SPECIAL INSPECTION AND TESTING AGREEMENT
Permit #: BLD2021-1023
Project: Tarqueno, 841 Elm Way
Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for
approval. The completed form must have signatures of acknowledgment by all parties.
DUTIES AND RESPONSIBILITIES
Special Inspection Firm and Special Inspectors:
The Special Inspection firm of Nelson Geotechnical will perform special
inspection for the following types of work (separate forms must be submitted if more than one firm is to be
employed):
Reinforced Concrete Spray applied Fireproofing
Bolting in Concrete Smoke Control Systems
Prestressed Concrete Lateral Wood
Shotcrete _Installation of soil nails and pin pyles
Structural Concrete X Soils to include backfill and excavation
Structural Epoxy _ - - Installation and construction/placement
of the rebar for shotcrete retaining wall
High Strength Bolting
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO
certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector
and the firm are qualified by education and experience to perform the work and testing required by the project
design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any
nonconforming work and resolution of nonconforming items.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be
detailed in the final report.
\\edmsvr-userfs\userprof$\dakau\Desktop\Comments Letters and Special Inspection forms 2019\Special Inspection forms\SI 2021-1023
Tarqueno.doc8/9/2021
Doc ID:62d6b9641378d96ca799d05aa6e7271578435102
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Building Department:
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Design Professionals:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to ensure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner: Joe Tarqueno
Contractor: Jason Fletcher
Arch./Eng:
Dennis Titus, PE, SE
Signature Date 11 / 15 / 2021
Signature/ Date: 11 / 30 / 2021
Signature
Special Insp. Alex Rinaldi Signature.
Special Insp. Agency
" Date: 10/20/21
Ae X 6. /Q`nald` Date: 11 / 15 / 2021
ACCEPTED FOR THE CITY OF EDMONDS BUILDING DIVISION
Date:
\\edmsvr-userfs\userprof$\dakau\Desktop\Comments Letters and Special Inspection forms 2019\Special Inspection forms\SI 2021-1023
Tarqueno.doc8/9/2021
Doc ID:62d6b9641378d96ca799d05aa6e7271578435102
OHELLOSIGN
Audit Trail
TITLE Special Inspection Nelson
FILE NAME Tarqueno Special Inspection Nelson.pdf
DOCUMENT ID 62d6b9641378d96ca799d05aa6e7271578435102
AUDIT TRAIL DATE FORMAT MM / DD / YYYY
STATUS Completed
Document History
0 11 / 15 / 2021 Sent for signature to Joe Tarqueno Qtarg12@yahoo.com),
SENT 23:05:59 UTC Jason Fletcher Qasonvfletcher@yahoo.com) and Alex Rinaldi
(alexr@nelsongeotech.com) from cgcontracts@cgengineering.com
IP: 50.237.138.130
(° 11 / 15 / 2021 Viewed by Alex Rinaldi (alexr@nelsongeotech.com)
VIEWED 23:10:08 UTC IP: 50.47.55.49
11 / 15 / 2021 Signed by Alex Rinaldi (alexr@nelsongeotech.com)
SIGNED 23:35:21 UTC IP: 50.47.55.49
(0 11 / 16 / 2021 Viewed by Joe Tarqueno Qtarg12@yahoo.com)
VIEWED 00:05:58 UTC IP: 50.34.40.255
11 / 16 / 2021 Signed by Joe Tarqueno Qtarg12@yahoo.com)
SIGNED 00:06:34 UTC IP: 50.34.40.255
Powered by OHELLOSIGN
OHELLOSIGN
Audit Trail
TITLE
Special Inspection Nelson
FILE NAME
Tarqueno Special Inspection Nelson.pdf
DOCUMENT ID
62d6b9641378d96ca799d05aa6e7271578435102
AUDIT TRAIL DATE FORMAT
MM / DID / YYYY
STATUS
Completed
Document History
(0
12 / 01 / 2021
Viewed by Jason Fletcher Qasonvfletcher@yahoo.com)
VIEWED
00:36:46 UTC
IP: 50.125.91.45
12 / 01 / 2021
Signed by Jason Fletcher Qasonvfletcher@yahoo.com)
SIGNED
00:38:20 UTC
IP: 50.125.91.45
G/
12 / 01 / 2021
The document has been completed.
COMPLETED
00:38:20 UTC
Powered by OHELLOSIGN