Loading...
APPROVED RESUB1 BLD2022-0392+Plumbing_Plan+7.20.2022_1.59.31_PM+3001874PIPE MATERIAL SCHEDULE GENERAL NOTES PLUMBING LEGEND AND SYMBOLS Q J m Z O M 0 N CV CD N I- Z O r, U_ U Q PIPE TYPE PRESSURE SHUT-OFF SERVICE MATERIAL OF FITTINGS RATINGS VALVE & WEIGHT JOINTS MATERIAL PSI - SWP Cast Bronze/ Ball OXYGEN Copper L Tube Soldered Wrought Copper 125 Check Cast Bronze/ Ball MEDICAL VACUUM Copper L Tube Soldered Wrought Copper 125 Check 1. THE TOTAL INSTALLATION SHALL COMPLY WITH ANY AND ALL REQUIREMENTS OF THE LEGALLY CONSTITUTED SYMBOL ABBREV. DESCRIPTION AUTHORITIES HAVING JURISDICTION INCLUDING 2018 INTERNATIONAL BUILDING CODE (IBC), 2018 INTERNATIONAL DETAIL No. MECHANICAL CODE (IMC), 2018 UNIFORM PLUMBING CODE (UPC) WITH WASHINGTON STATE AMENDMENTS AND THE 2018 DETAIL REFERENCE WASHINGTON STATE ENERGY CODE. SHEET No. ntgb I 2. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO BID AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE LiSECTION REFERENCE architects EXISTING CONDITIONS UNDER WHICH HE WILL BE REQUIRED TO WORK. ALL INDICATED DIMENSIONS ARE APPROXIMATE STACK/RISER AND ARE GIVEN FOR ESTIMATE PURPOSES ONLY. GE PLUMBING STACK OR RISER REFERENCE ID. No. 3. BEFORE PROCEEDING WITH THE WORK THIS CONTRACTOR SHALL CAREFULLY CHECK AND VERIFY ALL DIMENSIONS, EQUIPMENT SIZES, REQUIRED CLEARANCES AND SHALL ASSUME FULL RESPONSIBILITY FOR THE FITTING OF ALL EQUIPMENT AND EQUIPMENT REFERENCE MATERIALS HEREIN REQUIRED TO OTHER PARTS OF THE WORK OF OTHER TRADES. ID. No. CW COLD WATER 4. THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT ALL OFFSETS, BENDS, SPECIAL FITTINGS AND - - HW HOT WATER LOCATIONS ARE NOT EXACTLY LOCATED. IN THE PREPARATION OF THESE DOCUMENTS, CERTAIN ASSUMPTIONS ARE MADE REGARDING EXISTING CONDITIONS. SOME OF THESE ASSUMPTIONS MAY NOT BE VERIFIABLE WITHOUT - - - HWR HOT WATER RETURN EXPENDING ADDITIONAL SUMS OF MONEY OR DESTROYING OTHERWISE ADEQUATE OR SERVICEABLE PORTIONS OF DESIGN WEST ENGINEERING EXISTING BUILDINGS AND/OR EQUIPMENT. THEREFORE, THE ENGINEER SHALL NOT BE HELD RESPONSIBLE FOR ANY TW TEMPERED WATER MECHANICAL. ELECTRICAL. ENERGY CONSULTANTS CHANGES OR ADDITIONAL COSTS INCURRED DUE TO EXISTING CONDITIONS. ---------------- POP -OFF DRAIN LINE OR HIDDEN WATER LINE Special Inspection reports required prior to 5. ITEMS RELATED TO PLUMBING UTILITIES AND/OR OTHER SERVICE(S); MATERIALS, LABOR, PERMITS, FEES, ETC., SHALL S or W SOIL or WASTE BELOW GRADE (or FLOOR) final inspection. Please provide reports to BE VERIFIED WITH THE RESPECTIVE SERVING UTILITY COMPANY PRIOR TO SUBMISSION OF A BID. THE ACT OF RD/OD RD/OD ROOF & OVERFLOW DRAIN ABOVE & BELOW GRADE (or FLOOR) SUBMITTING A BID SHALL CONSTITUTE FULL RESPONSIBILITY OF THE CONTRACTOR TO INSTALL SERVICE(S) IN SD SD STORM DRAIN COMPLIANCE WITH THE REQUIREMENTS OF THE SERVING UTILITY COMPANY AND THE MECHANICAL ENGINEER. THE inspector. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CHARGES LEVIED BY THE SERVING UTILITY COMPANY EXCEPTING THE S or W SOIL or WASTE ABOVE GRADE (or FLOOR) FIRST BILLING DEPOSIT. - - - - - - - - V PLUMBING VENT 6. THE CONTRACTOR SHALL COMPLY WITH ALL CONTRACT DOCUMENTS IN LAYING OUT THEIR WORK AND EQUIPMENT. COND COND CONDENSATE DRAIN THEY SHALL COORDINATE THE WORK OF THIS SECTION WITH THE WORK OF OTHER TRADES AND ALL JOB CONDITIONS. G G GAS LOW PRESSURE 7. THE INSTALLATION OF ACCESS PANELS OR OTHER INDICATING EQUIPMENT OR SPECIALTIES REQUIRING READING, MPG MPG GAS MEDIUM PRESSURE n sta I I ati o n subject to DOH purview and ADJUSTMENT, INSPECTION, REPAIRS, REMOVAL OR REPLACEMENT SHALL BE CONVENIENTLY LOCATED WITH CA CA COMPRESSED AIR 1 10 James St., Suite 106 Edmonds, WA 98020 REFERENCE TO THE FINISHED BUILDING. Phone: 425.458.9700 CA � CAO COMPRESSED AIR OUTLET approval. NY OXY OXYGEN Email: cadd@designwesteng.com 8. ALL EQUIPMENT AND FIXTURES INSTALLED UNDER THIS CONTRACT SHALL BE HUNG OR ANCHORED IN ACCORDANCE WITH 2O18 (IBC) AND 2018 UPC. VAC VAC MEDICAL VACUUM STAMP: 9. THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO CONSTRUCT THE PROJECT IN ACCORDANCE WITH 2O18 BV BALL VALVE WASHINGTON STATE ENERGY CODE. SOV SHUT OFF VALVE 10. WHERE MATERIAL IS SHOWN ON THE DRAWINGS BUT NOT SPECIFIED, IT SHALL BE OF THE SAME TYPE AND QUALITY AS ��J SOV or GC SHUT OFF VALVE OR GAS COCK ON RISER OL E 0 EXISTING MATERIAL. CV SWING CHECK VALVE of WA L t4 11. TEST SYSTEM(S) IN ACCORDANCE WITH REQUIREMENTS OF THE GOVERNING AUTHORITIES. PRV PRESSURE REDUCING VALVE o 12. ALL CLEANOUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE AND LOCATED AS PER CODE REQUIREMENTS THE PTR PRESSURE -TEMPERATURE RELIEF VALVE CONTRACTOR SHALL COORDINATE ALL CLEANOUT LOCATIONS WITH EQUIPMENT CABINETS, ETC. AND THE ARCHITECT RPBFP REDUCED PRESSURE BACKFLOW PREVENTER 21007747 PRIOR TO ANY INSTALLATION. �0 GIST TMV THERMOSTATIC MIXING VALVE �SSIONAL�� 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND REPAIRING ALL PAVED AREAS WHICH ARE EXCAVATED AND/OR DAMAGED BY THEIR OPERATIONS. IN ADDITION, THE CONTRACTOR SHALL RESTORE TO ORIGINAL CONDITION DN PIPE DOWN ALL PLANTED AREAS DAMAGED BY THEIR OPERATIONS. __+0 UP PIPE UP ALLWORK SUBJECT 14. ALL CONNECTIONS TO EXISTING SERVICES SHALL BE MADE SUCH THAT INTERRUPTION TIME WILL BE AS SHORT AS DN TEE DOWN POSSIBLE. THE CONTRACTOR SHALL GIVE THE OWNERS REPRESENTATIVE A MINIMUM OF 72 HOURS NOTICE OF SUCH UP TEE UP INTERRUPTIONS AND THE ACTUAL SHUT -DOWN TIME SHALL BE AT A TIME DESIGNATED BY THE OWNERS TO FIELD REPRESENTATIVE. - 0- C- PIPE RISER &PIPE DROP (UP AND DOWN) FCO FLOOR CLEANOUT 15. POTABLE WATER SYSTEMS SHALL BE DISINFECTED AND FLUSHED PRIOR TO USE BY WATER -CHLORINATION SOLUTION w AND HAVE BACTERIOLOGICAL EXAMINATION MADE BY AN APPROVED AGENCY PER 2018 UPC 609.9 AND AS PRESCRIBED �C3--II WCO WALL CLEANOUT INSPECTION FOR IN AWWA C651. METHODS OF CLEANING/ DISINFECTING FOR NEW OR REPAIR PIPING AS DESCRIBED IN C651 OR NFPA 24. I CO CLEANOUT PLUG Z 16. PLUMBING PIPE, FITTINGS AND FIXTURES USED TO CONVEY OR DISPENSE WATER FOR HUMAN CONSUMPTION SHALL BE - - ---� COTG YARD CLEANOUT or CLEANOUT TO GRADE UJ LEAD-FREE PER 2018 UPC 604.2. CODE COMPLIANCE CAP ON END OF PIPE 17. ANY SUBSTITUTION MADE BY THE CONTRACTOR THAT IS DIFFERENT FROM WHAT IS SPECIFIED ON THE DRAWINGS HB HOSE BIBB WITH VACUUM BREAKER NEEDS TO BE APPROVED BY ENGINEER OF RECORD AND OWNER PRIOR TO BID AND SHALL BE CLEARLY INDICATED ON WHA & TP WATER HAMMER ARRESTOR & TRAP PRIMER THE SUBMITTAL AS TO ALL THAT IS BEING SUBSTITUTED. CS CIRCUIT SETTER w 18. SHUT-OFF VALVES SHALL BE PROVIDED IN MAIN BRANCHES, RUNS TO RISERS AND WHERE INDICATED ON DRAWINGS. �� GR GAS REGULATOR 19. NEW NON-RESIDENTIAL WATER CLOSETS SHALL COMPLY WITH 2O18 UPC 411.2 AND SHALL NOT EXCEED 1.6 GALLONS GC GAS COCK (or GAS STOP) PER FLUSH. GS GAS SOLENOID 20. NEW NON-RESIDENTIAL WALL MOUNTED URINALS SHALL COMPLY WITH 2O18 UPC 412.1 AND SHALL NOT EXCEED 1.0 EARTHQUAKE VALVE GALLON PER FLUSH. P.O.C. POINT OF CONNECTIONA ROV D E 21. NEW NON-RESIDENTIAL LAVATORY FAUCETS SHALL COMPLY WITH 2O18 UPC 407.2.1 AND SHALL NOT EXCEED 0.5 P.O.D. POINT OF DEMOLITION GALLONS PER MINUTE FOR PUBLIC LAVATORY AT 60 PSI. n AP ACCESS PANEL O 22. ALL FIXTURES, EQUIPMENT, PIPING, FITTINGS, AND MATERIALS SHALL BE LISTED. ABV ABOVE NO ANS < MUST 23. ALL PLUMBING FIXTURES SHALL MEET THE FLOW REQUIREMENTS SPECIFIED IN THE 2018 UPC. BEL BELOW AGA AMERICAN GAS ASSOCIATION 01-1 24. PUBLIC LAVATORIES SHALL HAVE CONTROLS TO LIMIT THE WATER TEMPERATURE TO 1207. CONN CONNECTION m UJ CONT CONTINUATION \ ON J0 SIT APPLICABLE CODES (E) EXISTING Q (N) NEW V) 1. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS: 2006 FACILITY GUIDELINES INSTITUTE DN DOWN ADA AMERICAN DISABILITY ACT 7� 7� 2. HEALTHCARE FACILITIES CODE: 2005 NATIONAL FIRE PROTECTION ASSOCIATION 99 IE INVERT ELEVATION 7 L 3. PLUMBING CODE: 2005 UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS (TYP) TYPICAL O O U.O.N. UNLESS OTHER NOTED 4. MECHANICAL CODE: 2005 UNIFORM MECHANICAL CODE WITH WASHINGTON STATE AMENDMENTS VTR VENT THROUGH ROOF FIRE/LIFE SAFETC ftRNATION DE I X � # I-- WA INGTON STATE AMENDM TS n I U '11 S Building Department Work Address Owner MED GAS 111111 PLB CHANGES 21911 76TH AVE W TRANSFORM WEIGHT LOSS Approved Date Building Official 08/01 /2022 Eric, Permit Number BLD2022-0392 W/ WITH UJ N UJ FU PLUMBING FIXTURE UNIT SEC COND SECONDARY CONDENSATE B.F.F. BELOW FINISH FLOOR R.I.C. ROUGH IN CONNECT ANCHORAGE AND BRACING NOTES PIPES, DUCTS AND CONDUITS SHALL BE SUPPORTED AND BRACED PER THE SMACNA "GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING SYSTEMS", THE "SUPERSTRUT SEISMIC RESTRAINT SYSTEM" FOR PIPES AND CONDUITS ONLY. REV BY DESCRIPTION DATE 1 LPM ADD TRIPLE SWITCH 4/26/2022 2 LPM DOH COMMENTS 07/08/2022 3 4 5 6 7 8 9 10 SHEET INDEX SHEET TITLE SHEET NUMBER SHEET TITLE P1.1 PLUMBING LEGENDS NOTES AND SCHEDULES PD2.1 PLUMBING MED GAS ROOM DEMO PLAN PLUMBING LEGENDS P2.1 PLUMBING MED GAS ROOM REMODEL PLAN NOTES AND SCHEDULES P2.2 PLUMBING FIRST FLOOR PLAN 2 P . SCALE: AS NOTED CONDENSATE PUMP SCHEDULE DRAWN DATE 4/ 12/22 APPROVED DATE TAG SYSTEM MANUFACTURER & MODEL LOCATION CAPACITY CONSTRUCTION MOTOR (HP) ELECTRICAL WEIGHT (LBS) DETAIL REMARKS COVER TANK AMPS V-P-HZ SHEET NUMBER RESUB Jul 20 2022 P 1.1 CP-1 COND LITTLE GIANT MODEL IA MED GAS ROOM 2.65 GPM @ 15' TDH ABS GALVANIZED STEEL 1/18 2.5 120-1-60 8.2 1/P3.1 AUTOMATIC ON/OFF CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 21-241 GENERAL NOTES Q OD z O N O N N O N z J d J LL D_ CL N N / 0 z O 0 w z w V) w V) Q U V) Q N N N O N U w O D_ I I I REMOVE EXIST. VENT LINES FROM MANIFOLD FOR INSTALL OF NEW VENT LINE I I I REMOVE EXIST. SEMI -AUTO I OXYGEN MANIFOLD AND I PARKING PLYWOOD BACKBOARD GARAGE �I I 2Z� rr-- I I I I I I IkI / / ,'d N II II 11 \ I EXIST. NITROUS OXIDE TANK STORAGE o REMOVE EXIST. NITROUS OXIDE 2 MANIFOLD AND CAP EXIST. NITROUS OXIDE LINE ELECT. ROOM EXIST. OXYGEN I TANK STORAGE EXIST. VACUUM VENT LINE c� TO REMAIN w I 2 MED GAS ROOM I I MED VAC ROOM EXIST. VACUUM PUMP TO BE REMOVED TO ALLOW INSTALLATION f OF PLATFORM TO ELEVATE PUMP SKID ---------- EXIST. PRESSURE RELIEF VALVE 3 TO DISCHARGE TO ATMOSPHERE 4 CONSTRUCTION NOTES 1O ADD CHAINS OR CYLINDER RACKS TO SECURE BOTTLES. O2 EXIST. JOINTS ARE NOT SOLDERED. BRAZE ALL FITTINGS OR USE LOKRING FITTINGS. O3 ADD PIPE LABELING TO EACH PIPE ACCORDING TO IT'S USE. IE, OXYGEN, NITROGEN, VENT, VACUUM AND ETC. O4 REPLACE EXISTING ALARM WIRES WITH WIRING IN ACCORDANCE WITH NFPA 70. O5 ADD VALVE TAGS TO 02 AND N20 SOURCE VALVES. O6 PROVIDE LOCAL ALARM INDICATORS FOR "RESERVE IN USE". O7 PROVIDE WIRING FOR ALL ALARMS. "VACUUM "LAG IN USE" MUST BE MONITORED. O8 ADD LABEL FOR "VAC LAG IN USE". 2 tgb I architects DESIGN WEST ENGINEERING MECHANICAL. ELECTRICAL, ENERGY CONSULTANTS 110 James St., Suite 106 Edmonds, WA 98020 Phone: 425.458.9700 Email: cadd@designwesteng.com STAMP: �G�oE o, WA 0 21007747 ��GISTEg�15) �SSI�NAL ��1 LU Z LU U (LU V V) ry 0 •o Q 0-4 O J 3� 00 =D 0%, 00 LU V C) L/) 0 "0 z � z 0 �0 L 01.1 C) r— Q LU N LU REV BY DESCRIPTION DATE 1 LPM ADD TRIPLE SWITCH 4/26/2022 2 LPM DOH COMMENTS 07/08/2022 3 4 5 6 7 8 9 10 SHEET TITLE PLUMBING MED GAS ROOM DEMO PLAN SCALE: AS NOTED DRAWN DATE APPROVED DATE 4/12/22 SHEET NUMBER RESUB Jul 202022 PD2,1 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PLUMBING MED GAS ROOM DEMO PLAN SCALE: 1 /4" = V-0" 1 21-241 GENERAL NOTES Q m z O N n O N N O N z J d J LL CL N N / 0 z O 0 w z w V) w V) Q U V) Q N N N O N U w O I CONSTRUCTION NOTES 1O ADD CHAINS OR CYLINDER RACKS TO SECURE BOTTLES. O2 EXIST. JOINTS ARE NOT SOLDERED. BRAZE ALL FITTINGS OR USE LOKRING FITTINGS. O3 ADD PIPE LABELING TO EACH PIPE ACCORDING TO IT'S USE. IE, OXYGEN, NITROGEN, VENT, VACUUM AND ETC. EXIST. WASTE LINE DIN FROM I O4 REPLACE EXISTING ALARM WIRES WITH WIRING IN ROUTE NEW 1-1/2" DRAIN LINE ABOVE ABOVE. CONTRACTOR TO FIELD I ACCORDANCE WITH NFPA 70. AND TIE-IN TO EXIST. WASTE LINE FROM FIRST FLOOR ABOVE I VE T 2 I O5 ADD VALVE TAGS TO 02 AND N20 SOURCE VALVES. 1" VENT LINE UP TO ROOF FOR MED EXIST. VACUUM VENT LINE UP O6 PROVIDE LOCAL ALARM INDICATORS FOR "RESERVE IN USE". TO ROOF AT MINIMUM 25-0" GAS MANIFOLD VENTS AT MINIMUM I FROM FRESH AIR INTAKE AND I PARKING O7 PROVIDE WIRING FOR ALL ALARMS. "VACUUM "LAG IN USE" 20' 0" FROM FLUE OR HEAT SOURCE a MINIMUM 20'-0" FROM FLUE MUST BE MONITORED. EXIST. VA E TO OR HEAT SOURCE GARAGE -REMAIN NEW FULLY AUTOMATIC I 8 ADD LABEL FOR "VAC LAG IN USE". ADD NEW MASTER ALARM PANEL a 1„ 1/2„ OXYGEN MANIFOLD AMICO ALERT 60 WIRED FROM EXIST. AMICO DOME LOADED I PANEL IN THE NURSES STATION NEMA-4 i ABOVE. NEW MASTER ALARM PANEL 2 TO MONITOR NEW OXYGEN I CAPPED OXY LINE FOR MANIFOLD AND VACUUM LINE. 8 a O 3/4 FUTURE OXY MANIFOLD VENT 0 EXIST. NITROUS OXIDE z 1/2" CAPPED N20 LINE FOR K AG "-' FUTU N20 LID2 EXIST. VACUUM VENT LINE 1 2 3 4 5 6 TO REMAIN E ST. OXY w TANKSTORAGE ao MED GAS ROOM �f w _ MED VAC ROOM C ROUTE VACUUM PUMP DRAIN TO CONDENSATE PUMP. PROVIDE INDIRECT CONNECTION TO DRAIN 2 ELECT. ROOM 2 7 CP E I INSTALL NEW 12" PLATFORM AND MOUNT 2 FOR EXIST. VACUUM PUMP SKID. RECONNECT ALL PIPING AN 3 ELECTRICAL CONNECTION , SEE DETAIL 1 4 EXIST. PRESSURE RELIEF VALVE P3.1 TO DISCHARGE TO ATMOSPHERE PLUMBING MED GAS ROOM REMODEL PLAN SCALE: 1/4"=1'-01, 1 tgb I architects DESIGN WEST ENGINEERING MECHANICAL. ELECTRICAL, ENERGY CONSULTANTS 110 James St., Suite 106 Edmonds, WA 98020 Phone: 425.458.9700 Email: cadd@designwesteng.com STAMP: �G�oE o, WA 0 21007747 ��GISTEg�15) �SSI�NAL ��1 LLB Z LLB U (LLB V V) 0 •o Q 0-4 O J 3� 00 > Q Q� V C) V) 0 "o z � z 0 �0 01.1 C)w � N REV BY DESCRIPTION DATE 1 LPM ADD TRIPLE SWITCH 4/26/2022 2 LPM DOH COMMENTS 07/08/2022 3 4 5 6 7 8 9 10 SHEET TITLE PLUMBING MED GAS ROOM REMODEL PLAN SCALE: AS NOTED DRAWN DATE APPROVED DATE 4/12/22 SHEET NUMBER RESUB Jul 20 2022 P2,1 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 21-241 GENERAL NOTES 1. MEDICAL GAS WILL BE REQUIRED TO BE CERTIFIED BY A QUALIFIED MEDICAL GAS INSPECTION COMPANY. THIS WILL BE PERFORMED BY OXYGEN MEDICAL GAS SERVICES. CONSTRUCTION NOTES (DEXISTING SINK WITH 4" WRIST BLADES TO REMAIN. OEXISTING SINK WITH 4" WRIST BLADES TO REMAIN. EXISTING HANDWASH SINK WITH 4" WRIST BLADES TO REMAIN. REMOVE EXISTING GOOSENECK FAUCET EMERGENCY EYEWASH FITTING AND REPLACE WITH NEW BRADLEY S19-200B FAUCET MOUNT EYEWASH. O4 EXISTING CLINICAL SINK AND FLUSH VALVE TO REMAIN. O5 EXISTING JANITOR SINK AND FAUCET TO REMAIN. tgb I architects DESIGN WEST ENGINEERING MECHANICAL. ELECTRICAL. ENERGY CONSULTANTS 110 James St., Suite 106 Edmonds, WA 98020 Phone: 425.458.9700 Email: cadd@designwesteng.com STAMP: E 0L 0 21007747 �0GISTEg��� �SSI�NAL�� w Z w U ry w 0 cry ry 0 �o Q No 1 3: 00 =D 01-1 Q Q v) � � v) 0 Z Z 0 0 o� r- Q w N w REV BY DESCRIPTION DATE 1 LPM ADD TRIPLE SWITCH 4/26/2022 2 LPM DOH COMMENTS 07/08/2022 3 4 5 6 7 8 9 10 SHEET TITLE PLUMBING FIRST FLOOR PLAN SCALE: AS NOTED DRAWN DATE APPROVED DATE 4/ 12/22 SHEET NUMBER RESUB Jul 20 2022 P2.2 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PLUMBING FIRST FLOOR PLAN I SCALE:1/4" = V-10" 11 21-241 0 0 v v 0 CONTINUOUS WELD 0o o _ 0 3x3x1/8" ANGULAR IRON 3x3x1/8" ANGULAR IRON SPREADER EACH END CONTINUOUS WELD 0 0 3x3x1/8" SQUARE TUBE 0 01 A 10 0 O O O CONTINUOUS WELD SECURE VACUUM PUMP SKID TO 441/8" PLATE WITH ANGULAR IRON WITH 3/8" THRU 4 HOLES FOR MOUNTING BOLTS AND DOUBLE NUTS AND WASHERS (TYP. 4 LOCATIONS) - 9 - 16 MED VACUUM MOUNTING 1 - 110 - 17 - 4 - 2 -Jill - 181 - 151 - 13 I I _ o o I I tgb I architects DESIGN WEST ENGINEERING MECHANICAL. ELECTRICAL. ENERGY CONSULTANTS STAMP: 110 James St., Suite 106 Edmonds, WA 98020 Phone: 425.458.9700 Email: cadd@designwesteng.com E L 0 WA 21007747 �0.� ISTEg�� �xv �SSI�NAL 01-1 ) w Z w U w cry O �o Q o 00 =D o1-1 Q Q v REV BY DESCRIPTION DATE 1 LPM ADD TRIPLE SWITCH 4/26/2022 2 LPM DOH COMMENTS 07/08/2022 3 4 5 6 7 8 9 10 SHEET TITLE PLUMBING DETAILS SCALE: AS NOTED DRAWN DATE APPROVED DATE 4/ 12/22 UMBE SHEET N RE� Jul 20 20 2 P3.1 CITY OF EDMON S DEVELOPMENT SER CES DEPARTMENT 21-241