BLD2022-1387_Site_Plan_10.11.2022_2.17.40_PM_3158456Equipment Summary
Modules:
(27) REC 405W
Inverter(s):
(1) SolarEdge 1000OH-US
Racking:
Ironridge XR100
Table of Contents:
Cover Page
Al Site Overview
A2 Roof Layout
E1 Single Line
E2 Electrical Calculations
G1 Roof As Built
G2 Electrician As -Built
G3 Micro/optimizer map
G4 Placards
G5 Equipment BOM
General Notes:
Additional Electrical Work:
Net Met
Site
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
U
Q
o
't
4-
N
o
O
°'rn�rn
0
p l0
U
Q
..
0 rn
L
�
V
U
0
o
-0��
0-
vi
0
U o
o
0
L
Ln
�
,i
E
a
M
_0
O1
W
0
1_1
REVISIONS
Rev. #: I Date:
Designed by: Thomas N
Project Manager:
Diallo Josey
(253) 267-4600
Current Date:Sep 28, 2022
Cover Page
N
m ❑ ❑
0
MSP
Net Meter, AC Disconnect, Inverter,
Customer Owned Production Meter
Attachment Detail
Side View (Portrait)
FLASHING AS REQUIRED
TO SEAL ROOF
MINIMUM (1) 5/16 X 4.75 LAC
BOLT EMBEDDED 2" MINIMUM
CENTER ON ROOF FRAMINC
PV MODULE,
BY OTHERS
IRONRIDGE
RAIL
(E) COMPOSITION
SHINGLE ROOF
IRONRIDGE
FLASHFOOT2
(E) ROOF FRAMING
Modules not to exceed height of existing ridge
— — — — — — — — — — — — — — — — — — — — — —
�181I�
,6,I
Building height
I
Manufactured trusses,
24" O.C.
(sample) Attachment point layout for array.
72" OC Max.
&*41./��.
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
U
Q
o
�
't
4-
N
o
06
o
'..J
pl0
UQ
..
0 rn
L
�
V
U
0
o
-0
0-
�i
v
-0
0^�
Uoo
0
a
M
0
p1
W
0
,--1
REVISIONS
Rev. #: I Date:
Designed by: Thomas N
Project Manager:
Diallo Josey
(253)267-4600
Current Date:Sep 28, 2022
Al Site
Overview
Required Setbacks from Ridge:
18"
"Alf
r � ��B"
Maximum Mount Spacing:
72"
Comp
Roof Type:
Roof Slope:
180
Array Tilt :
Flush
Array Azimuth(s):
910,1810,271°
Roof Area:
2824ft2
Array Area
538ft2
Array to Roof Coverage
19%
***Roof Attachments/ Fastners; see pg. G5 Equip. BOM * * * L — J
Net Meter *--\
Module and Rail Selection Guide
REC 405w Alpha BoB
40 x 71.7
Clamp Zone "A"
4.0-9.8"
Clamp Zone "B"
8.2-23.8"
Mods per Row
Rail typel+ rail type2
(5)Portrait, (3)rows
(2)14', (2)split 14'
(3)Portrait, (2)rows
(2)14',
(2)Portrait, (3)rows
(2)split 17',
NA,����i
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
U
Q
�
O
't
4-
N
o
0
p
U
Q
..
0 a
L
V
U
0
o
-0
0-
�
v i
-0
0^
U oN
o
0
L
Ln
..o
E
a
M
-0
p1
W
0
,--1
REVISIONS
Rev. #: I Date:
Designed by: Thomas N
Project Manager:
Diallo Josey
(253)267-4600
Current Date:SeD 28. 2022
A2 Roof Layout
I
I
I
I C
I
I
_ I
String 1
z
11 modules + o
String 2 U
� o
8 modules +
String 3
8 modules + AA A
0 Equipment Schedule
I
Line
L� O
Load
I Located less than 10'
I from net meter and S
I less than 10' from tap
I
I
�L---------
5
Customer Owned
Production Meter
Ref.
Category
Equipment
QTY
1
Modules
REC 405w Alpha BOB
27
2
Optimizers
P485 SolarEdge Optimizer
27
3
Jbox
Jbox
5
41
Inverters
Solar Edge SE10000H
1
5
MeterBase
MeterBase-125A 4 Jaw w/ 3.5" AWCAP
1
Meter
Landis Gyr EA110000-OP29 240V
1
6
Disconnect
60A 240V 2 Pole I Heavy Duty, Fuse, Lockable
1
DisconnectFuse
FLNR - 60 A Fuses for Disconnect (qty 1 /pole)
Monitoring
SolarEdge Consumption Monitoring (2p2OA breaker+CT's)
1
0 Conductor Schedule
0
L---.4
#6 GEC 1
Neutral Bar
w/ bonding jumper
Supply Side Connection
705.11
(Existing)
Main Service Panel
(1ph 240V Service)
Main Breaker: 200A
Bus Rating:200A
O
= Existing or A&RSOLAR
Others Scope
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
Service entrance conductors
4/0 XHHW-2
(L1 & L2)
2/0 XHHW-2
(N)
Inverter Specs
Watts
�
Output
�
AC
Voltage
# of
Inverters
OCPD
SolarEdge SE100001-1
10000
42
240
1
60
****N/A****
0
0
0
0
0
****N/A****
0
0
0
0
0
Module Specs
Watts w
Imp
Vmp
Voc
Isc
REC 405w Alpha BOB
405
9.56
42.4
48.9
10.14
Temp. Adjusted
0
0
37
52.7
0
Summary
Distance (ft)
Current
@125%
Operating
Voltage
Voltage
Drop
Volt. Drop
(total)
A
(2)#10 CU, (1)#6 EGC, PV Wire 60OV, AIR
50
18.75A
400V
0.35%
1.04%
B
(6)#10 CU, (1)#10 EGC, THWN-2, 0.75"EMT(min)
50
18.75A
400V
0.35%
C
(2)#6 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min)
10
52.5A
240V
0.17%
D
(2)#6 CU, (1)#6 N, THWN-2, 1"PVC(min)
10
52.5A
240V
0.17%
General Notes:
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
U
Q
O
It
a--'
N
O
o
O�
pl0
UQ
V
o
-�
,Z
U-)
ui
.
>
M
O
U0N0
0
aM
70
p1
LU
O
REVISIONS
Rev. #: IDate:
Utility: Snohomish PUD IDesigned by: Thomas N
1. EGC Where exposed to physical damage will be #6AWG Project Manager:
Bare CU Diallo Josey
2. If installing conduit on the roof, maintain greater than 7/8" (253) 267-4600
above the surface
3. NEC 690.12: Rapid Shutdown initiated by loss of Grid or AC Current Date:Sep 28, 2022
Disconnect
4. For supply side taps, a #6 GEC (min.) will be run separately
from the disconnect and connected to the grounding electrode E1 Single Line
with an irreversible crimp
PV Electrical Calculations
Inverter Specs
Watts
Output
AC
-
Voltage
# of
Inverters
OCPD
Total AC
Comb.
EGC
AC
W
(A)
out.(A)
OCPD
Solar Edge SE10000H
10000
42.00
240
1
60
42.0
60
#10
r
Ampe
****N/A****
0
0.00
0
0
0
****N/A****
0
0.00
0
0
0
Module Specs
at Watts
IMP
Vmp
Voc
Isc
Temp. Coef V(oc)
DC
Volt
REC 405w Alpha BoB
405
9.56
42.4
48.9
10.14
-0.24
#10
Max V(
Max,
Temp. Adjusted
37.0
52.7
Optimizer?
P485 SolarEdge Optimizer
Max current output: 15A, Max Voltage: 480V
Equipment
Solar Edge SE10000H
****N/A****
****N/A****
Mppt Input
1
1 2
1 3
1
1 2
3
1
1 2
3
Module
REC 405w Alpha BoB
****SELECT****
****SELECT****
# Modules per String
11
8
0
0
0
0
0
0
0
# Strings
1
2
0
0
0
0
0
0
0
# of Mods per group
11
16
1 0
0
0
0
0
0
0
# of Mods/inverter
27
0
0
# of Inverters
1
0
0
Total # of Modules
27
Ref.
Conductor Description
nce
Dist-a1
AL CU
A
String to Jbox
50
CU
B
Jbox to Inverter
50
Cu
C
Inverter to Disconnect
10
Cu
D
Disco. to Interconnect
10
Cu
E
F
G
H
Array Specs (Adjusted for Temperature)
Inverter
ilppt Input
-age (Imp)
age (Vmp)
Solar Edge
SE10000H
1
2
3
11.14
8.10
0.00
400.0
400.0
0.0
****N/A****
1 2 3
0.00 0.00 0.00
0.0 0.0 0.0
****N/A****
1 2 3
0.00 0.00 0.00
0.0 0.0 0.0
iltage(DC) 480.0 480.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
imps (DC) 15.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Max Array Power(STC): 10.935 kW DC
Max Continuous AC Power: 10kW AC
Interconnection Calcs
Main Breaker
200
Bus Bar
200
Max PV OCD AI lowed
40
PV OCPD Device Used
60
Tap or Breaker?
Tap
Site Conditions
ASHRAE Site:
Seattle
Low Temp (°F)
19
High 2%Temp (°F)
84
High 0.4%Temp (°F)
91
Wire
ja
(QTY) Phase
Neutral
Neutral
EGC
(AWG)
Wire Type
Conduit
Min.
Conduit
90°C
Rating
Temp
Correct.
Fill
Derate
Derated
7YC
Current
Operating
Voltage
Conductors
AWG
(QTY)
Type
Ampacity
Rating
@125%
Voltage
Drop
#10
2
N/A
N/A
#6
PV Wire 600V
AIR
N/A
40
1
100%
40.00
35
18.8
400
0.35%
#10
6
N/A
N/A
#10
THWN-2
EMT
0.75"
40
1
80%
32.00
35
18.8
400
0.35%o
#6
2
#8
1
#10
THWN-2
EMT
0.75"
75
1
100%
75.00
65
52.5
240
0.17%
#6
2
#6
1
#6
THWN-2
PVC
1"
75
1
100%
75.00
65
52.5
240
0.17%
�11P%.
.4
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
ND ITS RECEPTOR. POSSESSION DOES NOT
)NFER ANY RIGHT IN OR LICENSE TO USE IT
-�R THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
J RAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
U
Q
O
�
4-
fV
O
CO
�O)U)
oo
OI
IO
0
p �
U
Q
..
C
L
3:O
V
U
0
-0
Q
U-)
vi
__ ID
M
0^�>
UOo
0
L
Ln
E
a
M
_0
w
0
REVISIONS
Rev. #: I Date:
Designed by: Thomas N
Total Voltage Drop:1.04% Project Manager:
Diallo Josey
(253) 267-4600
Current Date:Sep 28, 2022
E2 Electrical
Calculations
Typical Placards
Custom Placards
A) NEC 2020 690.13 & 691.15
B) NEC 2020 705.12 (13)(3)(2)
C) Utility Requirement
D) Utility Requirement (Commercial Only)
D) A&R Solar Requirement (Residential
Customer -Owned)
E) A&R Solar Requirement * if combiner used
F) NEC 2020 690.13 (B)
I) NEC 2020 690.31 (D)(2)
K) NEC 2020 690.13 (B)
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFFPOSITION TO
SOLARAELS
PV PANELS
SHUTDOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD IN THE
ARRAY
L) NEC 2020 690.56 (C)
*Used with Micro Inverters or DC Optimizers
O) A&R Solar Requirement * if
multiple inverters
IAWARNING DUAL POWER SOURCE]
SECOND SOURCE IS PHOTOVOLTAIC SYSTEM
P) NEC 2020 705.12(C) & 690.59
R) AHJ Requirement * if combiner used
S) NEC 2020 230.85(1)
T) NEC 2020 230.85(3)
NEC 690.54
NEC 690.53
NEC 690.54
PLACARD
ti,=CS
L Ti
Letter Height: 1/8" Inverter
Maintain 1/4" border 1
Interconnection Point
Red / White
Letter Height: 1/8"
Maintain 1/4" border 1 Solar Edge SE10000H
Red / White
Letter Height: 1/8" (1) for each
Maintain 1/4" border 1 Disconnect or upstream
Red / White loadcenters.
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
U
Q
0
�
't
4-
N
O
0
p
U
Q
..
0 a
L
V
U
0
O
-0��
0-
vi
-0
0^�
U 0
0
0
L
Ln
�
,i
E
aM
LU
O
r_1
REVISIONS
Rev. #: I Date:
Designed by: Thomas N
Project Manager:
Diallo Josey
(253) 267-4600
Current Date:Sep 28, 2022
G4 Placards
J) NEC 2020 690.56 (C)(2)
Category Equipment QTY Notes
Solar Equipment
Modules REC 405w Alpha BOB 27
Optimizers P485 SolarEdge Optimizer 27
Inverters Solar Edge SE10000H 1
Monitoring Solar Edge Consumption Monitoring (2p20A breaker+CTs)
1
Electrical Equipment
Jbox Jbox 5
MeterBase MeterBase-125A 4 Jaw w/ 3.5" AWCAP
Meter Landis Gyr EA110000 )P29 240V
Disconnect 60A 240V 2 Pole I Heavy Duty, Fuse, Lockable
DisconnectFuse FLNR - 60 A Fuses for Disconnect (qty 1 /pole)
Solar Racking
Iron Ridge Racking BOM
Description
XR100 Black,17'
XR100 Black,14'
Kit, XR100 Bonded Splice BOSS
Universal Module Clamp, Black
Stopper Sleeve 30mm
Grounding Lug, Low Profile
Square -Bolt Bonding Attachment Hardware
1/4 x 3/4 Microinverter Bonding Hardware, T-Bolt
End Caps, 10 sets(package) XR100
IronRidge Flash Foot2, Black (Spacing: 72")
Fastener: 5/16 x 4.75" Lag(Included) (1 /mount)
System Weights
RackingWeight(lbs)
Total Weight(lbs)
Weight/Attachment(lbs)
DeadLoad(PSF)
QTY
1�
1
1 DH222NRK
3
13
6
70
32
8
51
27
2
51
250
1465
28.7
2.73
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
U
Q
O
�
4-
fV
O
O
�
�O�)Q)
oo
0
p�O
UQ
..
o 0)
L
V
U
C)
O
Q
vi
>
M
.IV
O_�e
U0
0
L
Ln
..
E
a
M
-v
w
O
REVISIONS
Rev. #: I Date:
Designed by: Thomas N
Project Manager:
Diallo Josey
(253)267-4600
Current Date:SeD 28. 2022
G5 Equipment
BOM