000
$100,000
$100,000
$100,000
$100,000
$120,000 $100,000 $100,000 $100,000 $100,000
bed scour during
a
U
a-
u_
U
00
N
O
N
M
N
O
N
d
N
O
OM
O
L
O
c
O
c
m
a�
a
2023-2028 CIP-CFP v0.3 81
Packet Pg. 154
Puget Sound
Project Description
The city has struggled to manage and raintenal
:edimentation,
ed outfall system at Perrinville Creek. The current
combination of multiple stake holde eek and undersized culverts creates several
issues which make the creek unsustainable aem. The concern must be addressed from the bottom
of the creek up in order to sequence the reli s correctly. The improvements are
needed to relieve current flooding, ease City,
a provide better and more sustainable fish
habitat. This project will build on any interim BNto lace the existing BNSF culvert and a new
culvert under Talbot Road which is fully compliant with managem and fish passage regulations. It
will also include time and effort to research and apply fontal/add* a ding sources so that the
project can be built. This complex project includes many ers. It i mate a minimum 2-year
design and development phase will be needed before by for ion. 46,
Project Benefit
The project will reduce City maintenance needs in the future and
Estimated Project Cost
$7,050,000
Design
Right of Way
Construction
Expense Total
Stormwater Utility Fund 422
ARPA Funds
Secured Grants
Unsecured Grants
Funding Source Total
$750,000 $500,000
$2,800,000 $3,000,000
$750,000 $500,000 $2,800,000 $3,000,000
$68,884 $45,896 $797,937 $750,000
$681,116 $454,104 $2,002,063
$ 2, 250, 000
$750,000 $500,000 $2,800,000 $3,000,000
N
A
a
U
d
u_
U
00
N
O
N
A
N
O
N
d
N
O
CL
O
L
O
c
O
c
m
a�
a
2023-2028 CIP-CFP v0.3 82
Packet Pg. 155
Seaview Park
185th St SW a
S j �.
v
i N
M CO
CO
186th St SW
Post
>2 Off ICE
r
185th PI SW
Project Descriptioi
dpwoor
Reducing scouring flows in order to red e is I in Perrinville Creek was identified in a previous basin
report completed in 2015 as a critica men f r g this creek which has been significantly impacted by
urban development. The project is an incre tal step toward recovering this stream run as an adequate fish
habitat. The grant for this project has alread een secured. Th, t proposes construction of an infiltration
system in Seaview Park, almost identical to t success ect which was completed in 2019, in order
to infiltrate more runoff in the Perrinville Creek
Design
Right of Way
Construction
$10,000
Expense Total
$10,000
Stormwater Utility Fund 422
$2,500
ARPA Funds
Secured Grants
$7,500
Unsecured Grants
Funding Source Total
$10,000
a
U
a
ILL
U
00
N
O
N
M
N
O
N N
d
N
O
O
L
4-
0
2023-2028 CIP-CFP v0.3 83
Packet Pg. 156
Project Descriptioi -q"MPP-
Supplemental study to update Perrinvil E
projects that would help decrease th ak <
Project will be updated to reflect projects co
basin to aid in the reduction of peak flows in
Project Benefit
Pit "- Ile
Lynnwood
Wanalysis that determined possible locations for
i ing high rain events.
!ted and also determine if there are other locations within the
basin.
Improve overall basin and stream health, by using green storm
that rainfall is not simply collected and conveyed downstream
conditions. This includes infiltrating rainfall runoff as close as
stream peak flows, which will decrease stream erosion and im
Estimated Project Cost
Design
$150,000
Right of Way
Construction
Expense Total
$150,000
Stormwater Utility Fund 422
$150,000
ARPA Funds
Secured Grants
Unsecured Grants
Funding Source Total
$150,000
ods. This will make it so
)se as possible to natural
)is will also decrease
O%kt for aquatic life.
FL
U
a
U-
U
00
N
O
N
M
N
O
N
d
N
O
OM
O
L
O
c
O
c
m
a
2023-2028 CIP-CFP v0.3
84
Packet Pg. 157
2023-2028 CIP-CFP v0.3 85
L
o s
CO 0D 2401h St SW
Mathay
Ballinger
Park
79th P�
nd
Project Descripti
00 r-
r- r-
LLI
a
240th PI SW = 241 st St SW U
H LL
U
n 00
N
O
N
M
N
O
N
d
N
O
CL
O
IL
4-
0
c
Lake Ballinger suffers from urban flood' rcility,
blooms along with other water quality impairments. °
The Highway 99 corridor is an area o dcluding a future City project which will require
stormwater mitigation. By creating a regionity can improve the stormwater mitigation achieved u,
by development, addressed stormwater mitirt Highway project, and treat runoff from a
one of the City bigger pollution generating a s. The ' as Ily improve Lake Ballinger water quality.
The project proposes to implement water qualit trol provements at City -owned Mathay-Ballinger
Park as green stormwater infrastructure (GSI) which would si tly benefit Lake ecology and habitat
conditions and enhance a valued neighborhood, but underutiliz park. This imited to design and
production of plans and specifications; construction phase will tracked eparat ject (to ease and
simplify grant management/reporting).
Project Benefit
The project proposes to implement water quality and flow control improvements at
Park as green stormwater infrastructure (GSI) which would significantly benefit thej
conditions and enhance a valued neighborhood, but underutilized, park.
Estimated Project Cost
$200,000
Design
$200,000
Right of Way
Construction
Expense Total
$200,000
Stormwater Utility Fund 422
$200,000
ARPA Funds
Secured Grants
Unsecured Grants
Funding Source Total
$200,000
3thay-Ballinger
d habitat
2023-2028 CIP-CFP v0.3 86
Packet Pg. 159
co 2401h St SW 3C
Mathay
Ballinger
Park
79th 4P
240th PI SW
pl
nd
Project Descripti
r�
i1
L
CO
r`
241 st St SW
A
Lake Ballinger suffers from urban flood' rionneeds
blooms along with other water quality impairments.
The Highway 99 corridor is an area o dcluding a future City project which will require
stormwater mitigation. By creating a regionity can improve the stormwater mitigation achieved
by development, addressed stormwater mitir t Highway project, and treat runoff from
one of the City bigger pollution generating aas Ily improve Lake Ballinger water quality.
This phase is limited to the construction phase a e ked separate project (to ease and simplify grant
management/reporting)
Project Benefit
The project proposes to implement water quality and flow co of
Park as green stormwater infrastructure (GSI) which would signifi
conditions and enhance a valued neighborhood, but underutilized,
Estimated Project Cost
$3,000,000
Design
Right of Way
Construction
Expense Total
Stormwater Utility Fund 422
ARPA Funds
Secured Grants
Unsecured Grants
Funding Source Total
$3,000,000
$3,000,000
$750,000
$ 2, 250, 000
$3,000,000
d Mathay-Ballinger
kand habitat
a
U
a
LL
U
00
N
O
N
M
N
0
N
m
O
CL
O
L-
a.
4-
0
c
O
c
m
a�
a
2023-2028 CIP-CFP v0.3 87
Packet Pg. 160
vela -._.. 4f R: T• i TT. T:
Project Description
The project proposes to purchase an a ,6
Ballinger flood plain. The City secure4r5oc
the lowest property on the lake and is badly
uninhabitable. It is also nearly undevelopabl
d
U
v_
U
00
N
O
N
N
- N
a-
'+nr•h77u d
m �rr m- m sn r .r ••
" �L. m r_.•r. �^ -s• : .r,. yr s r" - - 0
a ,
104 Q
0
0
c
00ment
r
dential property located within the Lake °
of Ecology grant to aid in this process. The home is
naged from previous flooding to the point it is generally u0i
ue to the flood d critical area regulations onsite. a
The City intends to remove the home and any p e tin
effort on the site. The grant has restrictions for allowing this
the structures and impervious surfaces, the planned site use wo
City storm drain line for SR-104 cuts through in an easement i
pursue a future project to split appropriate flows from the Cit
maximum extent feasible. The future project would provide w e
highway (SR-104) and would make significant improvement in wa
course to Lake Washington via McAleer Creek.
Project Benefit
ro
rfaces from the site as part of the initial
be used f ublic use. After demolition of
be for pu benefit only. Because the
iately cent t ' parcel, the City plans to
�m ide water trea ality tment to the
y trea t for a eavily trafficked
qualitv to La a Ball in
is downstream
Improve the health and water quality of Lake Ballinger by removing hard surfaM and a home that is generally
uninhabitable. Project will also provide a future location to treat stormwater runoff from portions SR-104.
Estimated Project Cost
$750,000
Design
Right of Way
$750,000
Construction
Expense Total
$750,000
Stormwater Utility Fund 422
$250,000
Secured Grants
$500,000
Unsecured Grants
Funding Source Total
$750,000 Packet Pg. 161
2023-2028 CIP-CFP v0.3
88
Packet Pg. 162
2023-2028 CIP-CFP v0.3 89
Project Descriptio ppp�
Annual storm drain replacement/maint c
infrastructure in several locations th ou•
firsthand knowledge or video inspection resu
lifespan and requires routine replacement or
conduct annual maintenance projects will Q
Construction
Expense Total
Stormwater Utility Fund 422
ARPA Funds
Secured Grants
Unsecured Grants
Funding Source Total
r
M
FL
�+
a
LL
0
00
N
O
N
ACI
} O
N
ML
d
to
O
Q.
O
a`
4-
0
c
cts jects propose to replace or rehab storm drain
cations of work identified by City crews and staff via
Much of Edmonds stormwater infrastructure is past its useful
air to preserve ction of the storm drain system. Failure to a`
se cha r rain system failure.
$1,622,400 $1,687,296 $1,754,786 $1,824,977 $1,897,976
$290,000 $1,946,880 $2,024,756 $2,105,744 $2,189,973 $2,277,572
$290,000 $1,946,880 $2,024,756 $2,105,744 $2,189,973 $2,277,572
$290,000 $1,946,880 $2,024,756 $2,105,744 $2,189,973 $2,277,572
2023-2028 CIP-CFP v0.3
90
Packet Pg. 163
Project Description
Road pavement overlays to cover areas
the Annual Storm Maintenance Proj
Project Benefit WV
Improve overall pavement condition in locati s
Replacement Projects.
Estimated Pr
$200,000
Design
$15,000
Right of Way
Construction
$185,000
Expense Total
$200,000
Stormwater Utility Fund 422
$200,000
ARPA Funds
Secured Grants
Unsecured Grants
Funding Source Total
$200,000
re excavated and patched in previous years as part of
and patched due to the Annual Storm
a
v
a
u-
0
00
N
O
N
M
N
O
N
d
N
O
C.
O
L
a
4-
0
_
0
c�
m
N
O
L
a
2023-2028 CIP-CFP v0.3
91
Packet Pg. 164
Packet Pg. 165
2023-2028 CIP-CFP v0.3 92
Stormwater Utility Fund 422
Funding Source Total
$600,000
$600,000
emuYi
� 1
r - !
EOMOHOS mnwy fw
NAM s+ NRnF9Y
i J
d
U
CL
LL
U
00
N
O
N
M
N
O
N
d
N
O
M
O
L
4-
0
O
r
r
L
2023-2028 CIP-CFP v0.3
93
Packet Pg. 166
DC
W
3
W
H
'i " . - .�".'% '^' - ..F •may k � Y
-- _ .'" ' ' _•'irk` - .'.�''r - - - -
7.A.b
Sower Prniects
#
UPPROJECT
OP
#
2024
2025
2026
2028
TOTAL
(2023-2028)
TOTAL
(2029-43)
TOTAL Project
Cost
PWS-01
Phase 9 Annual Sewer Re I/Rehab/Im rovements 2022
$30,000
$0
$0
$0
$0
$0
$30,000
$30,000
PWS-02
Phase 10 Annual Sewer Re I/Rehab/Im rovements 2023
$1,689,212
$0
$0
$0
$0
$0
$1,689,212
$1,689,212
PWS-03
Phase 11 Annual Sewer Re I/Rehab/Im rovements 2024
$349,517
$1,964,780
$0
$0
$0
$0
$2,314,297
$2,314,297
PWS-04
Phase 12 Annual Sewer Re I/Rehab/Im rovements 2025
$0
$363,498
$2,043,372
$0
$0
$0
$2,406,870
$2,406,870
PWS-05
Phase 13 Annual Sewer Re I/Rehab/Im rovements 2026
$0
$0
$378,038
$2,125,107
$0
$0
$2,503,145
1 $2,503,145
PWS-06
I
Phase 14 Annual Sewer Re I/Rehab/Im rovements 2027
$0
$0
$0
$393,160
$2,210,111
$0
$2,603,271
$2,603,271
PWS-07
Phase 15 Annual Sewer Re I/Rehab/Im rovements 2028
$0
$0
$0
$0
$408,886
$2,298,515
$2,707,401
$2,707,401
PWS-10
Annual Citywide CIPP Sewer Rehabiliation
$0
$521,611
$542,475
$564,174
$586,741
$610,210
$2,825,211
$2,825,211
PWS-11
Lake Ballinger Sewer
e7PWS-15
$0
$1,000,000
$6,000,000
$0
$0
$0
$7,000,000
$7,000,000
PWS-12
Citywide CIPP Sewer Rehabilitation Phase 3
$423,710
$0
$0
$0
$0
$0
$423,710
$423,710
PWS-14
2023 SS Overlays
$200,000
$0
$0
$0
$0
$0
$200,000
$200,000
Phase 16 Annual Sewer Re I/Rehab/Im rovements 2029Iff
$0
$0
$0
$0
$425,242
$425,242
$425,242
Total Projects 1%6— '0 �, $3,849,889 $8,963,885 $3,082,441 $3,205,738 $2,908,725 $24,703,117 $0 $24,703,117
Funding Source 2023 24
2025
2026
2027
2028
TOTAL
TOTAL
TOTAL
(2023.2028)
(2029-43)
1
Sewer Fund -423 mmmS $3,849,889
$8,963,885
$3,082,441
$3,205,738
$2,908,725
$24,703,117
$24,703,117
Total Revenue
$2,692,439
$3,849,889 $8,963,885 $3,082,441 $3,205,738 $2,908,725 $24,703,117 $0 $24,703,117
a_
U
IL
LL
U
00
N
O
CV
M
N
O
N
0
to
0
Q
0
a
0
C
0
�-r
m
C
d
N
0
L
a
2023-2028 CIP-CFP v0.3 95
Packet Pg. 168
Project Description INMOOV
Per the approved 2013 Sewer Comp
re
various locations throughout the Cit
0
to breakage due to its material properties
Project Benefit ,
Improve system reliability and capacity, decrea
day to day maintenance costs.
Estimated Project Cost
$1.7 to $2.7 million/year
Design
Right of Way
Construction
Expense Total
Sewer Fund 423
Funding Source Total
jects will replace pipe and related appurtenances at
undersized, need to increase capacity, or more prone
breakages, and decrease overall
$1,619,212
$1,964,780
$2,043,372
$2,121W7
$2,210,111
$2,298,515
$2,068,729
$2,328,278
$2,421,410
$2,518,267
$2,618,997
$2,723,757
$2,068,729
$2,328,278
$2,421,410
$2,518,267
$2,618,997
$2,723,757
$2,068,729
$2,328,278
$2,421,410
$2,518,267
$2,618,997
$2,723,757
d
u_
U
00
N
O
N
M
N
O
N
d
N
O
M
O
L
4-
0
c
O
c
m
a�
L
2023-2028 CIP-CFP v0.3
96
Packet Pg. 169
. � � tnsitu(vrm
Project Descriptio
Per the approved 2013 Sewer Compre e
line existing sewer mains that are su
by this trenchless method.
Expense Total
Sewer Fund 423
Funding Source Total
nd ent video inspections of sewer mains, the project will
tr , infiltration and inflow, and damage that can be repaired
$521,611
$542,475
$564,174
$586,741
$610,210
$521,611
$542,475
$564,174
$586,741
$610,210
$521,611
$542,475
$564,174
$586,741
$610,210
a
v
IL
IL
0
CO
N
O
N
O
i N
d
N
O
C.
O
aL
4-
0
C
0
c�
m
N
O
L
IL
Packet Pg. 170
2023-2028 CIP-CFP v0.3 97
t5F t:KANC.t _
asw •^ Holly Ln Mi Tr
,
R Maple
12341h`S11•SW— 3IT
234th St SW
a Madrona Ln n
O mac-
Z w
tOj1 236th St SW Q 236th St SW' 236th S1 SW- r
II� C
9L
St SW 238TH ST SW 23sth St SW a'
lie -
`;W 240th Si SW
d 242nd St SW z`\ d St S a
S
2-5
t
c0 —�.9
244TH ST SW V
Project Descripti
232nd St svJ�232nd St SW 232nd St
�,,4
Y
235thStSw '°sw I�zl
—1
235TH PL SW_
236TH ST SW
rn
^+'
Jy,
Of� II a
D
n
I
n � z
m
� N
Lake
�
4m
Ballinger
t
_BALLI.NGER_WAY.�244TH�ST=$WJ
`�
l r.,•., _
Per the approved 2013 Sewer Compreral
I nd ent video inspections of sewer mains, the sewer pipe
along Lake Ballinger will require addi a n the near future. These improvements are needed to
account for population growth, reduce Infiltn and Inflow from thepipe and improve maintenance and
emergency access for this major trunk syste
Project Benefit
Improve system reliability and capacity, decrease infiltration al
maintenance costs. Improved access will help ease maintenan
decease any chance of potential sewer spills into Lake Ballinge
Estimated Project Cost
Right of Way
Construction
Expense Total
Sewer Fund 423
Funding Source Total
$5,000,000
$1,000,000 $5,000,000
$1,000,000 $5,000,000
$1,000,000 $5,000,000
overall day to day
1gncies, which will further
a.
gth5,
L
y i ()
a 00
N
N
A
242ryd 0
N N
to
0
Q.
0
L
a.
4-
0
c
0
c
m
to
M
a
2023-2028 CIP-CFP v0.3 98
Packet Pg. 171
Project Description
Per the approved 2013 Sewer Comp
line existing sewer mains that are su
by this trenchless method.
Project Benefit ,
Improve system reliability and capacity, decrea
day to day maintenance costs.
Estimated Project Cost
$423,710
Design
Right of Way
Construction
Expense Total
Sewer Fund 423
Funding Source Total
$368,710
$423,710
$423,710
$423,710
a
U
d
u_
U
00
N
O
N
C
N
d
N
O
O
L
Q.
O
r-
ent video inspections of sewer mains, the project will °
r
Itration and inflow, and damage that can be repaired
r
m
U)
breakages, and decrease overall
2023-2028 CIP-CFP v0.3
99
Packet Pg. 172
Project Description
Road pavement overlays to cover are, -
the Sanitary Sewer Replacement Pry 4
Project Benefit
Improve overall pavement condition in locati
Replacement Projects.
Estimated Project Cost
Expense Total
Sewer Fund 423
Funding Source Total
$188,000
$200,000
$200,000
$200,000
re excavated and patched in previous years as part of
and patched due to Sanitary Sewer
2023-2028 CIP-CFP v0.3 100
Packet Pg. 173
LU
f
PPO
um
lk k C A L
F
Mm- -u-
m
•b. " Q
101
AWL:
7.A.b
Farilities Proier-ts
#
CFP
PROJECT
DP
#
2026
2027
2028
TOTAL
(2023-2028)
TOTAL
(2029-43)
TOTAL Project
Cost
PWF-01
Boys and Girls Club
U
$27,733
$37,453
$32,077
$15,101
$20,000
$282,398
$0
$282,398
PWF-02
Cemete Buildin
$2,094
$8,414
$3,377
$818
$1,000
$17,657
$0
$17,657
PWF-03
Ci Hall
$323,246
$279,064
$70,949
$108,628
$80,000
$1,011,887
$0
$1,011,887
PWF-04
Fishing Pier/Beach Ranger Station
$70,000
$2,971
$2,918
$5,628
$1,043
$1,500
$84,060
$0
$84,060
PWF-05
Frances Anderson Center
1
$525,002
$298,378
$98,892
$20,934
$113,029
$80,000
$1,136,235
$0
$1,136,235
PWF-06
Fire Station 16 k,
$47,689
$1,591
$69,388
$30,107
$31,631
$35,000
$215,406
$0
$215,406
PWF-07
Fire Station 17
$81,545
$100,000
$221,922
$27,575
$122,245
$45,000
$598,287
$0
$598,287
PWF-08
Fire Station 20
$20,000
$16,274
$94,248
$69,782
$23,765
$20,000
$244,069
$0
$244,069
PWF19
Fire Life Safety Communications
$60,000
$0
$0
$0
$0
$0
$60,000
$0
$60,000
PWF-09
Historic Log Cabin
$80,000
$888
$546
$1,361
$6,469
$1,500
$90,764
$0
$90,764
PWF-10
Historical Museum
$63,089
$15,000
$10,000
$4,621
$10,199
$5,000
$107,909
$0
$107,909
PWF-11
I
ILlbrary
$231.077
$53,3251
$45,038
$35,000
$0
$389,440
$0
$389,440
PWF-23
Library Plaza Deck Waterproofing Project
$0
$0
$0
$0
$4,900,000
$4,900,000
$0
$4,900,000
PWF12
Meadowdale Club House
$93,426
$3,665
$7,985
$4,446
$1,159
$5,000
$115,681
$0
$115,681
PWF-13
Old Public Works
$107,743
$24,308
$25,000
$25,000
$24,519
$25,000
$231,570
$0
$231,570
PWF-14
Parks Maintenance Building
$70,789
$40,320
$9,349
$5,177
$69,228
$20,000
$214,863
$0
$214,863
PWF-20
Parks Restrooms Maintenance
0
$50,000
$50,000
$25,000
$25,000
$100,000
$305,000
$0
$305,000
PWF-15
Public Safety
$445,276
$55,169
$151,481
$515,071
$80,000
$1,297,964
$0
$1,297,964
PWF-16
Public Works O&M
$201,570
$218,643
$80,315
$79,348
$43,821
$50,000
$673,697
$0
$673,697
PWF-21
Public Works EV Conduit Addition
$125,000
$0
$0
$0
$0
$0
$125,000
$0
$125,000
PWF-17
Wade James Theater
$18,600
$99
,880
$115,734
$21,872
$25,000
$324,163
$0
$324,163
PWF-18
I
Yost Pool House
$65,570
8,409
$19,127
$30,389
$30,000
$179,623
$0
$179,623
PWF-22
I
I City Park Gazebo Roof
$0 $0
$0
$0
$50,000
Total Projects $2,112,978 $1,926, $1,156,277 $1,198,987 $624,000 $12,655,673 $0 $12,655,673
Funding Source
2023
2024 2025 IAJV2026
TOTAL
(2023-2028)
TOTAL
(2029-43)
TOTAL
Fund 016 2021 Facilities Bond
$1,127,151
$1,388, 6
$0 $0
$2,968,461
$0
$2,968,461
Fund 016 non-bondproceeds)
$819,995
$432,081
$2 $76,5 $31,500
$2,315,378
$0
$2,315,378
General Fund
$25,000
$0
IfV8,481
$0
$0 $0
$25,000
$0
$25,000
Water Utility Fund 421
$12,500
$0
$0
$0 $0 $0
$12,500
$0
$12,500
Stormwater Utility Fund 422
$12,500
$0
$0
$0 $0 $0
$12,500
$0
$12,500
Sewer Utility Fund 423
$12,500
$0
$0
$ $0
$0
$12,500
$0
$12,500
Unsecured Funding$90,832
$106,074
$25,000
$46AJW $1,122,395
$592,500
$7,296,834
$0
$7,296,834
Total Revenue $2,112,978 $1,926,669 $1,156,277
W62 $1,198,987 $624,000 $12,655,673 $0 $12,655,673
a_
U
IL
LIL
00
N
O
N
M
N
O
N
0
to
0
Q
0
tr
a
0
C
0
fC
C
d
N
d
>r
a
2023-2028 CIP-CFP v0.3 102
Packet Pg, 175
Project Description
This building built in 1900 was the origi el
Field and not part of the large Civic F* Park
Snohomish County Boys and Girls Club in par
building has sustained some interior settling
back stairway. It has significant need for maj
years. Renovation and deferred maintenance
r47
e f monds High School. The property is located at Civic
st project. The building is solely operated by the
rship with the City's Parks and Recreation department. The
twill require i repair to back hallway floors and the
renovat' e cted to be in operation for another 10
n e buil g value in its current location.
Projects: Exterior plumbing access, Window replacement, Roof
Plumbing replacement, Front entry door replacement, Fire Alar
Baseboard heating replacement
Project Benefit
Public owned facilities and properties are maintained to assure safe and property
assure the protection of the physical asset throughout an expected lifespan. A we
safe work environment that is clean and sanitary which promotes workplace of
and preventative maintenance reduces energy consumption and provides for b
designed during manufacturer expected lifespan.
Estimated Project Cost
$282,398
Construction\Professional Services
Expense Total
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
Unsecured Funding
Funding Source Total
DA Access,
nkler updates,
op g conditions and to
I ntained facility creates a
cy and confidence. Routine
ding systems to operate as
$150,034
$27,733
$37,453
$32,077
$15,101
$20,000
$150,034
$27,733
$37,453
$32,077
$15,101
$20,000
$150,034
$27,733
$37,453
$32,077
$15,101
$20,000
$150,034
$27,733
$37,453
$32,077
$15,101
$20,000
a
U
d
u_
U
00
N
O
N
M
N
O
N
i d
N
O
O
d
4-
0
c
O
c
m
a�
a
2023-2028 CIP-CFP v0.3
103
Packet Pg. 176
�mox�ds
Meraokuu,
s ��ETekY
r
Project Description
This small structure houses the Edmom fun services and the cemetery Sextant office. The
building is in relatively good conditio d ha tt red maintenance backlog. Minor security and
communications updates will be needed as t nology dictates.
Projects:
Minor repair and maintenance
Project Benefit
Public owned facilities and properties are maintained to assur fe and erty ope n conditions and to
assure the protection of the physical asset throughout an exp ed lif n. ell -main d facility creates a
safe work environment that is clean and sanitary which promotes place a ncy and 'dence. Routine
and preventative maintenance reduces energy consumption and p vides for building sy s perate as
designed during manufacturer expected lifespan.
Estimated Project Cost
$17,657
Construction\Professional Services
$1,954
$2,094
$8,414
$3,377
$818
$1,000
Expense Total
$1,954
$2,094
$8,414
$3,377
$818
$1,000
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
$1,954
$2,094
$8,414
Unsecured Funding
$3,377
$818
$1,000
Funding Source Total
$1,954
$2,094
$8,414
$3,377
$818
$1,000
a-
LL
U
00
N
O
N
M
N
O
N
_ d
N
O
4_ M
O
L
O
c
O
c
m
a�
L
2023-2028 CIP-CFP v0.3 104
Packet Pg. 177
., 4
Project Description
City Hall was built in 1979 and was ope
renovated the building in the 1990s. City
renovations were completed. The building is
maintenance.
. � .
PF
,
..
W
t siness office center until the City purchased and
Wd Edmonds City Hall from this location since the
r original condition and needs substantial repair and
Projects: All Mechanical, Electrical and Plumbing re ement, Restroom remodels w/gender
neutral consideration, Center Stairway Code updates and rep fIrt, Lobby r del, Entry Awning re -glazing,
Interior Painting, ADA accessibility improvements.
Project Benefit
Public owned facilities and properties are maintained to assure salifespan.Awell-maiin
ope perati
assure the protection of the physical asset throughout an expecte
safe work environment that is clean and sanitary which promotes workplace efficienc
and preventative maintenance reduces energy consumption and provides for buil ys
designed during manufacturer expected lifespan.
Estimated Project Cost
$1,011,887
Construction\Professional Services
Expense Total
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
Unsecured Funding
Funding Source Total
GJWitions and to
'lity creates a
I confidence. Routine
ems to operate as
$150,000
$323,246
$279,064
$70,949
$108,628
$80,000
$150,000
$323,246
$279,064
$70,949
$108,628
$80,000
$323,246
$129,064
$150,000
$150,000
$70,949
$108,628
$80,000
$150,000
$323,246
$279,064
$70,949
$108,628
$80,000
I.L
U
a-
u_
U
00
N
O
N
M
N
O
N
d
N
O
CL
O
d
4-
0
c
O
c
m
a�
a
2023-2028 CIP-CFP v0.3
Packet Pg. 178
105
-db~
r
Project Description
The Pier was recently renovated and is ra oo ndition. The Beach Ranger Office is a 1200 square foot
office and restroom facility located he e e e pier. There are season programs and visitor support
functions that operate out of this facility.
Projects: Electrical panel and pier electrical f d replac n epairs, and maintenance
Project Benefit
Public owned facilities and properties are maintained to assure a and p
assure the protection of the physical asset throughout an expe d lifes
safe work environment that is clean and sanitary which prom s wo
and preventative maintenance reduces energy consumption and p es
designed during manufacturer expected lifespan.
Estimated Project Cost
$84,060
ons and to
lity creates a
nce. Routine
perate as
Construction\Professional Services
$70,000
$2,971
$2,918
$5,628
$1,043
$1,500
Expense Total
$70,000
$2,971
$2,918
$5,628
$1,043
$1,500
Fund 016 (2021 Facilities Bond)
$70,000
$2,971
$2,918
Fund 016 (non -bond proceeds)
Unsecured Funding
$5,628
$1,043
$1,500
Funding Source Total
$70,000
$2,971
$2,918
$5,628
$1,043
$1,500
IL
v
IL
u_
0
00
N
O
N
M
N
O
N
d
to
O
C.
O
IL
4-
0
a
0
c�
m
N
O
L
a
Packet Pg. 179
2023-2028 CIP-CFP v0.3 106
Project Description
The Frances Anderson Center serves as +hiu
n eation center offering arts, athletic and cultural
programing year round. Due to the a the building there are many building systems that are in
need of replacement or restoration. _
Projects: Replacement of Heating Boilers witIVIectric
Replacement of all exterior doors (24 ea), New,
appropriate), Plumbing drainage collector, Gym Floor, Drinki
gender neutral consideration), Replacement of all plumbing fi
classroom flooring, Addition of building security card readers,
Alarm replacement, Fire Sprinkler replacement. Oil tank reme
Project Benefit
X,0will add ventilation, cooling and heating,
sures, New Windows (historically
tains ADA c liant, Restroom remodels (w/
s, Replace everal common area and
ding HV ontrol aximize efficiency, Fire
ion, building ALcompliance efforts.
Public owned facilities and properties are maintained to assure safe and property
assure the protection of the physical asset throughout an expected lifespan. A we
safe work environment that is clean and sanitary which promotes workplace of
and preventative maintenance reduces energy consumption and provides for b
designed during manufacturer expected lifespan.
Estimated Project Cost
$1,136,235
Construction\Professional Services
Expense Total
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
Unsecured Funding
Funding Source Total
$525,002
$298,378
$98,892
$525,002
$298,378
$98,892
$525,002
$298,378
$98,892
$525,002
$298,378
$98,892
op g conditions and to
I ntained facility creates a
cy and confidence. Routine
ding systems to operate as
$20,934 $113,029 $80,000
$20,934 $113,029 $80,000
$20,934 $113,029 $80,000
$20,934 $113,029 $80,000
2023-2028 CIP-CFP v0.3
107
Packet Pg. 180
Project Description IqqIMMPP�
This facility is operated by South Snoho
of 10,700 square feet. The building i air
replacements to remain operationally ready
Projects: roll -up bay door controller replace
updates.
Fir d Rescue and was built in 2003 and has a building area
1itl will require some infrastructure updates or
the needs of the City. _
t, gutter replacement, interior coatings
Project Benefit
Public owned facilities and properties are maintained to assur fe and erty ope n conditions and to
assure the protection of the physical asset throughout an exp ed lif n. ell main t d facility creates a
safe work environment that is clean and sanitary which promotes place a ncy and 'dence. Routine
and preventative maintenance reduces energy consumption and p vides for buildings s perate as
designed during manufacturer expected lifespan.
Estimated Project Cost
$215,406
Construction\Professional Services
$47,689
$1,591
$69,388
$30,107
$31,631
$35,000
Expense Total
$47,689
$1,591
$69,388
$30,107
$31,631
$35,000
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
$47,689
$69,388
Unsecured Funding
$1,591
$30,107
$31,631
$35,000
Funding Source Total
$47,689
$1,591
$69,388
$30,107
$31,631
$35,000
IL
v
a
u_
0
00
N
O
N
M
N
O
N
d
to
O
C.
O
L
IL
4-
0
c
0
m
N
L
a
2023-2028 CIP-CFP v0.3
108
Packet Pg. 181
Project Description IRRIMMINIP�
This building is operated by South Snoh
9,800 square feet. This building has om
operationally ready.
i
Ilia -
li�i
ISM
F
rnd Rescue, was built in 1999 and has a building area of
will need some infrastructure upgrades to remain
Projects: bay door assessment, drainage upd1W lect ' r u
ceiling replacement.
Project Benefit
Public owned facilities and properties are maintained to assur fe anc
assure the protection of the physical asset throughout an exp ed lif
safe work environment that is clean and sanitary which promotes I
and preventative maintenance reduces energy consumption and p"Ovid
designed during manufacturer expected lifespan.
Estimated Project Cost
$598,287
Construction\Professional Services
Expense Total
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
Unsecured Funding
Funding Source Total
re updates, roof soffit enclosure, bay
$81,545 $100,000 $221,922 $27,575 $122,245
$81,545 $100,000 $221,922 $27,575 $122,245
$81,545 $100,000 $221,922
$27,575 $122,245
$81,545 $100,000 $221,922 $27,575 $122,245
is and to
r creates a
e. Routine
rate as
$45,000
$45,000
$45,000
$45,000
d
u_
U
00
N
O
N
M
N
O
N
d
O
M
O
d
4-
0
c
0
r
c
m
a�
L
2023-2028 CIP-CFP v0.3 109
Packet Pg. 182
Project Description IRRIMMIPP�
This building is the eldest of the City's t $sificant
on d is operated by South County Fire and Rescue. This
station serves Esperance and suppor a stations in Edmonds. The building is 6400 square feet
and was built in 1990. The building has haupdates to the exterior envelope and is in need of interior
and HVAC system updates.
Projects: storm water drainage system, interior oo to
Project Benefit
Public owned facilities and properties are maintained to assur fe and
assure the protection of the physical asset throughout an exp ed evidr,
safe work environment that is clean and sanitary which promotesand preventative maintenance reduces energy consumption and p
designed during manufacturer expected lifespan.
Estimated Project Cost
$244,069
Construction\Professional Services
Expense Total
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
Unsecured Funding
Funding Source Total
re replacement
conditions and to
Nd facileity creates a
dnce. Routine
s Aerate as
$20,000
$16,274
$94,248
$69,782
$23,765
$20,000
$20,000
$16,274
$94,248
$69,782
$23,765
$20,000
$20,000
$16,274
$94,248
$69,782
$23,765
$20,000
$20,000
$16,274
$94,248
$69,782
$23,765
$20,000
a
U
d
u_
U
00
N
O
N
M
N
O
N
d
N
O
0.
O
L
O
c
0
r
c
m
a�
a
2023-2028 CIP-CFP v0.3
110
Packet Pg. 183
d
U
ti
• 6 �
,f
Project Description
This Historic log cabin is home to the E d be Commerce visitor center, the structure was a purpose
built cabin from the turn of the cent he s c rofessionally maintained on a three year cycle by a log
cabin specialist and requires only minor main ance and upkeep annually.
Projects: new thick cut shingle replacement, inking o nish
Project Benefit
Public owned facilities and properties are maintained to assure e and pr y o ting conditions and to
assure the protection of the physical asset throughout an expe d lifes well m ined facility creates a
safe work environment that is clean and sanitary which prom s wo ce ciency a nfidence. Routine
and preventative maintenance reduces energy consumption and p es for b ing syste operate as
designed during manufacturer expected lifespan.
Estimated Project Cost
$90,764
Construction\Professional Services
$80,000
$888
$546
$1,361
$6,469
$1,500
Expense Total
$80,000
$888
$546
$1,361
$6,469
$1,500
Fund 016 (2021 Facilities Bond)
$80,000
Fund 016 (non -bond proceeds)
$888
$546
$1,361
$6,469
$1,500
Unsecured Funding
$5,969
Funding Source Total
$80,000
$888
$546
$1,361
$12,438
$1,500
Packet Pg. 184
2023-2028 CIP-CFP v0.3
� .. EWV.
-
V
Y.
a: � � *},��� -, � 'tom • � _ -
[r; A
r
Project Description
The 110-year-old original Carnegie Libr ui s ho to the Edmonds Museum. The building is on the State
of Washington Historic registry and een II fined over the last several years. Buildings of this age
require specialized maintenance and coordin on with the state historic architect to maintain the historic status.
Structural stabilization and weatherproofing the most signif' orities to maintain this facility.
Projects: minor structural reinforcement, entry f a y re r, lower entry restoration
Project Benefit
Public owned facilities and properties are maintained to assur fe and erty ope n conditions and to
assure the protection of the physical asset throughout an exp ed lif n. ell main t d facility creates a
safe work environment that is clean and sanitary which promotes place a ncy and 'dence. Routine
and preventative maintenance reduces energy consumption and p vides for building sy s perate as
designed during manufacturer expected lifespan.
Estimated Project Cost
$107,909
Construction\Professional Services
Expense Total
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
Unsecured Funding
Funding Source Total
$63,089
$15,000
$10,000
$63,089
$15,000
$10,000
$50,000
$15,000
$10,000
$13, 089
$63,089
$15,000
$10,000
$4,621
$10,199
$4,621
$10,199
$4,621
$10,199
$4,621
$10,199
$5,000
$5,000
$5,000
$5,000
a
U
d
v_
U
00
N
O
N
M
N
O
N
d
0
CL
0
L
4-
0
c
0
r
c
m
a�
a
2023-2028 CIP-CFP v0.3 112
Packet Pg. 185
1.w1tM%
N
FiE CR�eS cV
O
- N
d
N
-�' O
O
Project Description o
c
The Edmonds Library is operated by th -I ar em with exception of the Second floor Plaza room °
r
rental space. The library is a 19,000 re fo bu uilt in 1982. The building hosts special event rentals and
r
daily Library programming and community se ces. This is one of the City's most heavily used buildings by the
public and has significant deferred maintena needs, include ilcling facade and plaza deck a -
waterproofing. IN -.9990ppp,- A
Projects: window replacement, ADA access device upgrades cement, ge
creation, Plaza Room restroom/changing facilities, Plaza Room installati
building cladding, exterior stairway restoration, HVAC ventilate an repl eni
exterior planter box replacement and waterproofing, flood da ge re
Project Benefit
Public owned facilities and properties are maintained to assure safe and property
assure the protection of the physical asset throughout an expected lifespan. A we
safe work environment that is clean and sanitary which promotes workplace of
and preventative maintenance reduces energy consumption and provides for b
designed during manufacturer expected lifespan.
Estimated Project Cost
$389,440
Construction\Professional Services
$25,000
$231,077
Expense Total
$25,000
$231,077
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
$25,000
$150,902
Unsecured Funding
$80,175
Funding Source Total
$25,000
$231,077
c restroom
?storation or
✓vay remodel,
op g conditions and to
I ntained facility creates a
cy and confidence. Routine
ding systems to operate as
$53,325
$45,038
$35,000
$53,325
$45,038
$35,000
$53,325
$45,038
$35,000
$53,325 $45,038 $35,000
2023-2028 CIP-CFP v0.3 113
Packet Pg. 186
Lf � iy Y ~' +,rr� lr •45. y x.` t�4F' Jti
�� � }1 . � Fri �"I' �a•+[.fR�}�£ r^.i��._}1Si'
Project Description
IIIIIII M-r a
f
f
This 4000 square foot facility was built ' 6 o ity theater facility and later was transformed into the
Meadowdale community club house buil g ently owned and maintained by the City of Edmonds and
houses the City operated Meadowdale pre-s of and the 1500 square foot Meadowdale club house rental
facility. This facility while dated has been well aintained and o ires minor maintenance and repairs.
Projects: minor maintenance and repairs, interi g pai g, and bath fixture replacement.
Project Benefit
Public owned facilities and properties are maintained to assur fe and erty ope n conditions and to
assure the protection of the physical asset throughout an exp ed lif n. ell main t d facility creates a
safe work environment that is clean and sanitary which promotes place a ncy and 'dence. Routine
and preventative maintenance reduces energy consumption and p vides for building sy s perate as
designed during manufacturer expected lifespan.
Estimated Project Cost
$115, 681
Construction\Professional Services
$93,426
$3,665
$7,985
$4,446
$1,159
$5,000
Expense Total
$93,426
$3,665
$7,985
$4,446
$1,159
$5,000
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
$93,426
$3,665
$7,985
$4,446
$1,159
$5,000
Unsecured Funding
Funding Source Total
$93,426
$3,665
$7,985
$4,446
$1,159
$5,000
a
v
a
U.
0
00
N
O
N
M
N
O
N
d
to
O
0.
O
L
IL
4-
0
c
0
M
m
N
O
L
IL
2023-2028 CIP-CFP v0.3
114
Packet Pg. 187
Project Descri0io
This facility was built in 1965 to house 0
tenant space and City storage, as we Edt
adjacent to the Waste Water Treatment Pla
dictate. Building is primarily used as storage
readiness.
lic ks Department, the building was converted in 1995 to
ds arge evidence storage. This is a vital piece of property
nd could be converted for utility use if regulatory requirements
will need some to maintain current operational
Projects: HVAC updates, roll -up door replacement, parking to acing, secu ' camera system.
Project Benefit
Public owned facilities and properties are maintained to assur afe a ro operate
assure the protection of the physical asset throughout an expecte span. A mainta
safe work environment that is clean and sanitary which promotes orkplace efficiency a
and preventative maintenance reduces energy consumption and provides for buildin
designed during manufacturer expected lifespan.
Estimated Project Cost
$231,570
onditions and to
i cility creates a
n nce. Routine
ems to operate as
Construction\Professional Services
$107,743
$24,308
$25,000
$25,000
$24,519
$25,000
Expense Total
$107,743
$24,308
$25,000
$25,000
$24,519
$25,000
Fund 016 (2021 Facilities Bond)
$22,308
Fund 016 (non -bond proceeds)
$30,000
Unsecured Funding
$77,743
$24,308
$25,000
$25,000
$24,519
$25,000
Funding Source Total
$107,743
$46,616
$25,000
$25,000
$24,519
$25,000
a
U
IL
u_
0
00
N
O
N
M
N
O
N
d
to
O
C.
O
L
IL
4-
0
c
0
m
N
L
IL
Packet Pg. 188
2023-2028 CIP-CFP v0.3 115
Project Description
This facility was built in 1967 by Ed Hun
foot facility now houses all City Facili per
seasonal help) This Facility is home to the Ci
repair shop and Parks and Facilities mainten
This Facility is near end of life and is undersi
facility.
V
c
W1)n
was the City Facilities supervisor. The 4800 square ° and all of Park and Rec Parks Maintenance Staff(12+
c
arpentry Shop, Key Sho , City Flower program, Parks engine u)
a�
e supply stora as Parks and Facilities Manager offices. a
to sup p ental staffing that are assigned to this
Projects: maintenance and repair to maintain operational capa�ADA
replacement, Pine St. facility exit, exterior painting.
Project Benefit IT N
Public owned facilities and properties are maintained to assure saOandproperty ope
assure the protection of the physical asset throughout an expected lifespan. A well m-
safe work environment that is clean and sanitary which promotes workplace effid
and preventative maintenance reduces energy consumption and provides for b g
designed during manufacturer expected lifespan.
Estimated Project Cost
$214,863
Construction\Professional Services
$70,789
$40,320
$9,349
Expense Total
$70,789
$40,320
$9,349
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
$70,789
$40,320
$9,349
Unsecured Funding
Funding Source Total
$70,789
$40,320
$9,349
tes, shop floor
-a o?IIWons and to
fined facility creates a
and confidence. Routine
systems to operate as
$5,177 $69,228 $20,000
$5,177 $69,228 $20,000
$5,177 $69,228 $20,000
$5,177 $69,228 $20,000
2023-2028 CIP-CFP v0.3 116
Packet Pg. 189
Project Description IqqINNPP�
The Public Safety building houses Ed
mo
Chambers. The building was built in en
government uses. The building houses one c
simulator facilities and evidence processing
life and has a significant amount of deferred
19-liilill"�i r
W
U
d
lit- LL
U
00
N
O
N
M
N
O
N
d
N
O
O
c
epa ent, Edmonds Municipal Court and the City Council °
r
ipa 0,000 square feet of office, court and municipal
r
e City emergency operations centers, large police training,
a�
storage. The b as had minimal system updates over it's a
intena o e retrofitted with new fire sprinklers.
Projects: air handler and outdoor ventilation unit replacemel
reconfiguration to meet current usage, fire sprinkler installati
sleeping room remodel and gender specific/neutral accommc
windows is specific locations, courts flat roof replacement.
solar pl
rior half
, ge
Project Benefit - N
Public owned facilities and properties are maintained to assure safe and property
assure the protection of the physical asset throughout an expected lifespan. A we
safe work environment that is clean and sanitary which promotes workplace of
and preventative maintenance reduces energy consumption and provides for b
designed during manufacturer expected lifespan.
Estimated Project Cost
$1,297,964
Construction\Professional Services
Expense Total
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
Unsecured Funding
Funding Source Total
Ilation, parking lot
vation and painting,
6blic restrooms, operable
op g conditions and to
I ntained facility creates a
cy and confidence. Routine
ding systems to operate as
$50,967
$445,276
$55,169
$151,481
$515,071
$50,967
$445,276
$55,169
$151,481
$515,071
$445,276
$50,967
$55,169
$151,481
$515,071
$50,967
$445,276
$55,169
$151,481
$515,071
$80,000
$80,000
$80,000
$80,000
2023-2028 CIP-CFP v0.3
117
Packet Pg. 190
VMF,
d
U
LL
r
'• � . '� N
N
■
_ M
■ e— — - N
O
N
a)
N
O
M
O
L
IL
Project Description o
c
This building built in 1995 houses four P c div' s and the auxiliary City Emergency Operations Center. °
r
This building is 28,000 square feet a capa o tions 24/7 during weather emergencies and natural
disasters. The building has significant deferretements,
aintenance needs and infrastructure updates. u°',
a)
L
Projects: vehicle yard leveling, HVAC unit rep e r material bunkers, ventilation fan a
replacements, fire alarm system replacement, 1 o rest m remodel with gender inclusivity U_
U
considerations, electric vehicle charging and maintenance in ture, emer y communications updates, a
interior hallway flooring thresholds, utility bay HVAC replaceme water ma' ment (building connection). U
Project Benefit f
Public owned facilities and properties are maintained to assure saf d prope peratin itions and to
assure the protection of the physical asset throughout an expecte ifespan. A well main d ity creates a
safe work environment that is clean and sanitary which promotes workplace efficienc d confidence. Routine
and preventative maintenance reduces energy consumption and provides for buil ystems to operate as
designed during manufacturer expected lifespan.
Estimated Project Cost
$598,697
Construction\Professional Services
$201,570
$218,643
Expense Total
$201,570
$218,643
Fund 016 (2021 Facilities Bond)
$218,643
Fund 016 (non -bond proceeds)
$126,570
General Fund
$25,000
Water Fund 421
$12,500
Stormwater Fund 422
$25,000
Sewer Fund 423
$12,500
Unsecured Funding
Funding Source Total
$201,570
$218,643
2023-2028 CIP-CFP v0.3
118
$80,315 $79,348 $43,821 $50,000
$80,315 $79,348 $43,821 $50,000
$80,315
$79,348 $43,821 $50,000
$80,315 $79,348 $43,821 $5 Packet Pg. 191
Project Descriptio
This community theater was built by th ft PJ
theater group in 1967 and was deeded to City
ownership at a later date. The facilit 300 ua size and houses the Driftwood Players theatrical
performances and City meetings. The City's ntenanresponsibilities are limited to large infrastructure,
parking lot, roofing, and grounds.
Project Benefit 401
Public owned facilities and properties are maintained to assui
assure the protection of the physical asset throughout an exp
safe work environment that is clean and sanitary which prom
and preventative maintenance reduces energy consumption
designed during manufacturer expected lifespan.
Estimated Project Cost
$324,163
Construction\Professional Services
Expense Total
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
Unsecured Funding
Funding Source Total
rating conditions and to
Ctained facility creates a
confidence. Routine
sys%s to operate as
$18,600 $99,077 $43,880 $115,734 $21,872 $25,000
$18,600 $99,077 $43,880 $115,734 $21,872 $25,000
$18,600 $99,077 $43,880
$115,734 $21,872 $25,000
$18,600 $99,077 $43,880 $115,734 $21,872 $25,000
a
U
d
u_
U
00
N
O
N
M
N
O
N
d
N
O
OM
O
d
4-
0
c
O
r
c
m
a�
a
2023-2028 CIP-CFP v0.3
119
Packet Pg. 192
' �W= rM # P
r-
`
T R t T + RI 7 r
}
Y-
Y ,i
Jy
M r
�•y
•a
U.
• � -ed 00
* * * N
11 O
N
` N
O
_ - } N
-•• - r •'yry Zr
YZ
• �%! L 0
IL
Project Description o
c
This recreational facility houses the Cit ' u ogr g and some Parks and Recreation programs. Built in
1971 the pool house historical) was o e e nall The tenant run aquatic programing is currently
c°
p Y p Y• q p g g Y c
expanding to year round lap and team aquati ctivities and will continue to support summer open swim
programing. The facility requires minimal ma enance to rema' tional and is subject to tenant lease terms a`
of use.
Projects: security updates, roof replacement, gutter replace umbing fixt updates, exterior door
replacements, operational repair and maintenance to accommo e 365 op o
Project Benefit
Public owned facilities and properties are maintained to assure saf d prope perati
assure the protection of the physical asset throughout an expecte ifespan. A well main
safe work environment that is clean and sanitary which promotes workplace efficienc
and preventative maintenance reduces energy consumption and provides for buil y5
designed during manufacturer expected lifespan.
Estimated Project Cost
$179,623
Construction\Professional Services
Expense Total
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
Unsecured Funding
Funding Source Total
$65,570
$26,128
$8,409
$19,127
$65,570
$26,128
$8,409
$19,127
$65,570
$26,128
$8,409
$19,127
$65,570
$26,128
$8,409
$19,127
GJWitions and to
d • ity creates a
i confidence. Routine
ems to operate as
$30,389 $30,000
$30,389 $30,000
$30,389 $30,000
$30,389 $30,000
2023-2028 CIP-CFP v0.3
120
Packet Pg. 193
Project Description
All fire and life safety systems are requl o nit 24/7 in case of emergency. Previously this monitoring
has been done by traditional phone I' (PO astructure is aging in place and is not required to be
maintained by the telecommunications pro
rs as of 2020. In 2022 we have had 3 catastrophic communications
failures that resulted several thousand dollar xpense and lac Hance with fire code. The City has eleven
facilities with life safety monitoring, and six I ations w r aking a total of 17 locations with
monitoring requirements that will need to be upi 0.
Construction\Professional Services $60,000
Expense Total $60,000
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds) $60,000
Unsecured Funding
Funding Source Total $60,000
d
LL
U
00
N
O
N
M
N
O
N
d
N
O
M
O
L
4-
0
c
O
c
m
a�
a
2023-2028 CIP-CFP v0.3
121
Packet Pg. 194
Project Description
Facilities will take on the responsibility ut in nce at seven Park restroom structures. This
maintenance will include Mechanica ctric n ing systems, as well as building envelopes. These
structures have traditionally been maintaine Parks and Recreation. All of these structures have significant
deferred maintenance and will be added to t Facilities Condit' ssment, for future planning purposes.
Project Benefit
Maintaining clean and safe Park restrooms helps show case th of Edmon system, while meeting ADA
requirements for this type of public facility.
Estimated Project Cost
$305,000
Construction\Professional Services
Expense Total
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
Unsecured Funding
Funding Source Total
$55,000
$50,000
$50,000
$25
$25,000
$100,000
$55,000
$50,000
$50,000
$2 0
$25,000
$100,000
$55,000
$50,000
$50,000
$25,000
$25,000
$100,000
$55,000
$50,000
$50,000
$25,000
$25,000
$100,000
IL
0
IL
a_
0
00
w N
4 N
N M
N
O
N
d
I to
f C
Q.
O
aL
4-
0
2023-2028 CIP-CFP v0.3 122
Packet Pg. 195
Project Descriptio
The City fleet is rapidly changing to eIF
installed once there is demand bey,, 4
Project Benefit
Adding infrastructure in anticipation of futu
towards mostly electric vehicles.
Estimated Project Cost
Construction\Professional Services
Expense Total
Fund 016 (2021 Facilities Bond)
Fund 016 (non -bond proceeds)
Unsecured Funding
Funding Source Total
$125,000
$125,000
duit will allow for new EV charging stations to be
ity to remain agile while the fleet evolves
i1
U
a-
u_
U
00
N
O
N
M
N
O
N
d
N
O
0.
O
L
O
c
O
r
c
m
a�
a
2023-2028 CIP-CFP v0.3
123
Packet Pg. 196
�, ���" �yy
M;NN�WAYWALMwi`d'._ '+-..:ka ' 3"f dF.e�.e ti �"Y _ _ �. w y., .� �-..� � �j• � ,
Y
_, .s_6'# ems.
Project Description
The large round gazebo has a very war
composite roof material in a similar
Project Benefit
The gazebo is a gathering place for groups an ca
condition allows for more versatile use of City Pa'
Estimated Project Cost
$50,000
Construction\Professional Services $50,000
Expense Total $50,000
Fund 016 (2021 Facilities Bond) $50,000
Fund 016 (non -bond proceeds)
Unsecured Funding
Funding Source Total $50,000
at is at end of life. Roof will be replaced with
ng this covered space in operational
I.L
U
d
U_
U
O
N
O
N
M
N
O
N
d
N
0
Q
0
d
0
c
0
r
0
c
m
a�
a
2023-2028 CIP-CFP v0.3
Packet Pg. 197
124
ItiC
Project Description
r�
r�
.aor.r�f
The Library Plaza Deck is essentially a gFdin
r the and floor of the Edmonds Sno-Isle Library. The deck
surface was waterproofed and remo 3, hat project continuous water intrusion has occurred
through the waterproof membrane. This wat intrusion has been successfully mitigated over the years and has
not been deemed a project of significance pr ously. In 2 118rme
Specialty Contractors inspected the water
intrusion and offered an initial ROM price to molish he existing plaza deck. Rebuilding the
plaza deck and replacement of landscape, plant mshing and hand railings would be a
separate construction project. The Parks Director in 2018 ofimate t lace landscaping and
irrigations systems. In 2021 a draft structural report was perforMLA g to discover any structural
consequences from the years of water intrusion, building was tr rally so and water intrusion not
factoring in to building structural stability.46,
Project Benefit
Maintaining building in operational and safe condition, in order to maintain partne
system. Preservation of the City's physical assets in appropriate condition vs. the a;
capital investment.
Estimated Project Cost
$4,900,000
Construction\Professional Services
Expense Total
Fund 001 (Repair & Maint, Prof Services)
Fund 016 (2021 Facilities Bond)
Fund 016 (2021 Facilities Bond)
Unsecured Funding
Funding Source Total
(nth Sno-Isle Library
the facility and historic
$4,900,000
$4,900,000
$4,900,000
$4,900,000
00
N
O
N
M
N
O
N
-0
d
2023-2028 CIP-CFP v0.3
125
Packet Pg. 198
7.A.b
WastawatPr TraatmPnt Plant Prniectc
#
CFP
PROJECT
DP
#
20 2025
2026 2027
2028
TOTAL
(2022-2028)
TOTAL
(2029-43)
TOTAL Project
Cost
PWP-04
Nutrient Removal Project
$300,000 $0 $0
$0 $0
$0
$300,000
$0
$300,000
PWP-05
Prima Clarifier
$350,000 $0 $0
$0 $0
$0
$350,000
$0
$350,000
PWP-06
Joint Sealant
$60,000 $0 $0
$0 $0
$0
$60,000
$0
$60,000
PWP-07
Vacuum Filter
$187,453 $0 $0
$0 $0
$0
$187,453
$0
$187,453
Total Projects � $897,453 $0 $0 $0 $0 $0 $897,453 $0 $897,453
Funding Source
Edmonds Sewer Fund 423 50.79 %
2023
2024
2025
2026
2027
2028
TOTAL
(2022.2028)
TOTAL
(2029.43)
TOTAL
$455,816
$0
$0
$0
$0
$0
$455,816
$0
$455,816
Mountlake Terrace 23.17%
$207,940
$0
$0
$0
$0
$0
$207,940
$0
$207,940
Olympic View Water Sewer District 16.55 %
$IA&28
$0
$0
$0
$0
$0
$148,528
$0
$148,528
City of Shoreline 9.49%AMR&$0
$o
$0
$0
$0
$85,168
$0
$85,168
Total Revenue
$0 $897,453 $0 $897,453
a_
U
IL
ILL.
U
00
N
O
N
M
N
O
N
to
O
Q
O
t_
a
w
O
C
O
fC
C
d
N
d
a
2023-2028 CIP-CFP v0.3 127
Packet Pg. 200
Project Description
The WA Dept of Ecology has imposed/ic
full-scale trial on the Nuvoda Proces
discharged from the treatment plant. This re(
results and modeling that will be completed
and construction in 2025.
a
U
�
d
LL
U
CN
N
O
N
M
N
O
N
.
d
N
O
CL
O
L
4-
0
nd ral Permit upon us. We have conducted a preliminary
c
r at the process will reduce the total nitrogen that is
r
st is to begin pre -design of the project based on the full-scale test
022. Pre-desi then be followed by full design in 2024
a
Project Benefit ,
Nutrient reductions have been imposed for our WWTP that the
exceeding our cap next year with the return of Edmonds East I
once the cap is exceeded. The predesign effort will assist with
the permit.
Estimated Project Cost
Design
$300,000
Right of Way
Construction
Expense Total
$300,000
Sewer Fund 423
$152,370
Mountlake Terrace
$69,510
Olympic View Water Sewer District
$49,650
City of Shoreline
$28,470
Funding Source Total
$300,000
to treat. We anticipate
have a plan in place
kure compliance with
2023-2028 CIP-CFP v0.3
128
Packet Pg. 201
.._. . - [ I
I�r 31"7:r7L s.i i ihla7l�#•:ry ac,���w
WMma LiR [IF' r�k --_ .. __.. -:17 �#� ,Qi�. . ir,:.. , _o.�N: r r f3101
i�-2t Rol pr-� - _=-A�_W[-fkir WjPirsi.b.l !`� ��y.9Imrpe
U
a-
u_
,�04�_ I
—
O
0
d
Project Description o
c
The WWTP Annual Capital Replacemen o oje s intended to maintain infrastructure and equipment °
r
to ensure that the treatment plant is m a i in oje-ts for 2023 will include the WWTP Primary Clarifier 1
r
Rehabilitation, Joint Sealant repairs and a Va m Filter. The 3 I� projects are expected to be delivered for
$597,453.
a
Primary Clarifier #1 cage, center column, feedw rystshould
ir, counterweight, skimming device and rake
arms need replacement due to severe corrosion. The steeen replace 'nce the original construction.
The limited access will require that pieces be assembled iThe nts have been inspected by
Re -built it and CH Murphy. Both assessments were that tplace .
Project Benefit
There is a new design that will improve performance of the sweep rm. Repla
ensure that a metal fatigue issue will not cause a catastrophic failure.
Estimated Project Cost
$350,000
Design
Right of Way
Construction
$350,000
Expense Total
$350,000
Sewer Fund 423
$177,765
Mountlake Terrace
$81,095
Olympic View Water Sewer District
$57,925
City of Shoreline
$33,215
Funding Source Total
$350,000
is will
2023-2028 CIP-CFP v0.3
129
Packet Pg. 202
or A
d
U
d
LL
U
00
N
O
N
M
N
O
N
d
N
O
O
w L
Project Description o
c
The WWTP Annual Capital Replacemen o oje s intended to maintain infrastructure and equipment °
r
to ensure that the treatment plant is mai in ojects for 2023 will include the WWTP Primary Clarifier 1
r
Rehabilitation, Joint Sealant repairs and a Va m Filter. The 3 I� projects are expected to be delivered for
$597,453.
a
Joint Sealant: The Treatment Plant is constructed
against another concrete slab, a joint is formed. The joint mL
doesn't fill up with debri, fill with water and either leak into a
Project Benefit
The project will help to maintain the infrastructure and repair
Estimated Project Cost
Design
Right of Way
Construction
$60,000
Expense Total
$60,000
Sewer Fund 423
$30,474
Mountlake Terrace
$13,902
Olympic View Water Sewer District
$9,930
City of Shoreline
$5,694
Funding Source Total
$60,000
!e. When one concrete slab is butted up
led with joealant to ensure the space
or crackAWWter freezes.
2023-2028 CIP-CFP v0.3 130
Packet Pg. 203
ISHIGAICI
Project Description
The WWTP Annual Capital Replacemen
to ensure that the treatment plant is em
Rehabilitation, Joint Sealant repairs and a Vai
$597,453.
c
oje s intended to maintain infrastructure and equipment °
Nn ,if
for 2023 will include the WWTP Primary Clarifier 1
r
m Filter. The 3 I projects are expected to be delivered for u,
a
Vacuum Filter: When the Carbon Recovery Proje
current plan is to utilize the ash recovery system from the of
either re -built or replaced. Due to the cost of a new vacuum
the biochar production utilize the existing filter to ensure pro
Project Benefit
A vacuum filter is designed to remove water from ash/biochar
marketable biochar.
-
Estimated Project Cost
$187,453
Design
Right of Way
Construction
$187,453
Expense Total
$187,453
Sewer Fund 423
$95,207
Mountlake Terrace
$43,433
Olympic View Water Sewer District
$31,023
City of Shoreline
$17,789
Funding Source Total
$187,452
t
iochar will need to be dewatered. The
rator. Othe mponents of the system were
City staff r mending that start-up of
peratio or to t placement.
oving the excess
ide a more
2023-2028 CIP-CFP v0.3 131
Packet Pg. 204
Packet Pg. 205
2023-2028 CIP-CFP v0.3
7.A.b
UP / CIP COMPARISON (2022 TO 2023)
PROJECTS ADDED
Type
PROJECT NAME
CFP
DESCRIPTION
Transportation
2023 Traffic Signal and Safety Upgrades
Estimated future costs for transportation project.
Transportation
2023 Pedestrian Safety Program
Estimated future costs for transportation project.
Transportation
Olympic View Dr Overlay - 196th / SR-524 to Talbot Rd
Estimated future costs for transportation project.
Transportation
Citywide Lighting Study
Estimated future costs for transportation project.
Transportation
2023 Guardrail Program
Estimated future costs for transportation project.
Transportation
Green Streets 236th St. SW from Hwy 99 to 236th St. SW
Estimated future costs for transportation project.
Transportation
Green Streets Dayton St. from 3rd Ave. S to SR-104
Estimated future costs for transportation project.
Water
2023 Waterline Overlays
Estimated future costs for road repairs due to waterline replacements.
Water
Yost & Seaview Reservoir Repairs & Upgrades
Water
Phase 19 Annual Replacement Program (2029)
Estimated future costs for waterline replacements.
Storm
2023 Stormwater Overlays
Estimated future costs for road repairs due to storm replacements
Storm
7317 Lake Ballinger Way Purchase & Structure Removal
Estimated future costs for storm drainage project.
Storm
Perrinville Creek Basin Analysis Update
Estimated future costs for storm drainage project.
Sewer
Citywide CIPP Sewer Rehabilitation Phase 3
Estimated future costs for sewer project.
Sewer
2023 Sanitary Sewer Overlays
Estimated future costs for road repairs due to sewer line replacements.
WWTP
Primary Clarifier
Estimated future costs for waste water treatment plant project.
WWTP
Joint Sealant
Estimated future costs for waste water treatment plant project.
WWTP
Vacuum Filter
Estimated future costs for waste water treatment plant project.
Facilities
Fire Life Safety Communication
Estimated future costs for facilities project.
Facilities
Parks Restrooms Maintenance
Estimated future costs for facilities project.
Facilities
Public Works EV Conduit Addition
Estimated future costs for facilities project.
Facilities
City Park Gazebo Roof
Estimated future costs for facilities project.
Facilities
Library Plaza Deck
Estimated future costs for facilities project.
a_
U
a
U-
U
00
N
O
N
M
N
O
N
d
N
O
IZ
O
L
d
O
c
O
c
m
m
a`
a
Um
U
d
V
N
Y
L
O
a
N
O
N
A
N
O
N
C
d
E
t
V
O
a
2023-2028 CIP-CFP v0.3 133
Packet Pg. 206
7.A.b
CFP / CIP COMPARISON (2022 TO 2023)
PROJECTS REMOVED
Type
PROJECT NAME
CFP
DESCRIPTION
Transportation
84th Ave W Overlay - 220th St SW to 212th St SW
Completed
Transportation
2022 Guardrail Program
Com leted
Transportation
2022 Traffic Signal Upgrades
Completed
Transportation
Citywide Pedestrian Enhancements Project
Com leted
Water
2022 Waterline Overlays
Completed
Water
Yost & Seaview Reservoir Assessment
Completed
Storm
Green Street & Rain Gardens
Completed
Storm
2022 Stormwater Overlays
Completed
Storm
Phase 3 Annual Storm Replacement Project 2022
Completed
Sewer
2022 Stormwater Overlays
Completed
Sewer
Citywide CIPP Sewer Rehabilitation Phase 4
WWTP
WWTP Annual Capital Replacement In-house Projects
WWTP
Carbon Recovery Project
I
lCompleted
WWTP
City Park Odor Scrubber
I
lCompleted
a_
U
a
U-
U
00
N
O
N
M
N
O
N
d
N
O
IZ
O
L
a.
O
c
O
r
r
c
m
m
L
a
a-
U-
U
d
U
N
Y
L
O
3.1
w
N
O
N
M
N
O
N
C
d
E
t
V
a
2023-2028 CIP-CFP v0.3 134
Packet Pg. 207
7.A.b
UP / CIP COMPARISON (2022 TO 2023)
PROJECTS REVISED
Type
PROJECT NAME
CFP
CHANGE
Transportation
Annual Street Preservation Program
2025 cost revised from $1,386,0000 to $1,500,000
Transportation
76th Ave. W Overlay from 196th St. SW to Olympic View Dr.
Addition of $15,000 construction cost to 2023
Transportation
Puget Dr. @ OVD Signal Upgrades
Cost and funding moved from 2025-2026 to 2026-2027
Transportation
Signal Upgrades - 100th Ave @ 238th St. SW
Cost and funding moved from 2025-2026 to 2026-2027
Transportation
Main St. @ 3rd Signal Upgrades
Cost and funding moved from 2026-2027 to 2027-2028
Transportation
228th St. SW from Hwy 99 to 95th PI. W Corridor
Cost and funding revised, moved from 2025-2027 to 2026-2028
Transportation
Hwy 99 Revitalization & Gateway Project - Stage 2
Addition of $2,646,000 construction cost to 2023
Transportation
Hwy 99 Revitalization & Gateway Project - Stage 3
Cost and funding revised, moved from 2022-2026 to 2023-2027
Transportation
Hwy 99 Revitalization & Gateway Project - Stage 4
Cost and funding revised, moved from 2022-2027 to 2023-2028
Transportation
SR 524 (196th St. SW) / 88th Ave. W - Intersection Improvements
Cost and funding revised, moved form 2025-2027 to 2026-2028
Transportation
Main St. @ 9th Ave. Intersection Improvements
Cost and funding revised, moved from 2025-2026 to 2026-2027
Transportation
76th Ave. W @ 220th St. SW - Intersection Improvements
Cost and funding revised, moved from 2022-2025 to 2023-2026
Transportation
SR-104 Adaptive System - 236th to 226th
Cost and funding revised for 2023 and 2025
Transportation
SR-104 @100th Ave W. Intersection Improvements
Cost and funding revised, moved from 2025-2026 to 2026-2027
Transportation
SR-104 @ 95th PI. W Intersection Improvements
Cost and funding revised, moved from 2025-2026 to 2026-2027
Transportation
SR-104 @ 238th St. SW Intersection Improvements
Cost and funding revised, moved from 2025-2026 to 2026-2027
Transportation
SR-104 @ 76th Ave. W Intersection Improvements
2025-2026 cost and funding removed, $3,231,000 cost and funding added to 2029-2043
Transportation
175th St SW Slope Repair
2023 construction cost moved to 2026
Transportation
232nd St. SW Walkway from 100th Ave. to SR-104
Cost and funding revised, moved from 2026-2027 to 2027-2028
Transportation
236th St. SW Walkway from Madrona Elementary to 97th Ave. W
2026 and 2027 cost and funding revised
Transportation
84th Ave. W Walkway from 238th St. SW to 234th St. SW
2026 and 2027 cost and funding revised
Transportation
80th Ave. W Walkway from 212th St. SW to 206th St. SW
Cost and funding revised, moved from 2025-2027 to 2026-2028
Transportation
80th Ave. W Walkway from 188th St. SW to Olympic View Dr.
Cost and funding revised, moved from 2025-2026 to 2026-2027
Transportation
218th St. SW Walkway from 76th Ave. W to 84th Ave. W
Cost and funding revised, moved from 2026-2027 to 2027-2028
Transportation
Walnut St. Walkway from 6th Ave. S to 7th Ave S
Cost and funding revised, moved from 2025 to 2026
Transportation
216th St. SW Walkway from Hwy. 99 to 72nd Ave W
Cost and funding revised, moved from 2025 to 2026
Transportation
Citywide Bicycle Improvements Project
Cost and funding revised, moved from 2022 to 2023
Transportation
Maplewood Dr. Walkway from Main St. to 200th St. SW
Cost and funding revised, moved from 2025-2027 to 2026-2028
Transportation
95th PI. W Walkway from 224th St. SW to 220th St. SW
Cost and funding revised, moved from 2025-2026 to 2026-2027
Transportation
Railroad St. Walkway from Dayton St. to Main St. / SR-104
Cost and funding revised, moved from 2025-2026 to 2026-2027
Transportation
SR-104 @ 76th Ave. W Non -Motorized Trans Improvements
Cost and funding revised, moved from 2028-2042 to 2026-2028
Transportation
Downtown Lighting Improvements
Cost and funding revised, moved from 2025-2026 to 2026-2028
Transportation
SR-104 Walkway: HAWK to Pine / Pine from SR-104 to 9th
Cost and funding revised, moved from 2025-2027 to 2026-2028
Transportation
Elm Way Walkway from 8th Ave. S to 9th Ave. S
Cost and funding revised, moved from 2028-2042 to 2023
Transportation
Ferry Storage Improvements from Pine St. to Dayton St.
Cost and funding revised, moved from 2025 to 2026
Transportation
Transportation Plan Update
2023 cost and funding changed from $185,000 to $170,000
a_
U
a
LL
U
00
N
O
N
M
N
O
N
m
N
O
M
O
L
a
w
O
c
O
c
m
m
a`
a
LL
U
d
V
N
Y
O
3.1
a
00
N
O
N
A
N
O
N
c
m
E
t
to
a
2023-2028 CIP-CFP v0.3 135
Packet Pg. 208
7.A.b
UP / CIP COMPARISON (2022 TO 2023)
PROJECTS REVISED
Type
PROJECT NAME
CFP
CHANGE
Storm
Edmonds Marsh Water Quaility Improvements
Funding redistributed to include ARPA Funds
Storm
Lower Perrinville Creek Restoration Phase 1
Cost and funding extended to 2025 and 2026, ARPA Funds included
Storm
Lake Ballinger Regional Facility Design Phase
2023 cost and funding moved to 2024
Storm
Ballinger Regional Facility Construction Phase
Cost revised from $6M to $3M, and moved from 2024 to 2025
Storm
Storm and Surface Water Comprehensive Plan
Cost revised from $300,000 to $600,000, and moved from 2022 to 2023
Sewer
Phase 9 Annual Sewer Repl/Improvements (2022)
$30,000 cost and funding added to 2023
Sewer
Annual Citywide CIPP Sewer Rehabilitation
Six -year cost and funding (2023-2028) revised
Sewer
Lake Ballinger Sewer
Cost and funding shifted from 2023-204 to 2024-2025
WWTP
Nutrient Removal Project
2024 cost and funding removed; 2023 cost and funding revised to $300,000
Facilities
Boys and Girls Club
Six -year cost and funding (2023-2028) revised
Facilities
Cemetery Building
Six -year cost and funding (2023-2028) revised
Facilities
City Hall
Six -year cost and funding (2023-2028) revised
Facilities
Fishing Pier/Beach Ranger Station
Six -year cost and funding (2023-2028) revised
Facilities
Frances Anderson Center
Six -year cost and funding (2023-2028) revised
Facilities
Fire Station 16
Six -year cost and funding (2023-2028) revised
Facilities
Fire Station 17
Six -year cost and funding (2023-2028) revised
Facilities
Fire Station 20
Six -year cost and funding (2023-2028) revised
Facilities
Fire Life Safety Communications
Six -year cost and funding (2023-2028) revised
Facilities
Historic Log Cabin
Six -year cost and funding (2023-2028) revised
Facilities
Historical Museum
Six -year cost and funding (2023-2028) revised
Facilities
Library
Six -year cost and funding (2023-2028) revised
Facilities
Meadowdale Club House
Six -year cost and funding (2023-2028) revised
Facilities
Old Public Works
Six -year cost and funding (2023-2028) revised
Facilities
Parks Maintenance Building
Six -year cost and funding (2023-2028) revised
Facilities
Public Safety
Six -year cost and funding (2023-2028) revised
Facilities
Public Works O&M
Six -year cost and funding (2023-2028) revised
Facilities
Wade James Theater
Six -year cost and funding (2023-2028) revised
Facilities
Yost Pool House
I Six -year cost and funding (2023-2028) revised
a_
U
a
u_
U
00
N
O
N
M
N
O
N
m
N
O
M
O
L
a
w
O
c
O
r
c
m
m
a`
a
u_
U
d
V
N
Y
O
v
a
00
N
O
N
A
N
O
N
C
d
E
t
V
a
2023-2028 CIP-CFP v0.3 136
Packet Pg. 209
8.A
Planning Board Agenda Item
Meeting Date: 10/12/2022
Tree Code Amendments AMD2022-0004
Staff Lead: Deb Powers
Department: Planning Division
Prepared By: Deb Powers
Background/History
Edmonds' tree code, Chapter 23.10 ECDC<https://www.codepublishing.com/WA/Edmonds/> primarily
focuses on tree retention related to development. During its adoption last year, the City Council and the
Planning Board directed staff to further amend the code to limit property owner tree removals under a
second phase of tree code amendments. Note that new code requirements resulting in significant
changes to procedures or additional cost to permit applicants are 'Major' code amendments.
The City Council and Planning Board provided general feedback for improvements to the current tree
code and confirmed the project scope at the June 21 and July 13 meetings, respectively. Staff was
directed to expand the scope of "Phase 2" tree code amendments to consider minor changes to the
existing code that:
Clarify, simplify, and provide greater code consistency.
Streamline the development review or tree removal process.
Align with industry standards.
Address situations that have required a code interpretation, when the code is difficult or unclear
in its application, or as trends in code enforcement merit code clarification.
Staff developed an initial list of preliminary tree code amendments that follows this scope and general
direction. At the September 14 Planning Board meeting, the Board provided feedback on preliminary
code amendments #1-11, indicating a few clarifications were needed but that overall, the preliminary
code changes would achieve the scope and direction of the Phase 2 tree code amendments. The
Planning board raised one Major code amendment consideration that has been added to the Major
code amendment list, to be discussed later.
The list has been revised (Attachment 1) to show proposed code changes grouped by three primary
code amendment classifications, according to the impact of code modifications:
Minor - amendments do not change the meaning of the code. They clarify/simplify or further define
something already in the code, address redundancies, address typos or result in simple reformatting or
removal of outdated references, including industry standards, Best Management Practices, etc. without
resulting in increased requirements.
Moderate - amendments are relatively uncontroversial restructuring of code sections, and any of the
above Minor amendments that result in new, increased or eliminated requirements.
Major - amendments add a substantial prohibition/ban on something currently allowed or add
substantial new requirements. This category would include any amendments that result in significant
changes to existing procedures or significant additional cost to permit applicants, and/or change the
intent of the code.
Staff is expecting that several additional code amendments will be identified at subsequent Planning
Packet Pg. 210
8.A
Board, Tree Board, City Council, and stakeholder meetings and from public feedback.
Staff Recommendation
Confirm that the remaining preliminary 'Minor' code amendments to Chapter 23.10 ECDC, #12-19 are
appropriate in achieving the scope and direction of the Phase 2 tree code amendments.
Narrative
Urban Forest Planner Deb Powers will give a presentation on the remaining preliminary Minor code
amendments #12-19, shown in orange in Attachment 1. Some of these amendments may be further
defined, reformatted, or involve additional requirements as Moderate or Major code amendments.
These are shown with an asterisk and yellow highlighting.
Staff is seeking confirmation from the Planning Board that the general direction and sample code
language for #12-19 is appropriate, prior to addressing the related Moderate and Major code
amendments.
Next Steps
At the October 12 Planning Board meeting, staff would appreciate feedback on the following:
Staff acknowledges the Minor tree code amendments may need additional refinement. Does the
Planning Board agree with the general direction of the remaining preliminary Minor tree code
updates?
Is the Planning Board ready to review and discuss preliminary Moderate and Major code
amendments, moving forward?
Should the focus of the next joint meeting with Tree Board (proposed Nov 30 Special Meeting
date) be a discussion and consensus on the Minor code amendments and moving forward with
more complex Moderate and Major code changes?
Attachments:
Minor Tree Code Amend List
Packet PB Meeting PPT 10122022
Packet Pg. 211
ATTACHMENT 1
PRELIMINARY Minor Tree Code Amendment List
Revised 1016122
8.A.a
Applies to
#
POLICY
IMPACT
ECDC
23.10...
CURRENT CODE
SAMPLE CODE REWRITE
ISSUE/SOLUTION
Development
or Property
Owner?
de a�„ dse def„ti„e ,
Hazard tree damagedOF
- c sed Str„Gt„rau„
determined bya qualified tree prof ssi„a tree/tree part with an Extreme
or High overall risk rating using the most current version of the ISA Tree Risk
Issue: Current definition results in code interpretation issues,
Hazard tree -dead, dying, diseased, damaged, or
Assessment Qualification (TRAQ) method, with the following:
prolonged development review times and problems with code
p
1
Minor
020.Fi
structurally defective as determined by a qualified tree
1. A combination of structural defects and/or disease that makes it subject
enforcement.
Both
professional
to a high probability failure;
2. In proximity to moderate to high -frequency use targets, persons or
property, and
Solution: Replace with industry standard.
3. The hazard condition cannot be reduced with reasonable and proper
arboricultural practices, nor can the target be moved.
L s n-.f disturbanre _ the houndaFy hefiA,een the area, of minimum nroteotion
Issue: Current definition is unclear and does not specifically
tree apd- the- al/0- .,hie site gist„rhan a
Limits of disturbance - the boundary between the area of
Tree Protection Zone (TPZ) - a defined area as determined by a qualified
reference tree protection fence. Often confused with other
2
Minor
020.E
minimum protection around a tree and the allowable site
professional applicable to tree trunks, roots, and soil. TPZ is measured in
limits of disturbance on site plans, ultimately resulting in
Development
disturbance.
feet from the face of the trunk to its outer boundary, where tree protection
retained tree damage.
fence is located. May be determined using critical root zone formula, dripline,
air spade excavations and is variable depending on species, age and health
Solution: Replace with industry standard.
of the tree, soil conditions and existing infrastructure.
Nuisance tree ...is causing significant physical damage that is obvious in a
Issue: The term "significant" is vague and the definition does
Nuisance tree - is causing significant physical damage to a
photograph to a private or public structure and/or infrastructure, including but
not include remediation.
private or public structure and/or infrastructure, including but
not limited to: sidewalk, curb, road, water or sewer or stormwater utilities,
3
Minor
020.N
not limited to sidewalk, curb, road, water or sewer or
driveway, parking lot, building foundation, or roof. The problems associated
Solution: Include corrective actions that may prevent whole
Property
Owner
stormwater utilities, driveway, parking lot, building
with a nuisance tree must be such that they cannot be corrected by
tree removal. Allow a streamlined review process for situations
foundation, or roof
reasonable practices, including, but not limited to branch or root pruning,
that clearly don't need an arborist's expertise.
bracing, or cabling.
Qualified professional ...[has] relevant education and
Qualified professional ...[has] relevant education and training in arboriculture
or urban forestry, having 2 or more of the following credentials (or
Issue: Incomplete list of professional credentials, does not
training in arboriculture or urban forestry, having 2 or more
equivalent):
consider other qualifications.
4
Minor
020.Q
of the following credentials:
1. ISA Certified Arborist
Both
1. ISA Certified Arborist
2-4. Additional professional standards (TRAQ, ASCA, SAF)
2-4. Additional professional standards (TRAQ, ASCA, SAF)
Solution: add BCMA credential and "or equivalent."
5. Board Certified Master Arborist
...activities [that] are exempt from the provisions of this
[x]. Emergency Tree Removal. Any tree that requires City approval for
Issue: Lack of emergency tree removal provisions that apply to
chapter and do not require a permit [include tree removal] by
removal may be removed by the property owner if it is determined to pose an
property owners, outside of critical areas.
5
Minor
040.0
the City and/or utility ...in response to situations involving
imminent threat or danger to public health and safety, public or private
Property
danger to life or property, substantial fire hazards, or
property, or of serious environmental degradation; provided, that within 14
Solution: Move applicable text from 23.40.22.C.8.b.vi to
Owner
interruption of services provided by a utility.
days, the property owner notifies the City and demonstrates compliance with
23.10.040.
the provisions of this title.
030.0 - Tree removal associated with [certain permit types]
Issue/Solution: Any development types or "other land use
Minor
..or other land use approval ...
Examples:
approval" referenced under 23.10.030.0 that may be required
6
"Major?
030.C,
060.A
060.A ...the city requires approval of a tree retention and
[x]. Specific "other land use approval"
to submit a tree retention plan should be listed under
Development
protection plan in conjunction with ... any tree removal on
[x]....related demolition, clearing and grading permits...
23.10.060.A.
developed sites not exempted by ECDC 23.10.040...
'POLICY IMPACT
Minor - Amendments that in no way change the meaning of the current code. They clarify/simplify or further define something already in the code, address typos and redundancies, and/or result in simple reformatting or removal of outdated references,
including industry standards, Best Available Science, Best Management Practices, etc. that do not result in changes to code intent or an increase in requirements.
Moderate - Relatively uncontroversial restructuring of code sections, and any amendments above that result in new, increased or eliminated requirements without additional cost to permit applicants or procedural changes that require additional resources.
Major - Adds extensive new requirements or substantially prohibits/bans something currently allowed; amendments resulting in significant changes to procedures or significant additional cost to permit applicants, and/or change the intent of the code.
Packet Pg. 212
ATTACHMENT 1
PRELIMINARY Minor Tree Code Amendment List
Revised 1016122
8.A.a
Applies to
#
POLICY
IMPACT
ECDC
23.10...
CURRENT CODE
SAMPLE CODE REWRITE
ISSUE/SOLUTION
Development
or Property
Owner?
*If tree retention is desired with any other development types
(Office, Mixed Use, Commercial, etc.), add to Major code
amendments for consideration.
Issue: Code interpretation issues: some applicants feel dead
060. C: 30% [retention is required] of all significant trees...
trees >6" DBH should count towards meeting tree retention
060.0
060.C: 30% [retention is required] of all c gnifGanTtf viable trees...
thresholds if the code does not specify "viable."
Minor
060.F.3,
G. If a development retains 50% of the significant trees on a
7
*Moderate?
060.G,
site, fee -in -lieu provisions... do not apply
G. Tree Retention Incentive. If a development retains 50% of the giant
Solution: Replace "significant" with "viable" where needed.
Development
080.B.1,
etc.
080.B.1 No tree replacement is required ...if the tree is
viable trees on a site, the fee -in -lieu provisions... do not apply
*Consider defining tree condition applicable to trees retained
hazardous, dead, diseased, injured, etc.
with development, based on industry standards. Add to
Moderate code amendments if under consideration.
060.B.2.b.iv
iv. [Show] location of tree protection measure v fence at the proposed TPZs,
Issue: Various terminology is confusing to applicants, resulting
iv. [Show] location of tree protection measures...
with distances from the face of trunks to fence noted on the site plan, -�-
in tree protection fence locations incorrectly shown on
8
Minor
060.B.2.b.v,
v. Indicate limits of disturbance drawn to scale around all
I ,�:^,+o lifnif-s of drsf,.rha^^e drawn to scale around all trees impacted by site
proposals and/or inadequate on -site tree protection.
Development
060.6.2.c.ii,
trees impacted by site disturbances resulting from grading,
disturbances resulting from grading, demolition, or construction activities. Silt
060.B.2.c.iii
demolition, or construction activities.
fence per TESC requirements may satisfy tree protection fence requirements
Solution: Use "TPZ" industry standard. Clarify that silt fence
etc.
if TPZs are observed.
may be allowed if TPZs are observed.
Issue: Available incentives to retain trees on development
sites are not prominent enough in the code. Applicants
G. If a development retains 50% of the significant trees on a
G. Tree Retention Incentive. If a development retains at least 50% of the
interpret the 50% retention incentive as a "cap" versus striving
9
Minor
060.G
site, the fee -in -lieu provisions of ECDC 23.10.080(E) do not
signifiGant viable trees on a site, the fee -in -lieu provisions of ECDC
for greater than 50% retention rates.
Development
apply.
23.10.080(E) do not apply.
Solution: Clearly identify tree retention incentives, add "at
least" to numerical thresholds.
...After providing clear documentation to deveWment sep4Ges the City that
Issue: Inconsistent terminology. The appraisal requirement
all replacement options have been considered... the developer applicant
does not reflect the development review process and presents
Permit applicant and City/staff references throughout ECDC
shall pay a fee -in -lieu for each replacement tree ... [that] ... shall be deposited
a conflict of interest as shown.
10
Minor
080.E, etc.
23.10.
into the c-City's Ttree Ffund....For each significant tree greater than 24" DBH
-
Solution: Replace "developer" with "applicant." Replace "City,"
Development
removed, a fee based on an appraisal of the tree value by the t=tree
"Director," "development services," "Planning Official," "city
p g Y
protection pFofessiona applicant's arborist^ 4 F& FGte, gon ,,- f &&;Gp-a4
shall be required...
tree protection professional," etc. with appropriate terms
consistent with Chapter.
...After providing clear documentation ... that all replacement
...After providing clear documentation, which may include the applicant's
Issue: current code is unclear that an arborist report, although
11
Minor
080.E
options have been considered and are infeasible, including
arborist recommendations ...that all replacement options have been
not required, may be needed to document infeasibility.
arborist reports as necessary...
considered... i„^adrPg "beAst FepeFts as „eGe sarr
""
Solution: Clarify.
Issue: Current text has resulted in code interpretation issues
Viable tree - significant tree that a qualified professional has
,Viable tree" - significant tree that a qualified professional has determined to
and the practice of "downgrading" tree condition in arborist
Minor
determined to be in good health, with a low risk of failure
be in good health, with a low risk of failure due to structural defects, is
reports and tree inventories to avoid tree replacement and/or
12
*
020.X
due to structural defects, is windfirm if isolated or remains as
rove a
windfirm if isolated or remains as art of and is a species that is
p g p
fees in lieu.
Development
Moderate?
part of a grove and is a species that is suitable for its
suitable for its location, subject to City review/approval.
location.
Some applicants are unfamiliar with the development review
process: submitted proposals are subject to City review to
'POLICY IMPACT
Minor - Amendments that in no way change the meaning of the current code. They clarify/simplify or further define something already in the code, address typos and redundancies, and/or result in simple reformatting or removal of outdated references,
including industry standards, Best Available Science, Best Management Practices, etc. that do not result in changes to code intent or an increase in requirements.
Moderate - Relatively uncontroversial restructuring of code sections, and any amendments above that result in new, increased or eliminated requirements without additional cost to permit applicants or procedural changes that require additional resources.
Major - Adds extensive new requirements or substantially prohibits/bans something currently allowed; amendments resulting in significant changes to procedures or significant additional cost to permit applicants, and/or change the intent of the code.
Packet Pg. 213
ATTACHMENT 1
PRELIMINARY Minor Tree Code Amendment List
Revised 1016122
8.A.a
Applies to
#
POLICY
IMPACT
ECDC
23.10...
CURRENT CODE
SAMPLE CODE REWRITE
ISSUE/SOLUTION
Development
or Property
Owner?
provide permit determinations (approval, approved with
conditions, denied, etc.)
Solution: add "subject to review"
*Consider defining tree condition applicable to trees retained
with development, based on industry standards. Add to
Moderate code amendments if under consideration.
030.8 - Tree removal not specifically exempted will be
processed as a Type I permit...
23.10.040.F: ... trees that do not meet the exemptions... may
Issue: "Exceptions to exemptions" and other double negatives
be removed...
are confusing, reduce code compliance rates, and complicate
the tree removal permit application and review process.
A permit is required for [list]
Omission of clear code requirements has resulted in code
23.10.040... activities exempt from the provisions of this
0 Non -hazardous tree removal in critical areas
interpretation issues.
Minor
chapter [that] do not require a permit... except for...
0 Tree removal on commercial and multi -family properties
Solution: Clarify when a Type 1 permit or Landscape
13
*Moderate?
030-060
Tree removal on vacant lots and/or subdividable properties
Modification is required, the condition or criteria for tree
Both
23.10.050.A: Removal of protected trees is prohibited,
removal in critical areas, vacant lots, subdividable properties,
except as provided for in...
Tree Removal Allowances
etc. Tie into 030 for consistency. Add examples in code?
[List what is allowed]
23.10.050.8 ...removal of trees... is prohibited except as
*Consider restructuring code to replace "exemptions" with
provided for in...
"allowances" to define what IS allowed, versus what's NOT.
23.10.060.A.5 ...the city requires approval of a tree retention
Add to Moderate code amendments if under consideration.
plan in conjunction with... for... any tree removal on
developed sites not exempted by...
Issue: Terminology and identification of priorities, incentives
and variations to development standards is not prominent inthe
Specific tree retention and protection plan review standards
code.
14
Minor
060.A, last
provided in this section establish tree retention priorities,
Reformat and label priorities, incentives, and variations to development
Development
sentence
incentives, and variations to development standards ... to
standards.
Solution: Clearly distinguish code priorities, incentives, and
facilitate preservation of viable trees...
variations to development standards. Use consistent/uniform
terms (example: Conservation Subdivision).
Issue: Allowing tree removal over multiple development
Short [plat]/Subdivision Phased Review.
phases typically results in lower successful tree retention
i. If during the short [plat] or subdivision review process the
versus and gives the public the initial perception of greater
location of all proposed improvements... have not yet been
tree retention. Costs for tree removal under phased
060.B.3.a,
established, the applicant may submit a tree retention [plan]
Reference ECDC 20.75.048, the Tree Conservation Subdivision Design
development is greater.
15
Minor
0605.2
that addresses the current phase of development and limits
incentive more prominently in 23.10.060.F.2 or consider moving into 23.10.
Development
removal to the impacted areas... A new tree retention and
Solution: Increase successful tree retention on development
protection plan shall be required at each subsequent phase
of the project as more information about the location of the
sites by planning early in the short plat/subdivision design.
proposed improvements is known....
Disincentivize phased review by allowing tree removals to
occur at one time.
'POLICY IMPACT
Minor - Amendments that in no way change the meaning of the current code. They clarify/simplify or further define something already in the code, address typos and redundancies, and/or result in simple reformatting or removal of outdated references,
including industry standards, Best Available Science, Best Management Practices, etc. that do not result in changes to code intent or an increase in requirements.
Moderate - Relatively uncontroversial restructuring of code sections, and any amendments above that result in new, increased or eliminated requirements without additional cost to permit applicants or procedural changes that require additional resources.
Major - Adds extensive new requirements or substantially prohibits/bans something currently allowed; amendments resulting in significant changes to procedures or significant additional cost to permit applicants, and/or change the intent of the code.
Packet Pg. 214
8.A.a
ATTACHMENT 1
PRELIMINARY Minor Tree Code Amendment List
Revised 1016122
Applies to
# POLICY ECDC CURRENT CODE SAMPLE CODE REWRITE ISSUE/SOLUTION Development
IMPACT 23.10... or Property
Owner?
If there are not enough existing trees... to satisfy [the 30% If there are not enough existing trees... to satisfy [the 30% retention
retention threshold], the applicant shall be required to make threshold], the applicant shall be required to make up the deficiency by
16 Minor 060.F.4.a-b up the deficiency by planting a number of new trees planting a number of new trees nor 2310090 that would be sufficient, in
per 23.10.080 that would be sufficient, in combination with combination with the number of trees actually retained, to satisfy [the 30%
the number of trees actually retained, to satisfy [the 30 / tree retention threshold] ...
tree retention threshold] ...
...Tree replacement is required for tree cutting permits
...and/or for tree removal associated with development...
Each significant tree to be removed shall be replaced as
follows:
1. For each significant tree between six inches and 10
Minor inches DBH removed, one replacement tree is required.
*Major.
17 080.A.1-3 2 For each significant tree between 10.1 inches and 14
?
inches in DBH removed, two replacement trees are
required.
3. For each significant tree greater than 14 inches and less
the 24 inches in DBH removed, three replacement trees are
required
After providing clear documentation ...that all replacement
options have been considered and are infeasible... the
18 Minor 080.E [applicant] shall pay a fee -in -lieu for each replacement tree
required but not replaced [in] the amount of ... $1,000
multiplied by the number of trees necessary to satisfy the
tree replacement requirements of this section...
19 1 Minor 1080.E, et al I ...shall be deposited into the city's tree fund.
Tree replacement is required for tree cutting permits ...and/or for tree
removal associated with development... Each SigPffiGant viable tree to be
removed shall be replaced as follows:
Removed Tree Size
Required Replacements
6-10" DBH
1
10.1-14"DBH
2
14.1 — 24" DBH
3
Issue: 23.10.080 refers to replacements by the size (DBH) of
tree removals, which is confusing and has caused code
interpretation issues.
Solution: Clarify so that achieving the required number of trees
relates to meeting the 30% retention threshold.
Issue: Numerical requirements presented in a narrative format
appear complicated. By not specifying "viable," some
confusion has resulted over whether dead trees are required
to be replaced.
Solution: Reformat to chart form, add "viable."
*Consider adjusting range of tree sizes to include 24" DBH
tree removal replacements by planting 3 or more trees. Add to
Major code amendments if under consideration.
Issue: "of this section" implies the that the number of
replacement trees is based on the size of removed trees per
ECDC 23.10.080. However, the intent of the $1,000 per tree
Reformat ECDC 23.10.060 and 080 to provide fee in lieu requirements in fee in lieu relates to the number of trees required to meet the
sequence, according to retention, replanting and payment priorities. 30% tree retention threshold per ECDC 23.10.060.C.
..deposited into the City's Tree Fund per ECDC 3.95.
Solution: Reformat — see left
Issue: ECDC 3.95 (Tree Fund) is not cross-referenced
throughout 23.10
Solution: update reference throughout Chapter
Issue: Current code does not consider a broad diversity of
users. Greater code clarity leads to higher levels of
compliance and streamlined review times.
Development
Development
Both
Both
20 Moderate All General code -writing approach, code organization & Solution: Reorganize disparate sections, use charts in place of Both
formatting narrative code language where appropriate, use "allowance"
instead of "exemptions," shall instead of must, and replace
"Director may" and other subjective language with intended
code provision.
Issue: various terminology is confusing.
020.D, "Developable site" definition, trees within the required yard
21 Moderate 060.D.2.b, setbacks or around the perimeter, existing trees outside of Solution: Revise definition/language for consistency Development
0605.4 the improved areas ... non -developable areas... throughout Chapter, consider prioritizing tree retention by
location (outside the building envelope or within setbacks).
'POLICY IMPACT
Minor - Amendments that in no way change the meaning of the current code. They clarify/simplify or further define something already in the code, address typos and redundancies, and/or result in simple reformatting or removal of outdated references,
including industry standards, Best Available Science, Best Management Practices, etc. that do not result in changes to code intent or an increase in requirements.
Moderate - Relatively uncontroversial restructuring of code sections, and any amendments above that result in new, increased or eliminated requirements without additional cost to permit applicants or procedural changes that require additional resources.
Major - Adds extensive new requirements or substantially prohibits/bans something currently allowed; amendments resulting in significant changes to procedures or significant additional cost to permit applicants, and/or change the intent of the code.
Packet Pg. 215
ATTACHMENT 1
PRELIMINARY Minor Tree Code Amendment List
Revised 1016122
8.A.a
Applies to
#
POLICY
ECDC
CURRENT CODE
SAMPLE CODE REWRITE
ISSUE/SOLUTION
Development
IMPACT
23.10...
or Property
Owner?
'POLICY IMPACT
Minor - Amendments that in no way change the meaning of the current code. They clarify/simplify or further define something already in the code, address typos and redundancies, and/or result in simple reformatting or removal of outdated references,
including industry standards, Best Available Science, Best Management Practices, etc. that do not result in changes to code intent or an increase in requirements.
Moderate - Relatively uncontroversial restructuring of code sections, and any amendments above that result in new, increased or eliminated requirements without additional cost to permit applicants or procedural changes that require additional resources.
Major - Adds extensive new requirements or substantially prohibits/bans something currently allowed; amendments resulting in significant changes to procedures or significant additional cost to permit applicants, and/or change the intent of the code.
Packet Pg. 216
v M44,k
.� �• . i yt+ \ + h f`.
♦ . ,�I, � �. ;,��•• as .�`. •`•. '�+ J .
11 1 11 1
m
a
1I
V t .,• "� �1 ��;.� ,ray'♦ �• `a •'� � �
y' Y ,,s , �• } � Ir
�' �M 1i+�'.'J► 1� :ate �• 1- �• -, � ..
. is • +.•k . � ,
.� yr•
Tonight's Focus
Remaining Minor tree code amendments
Related Moderate code amendments
Next steps
Veb Powers, Urban Forest,
eb. powers@edmo Swd,
;.p r
' J 4
�4y 1 , �
1:4 7 i 3 T.
0
0
N
N
O
N
0
a
N
a+
C
d
E
E
CD
O
L
N
N
O
N
N
O
F-
a
a
a�
c
m
CD
m
a
m
V
a
s
w
a
Packet Pg. 218
Project Scope
Phase 11 Tree Code Amendments
1. Limit property owner tree removal (Major)
2. Consider Minor amendments to current code that:
• Simplify
• Align with industry standards/BMPs
• Streamline review process
• Address code interpretation issues
8.A.b
E
Packet Pg. 219 1
�P rncip
'sF .`•`'� fir. v. '�'-$i
.1
• S If Fjv
`rL 1 ♦.yam J"\ �.��
•
8.A.b
I
Minor Tree Code Amendments
Applies to
oeveroprnenf
°rPropertY
S Revised
fS fOiG.?2
Ue/SOLUDON
�0 refers
to r At
t e is� �ng °d has fhcaushe (pgtil of ac
v so fhar.._, . sed °Ode
Q the fete requir
`rest+Wd namberof A7ava ent
rt requtr��._ trees ropm
res aover notWh ith-rtl �ar�^sane va f°rmat
mat to than fo are equired
Development sting range rm"add'viable,^
P menis�SUyp/ahn83arrnctude24^D �+2v°Pment
By
r�Onstderahon, trees. Add to
o °wevet m the size nu berot
m
to
t�rOsh°td PerF DC 23M0p8�0tMe
ee Fund) /s
not
°tpss-refere
tce throughout Ocetl
sty leads fsider b og r Both
red review U+ves,rievel.t rsitY of
eve mentafion a9urred"".- ant s amonsA " vatue by the 24 oeH st as shown, few Process an ant a dispar arborisf reponsaes °Onsideredand are j that allroplacemant aKy_ireB Solution: Re d presents age ate sections
°ns,
Manor Viabl rrecessary""_ nfeasfbte, including er r r �v r eckar documental bee Pr tec Director � de ekPmenttservi aPPlicant.'Re 1thersub. msteadof to use nplace
With " a//' Pna Use ns j
%
t2 o2o.X deknrimeyto be fn nt hee that a qua!' cOftardemd.." ntlat{ons ...that al ah h mayinc/utle the apotica Consistent wttnh Chapter�nal, ^ eces�,ith aAPro9 offic at —city 'City' ^ ��t�ment eve languaas,rid ra �jacenCe"
sign hca
'Moderate? due to strut goodhealth, medArofession mant pfkns have nt's Issue: current Pnate terms ally is °°nf intended
clear
rmn grove entlis atspeckrs m m ated orremains as be in �- Slgn/ficant tree s not Solurequired, trey be gee ed t that
ar f asib although M ernguage o Dori
sisten
uitade fonts 4nr sdateCw sk of due P fa °sat has r rminad to arM the nCo of result code inf asibitily, uUarrrg envelizngI ;seen by
locatioq Aarf oya udufat del Pratt' ed in
Crt1'reviewJapprova{ a SAecks that is teee s st end bee Invent rt4 tree condtfrP'on n a iss t S
u avo d tree replacemenrtarndlcr
rocessPs�ibmitt are miller with Dei�-19 merit
P unfa
ed WOAOsais are subject M pf . _ nt revteH,
ENT CURRRE�tMtN
to {ft COpE
AR
CkMENT t Mhror rda/�earenote YMrnorTre
oso.F.a.a-b up the thresh°{dl ffih exrng tra eCode Rrrte
Per
the umf0 Bno byplan�{aantsya!{,p��ah�Ylthe 90^ `SAMP ndment list
#POLIC
PI-ly ECI,� PR ber wou 2umLgrof e4uiredto /o LE CO EL1M1N {d suffrci new
fMPACP 23.78.,, ARYMinor ent trees make /fryrereale OEREWR!
CURRENT CODE Tree Code amendment List rh esydd� re °trghe '�{ g
xi
tree$
to sa
SAMPLE COp —
E REWRITE Revised 10Ri/22
7 A41nor Bseo a 060aIrefenhonisregdlradJofaltsigntic ISSUEJSOLU•DON
11611 G, G' !f vel ant trees... 'If tree retention is
'Moderate? 080.9. t, site, fee_lndtePument retains 50% fCif+ce, Mi desired with
etc. Provisions...do not app/Y ant trees one 060.C: 30% amend, eon -ats i Use' Commercyal-Pother do
IS
080B. f No tree rePtea nJur lfthe tree is via Retentrof n lrircen ru{rodf ofah trees."" Issue: DB n censitleratron_ '' applicants� to ry}alm. ced�'Pes
hazardous G Tree erAretatto
dead, dis required .., secant viable trees >6"
eU, etc ble tees on a llve. Ifa develo threshold ff th
n iouldssues' so
ceo.B.2.b.ty site, the fee_ln-lku Pmentretafns 50% of
B Minor 060, `V IShow Aroree
visions. the signilloant SOlut(on: Re t e e not'
ate retention
co lnt towards
does of speot ve06
feel dead
62-by. v Ind" il. Aon oft "
060.6.2:Kate limits ofdlsiu�r Prokcfion me Y P
BBo.B.2.c.i7i frees " asures... n' IShow)locaN an With abt
en r
do not aPPI
demoliti;I; eelby site disf 'rt a d with dlstW1fir
°n ofh 'COnside+ defining eneeded.
constnrctlo »ces esulting ro round al/ ces frdtrt the %' A i ih horr V.,M deve o
ce "s" nific
(sing tree iron
n aclivihes. m grad/rill, offrunks to knee at t Moderate Ptnent, based on
w h "vi
da
re
e''Nn re
_ ntOn aPPlioableS. ustry t to
fe pa sCsu4ngerom gradi toHiornot�a{ 17 t e Sm MaPZs, in tr e: Van terminolments (t under corns y� Add f trees tamed
on
9 Mirror G /f rf re g de fees " ion
nBo.G � �h fee�r� U p�ovsrtons� ECOC23. Do g t trees on a G Try am observed mend they satisfy tree protecyron fcencen a u eSh �� tUand/or Inadequate on I °Drrecite beptlry Se�n t roSOitG(g
Soluti
0(E) do notes. ee Rteknfion lncenhv may be all se "TPZ" industry sta n.
viable tr e. If a development owed
23 f0.OBp Pmentrefains of k Issue: Avatta d �Zs are observed t ce P ent
n aid. Clla ' veto
(F7 do ces on a site, served. nTy that Silt fen m
I aPAty the fee-trr,fku prowskns f Sp% ofthe saes are not ro rncentfves to retatn tr to Minor ofECDC Interpret the 5p^ojamrtetentinent enough in the e q veloPment
oao.E, etc. 23a oft appticam and CitYlstaB references a{�Rer greater than 5p % ret ntive as a ace p�+cents
Arovrding dear Solution' entlon rates, P. versus striving
noes throughout ECpC shall a laa_jentoptions ha eme s,,, t . least°%. Cteany identify t
Into the ee'in-lkutor each rye n considered...the the Cr t numerical ihreshtre retention ince Development
re _7tr10 Pfaceme ty that slue: to ntives, add at s
t t rrrOVeq a fee based a ...For each sign�_1thatJ.. applicant doebeds not rceeryect the stent termtnokgy The a
Mirror ...ARer a ant free Aosit a con deve! PPrai
ao'F optionsvrding clear docu shelf bee lit PPraisal ofthe tree greater than ad flirt of intere OPment rev' sat requirem
Both
Developmm IIt
Packet Pg. 221
Led]
Oki
Are.
Vo
0.1
8.A.b
oderate Code
Discussion
mendments
Packet Pg. 223
Next Steps Moderate &Major
Code Amendments (6+)
Minor Code Amendments
(14) Moderate Major
Tree Board Code Amendments Code Amendments
Monthly Meetings (18+) (con't)
------------------1I ---- ------------
Project Scoping
No Impact
Code Amendments
(11)
Public Engagement
Planning Board/
Tree Board
Recommendations
to City Council
No Impact/Minor
Code Amendments Planning Board
(25) Public Hearing
City Council Check -in
and/or
Adopt Minor Code Amendments?
8.A.b
Final Code Adoption
3rd Q 2023?
City Council
Public Hearing
E
Packet Pg. 224 1
Questions?
y 'r
Ap-
Veb Powers, Urban Forest,
eb. powers@edmo Swd,
O
O
0
N
N
O
N
0
a
N
a+
C
d
E
C
d
E
Q
d
O
t�
d
d
L
N
N
O
N
N
O
F-
a
a
a�
c
m
CD
m
a
..
m
V
a
s
w
a
Packet Pg. 225
Mock Development Scenarios
bEVELOPMENT SCENARIO 1
10,000 square foot lot, 10 healthy trees >24" DBH. Can only retain 5 trees.
How many trees are required to be planted?
Are fees in lieu required?
DEVELOPMENT SCENARIO 2
10,000 square foot lot, 10 healthy trees >24" DBH. Can only retain 3 trees.
How many trees are required to be planted?
Are fees in lieu required?
8.A.b
CD
O
N
N
O
N
Q
N
r
C
N
E
C
d
E
Q
N
O
U
N
N
L
N
N
O
N
N
O
r
t—
Cf
C
N
N
m
a
a�
U
a
s=
a�
E
z
U
2
r
Q
Packet Pg. 226
Mock Development Scenarios
DEVELOPMENT SCENARIO 3
16,000 square foot lot, 10 healthy trees: 5 are 12" DBH, 5 are >30" DBH. Retaining one of each size.
How many trees are required to be planted? ,
Are fees in lieu required?
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
■
I
I
I �
I
DEVELOPMENT SCENARIO 4 ►
16,000 square foot lot in RS-8 zone, subdivided into a 2-lot short plat
10 healthy trees: 5 are 12" DBH, 5 are >30" DBH
How many trees are required to be planted?
Are fees in lieu required?
8.A.b
Packet Pg. 227
9.A
Planning Board Agenda Item
Meeting Date: 10/12/2022
Extended Agenda
Staff Lead: Kernen Lien
Department: Planning Division
Prepared By: Kernen Lien
Background/History
N/A
Staff Recommendation
Review Extended Agenda
Narrative
Extended Agenda attached.
Attachments:
10.07.2022 Extended Agenda
Packet Pg. 228
�y oV EQAf
6
l $90
October 2022
IPUMNM o CARD
Extended Agenda
October 7, 2022
9.A.a
Items and Dates are subject to change
October 26 1. CIP/CFP Public Hearing
2. Comprehensive Plan Update
3. Civic Park Rules
4. Code Modernization Process and Updates to Chapter 20.80 ECDC
November 2022
Nov 9 1. Civic Park Rules
2. Wireless Update — Work Session
3. Tree Code Update
Nov 23 1. No Meeting - Day before Thanksgiving
Nov 30 1. Code Modernization Process and Updates to Chapter 20.80 ECDC
Public Hearing
2. Tree Board Joint Hearing
December 2022
Dec 14 1. Election of Officers
2. Tree Code Update
January LULS
Jan 11 1.
Jan 25 1. Comprehensive Plan Update
r
Q
Packet Pg. 229
items ana vates are sui
9.A.a
o change
Pending 1.
Implementation / code updates concerning trees and the UFMP
For Future 2
Climate Action Plan update and public outreach
Consideration
2022 3.
Housing policies and implementation (incl Multifamily Design)
4.
Comprehensive Plan update preparation and gap analysis
5.
Subdivision code updates
6.
Community Development Code Amendments / Re -Organization
7.
Neighborhood Center Plans & implementation (esp. 5 Corners)
8.
Low impact / stormwater code review and updates
9.
Sustainable development code(s) review and updates
10.
Further Highway 99 Implementation, including:
a. Potential for "urban center" or transit -oriented
design/development strategies
b. Parking standards
11.
ADA Transition Plan (Parks)
12.
CIP/CFP
Recurring 1. Election of Officers (1St meeting in December)
Topics 2. Parks, Recreation & Cultural Services Department Reports & Updates- First
meeting after previous quarter (4/13, 7/13, 10/12, 1/11/23)
3. Joint meeting with City Council —April or as needed
4. Development Activity Report
r
Q
Packet Pg. 230