Loading...
ENG2022-0397 ROW PERMITRIGHT OF WAY EUC PERMIT o PERMIT NU M City of Edmonds www.cityofedmonds.gov / 4i Description: ZIPLY-SPLICING FIBER IN EX HH & PULLING THRU EX CONDUIT ISSUED: 10/11/2022 Address: 8502 MAIN ST E101 EDMONDS WA 98026-6972 EXPIRES:04/11/2023 Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00917500510100 CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT KAYLIE ALDOUS 6074 N DISCOVERY WAY STE125, BOISE ID 83713 (208)576-4031 CONTACT MOUNTAIN LTD 6074 N DISCOVERY WAY STE125, BOISE ID 83713 (208)576-4031 CONTRACTOR ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230 OWNER ROBERT & ROBERTA TALBOTT 8502 MAIN ST E101, EDMONDS WA 98026-6972 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $110.00 $110.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $110.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 10/11 /2022 RELEASED BY DATE Printed: Tuesday, October 11, 2022 2:15:27 PM 1 of 2 oe e n,y RIGHT OF WAY EUC PERMIT PERMIT NUM City of Edmonds Ad Edmonds WA 98020 CONDITIONS CONDITION TYPE NOTES ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND AND NOISE weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT NOTES COMPLETE A-1 JOB START E-7 TRAFFIC CTRL X-2 ENGINEERING FINAL" Printed: Tuesday, October 11, 2022 2:15:27 PM 2 of 2 RECEIVED J U LY 22 2022 RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General• Project Name 5510451 Site Address or if no site address use Property Address at NW corner of project area: 8502 Main St Associated Permits: BLD PLN ENG • • • .• .• - Name of Company Ziply Fiber Franchise Ordinance No: Point of Contact Dave Collins Title Engineer Address 1800 41 st St City Everett State WA Zip 98203 Phone 425-263-4020 Email david.collins@ziply.com Contractor and Authorized Agent of • Name of Company Ziply Fiber • - below) C• • • During Construction Primary Name Karl Peterson Agent Name Karl Peterson Title Manager Title OSP Construction SR Mobile 425-577-1247 Address 135 Lake St S Ste. 155 Email karl.petersoniii@ziply.com City Kirkland I State WA Zip 98033 Secondary Name Phone 425-577-1247 Title Email karl.petersoniii@ziply.com Mobile City of Edmonds Business License No: Email State License No: 604477970 X Contractor verifies it is currently bonded X Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: XUtility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Access HH Southwest side of Main st near Bowdoin Way, splice and pull fiber through existing to MDF Southwest side of Main st RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF JxJ F SF Parking 72 hours + LF JxJ LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: Xtelecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details 1. of Work to be CompletedNo Does the utility owner have existin overhead infrastructure in the area of work? 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? X 5. Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of • to be Completed ®i 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? X City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? 1 1 1 How many are to be added? 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: Kajlha,,Akloy. DATE: 7/20/2022 APPLICANT PRINTED NAME: Kaylie Aldous APPLICANT TITLE: Permitting Manager NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 MUNICIPALITY: ® BLANKET NO PERMIT REQUIRED ❑ TCP/TRAFFIC ❑ DETAILED(NOT BLANKET) JOINT POLE JFN/NJUNS TICKET # POLE OWNER: 51419-5510451 EDMONDS,WA CONSTRUCTION REQUIREMENTS PLACE TERMINALS, AGGREGATOR, SPUTTER, 1420 PRO PEDS, AND ❑ FLAGGING [:1 BRUSHING ❑ CONTRACTOR READYLINKS SWITCHES POINTS OF CONTACT 8502 MAIN ST SCHEDULING ENGINEER: FACILITIES: 8528 Ba22 85I8 t\ � z1u1a \ CUSTOMER CONTACT: CALL BEFORE YOU DIG! - 811 CONSTRUCTION STARTA/2/2022 IN SERVICE DATE:6/2/2022 I CERTIFY THAT THE WORK I COMPLETED ON THIS WORK ORDER AND AS -BUILT IS IN COMPLIANCE WITH ZIPLY FIBER QUALITY STANDARDS AS IDENTIFIED ON THE IPQIP CHECKLIST. tF 8403 (1)T-35 mm (1) OO-prroopper BLDG-F 112 FLA 30 UNITS PEDr1 (37) CAT-5 F421 8401 (SIGNATURE AND DATE) (1) T -27V - ZIPLY TO PULL NEW UNITS /ACCT CODES (1) iee-pr Copper 1Q FJI QR TI. EXISTNG CONDUR I (1)4--rD (1)7Di°riw (1)25-pr Copper 114 FId P 9, urr"'b 01G \(1)2'-5p OF WAY NCE LOCATION. 8502 PEDN2 8502BLDE F419 O (8) CAT-5 5 2 OV�tth -,)CA (1)2' U*ro—Footge (1) opper 4 A (,)r �0 (1)25-pr Copper1 YUSy Unkr~ Footage 85f1{ iM Fd eM-D 21106 2UITS (2)CAT-6 !nEFIBER PEDdf3 INTO E%ISTING ECw F418 PUCECASEBUNTS Cb n01 ED IN NANDHOLE LocatED ON A1NN 57 Q. ,L- •`• Wiy Sr (FooQ0 /8Z/61 25-pr Copper (Im RA Q�1Gn4 �. .....r ....... I H4 NOISInfIcI IaAANIJNA r (t)2'-tea (t)i-157 otri_ 11> I (2)� FW REVISIONS ZIPLY FIBER / CONTACT LIST: ZIPLY FIBER CORP. INFORMATION: PROPERTY CONTACT: LOCATES:811 CALL BEFORE YOU DIG COMPANY NAME:ZIPLY FIBER JENNIFER HANSEN 206-268-3315 ZIPLY PROJECT MGR:KEKE MURPHY 562-991-2708 ADDRESS: 8840 SW BURNHAM, TIRGARD, OR 97223 ZIPLY HALL 503-349-6820 ZIPLY FACIEO T ESL ARUEL KIELTY 426-263 4006 E-MAIL: DAVI CARN EGREG LEY CONTACT NAME: IY@Z Pf LY COM RECEIVED ZIPLY OPCEN:DAVID CARNLEY 971-940-9000 PHONE: 971-940-9000 LICENSE NUMBER: 49350 n UL 22 2022 ziply fiber CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT HLLKWAXX— BF DU 668502 MAIN ST EDMONDS WA— MONTCL/ — AE WNIV210 GNV_102111\100 NOISO2JA 2JOd 3­91SNOdS32J SI 2JOlOV J1NOO/b3NMO PROJECT NUMBER: 5510451 C.O. AREA EXCH.CODE: WA HALLS LAKE DRAWN DATE: ENGR: UNKNOWN CNTY ---_ joafoad pa; vied auj buunp sin000 ao pasneo sl jeyj spiepuels Ap aad 1 11A712021 PHONE:---- FILE: 66 8502MAINSTEDMONDS SCALE, 1:100 TAX DISTRICT: ---- DWG TWNSHP: ---- RNG ---- SEC ---- a5elml JO, s,a',kiJI} Ile eoeldaa/ Ip's�11Q�1N3 NOIl`dO0�32J 'S3111�I1f1 311S NO _nb inn IN�n� �.In� �alcnlnac».I �.In I ll\-1),I I n!n�n.I�n!nnn CONSTRUCTION-NOTES- 1. CAUTION- Facilities shown on this plan were obtained from records and/or visual surface inspection. 2. Some facilities may be omitted, or shown at an incorrect location. Exact location of all facilities must be determined prior to start of construction. 3. All materials, methods of placement and restoration must meet the requirements City of EDMONDS and County of SNOHOMISH. 4. Construction must replace and restore any landscaped area disturbed during construction back to its original or better then condition. 5. Contractor is to place all new UG facilities per work plan, Contractor will need to notify the area Frontier Inspector and or the engineer for making any additional field changes. PROJECT MATERIAL LIST 450'48 FIBER 1-6 PORT TERMINAL 50' TAIL 1-6 PORT TERMINAL 500' TAIL 1-6 PORT TERMINAL 1000' TAIL 5-4 PORT READYLINKS SWITCHES 1-24 PORT READYLINKS SWITCH 1-DUAL 1X8 SPLITTER 2-1420 PROPEDS 600' OSP DROPS Call Before You Dig 'NOTE TO CONSTRUCTION' BUILDING C AND D DO NOT HAVE EXISTING 120V POWER PER SURVEY. BOTH BUILDINGS WILL NEED 120V POWER INSTALLED. BF - MDU - READY LINKS (MIXED ISP & OSP BUILD WITH PON FIBER DESIGN). 66 UNITS IN 6 BLDG'S.ROW FIBER IS 540' FROM CAMPUS ON MAIN ST.CAMPUS HAS EXISTING COPPER DUCT UPSIZE (1) PED FOR SPLICING. PLACE (1) 6 PORT MDU TERMINAL IN BLDG F MDF. PLACE (1) 6 PORT MST IN PED 3&2 TO FEED BLDG'S A,B,C,D,E (OPS TO PLACE FIBER DROPS FROM MSTS TO DEMARCS). 120V POWER IS AVAILABLE IN MDF FOR ISP. NO POWER NOTED PER SURVEY FOR RLO BLDGS / CLIENT RPF REQUIRED. REQUESTING (2) F1 FIBERS FOR PON SPUTTER AND (2) F1 FIBERS ON 10 GIG CIRCUIT FROM CO. EXISTING SPLICE CASE IS IN STREET E OF THE PROPERTY. II UNITS /ACCT CODES I II REVISIONS HLLKWAXX_BF 4DU 66_8502 MAIN ST EDMONDS WA_MON PROJECT C.O. AREA,-J ---- NUMBER: 5510451 EXCH.CODE: WAHALLSIAKE DRAWN DATE ENGR UNKNOWN CNTY R 8502 ST 1111712021 PHONE: ---- MAIN EDMONDS FILE: 66 8602 MAIN ST EDMONDS SCALE, 1:100 TAX DISTRICT: ---- DWG 2 TWNSHR ---- RNG ISEC ---- N + =OSP DROP PROJECT MATERIAL LIST 450'48 FIBER 1-6 PORT TERMINAL 50' TAIL 1-6 PORT TERMINAL 500' TAIL 1-61PORT TERMINAL 1 000'TAIL 5-4 PORT READYLINKS SWITCHES 1-24 PORT READYLINKS SWITCH 1-DUAL 1X8 SPLITTER 2-1420 PROPEDS 600' OSP DROPS TERMINALS 56-PORT TERMINAL C9FDT FT-887608 T1 IN: HLLKWAXX FC1032,143-144 XD: 3-6 T2 6-PORT TERMINAL C9FDT FT-887609 T2 IN: HLLKWAXX S6001,1-5 XD: 6 T3 6-PORT TERMINAL C9FDT FT-887610 T3 IN: HLLKWAXX S6001,6-9 XD: 5-6 PIGTAILS 312' FTTP PIGTAIL 50OFT 5 HLLKWAXX S6001,1-5 (@608' FTTP PIGTAIL 50OFT 4 HLLKWAXX S6001,6-9 NEW FIBER 0450' 48-FIBER 4 HLLKWAXX FC1032,139-140+ HLLKWAXX FC1032,143-144 SPUTTER S1 DUAL 1 X8 SPUTTER S6001 S1 UNK_SPLITTER CABINET IN: HLLKWAXX FC1032,139-140 OUT: HLLKWAXX S6001,1-16 AGGREGATOR A110 GIG AGGREGATOR UNK_SPLITTER CABINET IN: HLLKWAXX FC1032,143-144 OUT: REMOVE PED F419 AND PLACE 1420 PROPED 1 SPLICE INTO EXISTING FIBER HLLKWAXX FC1032,139-140 AND 143-144 AND PULL IT TO 2422.201 MDF LOCATION TO PROVIDE SERVICE TO BUILDINGS. 2 SPLICE INTO NEW FIBER HLLKWAXX FC1032,139-140 AND 143-144 TO GIVE 10G 2422.201 SERVICE TO BUILDINGS. LOT LINE R� 8500 BLDG F 36 U P1 \ 50' 2f 216-/� \ 8502 LDG E / 8506 8 U BLDG C 6 U 8504 14'-2" BLDG 2U BLDG B 7Ui Access existing HH splice and pull fiber �35'-2" through existing to \ MDF 1 � O \ 8510 LDG A \7U �• HLLKWAXX 13 REMOVE PED F418 AND PLACE 1420 PRO PED NK FOOTAGE+ 410 03.2011 RBN XD,1-6+ HLLKWAXX FC1032,127-140+ XD,141-142+ HLLKWAXX FC1032,143-144 II UNITS/ACCT CODES I II REVISIONS I ziply HLLKWAXX-BF MDU 66_8502 MAIN ST EDMONDS WA MON -PROJECT NUMB R: 5510451 C.O.AR EXCH.CO WAWA HALLS LAKE DRAWN DATE: 1111712021 ENGR: UNKNOWN PHONE: --- CNTY: 66 8502 MAIN ST EDMONDS FILE - SCALE 1:100 1TWNSHR TAX DISTRICT: ---- DWG 3 ---- RNG: ISEO ---- ADDRESSING Feed Terminal Number Street City St Bldng #'s Units Fibers C9FDT FT-887610 T3 8510 MAIN ST EDMONDS WA BUILDING A 101-104 S6001,6 105-106,202 S6001,7 8508 BUILDING B 101-104 S6001,8 105-106,202 S6001,9 C9FDT FT-887609 T2 8506 MAIN ST EDMONDS WA BUILDING C 101-104 S6001,1 105,204 S6001,2 8504 BUILDING D 101-102 S6001,3 8502 BUILDING E 101-104 S6001,4 105-107,204 S6001,5 C9FDT FT-887608 T1 8500 MAIN ST EDMONDS WA BUILDING F 101,114-116, FC1032,143-144 201-216,301-316 II UNITS /ACCT CODES I II REVISIONS HLLKWAXX_BF 4 DU 66_8502 MAIN ST EDMONDS WA_MONTCL PROJECT NUMBER: 5510451 C.O. AREA', EXCH.CODE: WAHALLSLAKE DRAWN DATE 1111712021 ENGR UNKNOWN PHONE: ---- CNTY --_ FILE: 668502 MAIN ST EDMONDS SCALE, 1:100 ITAX DISTRICT: I DWG TWNSHR IRNG ISEC ---- SIGN SPACING = X (1) RURAL ROADS & URBAN ARTERIALS 35 /40 MPH 350'± RURAL ROADS, URBAN ARTERIALS, 25 / 30 MPH 200'± (2) RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. MINIMUM SHOULDER TAPER LENGTH = L/3 (feet) SHOULDER Posted Speed (mph) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 8' 40 40 60 90 - - - - - 10' 40 60 90 90 USE A 3 DEVICES TAPER FOR SHOULDERS LESS THEN 8' MAINTAIN TWO 11' TRAVEL LANES CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 35/40 30 60 25/30 20 40 BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (feet) 155 200 250 305 BUFFER VEHICLE ROLL AHEAD DISTANCE = R TRANSPORTABLE ATTENUATOR 30 FEET MIN. MINIMUM HOST VEHICLE WEIGHT 15,000 LBS. THE MAXIMUM TO WEIGHT SHALL BE IN ACCORDANCE WITH THE MANUFACTURERS 100 FEET MAX. RECOMMENDATION. PROTECTIVE VEHICLE NO SPECIFIED MAY BE A WORK VEHICLE STRATEGICALLY LOCATED TO SHIELD DISTANCE THE WORK AREA. REQUIRED - - - - - - - - - - - - - - - - - - - - - - - Z Z 0 N K ® ® WORK AREA X X 1-13 B R 50' 48" 48" OWNER/CONTRACTOR IS RESPONSIBLE FOR ROAD Applicant shall repair/replace all EROSION CONTROL AND DRAINAGE SHOULDER damage to utilities or frontage WORK \\748 improvements in City right-of-way AHEAD per city standards that is caused or \ occurs during the permitted project. OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING 48" ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY W20-1 W21-5 UTILITIES MAY REQUIRE A SEPERATE PERMIT. ENGINEERING DIVISION ���... ,�......,7TED 0)tv 19/28/2022 RESUB LEGEND Aug 17 2022 < TEMPORARY SIGN LOCATION SHOULDER CLOSURE - LOYY�/�� SPEED CITY OFEDMONDS NOTES: DEVELOPMENT SERVICES ® CHANNELIZING DEVICES (40 MPH OR LESS) DEPARTMENT 1. DEVICE SPACING FOR THE DOWNSTREAM TAPER SHALL BE 20' (FT). PROTECTIVE VEHICLE 2. ALL SIGNS ARE BLACK ON ORANGE. NOT TO SCALE FILE NAME S:\Design R P& S\4-Standards\2-Plan Sheet Library\01-Published PSL\(TC) Work Zone Traffic Control\W(TC-5) Shoulder Closure -Low Speed (40 M H or Less)1TC-5.dgn ., Washington State Plot 1 TIME 1:20:14 PM REGION NO. STATE FED.AID PROJ.NO. PLAN REF NO TC5 DATE 9/18/2014 WAS JOB NUMBER PLOTTED BY FletcCo DESIGNED BY SHEET ENTERED BY Department of Transportation OF CHECKED BY CONTRACT NO. LOCATION NO. TRAFFIC CONTROL PLAN PROJ. ENGR. BY DATE P.E. STAMP BOX DATE P.E. STAMP BOX SHEETS REGIONAL ADM. REVISION DATE NO R8-3 INSTALL ON TYPE 2 BARRICADES THROUGHOUT THE WORK AREA 24" x 30" 24 HOURS PRIOR TO IMPLEMENTING TRAFFIC CONTROL. PARKING R/W PRIOR NOTIFICATION OF LOCAL LAW ENFORCEMENT REQUIRED. NOTES 1. CONTROLS SHOWN ARE FOR PEDESTRIAN TRAFFIC 2. A 60" PATH WIDTH SHOULD BE MAINTAINED (48" IS 3. CONTACT AND COORDINATE IMPACTED TRANSIT AGI PRIOR TO IMPLEMENTING ANY CLOSURES. 4. SEE SHEET TC-52 FOR TEMPORARY PEDESTRIAN RF 5. ADA PEDESTRIAN FACILITIES MUST BE MAINTAINED. STANDARD SPECIFICATION 1-10.2(1)B. 6. TEMPORARY PEDESTRIAN PUSH BUTTONS SHALL BE THE DIVERTED PATH WHEN EXISTING BUTTONS ARI ACCESSIBLE TO PEDESTRIANS. IF CLOSING SIDEWALK ON MAIN STREET, DIRECT PEDESTRIANS TO CROSS AT NEAREST DESIGNATED CROSSWALKS (I.E. FIVE CORNERS AND MAIN ST/OLYMPIC AVE). LEGEND N TEMPORARY SIGN LOCATION ® CHANNELIZING DEVICES PEDESTRIAN CHANNELIZING DEVICES TEMPORARY PEDESTRIAN RAMP FOR SIDEWALKS FILE NAME S:1Design R P& S14-Standardsl2-Plan Sheet Library101-Published TIME 1:28:42 PM DATE 9/18/2014 PLOTTED BY FletcCo DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM. REVISION SIDEWALK DIVERSION Work Zone Traffic DATE SIDEWALK DETOUR INTERSECTION PEDESTRIAN TRAFFIC CONTROL NOT TO SCALE rC-16) Intersection Pedestrian Traffic Contr I\TC-16.dgn REGION STATE FED.AID PROJ.NO. Adw NO. WASMAW JOB NUMBER Washington State CONTRACT NO. LOCATION NO. Department of Transportation DATE I DATE P.E. STAMP BOX P.E. STAMP BOX RESUB Aug 17 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PLAN REF NO TC16 SHEET OF PEDESTRIAN CONTROL AND PROTECTION SHEETS