Permit_BLD2022-1453CITY OF EDMONDS
Building Permit
My6uildingPermitxom
Permit Information
Permit Number
RI ngn7q_1d_4 Issued Date
10/21/2022
Expiration Date
4/19/2023
Job Address
8726 185TH PL SW Fee Paid
$146.50
EDMONDS, 98026 Order Confirmation
1181272
Floor
Related Permit#
Suite
Application ID
1219475
Contact Information
Contact Name
Brandon Foster Contractor
ACHTEN'S QUALITY RFNG CON INC
Phone Number
(253) 254-4835
Property Owner
David S And Shana P Kesselring LNI License#
ACHTEQR923CM
Address
8726 185TH PL SW EDMONDS, WA Phone#
(253) 254-4835
City Bus. License#
VERIFIED
Property Owner Phone
Tenant Name
Job Description
A (Single Family Residential) (Re -Roof Replacement - Roofing Only) Residence project involving ( The height of the
building is not increasing.)
Conditions - Post Permit on site. Do not cover until inspected.
Do not start any work until the preconstruction meeting is completed.
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent, including an appropriately licensed contractor.
I have furnished true and
correct information. I will comply with all provisions of law and ordinances governing this type of construction work, whether specific herein or not. By
submitting this application I give the jurisdiction permission to enter the property to perform inspections. I understand that failure to comply with the
above may result in revocation of the permit.
Applicant: Brandon Foster
Page 1 of 2
t °F EDAf
0
1893
CITY OF EDMONDS
Building Permit
My6uildingPermitxom
Permit Information
Permit Number
RI n9n99_1d-r;'1
Issued Date
10/21/2022
Expiration Date
4/19/2023
Job Address
8726 185TH PL SW
Fee Paid
$146.50
EDMONDS, 98026
Order Confirmation
1181272
Floor
Related Permit#
Suite
Application ID
1219475
Inspections
Inspection IVR Inspector Date Inspection IVR Inspector Date
Tear Off or Sheathing
Building Final
Inspection Scheduling
The issuance of this permit in no way constitutes approval from any other agencies having regulatory authority over
the facility and this construction activity.
It is the responsibility of the property owner to obtain any and all such
required approvals.
Page 2 of 2