Loading...
Building Permit (3)Type: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED Parcel No: 00555000000500 Subdivision: 005549, 005550 Fire Sprinklers: Valuation: $4,950.00 Code Edition: 0 Site Address: 10116 241ST PL SW EDMONDS,WA 98020-5746 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: PETERSON-FOUNDATION REPAIR Applied: 9/15/2022 Issued:10/13/2022 Final: Expiration Date: 10/13/2023 Issued by: BAC I WA State Contractor L & I #: MATVEFR837K5 I CONTACTS NAME TYPE NAME ADDRESS T PHONE EMAIL APPLICANT PERMIT MANAGER 18915 16TH AVE S, SEATAC WA (253)327-1650 PERMITS@GOMATVEY.COM 98188 CONTACT MATVEY FOUNDATION 18915 16TH AVE S, SEATAC WA (206)660-7971 permits@gomatvey.com REPAIR 98188 CONTRACTOR MATVEY FOUNDATION 18915 16TH AVE S, SEATAC WA (253)327-1650 permits@gomatvey.com REPAIR INC 98188 RANDOLPH & BARBARA 10116 241ST PL SW, EDMONDS OWNER PETERSON WA 98020 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 9/19/22 R23162 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $217.00 $217.00 10/13/22 R23678 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $184.45 $184.45 9/19/22 R23162 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 10/13/22 R23678 TOTALS: $447.95 $447.95 • • CONDITION TYPE STATUS NOTES Printed: Thursday, October 13, 2022 2:16:17 PM 1 of 3 'RESIDENTIAL BLDG PermitCity • • • • - EL 98020 1 . •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Special inspections have been called for on this project and are noted on the approved construction plans. It is the owner and or contractors responsibility to ensure that reports SPECIAL INSPECTION BUILDING FOR are provided to the City on a weekly basis. Special inspections required for this project DIVISION INFORMATION are: 1. Pin Pile Installation 2. Foundation Bracket Installation 3. Grading and Soils 4. Stabilization Base and Hardware Installation. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. Printed: Thursday, October 13, 2022 2:16:17 PM 2 of 3 RESIDENTIAL BLDG Permit PERMIT NUM of Edmonds AveCity N, Edmonds WA 98020 1 www.edmondswa.gov 022• INSPECTIONSOnline INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-5 BLDG SPECIAL Special inspections required for this project are: 1. Pin INSPECTION Pile Installation 2. Foundation Bracket Installation 3. Grading and Soils 4. Stabilization Base and Hardware Installation. Printed: Thursday, October 13, 2022 2:16:17 PM 3 of 3