2022-10-26 Planning Board PacketPlanning Board Remote Zoom Meeting Agenda 121 5th Ave. N. Edmonds, WA 98020 www.edmondswa.gov Michelle Martin 425-771-0220 Wednesday, October 26, 2022 7:00 PM Virtual Online Meeting 1. 2. A. Remote Meeting Information Join Zoom Meeting: https://edmondswa- gov.zoom.us/j/88526558062?pwd=YUtoNGFFQ210Q2U5SDdwRUFadX15dz09 Meeting ID: 885 2655 8062. Passcode: 598700 Call into the meeting by dialing: 253-215-8782 Phyiscal Location The Planning Board members will be meeting remotely for this meeting and the public may as well at the zoom information above. However, given the expiration of Gov. Inslee's proclamation on open public meetings, a physical location to participate in the meeting must be provided. For this meeting the physical location provide is Edmonds Waterfront Center Community Room B located at 220 Railroad Avenue. Land Acknowledgement for Indigenous Peoples We acknowledge the original inhabitants of this place, the Sdohobsh (Snohomish) people and their successors the Tulalip Tribes, who since time immemorial have hunted, fished, gathered, and taken care of these lands. We respect their sovereignty, their right to self-determination, and we honor their sacred spiritual connection with the land and water. Call to Order Attendee Name Present Absent Late Arrived Approval of Minutes Generic Agenda Item (ID # 6935) Approval of Minutes Background/History N/A Staff Recommendation Review and approve draft minutes from the October 12th meeting. Planning Board Page 1 Printed 1012112022 Remote Zoom Meeting Agenda October 26, 2022 ATTACHMENTS: • PB221012 draft (PDF) 3. Announcement of Agenda 4. Audience Comments 5. Administrative Reports 6. Public Hearings A. Generic Agenda Item (ID # 6940) 2023-2028 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) Public Hearing Background/History The City's Capital Facilities Plan (CFP) Element is updated annually and identifies capital projects for at least the next six years, which support the City's Comprehensive Plan. CFP projects are capital improvement projects that expand existing facilities/infrastructure or provide new capital facilities in order to accommodate the City's projected population growth in accordance with the Growth Management Act. Thus, capital projects that preserve existing capital facilities are not CFP projects. These preservation projects are part of the six -year capital improvement program (CIP) along with capital facility plan projects that encompass the projected expenditure needs for all city capital related projects. Staff Recommendation Conduct Public Hearing for the 2023-2028 Capital Facilities Plan & Capital Improvement Program ATTACHMENTS: • Parks CIP_CFP 2023-2028 (PDF) • Public Works 2023-2028 CIP-CFP (PDF) 7. Unfinished Business A. Generic Agenda Item (ID # 6937) Comprehensive Plan Visioning Summary Background/History The City of Edmonds kicked of the community visioning process for the Comprehensive Plan update with a six -week themed outreach over the summer. Over 8,500 comments were received via survey, email and in person commentary throughout the process, which included a range of activities in different areas throughout the City. City staff and the PRR consultant team cataloged all comments and organized them into eight overarching themes chosen for capability with the Comprehensive Plan elements. The overarching themes are: • Community Culture Planning Board Page 2 Printed 1012112022 Remote Zoom Meeting Agenda October 26, 2022 • Urban Design • Economic Development • Housing • Land Use • Parks, Recreation, and Open Space • Transportation • Other (for comments that could not be reliably categorized) In collaboration with PRR, City staff will draft community vision and value statements, informed by what we heard through the visioning process. Finalizing a vision and value statement will be an iterative process, with feedback from the community, Planning Board, and City Council. However, as the vision is reviewed and refined, it will be important to stay consistent with the initial 8,500 comments to be held accountable for the collective view and to remain inclusive and representative. The final statements will guide development of the Comprehensive Plan. Staff Recommendation N/A ATTACHMENTS: • Edmonds Visions Survey Summary (PDF) 8. New Business A. Generic Agenda Item (ID # 6920) Development Code Update Work Plan Background/History This is a new item for the Planning Board. Staff introduced the topic to Council on September 27. Staff Recommendation Staff will present the proposed plan for the development code modernization work and discuss a proposal for a minor change code amendment process. ATTACHMENTS: • Attachment 1 - Development code update slides 10.26.22 (PDF) • Attachment 2 - PB draft ECDC 20.80 Text and Map Changes_minor amendment (PDF) B. Motion to make a budget request to City Council to fund a communications system that supports remote participation at in -person PB meetings. 9. Planning Board Extended Agenda A. Generic Agenda Item (ID # 6938) Planning Board Page 3 Printed 1012112022 Remote Zoom Meeting Agenda October 26, 2022 Extended Agenda Background/History N/A Staff Recommendation Review Extended Agenda ATTACHMENTS: • 10.20.2022 Extended Agenda (PDF) 10. Planning Board Chair Comments 11. Planning Board Member Comments 12. Adjournment Planning Board Page 4 Printed 1012112022 2.A Planning Board Agenda Item Meeting Date: 10/26/2022 Approval of Minutes Staff Lead: Mike Clugston Department: Planning Division Prepared By: Michelle Martin Background/History N/A Staff Recommendation Review and approve draft minutes from the October 12th meeting. Narrative October 12th draft meeting minutes attached. Attachments: PB221012 draft Packet Pg. 5 2.A.a CITY OF EDMONDS PLANNING BOARD Minutes of Webinar Meeting October 10, 2022 Chair Pence called the virtual meeting of the Edmonds Planning Board to order at 7:04 p.m. LAND ACKNOWLEDGEMENT FOR INDIGENOUS PEOPLES Board Member Campbell read the Land Acknowledgement. Board Members Present Staff Present Roger Pence, Chair Kernen Lien, Planning Division Manager Judi Gladstone, Vice Chair Angie Feser, Parks, Recreation, & Human Services Director 'c Mike Rosen Shannon Burley, Parks, Recreation, & Human Services Deputy Director Beth Tragus-Campbell (alternate) Kyle Woods, Parks Planner & Capital Projects Manager ° Lily Distelhorst (student rep) Rob English, City Engineer c Oscar Antillon, Public Works Director a Board Members Absent Deb Powers, Urban Forest Planner Q Matt Cheung (excused) $ Todd Cloutier Richard Kuehn (excused) READING/APPROVAL OF MINUTES MOTION MADE BY BOARD MEMBER ROSEN, SECONDED BY BOARD MEMBER CAMPBELL, TO APPROVE THE MINUTES OF SEPTEMBER 14, 2022 AND SEPTEMBER 28, 2022 AS PRESENTED. MOTION PASSED WITH VICE CHAIR GLADSTONE ABSTAINING. ANNOUNCEMENT OF AGENDA THERE WAS UNANIMOUS CONSENT TO APPROVE THE AGENDA AS PRESENTED. AUDIENCE COMMENTS None. ADMINISTRATIVE REPORTS A. Parks, Recreation & Human Services Department — Q3 Update Parks, Recreation & Human Services Department Director Angie Feser gave the quarterly update. Planning Board Meeting Minutes October 10, 2022 Page 1 of 10 Packet Pg. 6 2.A.a Administration/Park Planning Division: • Transfer of Cultural Arts Division to Community Services & Economic Development Department effective September 1. • 2023 Budget Development — Staff has been busy with both Operating and Capital budgets. • All Civic Park Memorial Benches/Tables have been adopted out and sold. This generated $66,000 to go towards the park. • Salmon Safe Certification draft went to Council. • Yost Park Bridge(s)/Shell Creek Study Proposal (2023 budget) — There is a larger study to look at all seven bridges and the trails that cross the streams. • Library Flood / Plaza Room support - Displaced staff and materials from the library have been moved to the Plaza Room which is normally rented out. • Kyle Woods has started a park asset inventory project (in-house). • Supported Special Events: Summer market, 4th of July, Taste Edmonds, Car Show, Safety Event, Oktoberfest Director Feser gave an update on Civic Park. It took a long time to build the base of the site. A lot of progress is now starting to be visible. The sod is in for the playfields and the lawn area. The skate park has been done for a while. The concrete path now winds throughout the site. There has been a lot of development on the inclusive playground. The prefabricated restroom will be brought in next week. The stormwater mitigation on 96th ° Avenue right of way adjacent to Yost Park was approved for funding through ARPA ($450,000). The allocation c for that was in Civic Park and has now been freed up to help with Civic Park. a Q Parks Maintenance: r_ • Aquatics — Yost Pool is in operation 7 days/week; the spray pad is now closed. • Seasonal staff extension into the fall has been especially helpful since there were fewer individuals this year. • Supported special events — Uptown Market (6), Summer Market, 4th of July, Taste Edmonds, Car Show, Safety Event, Oktoberfest • New installation at 6th & Bell • Highway 99 project plant inspections • Bill Anderson viewer at the marsh installation/repair Recreation Programming: • Q2 Reservations were reviewed. They are much higher than last year. • Leagues: adult summer softball (63 teams), pickleball (18 teams), volleyball (14 teams), 3 on 3 basketball (6 teams) • Day Camp re -instated (312 registrations, $21,250 scholarships from grant) • Contracted camps (21) • Outdoor Movies (4) — 4 locations with a focus on equity of locations • New Fitness Classes • Environmental Education — Discover Camps (5 camps/61 kids), Discovery Interpretive Tables at Olympic Beach, City Park, and Mathay-Ballinger Park • Beach Ranger Naturalists patrolled beaches (Memorial through Labor Day) • Birdfest (September 11) Planning Board Meeting Minutes October 10, 2022 Page 2 of 10 Packet Pg. 7 2.A.a Human Services: • Supported Snohomish County purchase of enhanced shelter in Edmonds — a hotel on Highway 99 • Provided Frances Anderson Center workspace for South Snohomish County Community Resource Advocate (1 day/week) • ARPA Funding — Ordinance revision support • Snohomish County — south county housing enhancement • Over 50 referrals/38 active clients with 40 needs presented/26 fully met • Relocation of long-term motel vouchers (5) for Emergency Shelter • Program Manager increased from part time to full time. Boards/Commissions — The department has staffed and provided public access to all remote City Board and Commission meetings as per OPMA (Open Public Meetings Act). The Cemetery Board is at full capacity. The Youth Commission has filled 8 positions. 2022 Q4 Upcoming: y • 2023 Budget — Staff will continue to work through the budget with Council. �? • Civic Park Construction • 96t' Avenue Infiltration Project — This must be completed before Civic Park can open. o • Parks small capital projects and greenhouse — Kyle Wood is leading this effort • Parks Maintenance transition — Rich Lindsay will be retiring after 51 years with the City. o • Street Tree Lights in downtown a Q. • Yost Pool winter operations will continue. Q • Fall recreation programs are up and running. Chair Pence asked if the Civic Park will be open for public activities like festivals. Director Feser replied that the park was designed with the intent to handle festivals and events. Vice Chair Gladstone asked for an update on park land acquisition. Director Feser said she did a park land presentation to Council in September but wasn't given any direction to proceed with any acquisitions. Vice Chair Gladstone also asked about staffs intentions to engage the Planning Board with budget development. Director Feser replied that the CFP and CIP would be introduced to the Planning Board tonight. Staff will be soliciting recommendations, suggestions, and questions. They will return in two weeks to do a public hearing on the same program. Board Member Campbell asked how water runoff will be addressed at Civic Park. Director Feser replied that all runoff will be collected and treated on site before it makes its way back through the natural system. Civic Park has a very high water table and big pockets of peat. The 96tb Ave mitigation work is being done as part of addressing this. NEW BUSINESS A. Presentation of Proposed 2023-2028 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) Planning Board Meeting Minutes October 10, 2022 Page 3 of 10 Packet Pg. 8 2.A.a City Engineer Rob English made a PowerPoint presentation regarding the proposed Public Works & Utilities 2023-2028 CFP and CIP. This includes transportation; utilities (water, stormwater sewer); facilities; and the wastewater treatment plant. Transportation: • 2023 Pavement Preservation Projects — 2023 Pavement Preservation Program for maintaining existing street infrastructure ($1.5 M); Main Street Overlay from 6th - 9th Ave; 76th Avenue Overlay Close-out • 2023 Safety & Capacity Projects — Highway 99 Revitalization/Gateway, Highway 99 Stage 3 244t' Street — 238t' Street; Highway 99 Stage 4 224th Street — 220t' Street; 76th Avenue/220th Street Intersection; SR-104 Adaptive System; Guardrail Improvements; and Traffic Signal Updates • 2023 Active Transportation Projects & Planning — Citywide Bicycle Improvements; Elm Way Walkway; Transportation Plan Updates; Traffic Calming Program; Pedestrian Safety Program; Citywide Street Lighting Study; Green Streets • 2023 Water Utility — 2023 Replacement Program; 2024 Replacement Program; Yost & Seaview Reservoir Assessment; and Waterline Overlays • 2023 Stormwater Utility — Storm & Surface Water Comprehensive Plan; Perrinville Creek Basin Projects; Edmonds Marsh Water Quality Improvements; Lake Ballinger Floodplain; Stormwater Overlays; Strom & Surface Water Comprehensive Plan; and 2024 Replacement Program • 2023 Sewer Utility — 2023 Replacement Program; 2024 Replacement Program; Cured in -place pipe rehabilitation; Sewerline Overlays • 2023 Wastewater Treatment Plant — WWTP Clarifier 1 Rehabilitation; Vacuum Filter Replacement; Nuvoda Pre -Design; Joint Sealant Public Works & Utilities — Facilities: Boys & Girls Club, Cemetery Building, City hall, Fishing Pier, Frances Anderson Center, Fire Station 16, Fire Station 17, Fire Station 20, Historic Log Cabin, Historic Museum, Library, Meadowdale Club House, Old Public Works, Parks Maintenance Building, Public Safety, Public Works O&M, Wade James Theater, and Yost Pool House Comments and Questions: Vice Chair Gladstone asked about the strategy for water and sewer pipeline replacement since the amounts for 2024 are significantly lower. Mr. English explained that the slideshow is only showing what is in the budget for 2023. The amounts shown for 2024 are just for the design of the 2024 project. The six -year projection would show the full amounts. Vice Chair Gladstone then referred to the Department of Ecology's new general permit for nutrients and asked if that is in the six -year CIP. Mr. English replied that it is not, but the Nuvoda Pre -Design will start to address the nitrogen issue. The work that is done in 2023 will generate numbers for a project. Board Member Campbell referred to the water and sewer line replacements and asked how they are prioritizing pipe replacement. Mr. English replied that the Comprehensive Plan is the initial planning level document that identifies the age of the pipes, whether there is a capacity or flow issue, and what other capital projects are occurring in the city. These are generally the drivers for identifying pipes for replacements. Board Member Rosen acknowledged the thoughtfulness and hard work that goes into creating a document like this. He asked: Planning Board Meeting Minutes October 10, 2022 Page 4 of 10 Packet Pg. 9 2.A.a • How do projects get on the list for prioritization? Mr. English replied that in general it comes from the Comprehensive Plan. They are usually ranked within the Plan. From there they look at funding opportunities. • He asked about the level of allocation for the Boys & Girls club since the building is going away. Director Feser replied that they just learned last week that the Boys & Girls Club intends to demolish the existing building and build a new one on that site. This budget was put together before that. • How are the budget and the Comprehensive Plan connected in their development? Mr. England replied that they build both at the same time to keep them as closely aligned as possible. He reviewed a diagram showing the inputs that go into project selection — Mayor & City Council, available funding, concurrency, safety, project delivery capacity, maintenance issue, grant sources and competitiveness, and Comprehensive Plan priority. • Is the WWTP on schedule to meet expectations for budget, schedule, and performance? Mr. England replied that the carbon recovery project is on schedule to be finished in December, but it will take another several months to get things operational with new equipment and processes. The goal is to have things fully online and functioning by spring. The work is about 90% done at this point. There have been some challenges with the contractor, but they are working through those issues. • He referred to the escalator for inflation and asked about confidence in the budget given the increased inflation and CPI rates. Mr. England thought that they increased the plug rate from 3% to 6% for the first few years because of the current economic climate. C • Is it correct that there about a dozen sidewalks that will be installed? Mr. England replied that there are c projects in the six -year plan to provide opportunities to go out and apply for grants. Most funding Q. agencies want to know that the project is in the six -year Transportation Improvement Program or the 0. Q six -year Capital Improvement Program. Staff continues to apply for grants, but it is a challenge to find $ funding for sidewalks. Chair Pence referred to the list of paving projects and noted that there were some projects in Esperance. He asked why the City of Edmonds would be building capital improvements in the County. Mr. England replied that both of those projects are in the Transportation Comprehensive Plan and they both cross both Edmonds and the unincorporated Snohomish County area. The 228th corridor is a critical transportation connection providing an east -west corridor for the community as well as citizens living in that area. The plan is to eventually secure funding to improve that facility. The City has had discussions with Community Transit about a future potential transit line once those improvements are made. Chair Pence agreed on the importance of this but wondered about Snohomish County's responsibility to be building those improvements. Why should the citizens of that area be interested in annexation if the City is improving their neighborhoods without being annexed. Mr. England clarified that these are not active projects, and there is no money in the budget for them. If they were to get funding, the County would need to be a partner in those projects. Vice Chair Gladstone asked if pipeline replacement costs include relocation that is often necessary with transportation projects. Mr. England replied that if there were a need for replacement, the funding would come out of that replacement program. Vice Chair Gladstone said she hopes that when the City is doing improvements on 228ffi they will coordinate with the local district who is putting a new well in on 228t'. She then referred to the funding difficulty with sidewalks and asked if there is a way to just do a dedicated walkway with a curb barrier to make it safer. Mr. England replied they typically look at doing curbs, gutters, and sidewalks together. There may be times when they could just do a curb and asphalt, but there are challenges with this related to ADA compliance and maintenance. Planning Board Meeting Minutes October 10, 2022 Page 5 of 10 Packet Pg. 10 2.A.a Director Feser reported on the Parks portion of the 2023-2028 CIP/CFP. She reviewed the PROS Plan capital recommendations related to acquisitions to fill park system gaps; open space and conservation acquisitions; park development and enhancements; Yost Pool replacement; trail connections; as well as ADA, accessibility, and other user convenience enhancements. She also reviewed PROS plan goals related to engagement; diversity, equity, and inclusion; parks, trails, and open space; waterfront use and access; natural resource and habitat conservation; climate change, adaptation, and resiliency; recreation programs and facilities; cultural services; and park operations and administration. She explained the project format and funding sources, noting that the 3% increase compounded annually is what was used for the Parks CIP/CFP because it was based on the PROS plan. She acknowledged it may not be accurate now but stressed that the PROS plan is not a budget document; it is a planning document. The largest funding source is unsecured grant funding (74%) but other significant sources include REET (Real Estate Excise Tax) funds, park impact fees, and the newly formed Tree Fund. Current/Ongoing Capital Projects include Civic Park redevelopment, 966' Ave infiltration project (Civic Park SW mitigation), Greenhouse installation, and deferred maintenance/small capital projects. Director Feser reviewed a distribution map showing each project with its location. She stressed that there are three big neighborhood parks that do not have a site yet. 2023 Projects: • Johnson Property — demolition and securing 1-acre property; Master Plan/Public Input Process — 2025; estimated cost $282,000 • Meadowdale Playfields — inclusive playground, dugout roofs, light fixtures; estimated costs TBD • Mathay Ballinger Park — paved loop pathway, shelter with picnic tables, permanent restroom; estimated cost $499,300 • Yost Park & Pool — playground replacement (2023), trail/bridge repair (2024), tennis court resurface (2025), pool upgrades (2025); estimated cost $958,200 2024 Projects: • Columbarium Expansion Phase II — design complete, Fund 130 and 137 (Cemetery Trust Fund); estimated cost $159,000 • Olympic Beach Park — renovation of existing restroom; estimated cost $53,000 • Pine Street Park — shelter with picnic tables (2024), paved pathway (2024), canopy shade trees (2024); estimated cost $164,400 • Sierra Park — playground replacement; estimated cost $187,500 • Neighborhood Park SE 1- park planning (2024), park construction (2025); estimated cost $899,100 plus parkland acquisition (2023) • Waterfront Walkway Completion — Ebb Tide Section — addressing accessibility, connect Brackett's Landing North to Marina Beach Park, currently under legal review; estimated cost $819,500 • Maplewood Hill Park — playground replacement (2024), oldest playground in park system; estimated cost $144,900 Other: Marsh Estuary Restoration (2025) — estimated cost $14,642,500 plus restoration plus Marina Beach Park renovation Q Planning Board Meeting Minutes October 10, 2022 Page 6 of 10 Packet Pg. 11 2.A.a • Elm Street Park— habitat restoration (2026), nature playground (2026), shelter with picnic tables (2026); estimated costs $225,100 • Neighborhood Park SR 99 — planning (2025), construction (2026); estimated cost $926,100 plus parkland acquisition (2024) • Neighborhood Park SE 2 — planning (2025), construction (2027); estimated cost $953,900 plus parkland acquisition (2025 • 4th Avenue Cultural Corridor — parks project? No funding identified; estimated costs $9,206,600 • Park & Facilities Maintenance Building — 40+ year old building; estimated cost $5,762,600 • Seaview Park Restroom — ADA improvements (2027), replacement or renovation of restroom; estimated cost $417,900 • Yost Pool Replacement — Pool is 50 years old, funding source TBD; estimated cost $23,881,00 Programs: • Citywide Park Improvements/Capital Replacement —backlog of 50+projects; small capital projects and deferred maintenance; job order contracting; estimated cost $2,700,000 • Signage and Wayfinding — trail identification, orientation markers, safety and regulatory messaging, park hours, park rules and etiquette, interpretive information and warning signs; estimated cost $51,500 Acquisitions: ° • Parkland Acquisition — neighborhood parks SE 1, SR99 & SE 2; acquisition as feasible; estimated cost 'o $5,230,500 Q. Q. • Interurban Trail Expansion — acquisition of lands, easements and/or right of ways; estimated cost g $985,585 $ There is a currently a decision package that was put in around Yost Park and Shell Creek to deal with the erosion that is happening there. Right now, this is ARPA funded ($220,000) but there is talk about switching it to a capital project. This would include an existing conditions analysis, critical areas report, cultural resources analysis, recommendations, and action plan. Capital projects maybe added by Council moving forward. Prioritization of 2023 projects based on what was heard from the community, what is in the PROS plan and the ability to get them done: 1. Civic Park completion (in process) 2. Green house completion (in process) 3. Mathay Ballinger Park improvements (2022 PROS Plan CIP) 4. Yost Park Playground (2022 PROS Plan CIP) 5. Johnson Property demolition (2022 PROS Plan CIP) 6. Yost Park/Shell Creek Study Comments and Questions: Board Member Campbell recommended moving the Park and Facilities maintenance building up in the schedule, if possible, based on current conditions and the expansion of the Parks Department. Board Member Rosen concurred. UNFINISHED BUSINESS Planning Board Meeting Minutes October 10, 2022 Page 7 of 10 Packet Pg. 12 2.A.a A. Tree Code Amendments AMD2022-0004 Urban Forest Planner Deb Powers presented the remaining minor tree code amendments and some related moderate/major code amendments. She explained that the new list shows potential code amendments arranged by policy impact. Minor Code Amendments #1-11 have already been discussed at a previous meeting. Ms. Powers stressed that the intent of the amendments is to clarify and simplify the code, not change the intent. Minor Code Amendments #12-19 / Easy to Fix per Scope: 12. Add "subject to review" 13. Clarify when a permit is required 14. Identify priorities, incentives, and variations ... 15. Emphasize Conservation Subdivision Design 16. Clarify requirement for replacement trees 17. Use chart format, add "viable" 18. Reformat to clarify order of priority: retain, plant pay fee 19. Consistently reference "City Tree Fund" r Ms. Powers then introduced possible related moderate/major code amendments which change the existing code: 2 12. Define tree condition for retention with development c 13. Restructure as "Allowances" 17. Consider replanting option for >24" DBH (diameter at breast height) trees (major) 6. Retain trees with more development types (major) Q 7. Define tree condition for retention 20. Reorganize ECDC 23.10 21. Define location of high priority trees retained with development. N Chair Pence expressed a concern that if they make "major" or "moderate" changes there is a possibility that they will be undoing what they did in the minor category. He wondered if they should tackle the major or moderate amendments first. Ms. Powers explained why they were progressing through the code amendments this way. Board Member Campbell said she would like to see the minor changes included (redlined) when reviewing the minor and major code amendments so they can better understand what they are considering. Ms. Powers agreed that would simplify the process. She stated she would show all the minor code changes in a marked -up code and they could move forward with looking at the moderate and major code amendments. She reviewed the next steps on the project timeline and suggested that November 30 could be a special joint meeting with the Tree Board. Chair Pence thought that would be helpful and indicated he and Tree Board Chair Janelle Cass would try to get together prior to that. Board Member Rosen also encouraged the joint meeting and the idea of looking at all the minor code amendments incorporated into the code. He referred to public engagement on the timeline and asked what they have in mind. Ms. Powers replied they are behind schedule, but they are internally reviewing an RFP to send out to find a consultant to help with developing and implementing the plan. Board Member Rosen expressed concern about the timeline. He noted that they are moving on from minor amendments to moderate and major ones, but the public stakeholders haven't had an opportunity to weigh in, and staff doesn't have an RFP out yet. He thought this could send the message that they don't really care and are just going to move ahead. Planning Board Meeting Minutes October 10, 2022 Page 8 of 10 Packet Pg. 13 2.A.a Ms. Powers pointed out that the minor amendments they have finished are things that don't change the intent of the code. The joint meeting with the Tree Board is just the first of several that will likely be happening. The purpose is just to check in with each other at this early stage in the process. Board Member Rosen didn't think they should assume that the public would necessarily see the minor amendments the same way they do. He thinks it sends a poor message if they go too far without stakeholders. Ms. Powers concurred. Mr. Lien agreed that the sooner they could get public engagement the better, but he thought it would be fine to have the joint meeting with the Tree Board early in the process and prior to the public engagement. There was consensus to have a joint meeting to touch base with the Tree Board about the minor code amendments (integrated into the code) and talk about what the public engagement might be. There was agreement to not go any further with code changes until the City has a consultant on board and has developed the public engagement plan. Chair Pence referred to a letter from Natalie Seitz and noted that this would be in line with her concerns about stakeholder involvement. B. City Council Joint Meeting Chair Pence said he talked with Council President Vivian Olson about doing a joint meeting with Council on Tuesday, October 25. He generally reviewed what he expected to cover in the presentation to Council based on her suggestions. He solicited any ideas from other board members. Board Member Rosen stated the need to be clear about the purpose of the meeting. He also wanted to make sure there was ample time to hear from all the council members. If there were things the Council brought up last time for the Board to do, they might want to address those. Chair Pence agreed and indicated he would refer to the minutes and/or recording of the last joint meeting to review any requests the Council had made. Vice Chair Gladstone suggested having some discussion with the Council about how they want the interchange with the Planning Board to be to be the most useful. She also wondered about having some discussion around the role of the Planning Board in thinking about Esperance. Chair Pence said he had never detected much interest from the Council in pursuing the Esperance issue and wasn't prepared to lay out this out as a topic of the Board's interest. Board Member Rosen suggested reaching out to Council President Olson to see what her interest is on this topic. Vice Chair Gladstone recommended explaining how it comes up in the Planning Board discussions. Board Member Campbell noted that Esperance does tailor some of the conversations the Planning Board has. Chair Pence noted he wanted to discuss what the Board's role is after November 5 when the Council rolls out the draft Vision Statement. How does this become part of a community conversation about the vision of the City of Edmonds? Board Member Rosen thought the Board would have opinions and recommendations on that topic. He agreed it would be helpful to have information about this process from the Council prior to the release of that draft. There was some discussion about having a subcommittee to discuss what the Board thinks its role should be in the roll out of the Vision Statement. Board members spoke in support of meeting in some form prior to the joint meeting to build a consensus. Board Members Pence, Campbell, and Rosen indicated an interest in meeting as a subcommittee prior to the joint meeting. Mr. Lien indicated he would confirm that this would be okay with the city attorney. Planning Board Meeting Minutes October 10, 2022 Page 9 of 10 Packet Pg. 14 2.A.a PLANNING BOARD EXTENDED AGENDA Chair Pence reviewed the extended agenda. He expressed frustration at the enormous amount of information they received in their packet related to the CIP/CFP last week. He requested that the information be reduced or dripped out incrementally so that the Board can make thoughtful decisions. Vice Chair Gladstone recommended discussing this topic at the retreat if they are having one. Chair Pence asked about the public notice for the public hearing. Mr. Lien reviewed how it is noticed. Chair Pence recommended increasing the scope of the notices. MOTION MADE BY BOARD MEMBER CAMPBELL, SECONDED BY BOARD MEMBER ROSEN, TO SCHEDULE A SPECIAL MEETING ON NOVEMBER 30. MOTION PASSED UNANIMOUSLY. PLANNING BOARD CHAIR COMMENTS None. PLANNING BOARD MEMBER COMMENTS None. ADJOURNMENT: The meeting was adjourned at 10:15 p.m. Planning Board Meeting Minutes October 10, 2022 Page 10 of 10 Packet Pg. 15 6.A Planning Board Agenda Item Meeting Date: 10/26/2022 2023-2028 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) Public Hearing Staff Lead: Rob English Department: Planning Division Prepared By: Kernen Lien Background/History The City's Capital Facilities Plan (CFP) Element is updated annually and identifies capital projects for at least the next six years, which support the City's Comprehensive Plan. CFP projects are capital improvement projects that expand existing facilities/infrastructure or provide new capital facilities in order to accommodate the City's projected population growth in accordance with the Growth Management Act. Thus, capital projects that preserve existing capital facilities are not CFP projects. These preservation projects are part of the six -year capital improvement program (CIP) along with capital facility plan projects that encompass the projected expenditure needs for all city capital related projects. Staff Recommendation Conduct Public Hearing for the 2023-2028 Capital Facilities Plan & Capital Improvement Program Narrative The 2022-2027 Capital Facilities Plan (CFP) and Capital Improvement Program (CIP) are being presented in one document with project lists that identify Capital Facility projects and project information sheets for all projects and programs. The Public Works and Utilities Department proposed 2023-2028 CFP/CIP is included as Attachment 1. The Parks, Recreation & Human Services Department proposed 2023-2028 CFP/CIP is included as Attachment 2. Following the Planning Board's Public Hearing and recommendation, the City Council will also hold a Public Hearing prior to final approval. Attachments: Parks CIP—CFP 2023-2028 Public Works 2023-2028 CIP-CFP Packet Pg. 16 A!. -k- EDMON DS PARKS, RECREATION & HUMAN SERVICES 2023-2028 PROPOSED CAPITAL FACILITIES PLAN & CAPITAL IMPROVEMENT PROGRAM EDMONDS PARKS, RECREATION & HUMAN SERVICES "ILA Table of Contents Director's Letter................................................................ 2 CIP/CFP Worksheets.......................................................3-6 Project Distribution Map ................................................. 7 Project Descriptions......................................................8-28 Program Descriptions...................................................29-32 Acquisition Descriptions...............................................33-35 FundDetail..................................................................... 36 Fund 332 Detail............................................................37-38 Fund 125 Detail.............................................................. 39 Fund 126 Detail.............................................................. 40 Fund 143 Detail.............................................................. 41 Fund 137 Detail.............................................................. 42 Project Comparison........................................................ 43 6.A.a EDMONDS PARKS, RECREATION & HUMAN SERVICES October 12, 2022 Members of the City Council, Parks & Planning Board, Staff and Citizens of Edmonds, It is an honor to present the 6-year Parks Capital Improvement Program (CIP) & Capital Facilities Plan (CFP). The CIP/CFP serve as a long-range planning guide identifying parks capital projects and related funding sources, both secured and unsecured. The CIP/CFP is updated each year and presented in conjunction with the operating budget. In 2022 the Parks, Recreation and Human Services Department completed the 2022 Parks, Recreation and Open Space (PROS) Plan based largely on citizens priorities and multiple rounds of review prior to adoption. The 2022 PROS Plan goals are: 1. Encourage and facilitate meaningful public involvement in park and recreation planning. 2. Decrease barriers and provide increased opportunities for participation and representative cultural, heritage and art programs, events representing the diversity of Edmonds demographics. 3. Provide an interconnected park system that offers a wide variety of year-round recreation opportunities and experiences which support and enhance Edmonds' cultural identity and the natural environment. 4. Preserve and pursue opportunities to expand public access and enjoyment of Edmonds' waterfront. 5. Conserve and provide access to natural resource lands for habitat conservation, recreation, and environmental education. 6. Adapt to climate change and increase local park system resiliency by improving environmental conditions, stewardship and sustainability in parks, trails, open spaces and recreation facilities within planning, development, maintenance, and operations. 7. Provide a varied and inclusive suite of recreation opportunities and experiences to promote health and wellness, year-round activity and social engagement. The adopted 2022 PROS plan included a CIP document which is consistent with this 2023-28 CIP/CFP. In 2023 the Parks, Recreation and Human Services Department will focus on completion of the largest ever City of Edmonds Parks Capital project, the redevelopment of the 8-acre Civic Center Playfields. In addition, the department will continue to focus on deferred maintenance of existing parks and recreation facilities and playground renovations and acquisition of additional parkland to fill system gaps in park services and to address inequities in parkland distribution. Your Parks, Recreation and Human Services Department is proud to serve the citizens of Edmonds and we look forward keeping the Edmonds Parks safe and enjoyable for all. Sincerely, Angie Feser Edmonds Parks, Recreation & Human Services Director 425-771-0256 Angie. Feser@ EdmondsWA.gov Page 2 Packet Pg. 19 2023-2028 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN 6.A.a Costs inflated at 3% per year Project CFP Project Site & Description 2023 2024 2025 2026 2027 2028 6-Year Toti # Johnson Property R2 Demolition and securing existing site, Master plan for park use. Site $ 200,000 $ $ 82,000 $ $ $ $ 282,0( P5 development not included in estimate. Meadowdale Playfields R3 Renovations as suggested by the City of Lynnwood and consistent with TBD TBD TBD $ $ $ $ existing ILA. To include addition of dugout roofs, light replacement and playground upgrade. D5 Mathay Ballinger Park D6 Park improvements to include a new paved loop pathway, permanent $ 499,300 $ - $ - $ $ $ $ 499,3( D7 restrooms and a small shelter with picnic tables. R9 Yost Park & Pool R4 Park enhancements, repair and maintenance to include a playground $ 257,500 $ 154,300 $ 546,400 $ $ $ $ 958,2( R6 replacement, resurface of tennis courts, pool upgrades and trail, bridge R11 and boardwalk repairs/replacement. Columbarium Expansion - Phase II D8 Expansion of the current columbarium. Funding provided through the Cemetery $ $ 159,100 $ $ $ $ $ 159,1( Trust Fund 137. R7 Olympic Beach Park $ $ 53,000 $ $ $ $ $ 53,0( Renovation of existing restrooms. D10 Pine Street Park D11 Park enhancements to include the addition of a small shelter with picnic tables, $ $ 164,400 $ $ $ $ $ 164,4( D12 canopy shade trees and a paved connecting pathway. R8 Sierra Park $ $ 185,700 $ $ $ $ $ 185,7( Playground replacement. Neighborhood Park SE 1 X Master plan and development of a new neighborhood park in South Edmonds. $ $ 79,600 $ 819,500 $ $ $ $ 899,1( D13 $1.5M parkland acquisition listed below. Waterfront Walkway P3 Connecting the waterfront walkway from Brackett's Landing North to $ $ 515,000 $ 819,500 $ $ $ $ 1,334,5( D14 Marina Beach Park by adding missing section in front of the Ebb Tide Condominiums, to provide ADA improvements. c m E m 0 Q. E ca U c Id d u_ U C R d v M LL r .Q M U 00 N O N M N O 04 00 N 0 N M N O N a LL U I a_ U Y a c E t R a Page 3 Packet Pg. 20 2023-2028 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN 6.A.a Costs inflated at 3% per year Project CFP Project Site & Description 2023 2024 2025 2026 2027 2028 6-Year Toti # R12 Maplewood Hill Park $ $ $ 144,900 $ $ $ $ 144,9( Playground replacement. Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) Master Plan and Master Plan implementation of the Marsh to daylight the X P4 D9 connection of Puget Sound to the Edmonds Marsh and two fresh water $ $ $ 5,900,700 $ $ $ $ 5,900,7( creeksproviding restoration of fresh water/salt water estuary and natural tidal D1 exchange. Restoration expenses are not included in this estimate. ($8M Acquisition expense listed below). D16 Elm Street Park D17 Park enhancements to include the addition of a nature playground, $ $ $ $ 225,100 $ $ $ 225,1( R14 small shelter with picnic tables and habitat restoration. Neighborhood Park SR99 X D15 Master plan and development of a new neighborhood park in Southeast $ $ $ $ 928,500 $ $ $ 928,5( Edmonds. ($1.5M parkland acquisition listed below). Neighborhood Park SE 2 X Master plan and development of a new neighborhood park in Southeast $ $ $ $ 84,400 $ 869,500 $ $ 953,9( D18 Edmonds. ($2M parkland acquisition listed below). 4th Avenue Cultural Corridor Prioritized in the 2014 Community Cultural Plan and State certified P8 Creative District. Improvements encourage pedestrian traffic and provide $ $ $ $ 2,251,000 $ 6,955,600 $ $ 9,206,6( D19 visual connection between ECA and downtown contributing to economic vitality. Funding TBD. X P1 Parks & Facilities Maintenance and Operations Building $ $ $ $ 1,125,500 $ 4,637,100 $ $ 5,762,6( D2 Replace and/or renovate deteriorating building in City Park. R16 Seaview Park $ $ $ $ - $ 417,900 $ $ 417,9( Replacement of permanent restroom to provide ADA upgrades. X R15 Pool Replacement $ $ $ _ $ - $ - $ 23,881,000 $ 23,881,0( Replacement of the existing pool. Location, design and funding TBD. (A) SUBTOTAL PARKS CIP/CFP PROJECTS $ 956,800 $ 1,311,100 $ 8,313,000 $ 4,614,500 $ 12,880,100 $ 23,881,000 $ 51,956,5( c m E m 0 Q. E V c Id a LL U_ c R d U) 2 v to LL to (U 00 N 0 N M N O N 00 N 0 N M N 0 N IL LL (U I a_ U Y a c t U R Q Page 4 Packet Pg. 21 2023-2028 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN 6.A.a Costs inflated at 3% per year PARKS CIP PROGRAMS Citywide Park Improvements / Capital Replacement Program R17 This ongoing program allocates funds for the regular and deferred maintenance, $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 2,700,0( repair and replacement of parks amenities, structures and equipment. Signage & Wayfinding R10 Replacement of aging signage to improve accuracy and provide a $ - $ 51,500 $ - $ - $ - $ - $ 51,5( consistent City of Edmonds Parks visual identification system. Playground Upgrade Program R13 Annual upgrades of playground equipment and fall surfacing to provide $ $ $ $ 197,000 $ 202,900 $ 209,000 $ 608,9( additional inclusive playgrounds/facilities providing access for children - - - of all ages and abilities. Debt Service and Interfund Transfers Debt service on Civic Park $1.6M bond (2021) and Interfund transfers to $ 123,000 $ 148,000 $ 198,000 $ 198,000 $ 198,000 $ 148,000 $ 1,013,0( Engineering for Capital Project Support. (B) SUBTOTAL - PARKS CIP PROGRAMS $ 573,000 $ 649,500 $ 648,000 1 $ 845,000 $ 850p900 $ 807,000 $ 4,373,4( PARKLAND ACQUISITION X A2 Neighborhood Park SE 1 $ 1,500,000 $ - $ $ $ $ $ 1,500,0( Acquisition of parkland in South Edmonds. X A3 Neighborhood Park SR99 $ - $ 1,545,000 $ - $ - $ - $ - $ 1,545,0( Acquisition of parkland in near SR 99. X A4 Neighborhood Park SE 2 $ $ - $ 2,185,500 $ $ $ $ 2,185,5( Acquisition of parkland in South Edmonds. Edmonds Marsh Estuary Restoration (Willow Creek Daylighting) X Al Acquisition of the Unocal property in support of greater Edmonds Marsh $ $ $ 8,741,800 $ $ $ $ 8,741,8( restoration. A5 Interurban Trail $ $ $ $ $ $ 895,585 $ 895,5i Extension and acquisition (C) SUBTOTAL - PARKLAND ACQUISITION $ 1,500,000 $ 1,545,000 $ 10,927,300 $ - $ $ 895,585 $ 14,867,81 (D) TOTAL PARKS CIP/CFP EXPENDITURES (A+B+C) 1 $ 3,029,800 1 $ 3,505,600 1 $ 19,888,300 1 $ 5,459,500 1 $ 13,731,000 1 $ 25,583,585 1 $ 71,197,71 c m E m 0 Q. E .Q V c Id d U_ C R a T) v M u_ r .Q M (U 0 N 0 N M N 0 0 N 0 N M N 0 N a LL U I a_ U L a C 0 E t 0 Q Page 5 Packet Pg. 22 2023-2028 SIX -YEAR CAPITAL IMPROVEMENT PROGRAM CAPITAL FACILITIES PLAN 6.A.a PARKS CIP REVENUE 2023 2024 2025 2026 2027 2028 6-Year Toti Real Estate Excise Tax (REET) I - Fund 126 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,200,0 Real Estate Excise Tax (REET) 11 - Fund 125 $ 2,000,000 $ 2,000,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 10,000,0( Park Impact Fees - Fund 332-100 $ 848,350 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 3,098,3 Tree Fund 143 - Land Acquisition $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 1,194,0 Cemetery Trust Fund 137 - Columbarium Expansion $ 70,971 $ 73,270 $ 67,728 $ 69,864 $ 72,108 $ 74,463 $ 428,4( Operating Contribution - General Fund $ - $ - $ - $ - $ - $ - $ Investment Interest (3%) $ 42,255 $ 54,144 $ 64,828 $ 74,243 $ 84,030 $ 94,111 $ 413,6: Donations $ - $ - $ - $ - $ - $ - $ Bond Proceeds $ $ $ $ $ $ $ Secured Grants $ $ $ $ $ $ $ Unsecured Grants/Funding $ $ $ 7,263,500 $ 4,276,900 $ 12,462,200 $ 23,881,000 $ 47,883,6( (E) TOTAL PARKS CIP REVENUE $ 3,360,576 $ 2,976,413 $ 9,745,056 $ 6,770,007 $ 14,967,338 $ 26,398,574 $ 64,217,91 Parks Fund 6-Year Overview 2022 2023 2024 2025 2026 2027 (F) Beginning Fund Balance (Funds 332 + 332-100) $ 2,383,820 $ 2,444,625 $ 1,802,269 $ (8,689,703) $ (7,563,660) $ (6,598,430) (E) Revenue $ 3,360,576 $ 2,976,413 $ 9,745,056 $ 6,770,007 $ 14,967,338 $ 26,398,574 (D) Expenditures $ 3,029,800 $ 3,505,600 $ 19,888,300 $ 5,459,500 $ 13,731,000 $ 25,583,585 (G) Ending Fund Balance (F+E-D) $ 2,714,596 $ 1,915,438 $ (8,340,975) $ (7,379,196) $ (6,327,322) $ (5,783,440) Project Type: A Acquisition P Master Planning D Development - New R Replacement / Upgrade c m E m O Q. E .Q tJ c Id a LL U_ c M a v M LL r .Q M U 00 N O N M N O N Page 6 Packet Pg. 23 6.A.a R2, P5 Johnson Property R3 Meadowdale Playfields D5, D6, D7 Mathay Ballinger Park R9, R4, R6, R11 Yost Park & Pool D8 Columbarium Expansion - Phase II R7 Olympic Beach Park D10, D11, D12 Pine Street Park R8 Sierra Park P3, D14 Waterfront Walkway R12 Maplewood Hill Park P4, D9, D1 Edmonds Marsh Restoration (Willow Creek Daylighting) D16, D17, R14 Elm Street Park P8, D19 4th Avenue Cultural Corridor P1, D2 Parks Building R16 Seaview Park R15 Pool Replacement Al Edmonds Marsh Restoration (Willow Creek Daylighting) AS Interurban Trail * Non -site specific projects A2 , P2, D13 Neighborhood Park SE 1 A3, P6, D15 Neighborhood Park SR99 A4, P7, D18 Neighborhood Park SE 2 R17 Citywide Park Improvements R10 Signage & Wayfinding R13 Playground Upgrade Program (2027 & 2028) Alm * Site specific projects only. R1S HIM _ ■rR2 P�5 � i� I� ■I J ' !� tAil 11 %fl 'f wV,•p;, AS annual citywide projects iia w wn—"'— Packet Pg. 24 2023-2028 Parks Capital Improvement & Capital Facilities Plan PROJECTS h �' mot,`_ �• n� EDMONDS PARKS, RECREATION & HUMAN SERVICES 00 N O N M N O N (L LL L) I d U L a. E t u cc r a Page 8 1 Packet Pg. 25 6.A.a Parks & Recreation Johnson Property - R2 & PS 9309 Bowdoin Way Project Summary: This project is the demolition and securing of the 1-acre property donated by Shirley Johnson in 2021. There is a small uninhabitable house, several small outbuildings and historic fruit and nut trees which have all been neglected for years. The site is becoming overrun with invasive plant species including Holly trees and blackberries. By removing the structures and clearing invasives, the city will be able to better start restoration on the many fruit and nut trees. Project Justification: The overgrown vegetation and abandoned buildings create an environment that can attract unwanted visitors and activity to the site which is currently not open to the public. This project is supported by 1 Recommendation, 5 Goals and 11 Objectives of the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.1— Maintain, renovate, or replace aging or damaged infrastructure in existing City properties to ensure public accessibility, use and safety. PROS Plan Goal 1, Objective 1.1; Goal 3, Objective 3.7, 3.8 and 3.10; Goal 5, Objective 5.1; Goal 6, Objectives 6.1, 6.4 and 6.5; Goal 9, Objectives 9.1, 9.3 and 9.5 also align with this project. Estimated Cost: $282,000 Construction (R2) — site demo $200,000 $200,000 Planning & Design (P5) $82,000 $82,000 Total Expenses $200,000 $82,000 $282,000 Real Estate Excise Tax II - Fund 125 $200,000 $82,000 $282,000 Total Revenue Unsecured Funding $200,000 $82,000 $282,000 00 N O N M N O N IL u_ U I a U Y L IL c m E z v c� Q Page 9 Packet Pg. 26 6.A.a Parks & Recreation Meadowdale Playfields - R3 1681h ST SW, Lynnwood Project Summary: The City of Lynnwood is replacing the existing playground and upgrading to a fully inclusive level of the play structure, will be adding dugout roofs, and replacing the light fixtures within a 6-year planning horizon. Project Justification: The cities of Lynnwood and Edmonds and Edmonds School District currently have an Interlocal Agreement (ILA) for Meadowdale Park for shared cost of capital improvements, renovations, and ongoing maintenance. The ILA states "The District and Cities agree to jointly plan for additional capital expenditures for maintenance and replacement costs for the Playfields. This work is supported by 2 Recommendations, 3 Goals and 5 Objectives of the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 1.2 — Expand partnerships and agreements with the Edmonds School District, Snohomish County, and other nearby jurisdictions (cities of Lynnwood, Mountlake Terrace, Woodway, and Shoreline) to improve public access and opportunities for outdoor recreation and Recommendation 6.2 - Implement upgrades and improvements to park facilities to conform with the American with Disabilities Act (ADA) and ensure universal accessibility to include required parking, providing ramped entrances and site furnishings. PROS Plan Goal 2, Objective 2.6; Goal 3, Objective 3.8, 3.10 and 3.11 and Goal 7, Objective 7.2 also align with this work. Estimated Cost: TBD, negotiations are ongoing with the City of Lynnwood. • 2027 2028 Total Construction (R3) TBD TBD TBD TBD Total Expenses TBD TBD TBD TBD Ending Fund Balance/Impact Fees - 332 TBD TBD TBD TBD Real Estate Excise Tax II - Fund 125 TBD TBD TBD TBD Total Revenue TBD TBD TBD TBD 00 N O N M N O N IL u_ U I a v Y L IL c m E z v Q Page 10 Packet Pg. 27 6.A.a Parks & Recreation Mathay Ballinger Park - D51 D6 & D7 24100 78th Place West Project Summary: Park improvements to Mathay Ballinger Park to include the addition of a permanent restroom, a small shelter with picnic tables and a paved loop pathway to provide ADA accessibility to the playground and connect the paved Interurban Trail to 78t" Place West Street. Project Justification: Upgrades to this park are supported by 5 Recommendations, 3 Goals and 8 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.3 is to prioritize improvements to Mathay Ballinger Park and upgrade, enhance or replace park amenities, specifically the play amenities. Recommendation 3.5 is to add amenities to existing parks, such as picnic shelters to Mathay Ballinger Park ... and paved pathway connections in Mathay Ballinger Park. Recommendation 6.4 is to install permanent restrooms at Marina Beach Park and Mathay Ballinger Park. PROS Plan Goal 2, Objective 2.6, Goal 3 Objectives 3.3, 3.4, 3.5, 3.6, 3.8 and 3.9 Goal 9 Objective 9.1 and Recommendations 3.1 and 6.2 also align with these upgrades. Estimated Cost: $499,300 2023 20241 126 2027 2028 Construction (D5) — Paved Loop Pathway $53,000 $53,000 Construction (W) — Shelter w/Picnic Tables $75,000 $75,000 Construction (N) — Permanent Restroom $371,300 $371,000 Total Expenses $499,300 $499,300 Ending Fund Balance/Impact Fees - 332 $371,300 $371,300 Real Estate Excise Tax II - Fund 125 $128,000 $128,000 Total Revenue $499,300 Unsecured Funding $0 $499,300 so N 0 N M N 0 N a- LL V I d U L c� a. c m E t U a Page 11 Packet Pg. 28 6.A.a Parks & Recreation Yost Park & Pool - R9, R4, R6 & R11 96th Ave W & Bowdoin Way, Yost Park Project Summary: Park enhancements, repair and maintenance to include a playground replacement, resurface of tennis courts, pool upgrades and trail, bridge and boardwalk repairs / replacement. The playground at Yost Park installed in 1995, is 27 years old, has reached the end of its lifecycle, is not ADA accessible and is scheduled to be replaced in 2023. Project Justification: To maintain safety amenities should be repaired and/or replaced as supported in the 2022 Parks, Recreation and Open Space (PROS) Plan Recommendation 3.1 which is to maintain, renovate or replace aging or damaged infrastructure in existing City properties to ensure public accessibility, use and safety and Recommendation 3.4 replace the playgrounds at ... Yost Memorial Park. In addition, this work is supported by PROS Plan Goal 1, Objective 1.1 and 1.4; Goal 3, Objective 3.6, 3.8 and 3.9; Goal 4, Objective 4.4, Goal 5, Objective 5.4; Goal 6, Objective 6.5; Goal 9, Objective 9.1 and Recommendation 3.10 and 6.2 for a total of 4 Recommendations, 6 Goals and 9 Objectives. Estimated Cost: $958,200 Construction (R4)—Trail/Bridge Repair 2023 20241 $80,000 126 2027 2028 $80,000 Construction (R6) — Playground Replacement $257,500 $257,500 Construction (R9)—Tennis Court Resurface $74,300 $74,300 Construction (R11) — Pool Upgrades $546,400 $546,400 Total Expenses $257,500 $154,300 $546,400 $958,200 Real Estate Excise Tax II - Fund 125 $546,400 $958,200 Total Revenue $546,400 $958,200 Unsecured Funding ij;;" 1 1 00 N O N M N 0 N IL u_ U I d U Y R d r c m E t r r Q Page 12 Packet Pg. 29 6.A.a Parks & Recreation Columbarium Expansion Phase II — D8 820 15th St SW, Edmonds Memorial Cemetery Project Summary: Expansion of the Edmonds Memorial Cemetery Columbarium. Funding provided through the Cemetery Trust Fund 137 which accumulates fund balance based on Cemetery usage and revenue generated. Project Justification: As the existing columbarium continues to fill up, it is appropriate to begin planning for the Phase II expansion. The design is complete and since it is continuation of phase improvements, should be relatively simple to implement. Estimated Cost: $159,100 2023 20241 126 2027 2028 Construction (D8) — Columbarium Expansion $159,100 $159,100 Total Expenses $159,100 $159,100 Fund Balance Cemetery Trust — Fund 137 $159,100 $159,100 Total Revenue Unsecured Funding $159,100 1 $159,100 1 00 N O N M N O N IL u_ U a� v Y L IL c m E z c� Q Page 13 Packet Pg. 30 6.A.a Parks & Recreation Olympic Beach Park - R7 200 Admiral Way, Entrance of the Fishing Pier Project Summary: Renovation of existing restroom and Visitor Center. Project Justification: This work is supported by 3 Recommendations, 3 Goals and 3 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 6.3 is to replace or renovate restrooms at Olympic Beach, Seaview Park and Brackett's Landing North. PROS Plan Goal 3, Objective 3.8; Goal 4, Objective 4.1; Goal 9, Objective 9.1 and Recommendation 6.3 also align with these upgrades. Estimated Cost: $53,000 00 N O N M N O N a- LL U I d U Y L R CL c� C ci r Q Page 14 Packet Pg. 31 6.A.a Parks & Recreation Pine Street Park - D10, D11 & D12 6th and Pine Street Project Summary: Park improvements to include the addition of a small shelter with picnic tables, canopy shade trees and a paved connecting pathway. Project Justification: These improvements are supported by 2 Recommendations, 2 Goals and 2 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation IS is to add amenities to existing parks, such as picnic shelters to Mathay Ballinger Park, Elm Street Park and Pine Street Park and paved pathway connections in Mathay Ballinger Park and Pine Street Park. PROS Plan Goal 3, Objective 3.8; Goal 9, Objective 9.1 and Recommendation 6.2 also align with these improvements. Estimated Cost: $159,100 Construction (D10) — Shelter w/Picnic Tables 2023 20241 $79,600 126 2027 2028 $79,600 Construction (D11) — Paved Pathway $58,300 $58,300 Construction (D12) — Canopy Shade Trees $26,500 $26,500 Total Expenses $164,400 $164,400 Real Estate Excise Tax II - Fund 125 $164,400 $164,400 Total Revenue Unsecured Funding $164,400 1 $164,400 so 00 N O N M N O N a- LL L) I d U d r c m E t U 2 a Page 15 Packet Pg. 32 6.A.a Parks & Recreation Sierra Park — R8 81st Ave W & 190th St SW Project Summary: Replacement of the playground and fall surfacing at Sierra Park. The playground is 27 years old and is currently the smallest playground in the park system. Project Justification: These improvements are supported by 2 Recommendations, 3 Goals and 3 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.4 is to replace the playgrounds at Maplewood Hill Park, Sierra Park and Yost Memorial Park. PROS Plan Goal 1, Objective 1.1; Goal 3, Objective 3.8, Goal 9, Objective 9.1 and Recommendation 3.1 also align with these improvements. Estimated Cost: $164,400 Page 16 Packet Pg. 33 6.A.a Parks & Recreation Neighborhood Park SE 1— P2, D13 w Project Summary: Acquire and develop an additional neighborhood park in the SE Edmonds area to address an existing gap in park services and inequities in parkland distribution. Once an acquisition has been authorized a Master Plan will be developed in collaboration with the surrounding community. Development of the park will be based on the Master Plan. Project Justification: The addition of a new park is supported by 2 Recommendations, 3 Goals and 11 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 1 is to fill the park system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor. PROS Plan Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3, Goal 3, Objectives 3.1, 3.2, 3.3, 3.6, 3.7, 3.8, 3.9 and 3.10 and Recommendation 6.2 also align with the development of a new park. Estimated Cost: $899,100 + Parkland Acquisition 2023 20241 126 Planning— Neighborhood Park SE 1 (P2) $79,600 2027 2028 $79,600 Construction — Neighborhood Park SE 1 (D13) $819,500 $819,500 Total Expenses $79,600 $819,500 $899,100 Real Estate Excise Tax II - Fund 125 $79,600 $79,600 Total Revenue 1 1 $79,600 1 1 Unsecured Funding 1 11 1$79,600 11 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) 00 N O N M N O N a- LL U I d U Y d r c al E t U 2 r a Page 17 Packet Pg. 34 6.A.a Parks & Recreation Waterfront Walkway Completion — Ebb Tide Section - P3 & D14 Beachfront in front of Ebb Tide Condominiums (200 Beach Place) Project Summary: This would connect the waterfront walkway from Brackett's Landing North to Marina Beach Park ensuring all individuals, including those with mobility challenges and those pushing strollers can safely enjoy the waterfront. The final missing piece would be constructed in front of the Ebb Tide condominiums in the easement owned by the City of Edmonds. The easement and walkway design are currently under legal review. Project Justification: To provide public access along the waterfront for all individuals. Completion of the walkway would meet ADA requirements, support efforts to keep dogs off of the beaches and was recognized as a high priority by residents participating in the development of the 2022 Parks, Recreation & Open Space Plan. This project is supported by 1 Recommendation, 3 Goals and 5 Objectives in the PROS Plan. Recommendation 6.2 is to implement upgrades and improvements to park facilities to conform with the American with Disabilities Act (ADA) and ensure universal accessibility to include required parking, providing ramped entrances and site furnishings. PROS Plan Goal 3, Objective 3.8; Goal 4, Objectives 4.1, 4.2 and 4.4, Goal 6, Objective 6.7 also align with this project. Estimated Cost: $1,250,000 00 N O N M N 0 N d LL U I d U U) Y L R r— cd i ci r Q Page 18 Packet Pg. 35 6.A.a Parks & Recreation Maplewood Hill Park — R12 19800 89th PI W Project Summary: Replacement of the existing playground installed in 1985. This playground is 38 years old and is the oldest in the park system. Project Justification: This improvement is supported by 2 Recommendations, 3 Goals and 3 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.4 is to replace the playgrounds at Maplewood Hill Park, Sierra Park and Yost Memorial Park. PROS Plan Goal 1, Objective 1.1; Goal 3, Objective 3.8; Goal 9, Objective 9.1 and Recommendation 3.1 also align with this improvement. Estimated Cost: $144,900 Page 19 Packet Pg. 36 6.A.a Parks & Recreation Marsh Estuary Restoration (Willow Creek Daylighting) - Al, P4, D9 & D1 Edmonds Marsh - City of Edmonds Marsh and property owned by Unocal (Chevron Services Co.) Project Summary: Reconnect the Puget Sound with the Edmonds Marsh restoring the natural tidal exchange. This project will impact the existing Marina Beach Park and its proposed renovation including daylighting of Willow Creek within the park. Project Justification: The marsh estuary restoration project will allow for and provide a natural tidal exchange, allow Chinook salmon to again migrate into Willow Creek, support migratory birds and waterfowl, provide a natural redistribution of saltwater -freshwater flora and fauna and address sea level rise impacts. This project is supported by 3 Recommendations, 5 Goals and 8 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 2.2 — Expand the Edmonds Marsh/Estuary to include the Unocal property. Develop funding strategy for purchase of the Unocal property or negotiate with the State of Washington to have the property become part of the Edmonds Marsh/Estuary. PROS Plan Goal 1, Objective 1.1; Goal 4, Objective 4.3; Goal 5, Objectives 5.1, 5.3 and 5.4; Goal 6, Objective 6.5 and 6.7; Goal 9, Objective 9.1; Recommendation 2.1 and 3.11 also align with this project. Estimated Cost: $14,642,500 + Restoration + Marina Beach Park renovation Continued on next page. 00 N O N M N O N IL u_ U I a v Y L a c m E z c� Q Page 20 Packet Pg. 37 6.A.a Marsh Estuary Restoration (Willow Creek Daylighting) — continued. Land Acquisition (Al) $8,741,800 Total $8,741,800 Master Plan (134) $273,200 $273,200 Master Plan Implementation (D9) $5,627,500 $5,627,500 Restoration (D1) - TBD TBD TBD Total Expenses $14,642,500 $14,642,500 Real Estate Excise Tax II - Fund 125 $273,200 $273,200 Real Estate Excise Tax I — Fund 126 Fund 332 Balance + Park Impact Fees Bond Proceeds Secured Grants Tree Fund 143 — Land Acquisition Park Donations Operating Contribution — General Fund Stormwater — Fund 422 Total Revenue Unsecured Funding $273,200 00 $273,200 00 Project Accounting #M070 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) Page 21 Packet Pg. 38 6.A.a Parks & Recreation Elm Street Park - D16, D17 & R14 7t" & Elm Street Project Summary: Park enhancements to include the addition of a nature playground, small shelter with picnic tables and habitat restoration. Project Justification: These improvements are supported by 2 Recommendations, 2 Goals and 2 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 3.1 is to add amenities to existing parks, such as picnic shelters to Mathay Ballinger Park, Elm Street Park and Pine Street Park. PROS Plan Goal 6, Objective 6.5; Goal 9, Objective 9.1; and Recommendation 3.5 also align with these improvements. Estimated Cost: $225,100 Construction (R14) — Habitat Restoration 2025 2026 2027 $56,300 2028 Total $56,300 Construction (D16) — Nature Playground $84,400 $84,400 Construction (D17) — Shelter w/Picnic Tables $84,400 $84,400 Total Expenses $225,100 $225,100 Real Estate Excise Tax II - Fund 125 $168,800 $168,800 Total Revenue Unsecured Funding $168,800 ii $168,800 00 00 N O N M N O N a- u_ U I a U L d E t V 2 a Page 22 Packet Pg. 39 6.A.a Parks & Recreation Neighborhood Park SR 99 — P6 & D15 Project Summary: Design and development of an additional neighborhood park in the SR 99 area to address an existing gap in park services and inequities in parkland distribution. Once an acquisition has been authorized a Master Plan will be developed in collaboration with the surrounding community. Development of the park will be based on the Master Plan. Project Justification: The addition of a new park is supported by 2 Recommendations, 3 Goals and 11 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 1 is to fill the park system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor. PROS Plan Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3, Goal 3, Objectives 3.1, 3.2, 3.3, 3.6, 3.7, 3.8, 3.9 and 3.10 and Recommendation 6.2 also align with the development of a new park. Estimated Cost: $926,100 + Parkland Acquisition 2023 20241 126 2027 2028 Planning— Neighborhood Park SR99 (P6) $82,000 $82,000 Construction — Neighborhood Park SR 99 (D15) $844,100 $844,100 Total Expenses $82,000 $844,100 $926,100 Real Estate Excise Tax II - Fund 125 $82,000 $82,000 Total Revenue Unsecured Funding $82,000 1 1 1$82,000 1 11 11 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) 10 N O N M N O N d u_ U I d U d r c m E t U 2 r a Page 23 Packet Pg. 40 6.A.a Parks & Recreation Neighborhood Park SE 2 — P7, D18 AC .� Project Summary: Design and development of an additional neighborhood park in the SE Edmonds area to address an existing gap in park services and inequities in parkland distribution. Once an acquisition has been authorized a Master Plan will be developed in collaboration with the surrounding community. Development of the park will be based on the Master Plan. Project Justification: The addition of a new park is supported by 2 Recommendations, 3 Goals and 11 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 1 is to fill the park system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor. PROS Plan Goal 1, Objective 1.1; Goal 2, Objectives 2.1 and 2.3, Goal 3, Objectives 3.1, 3.2, 3.3, 3.6, 3.7, 3.8, 3.9 and 3.10 and Recommendation 6.2 also align with the development of a new park. Estimated Cost: $953,900 + Parkland Acquisition 2023 20241 126 2027 2028 Planning— Neighborhood Park SE 2 (P7) $84,400 $84,400 Construction — Neighborhood Park SE 2 (D18) $869,500 $869,500 Total Expenses $84,400 $869,500 $953,900 Real Estate Excise Tax II - Fund 125 $84,400 $84,500 Total Revenue Unsecured Funding $84,400 1 $0 1 1 11 1 $84,500 11 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) 00 N O N M N O N d u_ U I d U Y d r c m E t U 2 r a Page 24 Packet Pg. 41 6.A.a Parks & Recreation 4th Avenue Cultural Corridor - P8 & D19 41h Avenue from Main St. to the Edmonds Center for the Arts, Downtown Project Summary: Final design of 4th Avenue Cultural Corridor to include site design and construction documents for a safe, pedestrian friendly, and art enhanced corridor in the public right of way which provides a strong visual connection along 4th Avenue N between Main Street and Edmonds Center for the Arts. Interim work on this project since the concept was developed includes a 2015 temporary light artwork "Luminous Forest", as well as preliminary design development through 2020-21. Funding for this project has not been secured at this time. Project Justification: The corridor improvements in the public right of way will encourage pedestrian traffic and provide a strong visual connection between the ECA and downtown retail. Improvements will enhance connectivity as an attractive walking corridor and contribute to the economic vitality in downtown. The project has been supported by the community in the 2014 Community Cultural Plan and in the goals and priorities for the State certified Creative District. This project is supported by 1 Goal, 2 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan - Goal 8, Objectives 8.1 and 8.6. Estimated Cost: $9,206,600 - Project Accounting #C538 Planning & Design (138) $2,251,000 $2,251,000 Construction (D19) $6,955,600 $6,955,600 Total Expenses $2,251,000 $6,955,600 $9,206,600 Real Estate Excise Tax II - Fund 125 Park Impact Fees - Fund 332-100 Operating contribution — general fund Secured Grants Total Revenue $0 $0 $0 0 N 0 N M N 0 N a- u_ U a U L c� d r c m E t U M 41 r a Page 25 Packet Pg. 42 6.A.a Parks & Recreation Parks & Facilities Maintenance Building - P1 & D2 600 3rd Avenue South, City Park Project Summary: The 40+ year old maintenance building in City Park is reaching the end of its useful life and needs major renovation or replacement and is too small to accommodate current staff and needed work areas. Project Justification: Parks and Facilities Divisions have long outgrown this existing facility and need additional work areas and fixed equipment in order to more efficiently maintain City parks and Capital facilities. The city's small equipment repair garage is used as the Park Maintenance locker room, daily meeting room, computer access (one for 11 FTEs) and work preparation space. It is insufficient for work efficiency and due to small size, inadequate for expansion of staffing with upcoming park and street landscape work requirements. This project is supported by 1 Goals, 3 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. PROS Plan Goal 9, Objectives 9.1, 9.3 and 9.9 align with this project. Estimated Cost: $6,955,600 2023 20241 126 2027 2028 Planning &Design (P1) $1,125,500 $1,125,500 Construction (D2) $4,637,100 $4,637,100 Total Expenses $1,125,500 $4,637,100 $5,762,600 Real Estate Excise Tax II - Fund 125 Park Impact Fees — Fund 332-100 Bond Proceeds Operating Contribution — General Fund Park Donations Total Revenue Unsecured Funding Capital Facilities Plan (CFP) & Capital Improvement Proeram 0000.00 (CIP) 00 N O N A N O N d u_ U I d U U) Y L R a r c d E t Q Page 26 Packet Pg. 43 6.A.a Parks & Recreation Seaview Park Restroom — R16 80th Ave W & 186th St SW Project Summary: ADA improvements to include renovation or replacement of the permanent restroom Project Justification: These improvements are supported by 3 Recommendations, 2 Goals and 2 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 6 is to make improvements to existing parks as needed to ensure proper maintenance, usability and quality of park features and grounds to remove barriers and improve universal access. Recommendation 6.3 is to replace or renovate restrooms at Olympic Beach, Seaview Park and Brackett's Landing North. PROS Plan Goal 3, Objective 3.8; Goal 9, Objective 9.1 and Recommendations 3.1 and 6.2 also align with these improvements. Estimated Cost: $417,900 2023 20241 126 2027 2028 Construction (R16) - Restroom Replacement $417,900 $417,900 Total Expenses $417,900 $417,900 Real Estate Excise Tax II - Fund 125 $417,900 $417,900 Total Revenue Unsecured Funding $417,900 1 $417,900 1 00 N O N M N O N d LL U I d U rn Y L R r- cd C M U r Q Page 27 Packet Pg. 44 6.A.a Parks & Recreation Yost Pool Replacement — R15 96th Ave W & Bowdoin Way, Yost Park Project Summary: Yost Pool was built nearly 50 years ago and continues to provide recreational opportunities for many residents. In addition to teaching our youth water safety, the pool serves as an opportunity for community members of all ages to lead healthy and active lifestyles. Funding for this project has not been identified and would likely require voter approval. Project Justification: Replacing Yost Pool is supported by 4 Recommendations, 4 Goals and 6 Objectives in the 2022 Parks, Recreation and Open Space (PROS) Plan. Recommendation 4 is to replace Yost Pool. PROS Plan Goal 1, Objective 1.1; Goal 3, Objective 3.7, 3.8 and 3.9; Goal 7, Objective 7.4; Goal 9, Objective 9.1 and Recommendations 3.1, 4.1, 4.2 and 6.2 also align with this replacement. Estimated Cost: $23,881,000 123 20241 126 2027 2028 Planning & Construction (1115) $23,881,000 $23,881,000 Total Expenses $23,881,000 $23,881,000 Real Estate Excise Tax II - Fund 125 Fund 332 Balance + Park Impact Fees Secured Grants Bonds Total Revenue Unsecured Funding Caoital Facilities Plan (CFP) & Capital Improvement Proeram (CIP) $0 $0 111 111 00 N O N eM N O N d u_ U I d U L c� a r c al E t U 2 r a Page 28 Packet Pg. 45 I 6.A.a I 2023-2028 Parks Capital Improvement & Capital Facilities Plan PROGRAMS W-4 Y EDMONDS PARKS, RECREATION & HUMAN SERVICES Page 29 Packet Pg. 46 6.A.a Parks & Recreation Citywide Park Improvements / Capital Replacement Program - R17 Project Summary: The 2022 Parks, Recreation & Open Space (PROS) plan identified a significant list of deferred park maintenance projects. With the addition of a Parks Capital Project Manager, hired in 2022 and the Job Order Contracting program, the Parks Department will begin to make progress on the needed system -wide repairs, renovations and replacements of an aging parks infrastructure. Project Justification: Insufficiently maintained parks and related assets lead to higher deferred maintenance costs, increased City liability and decreased level of service and community satisfaction. This program is supported by 5 Recommendations, 6 Goals and 21 Objectives in the 2022 Parks, Recreation and Opens Space (PROS) Plan. Recommendation 3.1 is to Maintain, renovate, or replace aging or damaged infrastructure in existing City properties to ensure public accessibility, use and safety. PROS Plan Goal 2, Objectives 2.1 and 2.3; Goal 3, Objectives 3.6, 3.7, 3.8 and 3.9; Goal 4, Objectives 4.1, 4.2, 4.4; Goal 5, Objective 5.1, 5.3, and 5.4; Goal 6, Objective 6.1, 6.3, 6.4, 6.5 and 6.7; Goal 9, Objective 9.1, 9.2, 9.3 and 9.9 and Recommendations 3.7, 6.2, 6.3 and 6.4 also align with this program. Estimated Cost: $2,700,000 (6-year total) Repair & Maintenance $300,000 $300,000 2025 $300,000 2026 $300,000 2027 $300,000 2028Total $300,000 $1,800,000 Professional Services $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $900,000 Total Expenses $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 $2,700,000 Real Estate Excise Tax II - Fund 125 $450,000 $450,000 $450,000 $450,000 $450,000 $450,000 $2,700,000 Total Revenue Unsecured Funding $450,000 so $450,000 1 i $450,000 1 $450,000 i $450,000 so 1 $450,000 1 $2,700,000 i 0 N 0 N M N 0 N a u_ U i a U L c� a. c m E t U M 41 r a Page 30 Packet Pg. 47 6.A.a Parks & Recreation Signage & Wayfinding — R10 • VIEW POINT PLAY STRUCTURE NATURAL AREA&DOG WALK PARK OPEN DAWN TO DUSK Project Summary: Update signage system wide to include uniform and accurate trail identification information, orientation markers, safety and regulatory messaging, park hours, park rules and etiquette, interpretive information and warning signs. Project Justification: A comprehensive and consistent signage system is necessary to inform, orient and educate park users. This program is supported by 2 Recommendations, 4 Goals and 6 Objectives in the 2022 Parks, Recreation and Opens Space (PROS) plan. Recommendation 6.5 is to develop and provide consistent graphics and citywide signage to improve communication on access, usability and "branding" of the city's park and open space system. PROS Plan Goal 2, Objectives 2.1 and 2.3; Goal 3, Objective 3.6; Goal 5, Objectives 5.3 and 5.4; Goal 9, Objective 9.1 and Recommendation 6.2 also align with this program. Estimated Cost: $51,500 1 M" 1 1. 1 1 Planning & construction (R10) $51,500 $51,500 Total Expenses $51,500 $51,500 Real Estate Excise Tax II - Fund 125 $51,500 $51,500 Total Revenue Unsecured Funding1 $51,500 $51500 00 N 0 N M N O N IL U I d U In Y IC d �i C d E t V R r-+ r Q Page 31 Packet Pg. 48 6.A.a Parks & Recreation Playground Replacement / Inclusive Upgrades — R13 Project Summary: City of Edmonds owns, operates and maintains 15 playgrounds and only two of them are considered fully inclusive and accessible (Seaview and Civic Park). One of the Parks, Recreation and Human Services Department initiatives is to continually update playgrounds which range in installation dates from 1985 - 2019. As part of these scheduled updates the department will work to enhance playgrounds to be inclusive versus merely meeting ADA standards. In many cases this includes enhanced play surfacing and play equipment that provide for users of all abilities. Elm Street Park, Maplewood Hill Park, Sierra Park and Yost Park playgrounds have been identified as priority in the PROS Plan and will be addressed in the first three years of this capital improvement plan. Project Justification: Playground upgrades are a necessary part of maintaining a safe play environment. With playgrounds that are 35+ years old many are scheduled for upgrades. Further, it is the goal of the City to ensure that those upgrades include considerations for children of all physical and mental abilities and that these play amenities are designed to be a welcoming and healthy experience for all. This program is supported by 2 Recommendations, 3 Goals and 3 Objectives in the 2022 Parks, Recreation and Opens Space (PROS) plan. Recommendation 3.1 is to Maintain, renovate, or replace aging or damaged infrastructure in existing Cit properties to ensure public accessibility, use and safety. PROS Plan Goal 1, Objective 1.1; Goal 2, Objective 2.1; Goal 3, Objective 3.8 and Recommendation 6.2 also align with this program. Estimated Cost: $197,000 Construction (R13) $197,000 $202,900 $209,000 $608,900 Total Expenses $197,000 $202,900 $209,000 $608,900 Real Estate Excise Tax II - Fund 125 $197,000 $202,900 $209,000 $608,900 Total Revenue Unsecured Funding $197,000 $202,900 $0 $0 $209,000 i $608,900 i 00 N O N M N 0 N a u_ U I d U Y L R r- d E t r r Q Page 32 Packet Pg. 49 :9 j P IA N rkq WA Age • 6.A.a Parks & Recreation Parkland Acquisition — Neighborhood Park SE 1, SR 99 & SE 2 - A2, A3 & A4 Project Summary: Acquisition of parkland when feasible that will benefit citizens and support the priorities identified in the PROS Plan. Currently, $900,000 is reserved for parkland and open space acquisition. These funds were accumulated in 2019, 2020, 2021 and 2022. There is no request to purchase a specific property at this time as opportunities are somewhat limited in a mostly built -out city, but staff continues to search for, develop and negotiate opportunities. Project Justification: Parkland Acquisitions are supported by 1 Recommendation, 2 Goals and 5 Objectives (land purchase only, see previous projects for development) in the 2022 Parks, Recreation & Open Space (PROS) Plan. Recommendation 1 is to fill the park system gaps, 1.1 Acquire property for neighborhood parks in underserved areas such as the south Edmonds area and the SR 99 corridor. PROS Plan Goal 2, Objective 2.1; Goal 3, Objective 3.1, 3.2, 3.3 and 3.9 also align with the acquisition of parkland. Estimated Cost: $5,230,500 2023 20241 126 2027 2028 Acquisition — Neighborhood Park SE 1 (A2) $1,500,000 $1,500,000 Acquisition — Neighborhood Park SR99 (A3) $1,545,000 $1,545,000 Acquisition — Neighborhood Park SE 2 (A4) $2,185,500 $2,185,500 Total Expenses $1,500,000 $1,545,000 $2,185,500 $5,230,500 Real Estate Excise Tax I - Fund 126 $1,100,000 $200,000 $200,000 $1,500,000 Tree Fund 143 - land acquisition - TBD Total Revenue $1,100,000 $200,000 $200,000 $1,500,000 Capital Facilities Plan (CFP) & Capital Improvement Program (CIP) Ib N O N . A N 0 N a- u_ U I d U Y (L c a) E t U 2 r a Page 34 Packet Pg. 51 6.A.a Parks & Recreation Interurban Trail Expansion — A5 4 t . 24100 78`h Place West Project Summary: Acquisition of additional lands, easements and/or right-of-ways to continue the Interurban Trail, including more off -road segments. Project Justification: This Expansion is supported by 3 Recommendations, 2 Goals and 6 Objectives in the 2022 Parks, Recreation and Opens Space (PROS) Plan. Recommendation 5 is to improve trail connections including sidewalks and bike lanes to help link destinations across the community. Recommendation 5.1 suggests the City peruse opportunities to acquire additional lands, easements and/or right of way to continue the Interurban Trail. Goal 2, Objective 2.1; Goal 3, Objective 3.1, 3.2, 3.4, 3.5 and 3.6 and Recommendations 1.1 and 5.2 also align with this expansion. Estimated Cost: $895,585 00 N O N M N O N a- LL U I d U L r_ d E M V 2 a Page 35 Packet Pg. 52 2023-2028 Parks Capital Improvement & Capital Facilities Plan FUND DETAIL 4EDMONDS PARKS, RECREATION & HUMAN SERVICES Page 36 I Packet Pg. 53 Fund 332 6.A.a Costs inflated at 3% per year Fund 332 Expenditures 2023 2024 2025 2026 2027 2028 6-Year Total D9 Edmonds Marsh Estuary Restoration (Master Plan Implementation) $ 5,627,500 $ 5,627,500 D1 Edmonds Marsh Estuary Restoration (Restoration) $ - R14 Elm Street Park Habitat Restoration $ 56,300 $ 56,300 R3 Meadowdale Playfields (Renovations, City of Lynnwood ILA) $ - D6 Mathay Ballinger Park Permanent Restrooms $ 371,300 $ 371,300 D13 Neighborhood Park - SE1 (Park Development) $ 819,500 $ 819,500 D15 Neighborhood Park - SR99 (Park Development) $ 844,100 $ 844,100 D18 Neighborhood Park - SE2 (Park Development) $ 869,500 $ 869,500 R15 Pool Replacement $23,881,000 $ 23,881,000 D14 Waterfront Walkway (Construction) $ 819,500 $ 819,500 P8 4th Avenue Cultural Corridor (Design Completion) $ 2,251,000 $ 2,251,000 D19 4th Avenue Cultural Corridor (Construction) $ 6,955,600 $ 6,955,600 P1 Parks Facilities M&O Building (Design) $ 1,125,500 $ 1,125,500 D2 Parks Facilities M&O Building (Construction) $ 4,637,100 $ 4,637,100 Interfund Services $ 25,000 $ 50,000 $ 100,000 $ 100,000 $ 100,000 $ 50,000 $ 425,000 Debt Service Civic Park $1.6M (2021) $ 98,000 $ 98,000 $ 98,000 $ 98,000 $ 98,000 $ 98,000 $ 588,000 (C) TOTAL Fund 332 Expenditures $ 494,300 $ 148,000 $ 7,464,500 $ 4,474,900 $12,660,200 $24,029,000 $49,270,900 Fund 332 Revenue 2023 2024 2025 2026 2027 2028 6-Year Total Park Impact Fees (Fund 332-100) $ 848,350 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 3,098,350 Investment Interest (3%) $ 42,255 $ 54,144 $ 64,828 $ 74,243 $ 84,030 $ 94,111 $ 413,612 Miscellaneous Park Donations $ - Bond Proceeds $ General Fund Transfer $ - Unsecured Grants - Marsh Estuary Restoration $ 5,624,500 $ 5,624,500 Unsecured Grants - Elm Street Park Habitat Restoration $ 56,300 $ 56,300 Unsecured Grants - Neighborhood Park SE 1 (Development) $ 819,500 $ 819,500 Unsecured Grants - Neighborhood Park SR99 (Development) $ 844,100 $ 844,100 Unsecured Grants - Neighborhood Park SE 2 (Development) $ 869,500 $ 869,500 Unsecured Grants - Waterfront Walkway (Construction) $ 819,500 $ 819,500 Unsecured Grants - 4th Avenue Cultural Corridor $ 2,251,000 $ 6,955,600 $ 9,206,600 Unsecured Funding (Bonds, Levy, Misc) Pool Replacement $ 23,881,000 $ 23,881,000 Unsecured Funding Park Facilities M&O Building $ 1,125,500 $ 4,637,100 $ 5,762,600 �(D) TOTAL Fund 332 Revenue $ 890,605 $ 504,144 $ 7,778,328 $ 4,801,143 $12,996,230 $24,425,111 $51,395,562 C d E d O L E V C Id a LL U_ c R d Y) T v O LL r O U 00 N 0 N M N 0 N 00 N 0 N M N 0 N a LL U I a_ U Y a C O E t U ca Q Page 37 Packet Pg. 54 Fund 332 6.A.a Fund 332 Parks Fund 6-Year Overview 2023 2024 2025 2026 2027 2028 (E) Beginning Fund Balance (332 + 332-100) $ 1,408,492 $ 1,804,797 $ 2,160,941 $ 2,474,769 $ 2,801,012 $ 3,137,042 (D) Revenue $ 890,605 $ 504,144 $ 7,778,328 $ 4,801,143 $12,996,230 $24,425,111 (C) Expenditures $ 494,300 $ 148,000 $ 7,464,500 $ 4,474,900 $12,660,200 $24,029,000 (G) Ending Fund Balance (E+D-C) $ 1,804,797 $ 2,160,941 1 $ 2,474,769 $ 2,801,012 $ 3,137,042 $ 3,533,154 Project Type: A Acquisition P Master Planning D Development - New R Replacement / Upgrade Page 38 Packet Pg. 55 REET II Fund 125 6.A.a Costs inflated at 3% per year REET II(Fund 125)Expenditures 2023 2024 2025 2026 2027 2028 6-Year Total P4 Edmonds Marsh Estuary Restoration (Master Plan) $ 273,200 $ 273,200 D16 Elm Street Park (Nature Playground) $ 84,400 $ 84,400 D17 Elm Street Park (Shelter w/Picnic Tables) $ 84,400 $ 84,400 R2 Johnson Property (Demo & Secure Site) $ 200,000 $ 200,000 P5 lJohnson Property (Master Plan) $ 82,000 $ 82,000 R12 Maplewood Hill Park (Playground Replacement) $ 144,900 $ 144,900 D5 Mathay Ballinger Park (Paved Loop Pathway) $ 53,000 $ 53,000 D7 Mathay Ballinger Park (Shelter w/Picnic Tables) $ 75,000 $ 75,000 P2 Neighborhood Park - SE1 (Master Plan) $ 79,600 $ 79,600 P6 Neighborhood Park - SR99 (Master Plan) $ 82,000 $ 82,000 P7 Neighborhood Park - SE2 (Master Plan) $ 84,400 $ 84,400 R7 Olympic Beach Park (Restroom Upgrade) $ 53,000 $ 53,000 D10 Pine Street Park (Shelter w/Picnic Tables) $ 79,600 $ 79,600 D11 Pine Street Park (Paved Connecting Pathway) $ 58,300 $ 58,300 D12 Pine Street Park (Canopy Shade Trees) $ 26,500 $ 26,500 R16 Seaview Park (Restroom Replacement) $ 417,900 $ 417,900 R8 Sierra Park (Playground Replacement) $ 185,700 $ 185,700 P3 lWaterfront Walkway Design Completion $ 515,000 $ 515,000 R11 Yost Pool Upgrades & Renovation $ 546,400 $ 546,400 R9 Yost Park (Tennis Court Resurface) $ 74,300 $ 74,300 R4 Yost Park (Trail, Bridge & Boardwalk Repairs) $ 80,000 $ 80,000 R6 Yost Park (Playground Replacement) $ 257,500 $ 257,500 R13 Playground Replacement / Inclusive Upgrades $ 197,000 $ 202,900 $ 209,000 $ 608,900 R10 Signage and Wayfinding $ 51,500 1 1 1 1 1 $ 51,500 R17 Citywide Park Improvements / Capital Replacement Program $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 450,000 $ 2,700,000 (C) TOTAL PARKS REET II (Fund 125) Expenditures $ 1,035,500 $ 1,653,500 $ 1,578,500 $ 900,200 $ 1,070,800 $ 659,000 $ 6,897,500 REET II(Fund 125)Revenue 2023 2024 2025 2026 2027 2028 6-Year Total Real Estate Excise Tax (REET) II - Fund 125 $ 2,000,000 $ 2,000,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 10,000,000 (D) TOTAL PARKS REET I (Fund 126) Revenue $ 2,000,000 $ 2,000,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $10,000,000 REET II (Fund 125) Parks Fund 6-Year Overview 2023 2024 2025 2026 2027 2028 (E) Beginning Fund Balance $ 75,328 $ 1,039,828 $ 1,386,328 $ 1,307,828 $ 1,907,628 $ 2,336,828 (D) Revenue $ 2,000,000 $ 2,000,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 $ 1,500,000 (C) Expenditures $ 1,035,500 $ 1,653,500 $ 1,578,500 $ 900,200 $ 1,070,800 $ 659,000 (G) Ending Fund Balance (E+D-C) $ 1,039,828 $ 1,386,328 $ 1,307,828 $ 1,907,628 $ 2,336,828 $ 3,177,828 c d E d O L E is .Q V c Id a LL U_ c to d U) T v to LL r .Q IC U ao N O N ch N O N 00 N O N M N O N IL LL U I a_ U Y L to a c CD E t U R a Page 39 Packet Pg. 56 REET I Fund 126 6.A.a Costs inflated at 3% per year REET I(Fund 126)Expenditures 2023 2024 2025 2026 2027 2028 6-Year Total Al Edmonds Marsh Estuary Restoration (Acquisition) $ 8,741,800 $ 8,741,800 A5 Interurban Trail (Expansion/Acquisition) $ 895,585 $ 895,585 A2 Neighborhood Park - SE1 (Acquisition) $ 1,500,000 $ 1,500,000 A3 Neighborhood Park - SR99 (Acquisition) $ 1,545,000 $ 1,545,000 A4 Neighborhood Park - SE2 (Acquisition) $ 2,185,500 $ 2,185,500 (C) TOTAL PARKS REET I (Fund 126) Expenditures $ 1,500,000 $ 1,545,000 $ 10,927,300 $ $ $ 895,585 $14,867,885 REET I(Fund 126)Revenue 2023 2024 2025 2026 2027 2028 6-Year Total Real Estate Excise Tax (REET) I - Fund 126 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,200,000 (D) TOTAL PARKS REET I (Fund 126) Revenue $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 1,200,000 REET I (Fund 126) Parks Fund 6-Year Overview 2023 2024 2025 2026 2027 2028 (E) Beginning Fund Balance $ 900,000 $ (400,000) $ (1,745,000) $(12,472,300) $(12,272,300) $(12,072,300) (D) Revenue $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 (C) Expenditures $ 1,500,000 $ 1,545,000 $ 10,927,300 $ - $ - (G) Ending Fund Balance (E+D-C) 1 $ (400,000) $ (1,745,000) $(12,472,300) $(12,272,300) $(12,072,300) $(11,872,300) c d E d O L E U C O a LL U_ C M d a� M LL r M U 00 N O N M N O N O N O N M N O N IL LL U I a_ U L a c as E a Page 40 Packet Pg. 57 TREE Fund 143 6.A.a Costs inflated at 3% per year TREE (Fund 143)Expenditures 2023 2024 2025 2026 2027 2028 6-Year Total Park and Open Space Acquisition Program $ (C) TOTAL TREE (Fund 143) Expenditures $ - $ $ - $ $ $ $ TREE (Fund 143)Revenue 2023 2024 2025 2026 2027 2028 6-Year Total Tree - Fund 143 $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 1,194,000 (D) TOTAL TREE (Fund 143) Revenue $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 1,194,000 TREE (Fund 143) 6-Year Overview 2023 2024 2025 2026 2027 2028 (E) Beginning Fund Balance $ 199,000 $ 398,000 $ 597,000 $ 796,000 $ 995,000 $ 1,194,000 (D) Revenue $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 199,000 $ 199,000 (C) Expenditures $ - $ - $ $ - $ $ - (G) Ending Fund Balance (E+D-C) $ 398,000 1 $ 597,000 1 $ 796,000 1 $ 995,000 1 $ 1,194,000 1 $ 1,393,000 c d E d O L E .Q V c Id a LL U_ c R d a� v to LL is r .Q to U 00 N O N M N O N 00 N O N M N O N IL LL U I a_ U L a c CD E U a Page 41 Packet Pg. 58 CEMETERY Trust Fund 137 6.A.a Costs inflated at 3% per year CEMETERY Trust (Fund 137) Expenditures 2023 2024 2025 2026 2027 2028 6-Year Total D8 Columbarium Expansion - Phase II $ 159,100 $ 159,100 Repair & Maintenance $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 150,000 (C) TOTAL CEMETERY Trust(Fund 137) Expenditures $ 25,000 $ 184,100 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 309,100 CEMETERY Trust (Fund 137) Revenue 2023 2024 2025 2026 2027 2028 6-Year Total Cemetery Trust - Fund 137 Investment Interest (@5%) $ 55,971 $ 58,270 $ 52,728 $ 54,864 $ 57,108 $ 59,463 $ 338,404 Cemetery Trust - Fund 137 Sales Revenue $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 90,000 (D) TOTAL CEMETERY Trust (Fund 137) Revenue $ 70,971 $ 73,270 $ 67,728 $ 69,864 $ 72,108 $ 74,463 $ 428,404 CEMETERY Trust (Fund 137) 6-Year Overview 2023 2024 2025 2026 2027 2028 (E) Beginning Fund Balance $ 1,119,420 $ 1,165,391 $ 1,054,561 $ 1,097,289 $ 1,142,153 $ 1,189,261 (D) Revenue $ 70,971 $ 73,270 $ 67,728 $ 69,864 $ 72,108 $ 74,463 (C)Expenditures $ 25,000 $ 184,100 $ 25,000 $ 25,000 $ 25,000 $ 25,000 (G) Ending Fund Balance (E+D-C) $ 1,165,391 $ 1,054,561 $ 1,097,289 $ 1,142,153 $ 1,189,261 $ 1,238,724 c m E d O L E .Q U c Id a LL U_ c R IL U) T v M LL r .Q IC U 00 N O N M N O N 00 N O N M N O N IL LL U I a_ U L a c CD E U a Page 42 Packet Pg. 59 6.A.a UP / CIP COMPARISON (2022 TO 2023) PROJECTS ADDED Type PROJECT NAME CFP DESCRIPTION Parks Johnson Property Demolition & Master Plan Demolition scheduled for 2023, master plan in 2025 Parks Meadowdale Pla fields Renovations consistent with City of Lynnwood ILA Parks Mathay Ballinger Park Improvements Addition of paved loop pathway, permanent restrooms, shelter and picnic tables - 2023 Parks lYost Park & Pool Improvements Playground replacement (2023); Tennis court resurface, pool upgrades, trail/bridge repairs Parks Columbarium Expansion - Phase II Funded through Cemetery Trust Fund 137 - 2024 Parks Olympic Beach Park Improvements Renovation of existing restroom - 2024 Parks Pine Street Park Improvements Addition of small shelter, picnic tables, shade trees and paved pathway - 2024 project Parks Neighborhood Park SE1 X Master plan and construction of new park in SE Edmonds Parks Maplewood Hill Park Playground replacement - 2025 Parks Elm Street Park Improvements Addition of nature playground, small shelter, picnic tables and habitat restoration - 2026 Parks Neighborhood Park SR99 Master Plan and construction of new park along SR99 Parks Neighborhood Park SE2 X Master Plan and construction of new park in SE Edmonds Parks Seaview Park Improvements Replacement of permanent restroom and ADA upgrades - 2027 Parks Yost Pool Replacement I X Replacement of existing pool - 2028 Parks I Si na a and Wayfinding I I Standardization of park si na e - 2024 CFP / CIP COMPARISON (2022 TO 2023) PROJECTS REMOVED Type PROJECT NAME CFP DESCRIPTION Parks Civic Center Playfield X 2022 project Parks Marina Beach Park Improvements X Council declined grant and put project on hold Parks Yost Pool Repair (plaster) 2022 project - completed Parks Community Park & Athletic Complex - Phase II X Not identified as priority in 2022 PROS plan Parks I Beautification Program I Program moved to Gift Catalog based on large donation CFP / CIP COMPARISON (2022 TO 2023) Type PROJECT NAME CFP CHANGE Parks 4th Avenue Cultural Corridor Moved back one year from 2025 to 2026 Parks Waterfront Walkway Completion lExpanded Expense increase $84,500 due to inflation Parks Edmonds Marsh Estuary Restoration X Estimate for Master Plan added, acquisition and restoration expense still TBD Parks Parks & Facilities Maintenance and Operations Building X Cost estimate for design and construction added Parks I Parkland Acquisition I X to include 3 neighborhood parks, marsh and Interurban trail c m E a� O L 0. E �a .Q �a V c �a a LL U_ c R (L U) T .v M LL �a r .Q M U 0 N 0 N M N 0 N 0 N O N M N O N a LL U I a_ U a c CD E U a Page 43 Packet Pg. 60 lk ojoppr, a O CM `` cm 5 F._ V cu 'Packet Pg. 61 6.A.b TRANSPORTATI FACILITIES & W TRANSPORT UTILITY PROJECT MAP.............................................................iii PROJECT MAP............................................................................iv ...................................................................................1 AOJECTS............................................................4 ALYSIS...........................................................................12 NON -MO SPORTATI PROJECTS .........................................36 FERRYCTS........ ......................................................................61 TRAFFICALMING .................................................................... 63 TRAFFIC PLANNING. ......................................... ............................... 65 GREEN STREETS........ .......................... ..................................68 WATER............................ ............ ............... ............................... 71 STORMWATER...................... ......... ....................................... 76 EDMONDS MARSH ESTUARY RESTORATI D PROJECTS .....78 PERRINVILLE CREEK BASIN PROJECTS .............. .................... .......... 0 STORM DRAINAGE IMPROVEMENT PROJ ............. ...................... ANNUALLY FUNDED PROJECTS ................ .......... ...... ...............88 COMPLIANCE RELATED PROJECTS .................... ..................... .......91 SEWER............................................................................................................................ 93 FACILITIES.....................................................................................................................100 WASTEWATER TREATMENT PLANT.........................................................................126 CIP-CFP COMPARISON(2023-2028)....................................................................131, . • Packet Pg. 62 6.A.b Lei JVT-42 PWT-07 • PWT-65 F7 PWT-04 LI PWT-51 �—MI i PWT-36 _m D~01 �WME � �1 Wiir—-PWT-20 PWT-21 PWT-�2.9 PWT-30 PWT-47 PWT-06 WT-28� P: T 7 PWT-24 • PWT-03 PWT-17 MMOM W I PWT-0/WT-12 -35 ,JO • �-16 P,W PWT-19 P, 1 PWT-25 PWT-15 � PWT-08 \20 WTIPWT-13 PWT-14 _ PWT-3` PWT-23 PWTi64 PWT-5 • PWT-06 lmm PWS-1- rlgj P7m • �PWD-06 PWT-26 P NWT-1• * Site specific projects only. Citywide/annual citywide projects not shown. PWT-43 0 lo I Packet Pg. 63 A t �o Sprague St Sprague SAWN ` ?//,� °ds � ;WF-01 ri • /�•_ 4 , • I - �X- MI Edmonds St_ �WF-03_ 0 Z r11;11111 <4 11 Belli St r MaO F-10 P`WiF U9 : a low 1 �f j^ r r J Mill• r 7■+yMTO o ° '5 PWF-13 ra; O ' �i � w Maple St 3 0O� • �i �M CO• °. Alder!St .L n I 0 ��� IM Ider St 0 w �� WR T ■ Walnut St s r ■I MAIM MI Inut MIN PWF-09 G'W■ F04r-fm PWF-03 •PWI PWF-10 10 ° ' 8Fuff,@,F-23;+ •u • .0 PIWF 1id 1,1 ■■PWF-1 MEN C IW It Re "i AL AW .t j ' r 14Pr� o r ' '� w s m 6.A.b •l f Packet Pg. 65 IL 6.A.b Transportation Projects # CFP PRO. DP 3 2024 2025 2026 2027 20Y8 TOTAL TOTAL TOTAL Proj # (2023-2028) (2029-43) Cost Preservation / Maintenance Projects - PWT-01 Annual Street Preservation Progra 64 $1,500,000 $1,500,000 $1,500,000 $1,650,000 $1,650,000 $1,650,000 $9,450,000 $24,750,000 $34,200,0 PWT-03 76th Ave. W Overlay from 196 Olympic View Dr. 65 $15,000 $0 $0 $0 $0 $0 $15,000 $0 $15,0 PWT-04 Main St. Overlay from 6th ve. 69 $157,000 $780,500 $0 $0 $0 $0 $937,500 $0 $937,5 PWT-05 Puget Dr. @ OVD Sig s $0 $0 $0 $86,000 $480,000 $0 $566,000 $0 $566,0 PWT-06 Signal Upgrades - 100th h St. SW $0 $0 $0 $160,000 $750,000 $0 $910,000 $0 $910,0 PWT-07 PWT-61 Main St. @ 3rd Signal Upgrad bill, $0 Olympic View Dr Overlay - 196th Lalbot Rdqmnkh�$0 $0 $0 $0 $0 $106,000 $0 $371,0001 $0 $477,000 $0 $477,0 $200,000 $1,300,000 $1,500,000 $0 $1,500,0 Safety/ Capacity Analysis Q U C a ILL U C tC IL PWT-08 X 228th St. SW from Hwy 99 to 95th PI. W Corridor $0 $0 $1,000,000 $1,862,000 $6,360,000 $9,222,000 $0 $9,222,0 , PWT-09 X Hwy 99 Revitalization & Gateway Project - Stage 2 66 $2,64 $0 $0 $0 $0 $0 $2,646,000 $0 $2,646,0 ; PWT-10 X Hwy 99 Revitalization & Gateway Project - Stage 3 $2,01 $2,608,000 $1,500,000 $15,000,000 $11,752,000 $0 $32,870,000 $0 $32,870,0 PWT-11 X Hwy 99 Revitalization & Gateway Project - Stage 4 $2,700,000 $4,348,000 $2,262,000 $16,434,000 $16,000,000 $42,484,000 $0 $42,484,0 PWT-12 X Hwy 99 Revitalization & Gateway Project - Stage 5 0 $0 $0 $2,080,000 $4,964,000 $0 $7,044,000 $37,971,000 $45,015,0 PWT-13 I X Hwy 99 Revitalization & Gateway Project - Stage 6 $0 $0 $0 $0 $0 $0 $0 $20,217,000 $20,217,0 PWT-14 X Hwy 99 Revitalization & Gateway Project - Stage 7 $0 $0 $0 $0 $0 $0 $0 $38,142,000 $38,142,0 PWT-15 X Hwy 99 Revitalization & Gateway Project - Stage 8 $0 $0 $0 $0 $0 $0 $35,242,000 $35,242,0 PWT-16 X Hwy 99 Revitalization & Gateway Project - Stage 9 $0 $0 $0 $0 $0 $0 $20,072,000 $20,072,0 PWT-17 X SR 524 (196th St. SW) / 88th Ave. W - Intersection Improvements $0 $0 $255,000 $230,000 $765,000 $1,250,000 $0 $1,250,0 PWT-18 X Main St. @ 9th Ave. Intersection Improvements $0 $0 $190,000 $1,060,000 $0 $1,250,000 $0 $1,250,0 PWT-19 I X 76th Ave. W @ 220th St. SW - Intersection Improvements 11, $800,00 $462,750 $6,673,0001 $0 $0 $8,647,000 $0 $8,647,0 PWT-20 SR-104 Adaptive System - 236th to 226th 7 $243,440 $1,984,000 A.$0 $0 $2,227,440 $0 $2,227,4 PWT-21 X SR-104 @100th Ave W. Intersection Improvements $0 $0 $987,000 $0 $1,157,000 $0 $1,157,0 PWT-22 X SR-104 @ 95th PI. W Intersection Improvements $0 $0 0 478,000 $0 $563,000 $0 $563,0 PWT-23 X SR-104 @ 238th St. SW Intersection Improvements $0 $ 14,000 ,000 $0 $1,433,000 $0 $1,433,0 C PWT-24 X Olympic View Dr. @ 76th Ave. W Intersection Improvements $0 0 $0 $0 $0 $1,266,000 $1,266,0 CC PWT-25 X 84th Ave. W (212th St. SW to 238th St. SW) $0 $0 $0 $0 $0 $16,622,000 $16,622,0 C PWT-26 X SR-104 @ 76th Ave. W Intersection Improvements $0 $0 0 $0 $0 $0 $3,231,000 $3,231,0 (C' PWT-27 X I Olympic View Dr. @ 174th St. SW Intersection Improvements $0 $0 $0 0 $0 $0 $0 $671,000 $671,0 C PWT-28 175th St SW Slope Repair $0 $0 $1, $0 0 $1,000'000 $0 $1,000,0 PWT-63 2023 Guardrail Program $20,190 $ $0 Irr $0 $20,190 $0 i $20,1 1 PWT-59 2023 Traffic Signal and Safety Upgrades $30,280 $0 $0 $0 $0 $30,980 $0 $30,2 Non -motorized transportation projects 1 J PWT-29 X 232nd St. SW Walkway from 100th Ave. to SR-104 $0 $0 $0 $0 $276,000 00 $ $0 $1,802,0 PWT-30 X 236th St. SW Walkway from Madrona Elementary to 97th Ave. W $0 $0 $0 $286,000 $1,642,000 $0 $1,92 $0 $1,928,0 PWT-31 X 236th St. SW Walkway from Hwy. 99 to 76th Ave. W $0 $0 $0 $0 $0 $0 $1,831,000 $1,831,0 j PWT-32 X 84th Ave. W Walkway from 238th St. SW to 234th St. SW $0 $0 $0 $160,000 $0 $840,000 $0 $840,0 ; PWT-33 X 80th Ave. W Walkway from 212th St. SW to 206th St. SW $0 $0 $0 $250,000 0 $2,500,000 $3,000,000 $0 $3,000,0 1 PWT-34 X 80th Ave. W Walkway from 188th St. SW to Olympic View Dr. $0 $0 $0 $633,000 4,000 $0 $3,007,000 $0 1 $3,007,0 PWT-35 I X 1218th St. SW Walkway from 76th Ave. W to 84th Ave. W 1 1 $0 $0 $0 $0 $256,000 $1,431,000 $1,687,000 $0 s $1,687,0 PWT-36 X I Walnut St. Walkway from 6th Ave. S to 7th Ave S $0 $0 $0 $281,000 $0 $0 $281,000 $0 $281,0 PWT-37 X 216th St. SW Walkway from Hwy. 99 to 72nd Ave W $0 $0 $0 $213,000 $0 $0 $213,000 $0 $213,000 N m y+ 0 tC LL CL ci O N O N M N O N Packet Pg. 66 2023-2028 CIP-CFP VIDA 6.A.b -[-I DP 2023 2024 2028 TOTAL TOTAL TOTAL Proj DIP 20231 2024# (2023-2028) (2029-43) Cost PWT-39 X Citywide Bicycle Improvements Project 71 $1,771,847 $0 $0 $0 $0 $0 $1,771,847 $0 $1,771,8 PWT-40 X Maplewood Dr. Walkway from Main St. SW 95th PI. W Walkway from 224t 20th St. SW $0 $0 $0 $213,000 $213,000 $2,438,000 $2,864,000 $0 $2,864,0 PWT-41 X $0 $0 $0 $127,000 $710,000 $0 $837,000 $0 $837,0 PWT-42 X Railroad St. Walkway from o Main St. / SR-104 $0 $0 $0 $180,000 $800,000 $0 $980,000 $0 $980,0 PWT-43 X SR-104 @ 76th Ave. rized Trans Improvements $0 $0 $0 $200,000 $200,000 $1,600,000 $2,000,000 $0 $2,000,0 PWT-44 X Downtown Lighting Impro $0 $0 $0 $300,000 $1,200,000 $0 $1,500,0001 $0 $1,500,0 PWT-45 PWT-46 X X SR-104 Walkway: HAWK to P rom SR-104 to 9th 191st St. SW Walkway from 80th th Ave. W $0 $0 $0 $0 $0 $0 $265,000 $0 $265,000 $0 $2,650,000 $0 $3,180,000 $0 $0 $678,000 $3,180,0 $678,0 PWT-47 PWT-48 X X 104th Ave. W / Robinhood Lane Walk Ave. W 80th Ave. W Walkway from 21811 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,060,000 $324,000 $1,060,0 $324,0 PWT-49 X 84th Ave. W Walkway from 188th St. SW to 186th St. SW $0 $0 $0 $0 $0 $0 $328,000 $328,0 PWT-50 X 238th St. SW Walkway from Hwy. 99 to 76th Ave. W $0 $0 $0 $187,000 $1,098,000 $1,285,000 $0 $1,285,0 PWT-55 X Elm Way Walkway from 8th Ave. S to 9th Ave. S $9 $0 $0 $0 $0 $0 $901,974 $0 $901,9 PWT-60 2023 Pedestrian Safety Program $0 $0 $0 $0 $0 $80,780 $0 $80,7 PWT-62 Citywide Lighting Study NIF00 $0 $0 $0 $0 $0 $60,000 $0 $60,0 PWT-51 I X IFerry Storage Improvements from Pine St. to Dayton St. Traffic PWT-52 PWT-53 I I Citywide ADA Transition Plan PWT-54 I Transportation Plan Update caa. sfaat. CL M V C a LL U C d N d y+ LL .Q W L) $0 $380,000 $0 $380,0 00 N O N $18,000 $123,130 $0 $123,1 M N O C14 $0 $105,000 $0 $105,0 $0 $170,000 $0 $170,0 LL 9 C PWT-64 I Green Streets 236th St SW - 84th Ave W to Highway 99 72 $219,717 $3, $0 $ $0 $0 $3,719,717 $0 $3,719,7 PWT-65 Green Streets Dayton St- Highway 104 to 2nd Ave S 72 $78,027 $1,600,00 $0 $0 $0 $1,678,027 $0 $1,678,0 C Total Projects $11,388,635 $ 00 $11,6 $35,631,000 $ $38,407,000 $160,093,885 $202,405,000 $362,498,8 C C Funding Source 2023 2027 -128 TOTAL TOTAL TOTAL 0 (2023-2028) (2029-43) C Street Fund 112 - Gas Tax & Multi -modal revenue $670,000 $0 $1 $150,000 $1,120,000 $2,250,000 1 $3,370,0 j REET Fund 125 $1,277,862 $656,000 $600,000 $800,00 $500,000 $50 $4,333,862 $7,500,000 $11,833,8 REET Fund 126 $1,169,492 $834,000 $1,322,000 $1,383,000 $518,000 $518 ,744,492 $7,500,000 $13,244,4 Transportation Impact Fees $673,500 $377,000 $2,098,000 $727,000 $0 ,500 $0 $3,875,5 General Fund $0 $645,000 $540,000 $500,000 $500,000 0 $7,500,000 $10,185,0 C Water Utility Fund 421 $30,000 $50,000 $27,000 $635,000 $400,000 0,000 $1,4 $0 $1,442,0 y Stormwater Utility Fund 422 $349,927 $0 $0 $0 $0 $349,927 $0 $349,9 t 1 Sewer Utility Fund 423 $0 $30,000 $30,000 $100,000 $IF $150,000 $490,000 $0 $490,0 Federal Grants $1,083,925 $2,254,500 $1,798,150 $1,670,000 $0 $6,806,575 $0 $6,806,5 State Grants $4,586,685 $3,665,000 $1,613,600 $14,765,000 1,000 $0 $31,011,285 $0 $31,011,2 Other Sound Transit Grant $1,249,500 $0 $0 $0 $0 $0 $1,249,500 $0 $1,249,5 4 ARPA $297,744 $1,113,006 $0 $0 $0 $0 $1,410,750 $0 $1,410,7 Unsecured Funding $0 $2,386,9941 $3,584,0001 $14,901,0001 $42,414,0001 $36,289,000 $99,574,994 $177,655,000 $277,229,994 Total Revenue $11,388,635 $12,011,500 $11,612,750 $35,631,000 $51,043,000 $38,407,000 $160,093,885 $202,405,000 $362,498 885 Pg. 67 Packet 2023-2028 CIP-CFP v0.4 3 6.A.b J 'la 36*13 ',TS-�1 I E e :Jae 2023-2028 CIP-CFP v0.4 Packet Pg. 68 Project Description Annual pavement preservation progra maintain City streets. Project Benefit Maintains the City's pavement infras re an a ne steets. Estimated Project Cost $1,500,000 to $1,650,000/ year rger capital investment to rebuild City Design $50,000 $50,000- $50, $60, $60,000 $ 00 $900,00 a Right of Way Construction $1,450,000 $1,450,000 $1,45 00 $1,590,000 $ 90,000 $1,590'0 3,850,00 Expense Total $1,500,000 $1,500,000 $1,500,000 $1,650,000 $1,650,000 $1,650,00 0,00, Street Fund 112 - Gas Tax & Multi -modal $500,000 $150,000 $150,000 $15 $ , 0 i REET Fund 125 $500,000 $500,000 $500,000 $500,000 $500,000 $7,50 i REET Fund 126 $500,000 $500,000 $500,000 $500,000 $500,000 000 $7,500,00 Transportation Impact Fees i General Fund $500,000 $500,000 $500,000 $5,fr $500,000 $7,500,00 Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $1,500,000 $1,500,000 $1,500,000 $1,650,000 $1,650,000 $1,650,000 $24,750,00, Packet Pg. 69 2023-2028 CIP—CFP v0.4 1841h St SW tTh PI SN! - i 1861h St SW y Q q 187th St SW m Jill 3 i187t1)P1 SN1 W 188th St SW ¢ ac a, °p 189th PI S <190th St SW" SOP 1v1GPIs�:: 797s1F``-'� 0 191st St SW 192nd St SW Icp _S, ., 10 80tb 192nd Pi SW � w Q1 D 193rd PI SW r ¢ 194th St 9Sth St 'h St SW ^4\c - -196T Project Description Pavement overlay of 76th Ave. W from addition of a bike lane for the northbo Lynnwood, since the west half of the Project Benefit I I." y%3rd-PI-SW--d Q a 3 y � ¢ � 1I85thPP.SW t lr'icy ¢ y 86th St SW " m r r a I �a6sh-st rrsW LLI 187th-PI=SW: � --t �-1aft =PI:SW F_188TH-ST-SW � Penny Ln !. �c 189th=Pi- � 1 B9t h PI sw LO'789th AI r ¢--190th-5t-5W� Tssw� r:➢.140th.St-SW i O n191st PI, SW, ( 1 w I �1.91st-St-SW w Lf W � 1'.d St Sa�/e_ � 192nd - P1 SW _ �3 192nd P_I=BW Q � W Park:lrya9 yy Y � d � 193rd:Pf S� � 7— a-193rSt =SW-_ Ld St SW SW 19q�h PI SW n 194thStSw- s N a :h St. SW to Olympic View iovement. This is a is in the City o t Improve pavement condition and upgrade'RPM-strian cIi existing southbound bike lane, the project may add a new Transportation Comprehensive Plan. Estimated Project Cost Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REST Fund 125 REST Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Other Unsecured Funding Funding Source Total $11,685 $15,000 with pedestrian curb ramp upgrades and funded by the Cities of Edmonds and he east half is in the City of Lynnwood. In addition to the in the City's 2023-2028 CIP-Cl v0.4 6 Packet Pg. 70 Edmonds Police and Civic Playfield Municipal Court Veteran's Z Plaza MAI Christian Science Church z z - W c Bell St St s a a'Bell r` 00 is 0 i c Yo -Isle Frances Anderson Pa c rary Anderson Center (A c I enter Field LU y > > i Dayton Si _ Ytal. i - MaplA. Project Description qr' Pavement overlay along Main St. from be funded with a federal grant (funds Project Benefit Improve pavement conditions and ped Estimated Project Cost $937,500 'e. to 8th Ave. with pedest ian curb ramps upgrades. The project will le in 2023) and City�j local match. Design $157,000 Right of Way Construction $780,500 Expense Total $157,000 $780,500 Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 $31,400 $156,000 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants $125,600 $624,500 State Grants Unsecured Funding Funding Source Total $157,000 $780,500 rb ramps) on this segment of Main Street Packet Pg. 71 2023-2028 CIP-CFP v0.4 7 z �r'- cr QQ' PUGET DR _ onds ktary a' u Excelsior PI n E 7, O Project Description The project consists of a complete sign uilt, with the removal of al vehicle head currently on Spam wire and conversion to standard traffic signal p ith mast arms. Vehic n will also be upgraded as part of this project. Project Benefit This upgrade will provide safer roadway co Fnwires. The new vehicle detection will guarantee that Estimated Project Cost $566,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total ads aren't detected. $86,000 He handing on those $480,000 $86,000 $480,000 $86,000 $480,000 $86,000 $480,000 z a N A 2023-2028 CIP-CFP v0.4 8 Packet Pg. 72 Fait[ Com Chur a� � Project Description_ Install new traffic signal and vehicle d Project Benefit The existing traffic signal is near the Estimated Project Cost $910,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total � � I � V fII W � � � 23,th '°I SW I = l0i c` l� 1. 238th St SW n system. its a rvice I $160,000 $160,000 $750,000 $160,000 $750,000 237th PI 2023-2028 CIP-CFP v0.4 9 Packet Pg. 73 B racketts Landing �a South .\'3 Railroad Station Project Description - Install new traffic signal and vehicle d Project Benefit The existing traffic signal is near the Estimated Project Cost $477,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total Post am Office IT a n system. its a rvice I Edmonds Polic 7st and Municipal t p Court I Veteran' Edmonds Centennial Paz City Hall Plaza Bell AO I N Fountain MAIN ST 202 2028 2029-4 $371, ;,106,000 $371,0b, lArA $106,000 $371,000 $106,000 $371,000 2023-2028 CIP-CFP v0.4 Packet Pg. 74 10 Project Description_ Pavement overlay along Olympic View upgrades. Project Benefit � Improve pavement condition and imp Estimated Project Cost $1, 500,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Grants Funding Source Total i m 196th St. SW / SR-524 taTalbot Road, along with ADA curb ramp all abilities. $1,300,000 $200,000 $1,300,000 $100,000 $300,000 $100,000 $300,000 $700,000 $200,000 $1,300,000 2023-2028 CIP-CFP v0.4 11 Packet Pg. 75 4 2023-2028 CIP-CFP v0.4 12 S',. ; . t5Vt:KANC.t L 'J Si . 22'f Lf7 JL _"1'Y _ _ _ r■ *.- w•�t•t'.b• �:'��Il�� w� i 2241K 5t=5W- 224th' I sw r' dj� ■• r. • i �r at •!L. i 2+4t;:Swa ■ Lx r J- t; I• a� fi4I� I+ w�♦ • w .`w 4. L h 7�aI �01 : " ■' I + r 1f 'ri 1 $' I■ .'�' R Co Q ��� III f��l, ■ 0_4 IL 7 'tI zzstT�sw any^wsw , A I� r,�rw...3, . .6 ..- i n ■. . 225 r 226th St SW �. 226th St SW_a_ I �! y 1 Lm ✓a ■ 1 I' r=;�. 3 Y pfy �i:r„��r oI p1 .'*LJI La ■ ilLc I�m1,• 1 q 1 �♦ o==� i 4„ *' �. w t. t[W { r"h w■ "! �' pl sw 3 rn R ' * wr f0 An w -a.r •. !► r y+ 5 1 . 21' E'�lll i .'•• F. '�.. a 110 A �y� ; 1-ar • J AA PIL16 CIO m d .10 m TI 232nd St SW J WiIIu■ > ■71 L,_1 Project Description Wr Widen 228th St. SW from Hwy. 99 to 9 I. W to three lanes (with gutter, sidewalk, and bike lanes. -.A Project Benefit NTH ST SV r. ti S� i. I.i �2l9th� .� _ :� a ,. ~. w a '�.wF■iM'r � 1 r � �. �'i� � L3 30th Sty W - ° .230th St SWn _ �•,3 • Vr a. a'ILI Q���r� _II 13 _JJI` two-way left turn lane), with curb and This project would improve active transj5 traffic s along this corridor. Community Transit will evaluate the possibility of creating a n st-west ut g 228th St. SW this project moves forward (connecting Edmonds Transit Station to Mountlake ransit Statio Estimated Project Cost $9,222,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $1,000,000 'W2,000 $1,000,000 $ 6, $1,000,000 $1,862,000 $6, $1,000,000 $1,862,000 $6,360,000 $1,000,000 $1,862,000 $6,360,000 2023-2028 CIP-CFP v0.4 13 Packet Pg. 77 m a ' tl: � K .i .• F r 22OTH+ST�SW. o„228TH ST S — - l ST Project Description e 0 Installation of raised landscaped media ng Highway 99 corridor of "Gateway" signage on both ends of orridor, and anew p The project is funded from state fund ided by the Co as REET funds. Project Benefit The conversion of the center two-way lef0 t turn lane to a la along this Highway of Regional Significance (HRS), with an Ave day. The new HAWK signal will provide a signalized pedestri s 238th St and 228th St. Estimated Project Cost $9,891,000 Design Right of Way Construction $2,646,000 Expense Total $2,646,000 Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 $81,000 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants $2,565,000 Unsecured Funding Funding Source Total $2,646,000 2023-2028 CIP-CFP v0.4 14 r .:LLP ��� 11rr1Ilrrg JLJlinl� L LU LU l�L� --�I W _ J[LLL�111 � �� 244th St. SW to 212th St. SW, addition �igt�AK signal just north of 234th St. SW Transportation program, as well -aised media My Traffi ng bet corridor safety ) vehicles per tic signals at Packet Pg. 78 /40 238th Si SW _ 238TH ST SW � 238th St SW m w ui 3 5 2401 �O `24Dth St -SW �L_J 240th St SW -� 9 , co 79M Q� 240th P! SW241st St SN cL _ { � coa 242nd St S ` // F y �� 242nd St SW— — a 242nd PI S4V m w ti'�gway �nfj-.� 55 of*ramp mp - - o - - - - r- 243rd PI S N ; �`S'WAY TSW� _LAKE_BALLINGER-WAY ----AN iAKGEi i Project Description_ The Stage 3 Highway 99 project limits a om 244th St SW to 238th jS SW. The project will add a planter strip on both sides of the street, new street ing, improved storm ' ies, targeted utility replacements, potential undergrounding of overhea ties, landscapi scape treatments. The Design and right of way phases are funded through se Con gton Project Benefit Improve aesthetics, safety, and user experience along this f the Hwy 99_ Estimated Project Cost $32,870,000 Design $1,775,000 $1,425,000 $5W00 _ Right of Way $235,000 $1,183,000 $1,000,000 Construction $15,000,000 $11,752,000 Expense Total $2,010,000 $2,608,000 $1,500,000 $15,000,000 $11,752,000 Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Water Utility Fund 421 $20,000 $20,000 $135,000 $100,000 Stormwater Utility Fund 422 Sewer Utility Fund 423 $10,000 $10,000 $10,000 $30,000 Federal Grants State Grants $2,010,000 $2,578,000 $1,470,000 $14,765,000 $6,381,000 Unsecured Funding $5,241,000 Funding Source Total $2,010,000 $2,608,000 $1,500,000 $14,910,000 $11,752,000 Packet Pg. 79 2023-2028 CIP-CFP v0.4 15 ,A * a� 7 j i * * ■ a y, o m* r fir do VIP t sw "724*thSjtSw a Project Description_ tit Ist Pi SW ... W o� o W Y W� A The Stage 4 Highway 99 project limits a om 224th St SW to app project will add a planter strip on both s of the streenewtargeted utility replacements, potenti dergroundintreatments. The intersection of High 9 and 2of service. The Design and right of wa a federal grant and local traffic impact fees. Project Benefit Improve aesthetics, safety, and user experience. In addition, E Estimated Project Cost . $42,534,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees Water Utility Fund 421 Stormwater Utility Fund 422 Sewer Utility Fund 423 Federal Grants State Grants Unsecured Funding Funding Source Total 2023-2028 CIP-CFP v0.4 ately 500 feet north of 220th St. SW. The g, improved stormwater facilities, Ies, landscaping and other softscape d to add capacity and improve the level red Connecting Washington funds, a $740,000 $2,200,000 $1,348,000 $162,000 $500,000 $3,000,000 $2,100,000 $16,434,000 $ $740,000 $2,700,000 $4,348,000 $2,262,000 $16,434,00A be improved. $704,000 $565,000 $365,000 $269,000 $1,917,000 $727,000 $40,000 $40,000 $300,000 $300,000 $20,000 $20,000 $150,000 $150,000 $375,000 $1,284,000 $1,523,400 $970,000 $1,087,000 $143,600 $15,984,000 $15,550,000 $740,000 $2,700,000 $4,348,000 $2,262,000 $16,434,000 $16,00 packet Pg. 80 16 sw 276th St SW 212TH ST SW'�_ 20 _ j �21bth St SW 216thA i Project Description - Along Hwy 99 from 216th St SW to 212 SW, the project will add new street lighting, better stormwater agement, targeted u ' 7 overhead utilities, landscaping and of ftscape treat Project Benefit Improve aesthetics, safety, and user expert . In addi to along the corridor. Estimated Project Cost $45,015,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total nter strip on both sides of the street, fements, potential undergrounding of the area as being in Edmonds. omic develojiftent will be improved $1,580,000 $W3,000 $500,000 $2,951,000 $2,080,000 $4,964,000 $2,080,000 $4,964,000 $2,080,000 $4,964,000 1,000,00 [ $37 $37,971,00 I $37,971,00 2023-2028 CIP-CFP v0.4 17 Packet Pg. 81 23t I Madrona Ln I 1-�I:111110311111031Z Project Description Along Hwy 99 from 238th St. SW to new street lighting, better stormwat overhead utilities, landscaping and c Wm Project Benefit Improve aesthetics, safety, and user along the corridor. Estimated Project Cost $20,217,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total =KAN(—t = a 234th St SW C� m a' r- 236th St SW 4 I a a a' o — CO 238th St SW.: SW, the project will add a lanter strip on both sides of the street, ;ement, targeted u ' ' ements, potential undergrounding of scape treat the area as being in Edmonds. In add omic develojiftent would be improved 2,146,00 [ $ 20, 217,00 I $20,217,00, 2023-2028 CIP-CFP v0.4 Packet Pg. 82 18 ,e 228_Tti ST 5WIL m - 4ad am am J a 1 . 229th St -SW'- F RRR 00 IF .� .� 1 y� 1 1! a 1 � ■ i in �230th St SW 230th St SW su.ay ✓ , ■ 11 237 0 StIS Qy Ca'i Zn -11. 44 �1 .ZITplop iy r vJ� 0i Q �11��1l� .R t ■ _ 232nd St SI"J ,.r0. i� til —' 234 Project Descriptio" Along Hwy 99 from 234th St. SW to 2 new street lighting, better stormwat( overhead utilities, landscaping and o1 Project Benefit Improve aesthetics, safety, and user ex along the corridor. Estimated Project Cost $38,142, 000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total a Q� 234th Si SW I 229th St SW� 4 v ,230th S1 SW �W w � S QJ i►1 Q b � 0 K A SW, the project wi"the nter strip on both sides of the street, ;ement, targeted uements, potential undergrounding of scape treat area as being in Edmonds. In add omic develojiftent would be improved $38,142,00 $38,142,00, 2023-2028 CIP-CFP v0.4 19 Packet Pg. 83 9611 ■�'�� a ds 225tha Pf SW ■ 4226th�_%r_§e� Svs -0 dF!n" y gr oil L— 224th St SW ' 224th St e ■ Q ■ ■ �% �3: -M� Pi SWc, Project Descriptio" Along Hwy 99 from 228th St. SW to 2 new street lighting, better stormwat( overhead utilities, landscaping and of Wm Project Benefit Improve aesthetics, safety, and user i along the corridor. Estimated Project Cost $35,242,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total w 224thT St SW C N a n a r sue' EDMONDS ccr WOUNTLAKE 0 226TH PL SW r 3 N SW, the project wi"the nter strip on both sides of the street, ;ement, targeted uements, potential undergrounding of scape treat area as being in Edmonds. In add omic deve t would be improved 3,596,00 1 $ 35, 242,00 $35,242,00, 2023-2028 CIP-CFP v0.4 20 Packet Pg. 84 i St SW ESPERANCE Project Description_ Along Hwy 99 from approximately 500 strip on both sides of the street, new s replacements, potential underground identify the area as being in Edmond s r SW north of 220th St. SW to 2 lighting, better stor overhead utili w-9 Project Benefit _ , Improve aesthetics, safety, and user experience. In additio along the corridor. Estimated Project Cost Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total 6th St A h St. SW, the project will add a planter nagement, targeted utility and other softscape treatments to would be improved $20,072,00 $20,072,00, 2023-2028 CIP-CFP v0.4 21 Packet Pg. 85 PU D Sub Statig Maplewood Hill Park Project Description Install traffic signal at the intersection Plan indicated that restricting northbo through movements) would also addr alternative as one concluded by cons implemented as an alternate solution, LOS is F (below City Standards: LOS D). Transportation Plan. W a ► 00 6th St. SW @ 88th Ave. W ind southbound traff' e deficiency i i n 2007 of r ution un Project Benefit .'" Improve traffic flow characteristics and safety at the inte increase the delay along 196th St. SW. Estimated Project Cost Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Federal Grants State Grants Unsecured Funding Funding Source Total s v Seventh Day Q Adventist Church co 196TH ST SW e modeling in the 2009 Transportation urn -only (prohibiting left -turn and cation through 2025. This is same ended by City Council. This could be ffic signal warrants are met. The existing e Roadway Pro ,kct Priority in the 2015 $255,000 $230,000 $255,000 $230,000 NC S $765,000 $765 ^ Packet Pg. 86 2023-2028 CIP-CFP v0.4 22 Project Description_ Installation of a traffic signal or min 2015 Transportation Plan. Project Benefit The existing intersection is stop-controR (below the City's concurrency standards delay to LOS B. Estimated Project Cost $1,250,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total MAIN St7W- W > Yost Park a St 0% Dayton Sf bout. The project ranked Uin the Roadway Project Priority of the es and rojected intersection LOS in 2035 is LOS F The ins onffraffic signal wgd&improve the intersection $190,000 $1,060,000 $190,000 $1,060,000 $190,000 $1,060,000 $190,000 $1,060,000 2023-2028 CIP-CFP v0.4 23 Packet Pg. 87 U m a WINCO 219th St SW YI ti r` 21919 2ST SW 0TH - -- -- . •• OP - Q 7514 221st PI SW STARBUCKS Project Description - Reconfigure eastbound lanes to a left t ne and through / right tur lane. Add eastbound and westbound dedicated left turn lanes with a protec ermitted phase. Prov' rn overlap for westbound movement during southbound left turn phase. (A nal improvem r sidewalk, bike lanes, and various utility improvements (including pote onversio utilit s to underground). ROADWAY PROJECT PRIORITY #1 in 2015 Transportation PI Project Benefit Reduce the intersection delay and improve the LOS. The proje OS in 2 LOS D. Improve active transportation conditions for pedestri d bicyck Estimated Project Cost $9,000,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Water Utility Fund 421 Federal Grants State Grants Unsecured Funding Funding Source Total 2023-2028 CIP-CFP v0.4 $556,250 $300,000 $64,750 $155,000 $500,000 $398,000 $6,673,000 $711,250 $800,000 $462,750 $6,673,000 $316,000 $308,500 $108,000 $181,000 $30,000 $30,000 $7,000 $500,000 $372,750 $346,000 $274,750 $ 6,173,000 $711,250 $800,000 $462,750 $6,673,000 24 from LOS F to Packet Pg. 88 Aigonq,,l 226th St SV: �!5tt 5t SlyW a r 228th St \ ,,Dees=D��- n � �y ¢ p- -a r � _ o 231 st St S� Q thus F 3 0 .NottingL' i W i y J a > a y a = 11=...d C% %9b PIS^; W a 2 M C, St SW - --- u4-226th `, CO Co +i:YL'1r. 1L_j a _ '�7 228TH ST SW,,,.,- g# �-i r■ A.A. F 'w i 2 h.St 2i. 7O < •r J7.ArCO, . ON F[01 ■' a�} rrF-. iER 230th-St- z231s` a q `W��� 231'st St SW�ri r r . 232nd St SW ° v� �,� •■.i1■ �, is a 232nd PISW.1 �r ,c� 1. r _-� ��; , ji, 4: � ..:� -rE L•� A. K7 IrL, a 'f Holly Ln =�+II ":'rl Maple Ln pN■ 2341h St SW ° y ""t z" S . 234th-t S a P. Madrona Ln N 1f �Z236th St SW 236th St SW 236th�: ' V i Project Descriptio .dW Installation of an Adaptive System alon 104 from 236th St. SW to along this stretch / spaced — % mile fro ch other). No signal the existing traffic signals. (SR-104 @ St. SW, SR-10 0 100th Ave. W, and SR-104 @ 226th S ). Possib Itionl traffic management center (TMC) at th u lity bL Project iffl� Improve traffic flows along this regional corridor with a curre per day. Estimated Project Cost 4 $2,394,000 and cA th St. SW (total of five traffic signals tion currently exists between any of , SR-104 @ 95th PI. W, SR-104 @ is project may include addition of a Lion of the Adaptive System to the TMC rage Daily Design $243,440 Right of Way Construction $1,984,000 Expense Total $243,440 $1,984,000 Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 $32,865 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants $210,575 State Grants Unsecured Funding $1,984,000 Funding Source Total $243,440 $1,984,000 25,000 vehicles Packet Pg. 89 2023-2028 CIP-CFP v0.4 25 QFC PCC NATURAL MARKET Y 76 GA: a WALGREEN'S j PARKING j BANK EDMONDS WAY'' a„e. O O 00 W N 00 d' N O Vi N O W co 00 00 co co rl- 1- P.-1- BANK mmmm mmmmm �Q } N N CM Q IVAR'S D o N ARTELL' O � a ; y Q � r m m � Project Description Implement Westgate Circulation Accit , install mid -block I safety to access the driveways withinity to the intersect potential addition of bike lanes. This was identifie (completed in 2015). Project B X� 4 Improve access and safety at the intersection and improve L Estimated Project Costy $1,157,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total crossing along 100th Ave. W, improve striping of 100th Ave. W with the ..ompleted Streets Corridor Analysis sportation $170,000 $987,000 $170,000 $987,000 $170,000 $987,000 $170,000 $987,000 2023-2028 CIP-CFP v0.4 26 Packet Pg. 90 LO 228th St SW PU SubA Project Description qr' Upgrade all ADA Curb Ramps; and add Complete Streets Corridor Analysis (co Project Benefit Improve intersection safety for pedestr Estimated Project Cost $563,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total P a M 228TH ST SW Westgate Chapel rb for access management. his project was identified in the SR-104 ted in 2015). $85 $85,000 $1 $85,000 $478,000 $85,000 $478,000 2 27th St i c a i s C G CV C7' 0 2023-2028 CIP-CFP v0.4 27 Packet Pg. 91 8t h St S W 04 Off, O� Os �q r Project Description_ Install traffic signal. This project was id fied in the SR-104 Compl 2015). Project Benefit V Improve vehicular and pedestrian safet A Estimated Project Cost $1,433,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total 238TH ST SW�,, 7 Q CO N Korean Presbyter Church reet Corridor Analysis (completed in 14, $214,000 $1,; $214,000 $1,219,000 $214,000 $1,219,000 2023-2028 CIP-CFP v0.4 28 Packet Pg. 92 3 a� S,� �iv;pvl Park Post Office 184th PI SW ¢. EDM •r°c� LVjvN�OODS Osw�_ - - OLYMPIC VIEW �R Lynndale Park Project Description_ Install traffic signal (the intersection cu ly stop controlled for all 2015 Transportation Plan: #11). —.A Project Benefit The improvement will reduce the inters below the City's concurrency standards Estimated Project Cost $1,266,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total e ments). (ROADWAY ROJECT PRIORITY in I of Service is LOS F in 2035, which is the Level ofAkrvice to LOS B. $213,00 me $1,266,00 $1,266,00, 2023-2028 CIP-CFP v0.4 29 Packet Pg. 93 '00w""'e I -- 220TWST=SN g' i J ��� i:,,f r3 " 228TH ST Stir �a i Project Descriptio Widen 84th Ave. W to (3) lanes with cu utter, bike lanes, and s project was ranked #6 in the Long Wal list of the 2015 Tran Project Benefit Improve traffic flow, access and active t y inst� bike lanes and street lighting. Estimated Project Cost $16,622,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total r I on each side of the street. (part of this ,Plan). a center two way left turn lane, sidewalks, $2,122,00 0 u L0,00 $16,622,00 $16,622,00, Packet Pg. 94 2023-2028 CIP-CFP v0.4 30 .1 CO r, Project Description Add a second westbound left turn lane Corridor Analysis (completed in 2015).,l Project Benefit q Improve access, safety and delay at the Estimated Project Cost $3,231,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total Seattie Baptist Church W SW 2 --- Lake Ballinger N 205TH S T w Z w :d ��?ND,� l g SR-104. This project wasj�entified in the SR-104 Complete Street $3,231,00 $3,231,00, 2023-2028 CIP-CFP v0.4 31 Packet Pg. 95 CEjI 773rd Pl SW .0 v ; a 6�31th a�sWa Project Description Widen Olympic View Dr. to add a nort the east to provide an acceleration lar reduce intersection delay. (ROADWAY, Project Benefit Improve intersection efficiency and safety Estimated Project Cost $671,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total d left turn lane for 50' sto eastbound left turns JECT PRIORITY n rs acce e 7>3rd St SVti 174th St SW St. Thomas Moore School length. Shift the northbound lanes to 'fic signal to increase the LOS and :ation Plan: #13) reet. A $109,00 $671,00 $671,00 2023-2028 CIP-CFP v0.4 32 Packet Pg. 96 T Ll . 175th St SW c Z r Snoh Project Description_ The project will stabilize the roadway s ade and embankment and St. SW. Project Benefit Repair roadway and stabilize slope em Estimated Project Cost $1,000,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total ild the damaged pavement on 175th $1,000,000 $1,000,000 $1,000,000 $1,000,000 A 2023-2028 CIP-CFP v0.4 33 Packet Pg. 97 —� — --, x s �ii J �txl= 'k i Project Descriptio Upgrade traffic signal equipment at sell signalized intersections wi h new equipment within signal cabinet, new vehicular detection, new vehicle , and/or new pedest Project Benefit Improve reliability of traffic signal oper i Estimated Project Cost $30,280 Design $2,000 Right of Way Construction $28,280 Expense Total $30,280 Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 $30,280 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Grants Funding Source Total $30,280 Packet Pg. 98 2023-2028 CIP-CFP v0.4 34 Project Description Install guardrails along selected stretch roughout the City with ste Project Benefit Improve safety of City transportation em. MEW Estimated Project Cost $20,190 Design $1,000 Right of Way Construction $19,190 Expense Total $20,190 Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 $20,190 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Grants Funding Source Total $20,190 drop-offs and other safety issues. 2023-2028 CIP-CFP v0.4 35 Packet Pg. 99 2023-2028 CIP-CFP v0.4 36 231 s1 PI S'Jd 1 Project Descriptio Install sidewalk along 232nd St. SW fro of 2015 Transportation Plan. Project Benefit This project would improve pedestrian Estimated Project Cost $1,802,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total c�rrrc,yivLc � 5 1 L t u i' s 13 a ' 231 st St SW \Q� 0 r ' y�►��i A 0 0 L J O 232nd St SUJ # i 7 I 233rd St SW � a N � > S 4 V2341h 51 5W C Ave. W to SR-104. This_.Qroject ranked #3 in the Long Walkway List $2 $276,000 $1,526,000 $276,000 $1,526,000 2023-2028 CIP-CFP v0.4 Packet Pg. 101 37 234th S i _-A oodway ,-mentary N Madrona 236th St S%AA School Project Description_ Install sidewalk with curb and gutter al 36nd St. SW from Madron Elementary to 97th Ave. W. This project ranked #4 in Long Walkway list of the Transportation Plan Project Benefit This project would improve pedestrian Estimated Project Cost $1,928,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $286,000 $1,f $286,000 $1,642,000 $286,000 $1,642,000 2023-2028 CIP-CFP v0.4 38 Packet Pg. 102 W a Q CO H �o n a.w 236th 3: Sr d < a N L v CO Q N I L r CO h Project Description_ Install sidewalk along 236th St. SW fro y 99 to 76th Ave. W. This the 2015 Transportation Plan. Project Benefit This project would improve pedestrian Estimated Project Cost $1,831,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total ject ranked #10 in Long Walkway List of $1,831,00 $1,831,00, 2023-2028 CIP-CFP v0.4 39 Packet Pg. 103 ESPERANCE 234th-St SW 234th St SW - 'i �� �7_� �rt PARK , T Madrona Ln -- -- ECMONCS APTS %- wHIRLr BALL ; b_ad1%E__M_k `,I „ m Rs i 00 W j ■ ���� °° !� Christ "LL m NORTH 88th 235th Pi til°I O Lutheran n HAVEN " MANOR t � m a CHRISTLU EANChurch% CHURCHOR m aS TRAILERN''E sw�� '� ■ 236th dOFFICE Park and Rie 236th St SW 3� COURT 236th St SW a 23601 Q 23603 SAFEWAY 23605 M N L KJIHG F F 23607 SUNSET W 23619 O RK PL P Q WILLOW CONDOS BROOK B1-10 APTS F R AURORA - 23701-32 ED noNo�, -vMPlc R C E ] g MARKETPLACE - 00 CRE ST 6 Q -, 04 78G `" p = U FAMILY PANCAKE 08 , N 8$01 m y „7 55„ o � -c w ;; SVI 238TH ST °p - 238th St SW ; zaeoo xaaoa23810 - SEOUL Project Description_ Install sidewalk along 84th Ave. W fro th St .SW to 234th St. SW, in the Long Walkway List of the 2015 T ortation Plan. Project Benefit 4 This project would improve pedestrian Estimated Project Cost $840,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total h curb and gutter. This project ranked #5 160, $160,000 $f $160,000 $680,000 $160,000 $680,000 2023-2028 CIP-CFP v0.4 40 Packet Pg. 104 MA L W a 207th SL S a E '0 G9 m 2G_lh St=S } 3 iv Q a c N 20 att,-s'stiv fw _ lb 208th Pl SW m Project Description_ Install sidewalk along 80th Ave. W fror in Long Walkway List of the 2015 Tran! Project Benefit I The improvements will improve active schools). Estimated Project Cost $3,000,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total -"208TH-ST IEDM(MDS-- SW — -- -- --- � S LU = a c i a S 210th Si SW I � � v a s � s � E i r St. SW to 212th St. SW vy'th curb and gutter. This project ranked #1 on Plan. (inclugWor school kids due to proximity of several $250, $250,000 $; $250,000 $250,000 $2,500,000 $250,000 $250,000 $2,500,000 2023-2028 CIP-CFP v0.4 Packet Pg. 105 41 r1by v� 1 v � a PI m 182`, v W -4; m 84th St SW St SW 0 a Damns-.`180th St SW� v Q 181st Pl SW c 70 Q� r S �s s•,v 182rd PI 782t d ST SW �� G �p � ,e'tridPismr t~O e Way a �d9 -E Q I �r 185th PI SW A/� _—' 1861h St � 7th PI Sw > LYNIV 0 0 D a' Y SW a th St SW > m m a 7th PI SW CD -187th-PI-swV—: + _h 00 SW Project Description Project Z S ` 0 Install sidewalk along 80th Ave. W fro th St. SW to OVD. This pro' ct ranked #13 in Long Walkway List of the 2015 Transportation Plan. ii Project Benefit This project would improve pedestrian c u Estimated Project Cost $3,007,000 'i ` c Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total 33, $633,000 $2,: $633,000 $2,374,000 $633,000 $2,374,000 2023-2028 CIP-CFP v0.4 42 Packet Pg. 106 Chase Lake Elementary 216th St SWi;: a a a' N L Chase Lake School 218th c Project Description Install sidewalk along 218th St. SW fro 7Ave 84th Ave. W in Long Walkway List of the 2015 Tran a Project Benefit The improvements will improve pede Estimated Project Cost $1,687,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total Edmonds Woodway High School Swedis a Y 3;: Edmonc ; M W I8th St c 7 9th St S' N curb and gutter. This project ranked #2 2 $256,000 $1,431,000 $256,000 $1,431,000 2023-2028 CIP-CFP v0.4 43 Packet Pg. 107 'ER BECK'S Alder St a C Z Cedar St N Project Description_ Install sidewalk on the south side of W St. from 6th Ave. S to 7th e. S. This project is ranked #9 in the Short Walkway List (from 2015 Transportati n). Project Benefit This project will improve pedestrian Estimated Project Cost $281,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $45 $236,000 $281,000 $281,000 $281,000 2023-2028 CIP-CFP v0.4 44 Packet Pg. 108 ANT TEVENS 11RT Swedish Edmonds 216 N'S R MCDO"ALD'S f� a a a T AEGIS VALUE O VILLAGEt? EDMONDS MEDICAL PAVI �T K OC `C?� /oJ 216th St SW Project Descriptio Install 150' sidewalk on north side of 2 St. SW from Hwy. 99 to 72n Ave. W (completing a missing link on north side of 216th St. SW). This proje anked #3 in the Shor List (from 2015 Transportation Plan) Project Benefit To provide a safe and desirable walking Estimated Project Cost $213,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $2519 $188, 000 $213,000 $213,000 $213,000 N c 2023-2028 CIP-CFP v0.4 Packet Pg. 109 45 _­= o Project Description Installation of bike lanes or sharrows al 7RFB s street segm0ents as i entified on the Proposed Bike Facilities map of 2015 Transportation Plan. Bik arrows will be g 1O0th St. SW / 9th Ave. from 244th St. SW to Walnut St, Bowdoin Way fr to 84th from 80th Ave. to 78th Ave., and 80th Ave. from 228th St. SW to 220th St. S l vari rossings along the Bowdoin and 9th Ave / 100th St. SW corridors. Project Benefit This project will create new bike connections to various desti parks, Downtown, Sound Transit Station...). Sound Transit au provide more convenient access so that more people can u 4 Estimated Project Cost $2,234,000 Design $12,652 Right of Way Construction $1,759,195 Expense Total $1,771,847 Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 $522,347 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Other (Sound Transit Grant) $1,249,500 Funding Source Total $1,771,847 2023-2028 CIP-CFP v0.4 ■ ch as schools, its that will Packet Pg. 110 / a a CASP_ERS-ST 200th-St=SW .asmerr z Q 1Mountain Lnz V{sta PI a > i Q N lki r 201 st ?I SW to �y Q Carol (Sierra 9 a 3 202nd St SW� a =ha St W PI - a w 2 n 202nd PI SW ¢ a > a `m Q t Q H Glen Q� a135 = St SW �0 m 203rd S1 Ip 2 '��4th 5t 51�1 Dale Daley Stv ,ca�is sw s Sprague St PI N ��30 �\9 �� a u 05th PI SW a _� nds St dmonds St d„ s St E dmond `' L -h2061h SFSW- o Bell St St 5 o x 207th PI SW NI Q a °isvd 207th 5t m N r— - N_S_T_-- Cl co it 2 208th PI SW Project Description Construct sidewalk on Maplewood Dr. Main St. to 200th St. SW 200th St. SW from Main St. to 76th Av adjacent to Maplew Walkway list of the 2015 Transportati an). Project Benefit AW Create pedestrian connection between Ma ood Ele y encouraging kids to use non -motorized transportation to w Estimated Project Cost T $2,864,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total ,700'). A sidewalk currently exists on kkntary School (rated #18 in the Long on 200th St. nd Main St., by n school. $213,000 $ 2, $213,000 $213,000 $213,000 $213,000 $2,438,000 $213,000 $213,000 $2,438,000 2023-2028 CIP-CFP v0.4 47 Packet Pg. 111 220THSTSW _ —_—V- - m- LU El 0 '' . ■ • ZZ s ■ OW L- NEI W N � t' ..e'er W w zzi71 *► . LID 221. PI r rf I 22Ph St SW 7; MOM I mom Project Description_ Install sidewalk along 95th PI. W from St. SW to 220th St. SW wit curb and gutter. This project ranked #8 in the Long Walkway List of the 2015 Tra rtation Plan. Project Benefit This project would improve pedestrian Estimated Project Cost $837,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total 127, $127,000 $j $127,000 $710,000 $127,000 $710,000 2023-2028 CIP-CFP v0.4 48 Packet Pg. 112 I Washington State Ferry Bracketts Terminal Landing South a ' Post Office sr cj Mini Park C2 C-11 Q, a LU �a James Si 4ij 0 > z a � n City of Edmonds —_ Treatment Plant Dayton St Da N - --A 7n st Project Description Install new and wider sidewalk along R d Ave from Dayton St. to S -1C IMMMEW Project Benefit Improve active transportation safety 0 g Railr Jr o to SR-104, key stretch since connects to various destination points (such as Wat , Downtown Edmonds, WSDOT Ferry Terminal...). Estimated Project Cost $980,000 Design $180,00� Right of Way IV Construction $800,000 Expense Total $180,000 $800,000 Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund 40 Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding $180,000 $800,000 Funding Source Total $180,000 $800,000 Packet Pg. 113 2023-2028 CIP-CFP v0.4 49 � � a Seattle W 243rd PI SW s EQ�O. s Baptist n Church Q Lake Ballinger `- Nas O � o 205TH ; N 205TH ST ` N 204TH PL 104TH PIL w a s z LU /V2 R� P� =s a20 o W —N�_ - a I Q�N m Project Descriptio Aff Extend bike lanes within proximity of t corners and new ADA curb ramps. Project Benefit I Improve active transportation safety a Estimated Project Cost $2,000,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total rsection in northbound arjl southbound directions. Install APS on all e Inter"n Trail and across SR-104. 0011111111111111111L$2 $200,000 $; $200,000 $200,000 $1,600,000 $200,000 $200,000 $1,600,000 2023-2028 CIP-CFP v0.4 Packet Pg. 114 50 4 Project Description Installation of street lights along variou eets within Downtow Project Benefit This project will add new street lightil. Downt- OrovE �. Estimated Project Cost $75,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $300,000 )0,000 $300,000 $1,200,000 $300,000 $1,200,000 $300,000 $1,200,000 2023-2028 CIP-CFP v0.4 51 Packet Pg. 115 Edmonds Marsh a to 0 Z 0 it Howell Way I I� Homeland 9s ■I 0 r a +m Hemlock Way 10 � �fA 10 a iQ Seamont Ln s7 a T -at St A � G Mac�ndia i ^ r Spruce St Spruce PI Hemlock St 0 Laurel Wa1 < Laurel St w a' CO Iv � � syth Ln ° a' Q a % a' a m "� Fir P a i ■ Fir SJL� JL Cedar St s s c 3 Spruce St , I Pine St Project Description �r Installation of sidewalk with ADA curb s along SR-104 from the H K signal to Pine St and along Pine St from SR-104 to 9th Ave S Project Benefit This project will improve pedestrian con he resi al areas along 3rd Ave. S to Downtown Edmonds and City Park. Estimated Project Cost $3,180,000 Project Cost 2023 2024 F 2025 202.. 2027 k(O Y �- Design $265,00 '65,000 Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $2,650,00 $265,000 $265,000 $2,65 c c c L03 $265,000 $265,000 $2,650,000 $265,000 $265,000 $2,650,000 Packet Pg. 116 2023-2028 CIP-CFP v0.4 52 ~ M Sierra Park a CO M how -- 192nd Pi SW Project Descriptio d7 Install sidewalk along 191th St. SW froi Long Walkway List of the 2015 Transp Project Benefit This project would improve pedestrian Estimated Project Cost $678,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total th Ave. W to 76th Ave., w on Plan. _1dA urb and gutter. This project ranked #8 in $678,00 $678,00 2023-2028 CIP-CFP v0.4 53 Packet Pg. 117 Pabin Hood Drfo% P `v � Friar P E G = Or U1 Nottingham Rd I� Project Description - Install sidewalk along 104th Ave. W fro #10 in the Long Walkway List of the 20 Project Benefit This project would improve pedestrian Estimated Project Cost $1,060,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total 235th PI SW Salem Edmonds Lutheran Heights Church K-12 Scriber'Lake ■ High School ut 2aeu, ri s:a Q 2 236th PI SW �" 105th,c Hickman .o Park a v a I i a a a f c 23� A� SW N monds Faith C ;' � Orial Communit 238th St SW ! y C etery Church z th ST. SW to 106th Ave nsportation Plan. _,A with curb and gutter. This project ranked $1,060,00 $1,060,00, 2023-2028 CIP-CFP v0.4 54 Packet Pg. 118 r. 219th st sW 20TH Edmonds Church of God Project Description Install sidewalk along 80th Ave. W froi #7 in the Short Walkway List of the 20 Project Benefit 4 This project would improve pedestrian Estimated Project Cost $324,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total SW psi :h ST. SW to 220th ST. SW, Ith curb and gutter. This project ranked nsportation Plan. $324,00 $324,00 2023-2028 CIP-CFP v0.4 55 Packet Pg. 119 186th St SW 187th St SW N 1881h St SW _ a Project Description_ Install sidewalk along 84th Ave. W fro 7St.SW186th St. SW #5in Short Walkway List of the 2015 T n. Project Benefit This project would improve pedestrian Estimated Project Cost $328,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total curb and gutter. This project ranked $328,00 $328,00 2023-2028 CIP-CFP v0.4 56 Packet Pg. 120 Q 3 N o ,G y S s 2J81h St SW CO M 0ON z �q i W s r 2401h W Mathay Ballinger J �.._ Park Project Description Install sidewalk along 236th St. SW froi the 2015 Transportation Plan. Project Benefit This project would improve pedestrian Estimated Project Cost $1,285,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total 99 to 76th Ave. W. This pkoject ranked #10 in Long Walkway List of 7 $1 $187,000 $1,098,000 $187,000 $1,098,000 2023-2028 CIP—CFP v0.4 Packet Pg. 121 57 a 7th and Elm Park m PI to C Ave W Vista PI � _� H O� V) CO w a o � 0 yo 0 �dr �Gp r �y I Sea Vista 220TH ST SW Project Description_ The walkway project is ranked #6 on th 7sixpedesl,�trian ist from the 20 5 Transportation Plan. The project will install approximately 700 feet of new ac nd modify the existing stormwater system on Elm Way between 8th Ave. d Project Benefit The project will improve pedestrian safety and 9th Ave. Estimated Project Cost $1,032,000 Design Right of Way Construction $901,974 Expense Total $901,974 Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 $552,047 Transportation Impact Fees General Fund Stormwater Utility Fund 422 $349,927 Federal Grants State Grants Unsecured Funding Funding Source Total $901,974 de J3qJJhLng JWf sidewalk on UJLWay between 8th Ave A 2023-2028 CIP-CFP v0.4 58 Packet Pg. 122 Project Description Addition of Rectangular Rapid Flashing selected locations throughout the City, Project Benefit 1 Improve safety at pedestrian crossings. Estimated Project Cost $80,780 (2023) Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Grants Funding Source Total ons (RRFB) and/or flashin project will also beajW $80,780 �I D lights around regulatory signs at rung and signage. 2023-2028 CIP-CFP v0.4 59 Packet Pg. 123 Project Descriptio" The study will evaluate and inventory t study will also develop a priority list of pedestrian lighting and policies for th lights within residential neighborhoo :y's existing street light rvements and cost e ion of street I Improve the City's street light system and reduce gaps in Estimated Project Cost Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Grants Funding Source Total $60,000 i and identify gaps in service. The ndard details for street and ,elopments and addition of street 2023-2028 CIP-CFP v0.4 60 Packet Pg. 124 2023-2028 CIP-CFP v0.4 61 Puget Sound �W Dayton St Edmonds Marsh Project Description Modify existing lane channelization on Project Benefit Reduce conflicts between ferry stora Estimated Project Cost $380,000 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total n. Dayton_St-- bayton St n-DaytonSt _ -- N a Maple St c Alder St� Alder St a N N r a Q a = M Ln Holly Dr I Howell Way Home\and Dr a m � r a' �o r N c Hemlock Way Erben Dr Seamont Ln to add vehicle storage forferry users. $380,000 $380,000 $380,000 $380,000 �L2028 20294 2023-2028 CIP-CFP v0.4 62 Packet Pg. 126 6.A.b 1 OVA nn[a AO Packet Pg. 127 2023-2028 CIP-CFP v0.4 63 I Project Description Install traffic calming devices (such as Project Benefit Reduce vehicle speeds on City streets) Estimated Project Cost $33,130 (for 2023 $18,000 baseli Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total Feedback signs, speed cus!�Lons, or other elements). Calming Policy. $30,130 $18,000 $' J $18,000 `18,000 $1 $33,130 $18,000 $1b,000 $18,000 $18,000 $1 $33,130 $18,000 $18,000 $18,000 $18,000 A L'A $33,130 $18,000 $18,000 $18,000 $18,000 $18,000 Packet Pg. 128 2023-2028 CIP-CFP v0.4 64 ..... _ �y . •• Aver'.. � .. Project Description_ The Plan identifies all existing ADA del ramps, tripping hazards within sidewa Audible Pedestrian Signals (APS). Project Benefit Inventories and prioritizes ADA issues in t Estimated Project Cost ies within the City Right of ay (such as non -compliant ADA curb i-compliant ADA dri d signalized intersection without F 0 Project Cost 2023 2024 2025 0 2027 0W 2029-43 Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $105,000 $105,000 $105,000 $105,000 2023-2028 CIP-CFP v0.4 65 Packet Pg. 129 6.A.b DJF1 U -1 Um • 2023-2028 CIP-CFP v0.4 66 Packet Pg. 130 Project Descriptio Update the City's long range transport plan. Project Benefit The Transportation Plan serves as th sport Transportation Plan is being updated in I existing and projected future land use and patter bicycle and transit infrastructure and services and provides transportation needs. The Plan will establish the transportal year Transportation Improvement Program (TIP), Capital Im (CFP). , Estimated Project Cost Design Right of Way Construction Expense Total Street Fund 112 - Gas Tax & Multi -modal REET Fund 125 REET Fund 126 Transportation Impact Fees General Fund Stormwater Utility Fund 422 Federal Grants State Grants Unsecured Funding Funding Source Total $170,000 $170,000 $170,000 it of th e 202 le Tr 's Comprehensive Plan. The prehensive Plan Update. Based upon Fment a tion Plan nd ibes roadway pedestrian, of exis ' rojected future rities and P1 opment of the six- ?nt Pro and Facilities Plan Packet Pg. 131 2023-2028 CIP-CFP v0.4 67 2023-2028 CIP-CFP v0.4 68 Project Description The City of Edmonds proposes the d( infrastructure can both address storr neighborhood and the downtown co This project includes the following eleri�nts• *Roadway narrowing to reduce traffic spe re%' *Sidewalks and planting strips added •Bioretention cells collect runoff from the road through curb •Bioretention cells collect runoff directly from sidewalks •Public private partnership potential with Housing Hope and, Project Benefit to demonstrate how green pes to benefit the Hwy 99 Incorporating green streets into the urban fabric of the City of E s is intended demonstrate how trees, vegetation, engineered green stormwater olutions, physical and visual narrowing of vehicular lane widths, and shortening pedestrian crossings with curb bulbs help to slow traffic, ameliorate climate change impacts, and reinforce desired land use and transportation patterns on appropriate street rights -of -way. These projects are intended to increase the livability of a diverse, growing city. Estimated Project Cost $4,264,342 Design $219,717 Right of Way Construction $3,500,000 Expense Total $219,717 $3,500,000 ARPA $219,717 $1,113,006 Unsecured Funding $2,386,994 Funding Source Total $219,717 $3,500,000 2023-2028 CIP-CFP v0.4 69 r capacity retained) Packet Pg. 133 i Project Description0 - The City of Edmonds proposes the dev ent of two (2) prototypical ites to demonstrate how green infrastructure can both address storm flows and enhance apes to benefit the Hwy 99 neighborhood and the downtown cor This project includes the following elerignts *Roadway narrow (vehicular capacity reta "N *Sidewalks and planting strips expanded •Bioretention planter collecting runoff from the road •Standard landscape beds adjacent bioretention planter pic planter. Project Benefit Incorporating green streets into the urban fabric of the City of demonstrate how trees, vegetation, engineered green stormw and visual narrowing of vehicular lane widths, and shortening I curb bulbs help to slow traffic, ameliorate climate change impa land use and transportation patterns on appropriate street rig[ are intended to increase the livability of a diverse, growing city Estimated Project Cost $1,722,652 Design $78,027 Right of Way Construction Expense Total $78,027 ARPA $78,027 Unsecured Funding Funding Source Total $78,027 2023-2028 CIP-CFP v0.4 70 $1,600,000 $1,600,000 $1,600,000 $1,600,000 Packet Pg. 134 6.A.b Water Prniects "AhL, # CFP DP # 2023 2024 2025 2026 2028 TOTAL (2023-2028) TOTAL (2029-43) TOTAL Project Cost PWW-01 Phase 12 Annual Re lace 2022 34 Phase 13 Annual Re I ram 2023 38 Phase 14 Annual Pro ram 2024 35 $10,000 $0 $0 $0 $0 $0 $10,000 $10,000 PWW-02 $1,700,000 $0 $0 $0 $0 $0 $1,700,000 $1,700,000 PWW-03 $506,128 $3,525,379 $0 $0 $0 $0 $4,031,507 $4,031,507 PWW-04 Phase 15 An ant Program 2025 $0 $0 $0 $526,373 $0 $0 $3,666,379 $0 $547,428 $3,813,034 $0 $569,325 $0 $0 $3,965,555 $0 $0 $0 $4,192,752 $4,360,462 $4,534,880 $4,192,752 $4,360,462 $4,534,880 PWW-05 Phase 16 Annua nt Pro ram 2026 Phase 17 Annual Re ro ram 2027 PWW-06 PWW-07 Phase 18 Annual Re lac m 2028 $0 $0 $0 $0 $592,098 $4,124,177 $4,716,275 $4,716,275 PWW-10 2023 Waterline Overlay s 36 ,000 $0 $0 $0 $0 $0 $50,000 $50,000 MAW-11 Yost & Seaview Reservoir Re airs 37 $0 $0 $0 $0 $0 $805,000 $805,000 PWW-12 Phase 19 Annual Replacement Pro ram 20 $0 $0 $0 $0 $615,782 $615,782 $615,782 Total Projects $3,071, $4,051,752 $4,213,807 $4,382,359 $4,557,653 $4,739,959 $25,016,658 $0 $25,016,658 Funding Source 024 2025 2026 2027 202g TOTAL TOTAL TOTAL (2023.2028) (2029.43) -MIJWater Fund-421 28 $4,051,752 $4,213,807 $4,382,359 $4,557,653 $4,739,959 $25.016,658 $25,016,658 Total Revenue $3,071,128 $4,051,752 $4,382,359 $4,557,653 $4,739,959 $25,016,658 $0 $25,016,658 2023-2028 CIP-CFP v0.4 72 Packet Pg. 136 Project Description - Per the approved 2017 Water Compre ve Plan, the projects will appurtenances at various locations thr out the City due to 0 pressure, or more prone to breakage o its material Project Ben � Maintain a high level of drinking water qua mpr0ve I s breakages and leakage, improve fire flows, and decrease o Estimated Project Cost $1.7 to $4.1 million/year ace/maintain pipe and related khpg undersized, need to increase flow or reliability, de se probability of day maint sts. Design $506,128 $526,373 $54W28 $569,325 lW2,098 $615,14 Right of Way Construction $1,710,000 $3,525,379 $3,666,379 $3,813,034 $3,965,555 $4,124 Expense Total $2,216,128 $4,051,752 $4,213,807 $4,382,359 $4,557,653 $4, Water Fund 421 $2,216,128 $4,051,752 $4,213,807 $4,382,359 $4,557,653 ,959 Funding Source Total $2,216,128 $4,051,752 $4,213,807 $4,382,359 $4,557,6 39,959 Packet Pg. 137 2023-2028 CIP-CFP v0.4 73 Project Description Road pavement overlays to cover area the Waterline Replacement Projects. Project Benefit Improve overall pavement condition in Projects. Estimated Project Cost Design Right of Way Construction Expense Total Water Fund 421 Funding Source Total $50,000 $50,000 $50,000 $50,000 and patched in previous years as part of d patched due to Waterline Replacement 2023-2028 CIP-CFP v0.4 74 Packet Pg. 138 Project Descriptio This work is being done to provide stru potable water storage reservoirs. Prel magnitude/preliminary costs and nex report for the Yost Reservoir, which i plus repairs to address leakage from t process of being finalized, shows similar v i85th PI SW 0 rn 186th PI SW Seeaaview Water Tank tI upgrades, repair leaka, dry findings einary ,s for the no plete, a s Project Benefit Maintain a high level of drinking water quality, improve ove retrofit structures so that they meet current structural code decrease overall day to day maintenance costs. Estimated Project Cost Design Right of Way Construction Expense Total Water Fund 421 Funding Source Total $805,000 $805,000 $805,000 W a 00 00 ind upgrades to our two underground 022 were used to determine order of nd upgrades project. Preliminary major structural and seismic retrofit, r the Seaview Reservoir, which is in the to a somewhat lesser scale. ility of leakage, hLquakes, and 2023-2028 CIP-CFP v0.4 75 Packet Pg. 139 #fi +` � `(47,( �{�+ ��y�_ ttiR�.�, Al Jam- •. �. NMI. 6.A.b m Packet Pg. 140 6.A.b Stormwater P # CFP PROJECT DP 2023 2024 2025 2026 2027 Y028 TOTAL TOTAL TOTAL Proje # (2023-2028) (2029-43) Cost I _ Edmonds Marsh tuary Restoration Related Projects +�+ PWD-01 X Edmonds Marsh Water Quality Improvements Phase 1) 1 $366,843 $0 $0 $0 $0 $0 $366.843 $366,£ .Q V Perrinville Creek Basin Projects PWD-03 Perrinville Creek Flow Management Projects 44 $120,000 $100,000 $100,000 $100,000 $100,000 $100,000 $620,000 $620,( PWD-04 X Lower Perrinville Creek Restoration Phase 1 39 $750,000 $500,000 $2,800,000 $3,000,000 $0 $0 $7,050,000 $7,050,( PWD-05 X Seaview Park Infiltration Facility Phase 2 40 $10,000 $0 $0 $0 $0 $0 $10,000 $10,( PWD-23 Perrinville Creek Basin Analysis Update 43 $150,000 $0 $0 $0 $0 $0 $150,000 $1501( _ a ILL U Storm Drainage Improvement Projects cc IL PWD-06 Lake Ballinger Regional Facility Design & Construction $0 $200,000 $3,000,000 $0 $0 $0 $3,200,000 $3,200,( N PWD-22 7317 Lake Ballinger Way Floodplain Purchase & Structure Removal 46 $750,000 $0 $0 $0 $0 $0 $750,000 $750,( 41 y+ Annually Funded Projects ( PWD-11 I Phase 4 Annual Storm Replacement Project 2023 42 $290,000 $1,622,400 $0 $0 $0J$01 $1,912,400 $1,912f PWD-12 Phase 5 Annual Storm Replacement Project 2024 $0 $324,480 $1,687,296 $0 $0 $2,011,776 $2,011,i PWD-13 Phase 6 Annual Storm Replacement Project 2025 $0 $0 $337,460 $1,754,786 $0 $2,092,246 $2,092,: PWD-14 Phase 7 Annual Storm Replacement Project 2026 $0 $0 $0 $350,958 $1,824,977 $2,175,935 $2,175,t PWD-15 Phase 8 Annual Storm Replacement Project 2027 $0 $0 $0 $0 $364,996 $2,262,972 $2,262,t PWD-16 Phase 9 Annual Storm Replacement Project 2029 $0 $0 $0 $0 $0 $379,596 $379,F PWD-19 2023 SD Overlays 41 $200,000 $0 $0 $0 $0 $200,000 1 $200,( M LL Q O N O N Compliance Related Projects r M N PWD-17 Storm and Surface Water Comprehensive Plan 45 $600,000 $0 $0 $0 $0 $0 $600,000 $600,( N ..r Total Projects $3,236,843 $2,746,880 $7,924,756 $5,205,744 $2,289,973 $2,377,572 $23,781,768 $0 $23,781,7 d IL 0 Funding Source 2023 2024 2025 2026 2027 Y028 TOTAL (2023-2028) TOTAL (2029-43) TOTAL Stormwater Utility Fund - 422 $ 1,834,220 $ 2,292,776 $ 3,672,693 $ 2,955,744 $ 2,289,973 $ 2,377,572 $ 15,422,978 $ 15,422,9 ARPA Funds $ 681,116 $ 454,104 $ 192,464 $ - $ - $ - $ 1,327,684 $ 1,327,6 Secured Grants $ 721,507 $ - $ - $ - $ - $ - $ 721,507 $ 721,5 Unsecured Grants $ - $ - $ 41059,599 1 $ 2,250,000 1 $ -I $ - $ 6,309,599 L 1 $ 6,309,5 Total Revenue $ 3,236,843 $ 2,746,880 $ 7,924,756 1 $ 5,205,744 1 $ 2,289,973 1 $ 2,377,572 $ 23,781,768 1 1 $ 23,781,7 d ci O N O N r M N O N In Y L Q a m E a 2023-2028 CIP-CFP v0.4 77 Packet Pg. 141 Packet Pg. 142 2023-2028 CIP-CFP v0.4 Project Descriptio The project will be improving water qu side of SR-104, along the frontage of th include water quality filter cartridges. discharges that directly enter the ma 1 replacing the catch basins on the we! side of SR-104. Project Benefit Wildlife Refuge Walnut St-z I I I �. QI Howell Way O City Park Z ¢ O of stormwater runoff by re acing existing catch basins along the west monds marsh. The c will be replaced with catch basins that proposes this provide water quality mitigation for all m thes e pr twill be divided into phases, with phase d a futur se replacing the catch basins on the east Improve water quality of stormwater discharging into the Ed located near the marsh. The improvements will provide be4 Estimated Project Cost $366,843 Design Right of Way Construction Expense Total Stormwater Utility Fund 422 ARPA Funds Secured Grants Unsecured Grants Funding Source Total $366,843 $366,843 $152,836 $214,007 $366,843 Packet Pg. 143 2023-2028 CIP-CFP v0.4 79 2023-2028 CIP-CFP v0.4 80 Ilt►1 Project Description_ Reducing scouring flows to reduce sedi s load in Perrinville Creek completed in 2015 as a critical elemen estoring this creek w development. The projects funded by rogram are iCn adequate fish habitat. These efforts ecome itical Perrinville Creek outfall area. This pro i ement' to reduce scour flows in the creek. It allo exibIrescluster projects, or ensure matching funds are available Project Benefit The project will reduce peak flows in Perrinville creek, im peak flow events. Estimated Project Cost $120,000/year Design Right of Way Construction Expense Total Stormwater Utility Fund 422 ARPA Funds Secured Grants Unsecured Grants Funding Source Total s identified in a previous basin report en significantly impacted by urban oward recovering this stream run as n recent challenges around the rojects within the Perrinville Creek basin o ad -hoc oppor unities such as rain garden nt applicatiow reductions projects $110,000 $90,000 $90,000 $90,000 $120,000 $100,000 $100,000 $100,000 $ $120,000 $100,000 $100,000 $100,000 $ $120,000 $100,000 $100,000 $100,000 $100,000 Packet Pg. 145 2023-2028 CIP-CFP v0.4 81 Puget Sound 4P F� �0 K's A Project Descriptio The city has struggled to manage and ain the undersized outfall s tem at Perrinville Creek. The current combination of multiple stake holders k alignment, sedime undersized culverts creates several issues which make the creek unsustai as a natural s rn must be addressed from the bottom of the creek up in order to sequence lief oft con correctly. The improvements are needed to relieve current flooding, ease City m to This project will build on any interim BNS -wa under Talbot Road which is fully compliant with current fl also include time and effort to research and apply for supp can be built. This complex project includes many stakehold development phase will be needed before being ready for Project Benefit nd pr kDlac The project will reduce City maintenance needs in the future an Estimated Project Cost Design Right of Way Construction Expense Total Stormwater Utility Fund 422 ARPA Funds Secured Grants Unsecured Grants Funding Source Total etter and more sustainable fish habitat. existing BNSF c vert and a new culvert ment and fis a regulations. It will /additional f s so that the project estimate mini year design and tic $2,800,000 $3,000,000 IV $750,000 $500,000 $2,800,000 $3,000,000 $68,884 $45,896 $797,937 $750,000 $681,116 $454,104 $192,464 $1,809,599 $2,250,000 $750,000 $500,000 $2,800,000 $3,000,000 Packet Pg. 146 2023-2028 CIP-CFP v0.4 82 i Post 12 Office Seaview Park r � s � o 185th St SW a' o C W q� I . 185th PI SW i c i CO St SW I i i `� rn CO ( C Project Description ff Reducing scouring flows in order to red report completed in 2015 as a critical urban development. The project is a habitat. The grant for this project has system in Seaview Park, almost identic o sediments load in Perrinvill Creek was identified in a previous basin nt of restoring this c has been significantly impacted by mental step t this stream run as an adequate fish dy been is pr proposes construction of an infiltration Phase 1 ct which was completed in 2019, in order ARPA Funds Secured Grants $7,500 Unsecured Grants Funding Source Total $10,000 Packet Pg. 147 2023-2028 CIP-CFP WA 83 Project Description Supplemental study to update Perrinvi projects that would help decrease the Project will be updated to reflect prof basin to aid in the reduction of peak Project Benefit reek 2015 basin analysis th r1 storm flows during :ompleted and in the bama Improve overall basin and stream health, by using green stal that rainfall is not simply collected and conveyed downstrea conditions. This includes infiltrating rainfall runoff as close a stream peak flows, which will decrease stream erosion and J Estimated Project Cost Design Right of Way Construction Expense Total Stormwater Utility Fund 422 ARPA Funds Secured Grants Unsecured Grants Funding Source Total $150,000 Lynnwood etermined possible locations for ents. there are other locations within the rInfrastructur stea4wbeh ble to the This will make it so possible to natural so decrease uatic life. 2023-2028 CIP-CFP v0.4 84 Packet Pg. 148 6.A.b 'l� •lp 2023-2028 CIP-CFP v0.4 85 Packet Pg. 149 j 0D 2401h St SW `tier Mathay Ballinger LLI IL Park 240th PI SW = 241 St St SW a N r, 42 nAStS Project Descriptio Lake Ballinger suffers from urban flood seasonal algae blooms a The Highway 99 corridor is an area of evelopment, includi stormwater mitigation. By creating a nal facility, the by development, addressed stormwa itigation a fut one of the City bigger pollution genera g can dra The project proposes to implement Ovate and ntro Park as green stormwater infrastructure (GSI) which woul conditions and enhance a valued neighborhood, but underut < Project Benefit The project proposes to implement water quality and flow rol im Park as green stormwater infrastructure (GSI) which would si ific conditions and enhance a valued neighborhood, but underutiliz Estimated Project Cost Design Right of Way Construction Expense Total Stormwater Utility Fund 422 ARPA Funds Secured Grants Unsecured Grants Funding Source Total Pith otherwater quality impairments. City project which will require the stormwater mitigation achieved hway project, and treat runoff from mprove Lake Ballinger water quality. ments at&Q-ownecl Mathay-Ballinger ly benefit theogy and habitat rk. $200,000 $3,000,000 $200,000 $3,000,000 $200,000 $750,000 $ 2, 250, 000 $200,000 $3,000,000 Packet Pg. 150 2023-2028 CIP-CFP v0.4 86 Project Description The project proposes to purchase an e g single family residential ploperty located within the Lake Ballinger flood plain. The City secured 0,000 Department o ant to aid in this process. The home is the lowest property on the lake and i y damaged fro ing to the point it is generally uninhabitable. It is also nearly undev ble due plain critical area regulations onsite. The City intends to remove the home an ution atin faces from the 'te as part of the initial effort on the site. The grant has restrictions for allowing t be used for e. After demolition of the structures and impervious surfaces, the planned site use a for publi t only. Because the City storm drain line for SR-104 cuts through in an easement i diately ad' o this the City plans to pursue a future project to split appropriate flows from the C' stem an a water qu atment to the maximum extent feasible. The future project would provid er qua ' t for a very trafficked highway (SR-104) and would make significant improvement ate to L Ilinger and i s d stream course to Lake Washington via McAleer Creek. Project Benefit Improve the health and water quality of Lake Ballinger by removing hard surfaces and a home that is uninhabitable. Project will also provide a future location to treat stormwater runoff from portions S1 Estimated Project Cost Design Right of Way $750,000 Construction Expense Total $750,000 Stormwater Utility Fund 422 $250,000 Secured Grants $500,000 Unsecured Grants Funding Source Total $750,000 2023-2028 CIP-CFP v0.4 87 Packet Pg. 151 6.A.b Am01 0 10WA ♦131 2023-2028 CIP-CFP v0.4 88 Packet Pg. 152 ILI, Project Descriptio Annual storm drain replacement/main ce projects. Projects propo a to replace or rehab storm drain infrastructure in several locations thro ut the City. Locations entified by City crews and staff via firsthand knowledge or video inspecti sults. Much of ater infrastructure is past its useful lifespan and requires routine replace or repai the ion of the storm drain system. Failure to conduct annual maintenance projects i s of stor in system failure. Improve system reliability and capacity, decrease breakages, a crease ove,@11111 &taintenance costs. $1.9 to $2.2 million/year 2023-2028 CIP-CFP v0.4 89 Packet Pg. 153 o n. F..447�d Project Description Road pavement overlays to cover area! the Annual Storm Maintenance Projec Project Benefit Im Improve overall pavement condition in Replacement Projects. 4==Nff $200,000 dways that were excavated and patched in previous years as part of 2025 Design $15,000 Right of Way Construction $185,000 Expense Total $200,000 Stormwater Utility Fund 422 $200,000 ARPA Funds Secured Grants Unsecured Grants Funding Source Total $200,000 d patched due to the Annual Storm 4 2023-2028 CIP-CFP v0.4 90 Packet Pg. 154 6.A.b 011TAUIU k1l3 Packet Pg. 155 2023-2028 CIP-CFP v0.4 91 Project Description This project would be a comprehensi) recommendations for improvements maintenance projects. No on -going c or projects, which will be done as ney ' a � eMuw � t r - ! EOMOHOS mnwy fw NAM s+ NRnF9Y ' unw�wirouteo 1: NTLAKE _ e RRACE rnx:� w r � e ■s luation of the City's storm ustments and recom e anticipated ital proj budij Project Benefit A holistic summary of the City's Stormwater system with maintenance and improvements projects. Estimated Project Cost $600,000 Design Expense Total Stormwater Utility Fund 422 Funding Source Total in system and operations with Iorities for selecting future capital ent any recommended improvements lanning/process. ng future capital 2023-2028 CIP-CFP v0.4 a Packet Pg. 156 fi l4k IN, � !j 114 Wo -, yr- 6.A.b Sower Prniects n # CFP CT Phase 9 Annual Sewer Re rovements 2022 Phase 10 Annual Sew /im rovements 2023 Phase 11 Annual ehab/Im rovements 2024 DP # 49 2024 2025 2026 2028 TOTAL (2023-2028) TOTAL (2029-43) TOTAL Project Cost PWS-01 $30,000 $0 $0 $0 $0 $0 $30,000 $30,000 PWS-02 52 $1,689,212 $0 $0 $0 $0 $0 $1,689,212 $1,689,212 PWS-03 50 $349,517 $1,964,780 $0 $0 $0 $0 $2,314,297 $2,314,297 PWS-04 Phase 12 An a I/Rehab/Im rovements 2025 Phase 13 Annua I/Rehab/Im rovements 2026 Phase 14 Annual Se hab/Im rovements 2027 $0 $363,498 $2,043,372 $0 $0 $0 $2,406,870 $2,406,870 PWS-05 $0 $0 $0 $0 $378,038 $0 $2,125,107 $393,160 $0 $2,210,111 $0 $0 $2,503,145 $2,603,271 1 $2,503,145 $2,603,271 PWS-06 PWS-07 Phase 15 Annual Sewer Im rovements 2028 Annual Citywide CIPP Sewer $0 $0 $0 $521,611 $0 $542,475 $0 $564,174 $408,886 $586,741 $2,298,515 $610,210 $2,707,401 $2,825,211 $2,707,401 $2,825,211 PWS-10 PWS-11 Lake Ballin er Sewer $1,000,000 $6,000,000 $0 $0 $0 $7,000,000 $7,000,000 PWS-12 Ci ide CIPP Sewer Rehabilitation Phase 53 $4 $0 $0 $0 $0 $0 $423,710 $423,710 PWS-14 2023 SS Overlays 51 $200, $0 $0 $0 $0 $0 $200,000 $200,000 PWS-15 I Phase 16 Annual Sewer Re I/Rehab/Im rovements 2029 $0 $0 $0 $0 $425,242 $425,242 $425,242 Total Projects $2,69 $3,849,889 $8,963,885 $3,082,441 $3,205,738 $2,908,725 $24,703,117 $0 $24,703,117 Funding Source7:=S :p 2024 2025 2026 2027 2028 TOTAL TOTAL TOTAL 4 I(2023.2028) (2029.43) „ a I— - — A —1 ezQAoQsa ez Q AA, I ez� �7 Q 1e o Q, G ,�z,,, —A—,,, Total Revenue $2,692,439 $3, ,a F $3,082,441 $3,205,738 $2,908,725 $24,703,117 $0 $24,703,117 tC a+ .Q R U C fC a LL U_ c N d �r fC LL tC .Q tC U 00 N O N M N O N a LL U a U 00 N O N M N Co N to Y i O _v 3 a c a> E U t0 Q 2023-2028 CIP-CFP v0.4 94 Packet P9, 158 # .0 T--;4 A Project Description_ Per the approved 2013 Sewer Compre various locations throughout the City to breakage due to its material prope Project Benefit Improve system reliability and capacity, d day to day maintenance costs. Estimated Project Cost $1.7 to $2.7 million/year e Plan, the projects will re ace pipe and related appurtenances at old age, being unde d to increase capacity, or more prone and decrease overall Design $449,517 $363,498 $3-710IT38 $393,160 '68,886 $42 Right of Way Construction $1,619,212 $1,964,780 $2,043,372 $2,125,107 $2,210,111 $2,29 Expense Total $2,068,729 $2,328,278 $2,421,410 $2,518,267 $2,618,997 $2, Sewer Fund 423 $2,068,729 $2,328,278 $2,421,410 $2,518,267 $2,618,997 Funding Source Total $2,068,729 $2,328,278 $2,421,410 $2,518,267 $2,618,9 , 2 Packet Pg. 159 2023-2028 CIP-CFP v0.4 95 •YA Lam, Project Description Per the approved 2013 Sewer Compre line existing sewer mains that are subj by this trenchless method. Project Benefit Improve system reliability and capacity, d day to day maintenance costs. Estimated Project Cost $520,000 to $600,000/year Design Right of Way Construction Expense Total Sewer Fund 423 Funding Source Total plan and current video intrusion, infiltrat-WA ons of sewer mains, the project will v, and damage that can be repaired and decrease overall 2023-2028 CIP-CFP v0.4 96 Packet Pg. 160 t5F t:KANC.t _ a rlsw R. Holly 1 M T%f Y Ln �. , Maple i 2341h`St'SW— 3'T 234th St SW 1 a Madrona Ln n O `cZ �. 236th St SW t SW236th St SW, / C 00 L N St SSW 23 W �'� nth St SW ` a' r S�� a �3 240th S mj Q is 701 242nd St 244TH ST SW Project Description Irk 232nd St Sw 232nd St SW 232nd St m q 235thStSv .r>sw �z 235TH PL SW_ LV 236TH ST SW Lake Ballinger JEB-ALLINGER-WAY—=244 : 3 C 23gthSJ IL v y i k o ` z421V c N Per the approved 2013 Sewer Compre ve plan and current video i pections of sewer mains, the sewer pipe along Lake Ballinger will require additi low capacity in the n These improvements are needed to account for population growth, reduc Itration and Inf a and improve maintenance and emergency access for this major trun em. Project Benefit Improve system reliability and capacity, decrease infiltratioq maintenance costs. Improved access will help ease maintena decease any chance of potential sewer spills into Lake Balling Estimated Project Cost $7,000,000 Design Right of Way Construction Expense Total Sewer Fund 423 Funding Source Total $1,000,000 w,and d access fc $5,000,000 $1,000,000 $5,000,000 $1,000,000 $5,000,000 $1,000,000 $5,000,000 II day to day \which will further 2023-2028 CIP-CFP v0.4 97 Packet Pg. 161 a FA 'GION Lam, Project Description Per the approved 2013 Sewer Compre line existing sewer mains that are subj by this trenchless method. Project Benefit Improve system reliability and capacity, d day to day maintenance costs. Estimated Project Cost Design Right of Way Construction Expense Total Sewer Fund 423 Funding Source Total plan and current video intrusion, infiltrat-WA ons of sewer mains, the project will v, and damage that can be repaired and decrease overall 2023-2028 CIP-CFP v0.4 98 Packet Pg. 162 Project Description Road pavement overlays to cover area the Sanitary Sewer Replacement Proje Project Benefit Improve overall pavement condition in Replacement Projects. Estimated Project Cost Design Right of Way Construction Expense Total Sewer Fund 423 Funding Source Total $188,000 $200,000 $200,000 $200,000 and patched in previous years as part of d patched due to Sanitary Sewer 2023-2028 CIP-CFP v0.4 99 Packet Pg. 163 POW so% w �' I c C A L T a it — -MUSEUM• i910 • - '10C .4 100 6.A.b m 0 3: .2 E 0 L- IL as 6.A.b Facilities Projects # CFP ECT Bo s and Girls Club Cemete Buildin CityHall FishingPier/ rStation Frances Anders DP # 2023 2026 2027 2028 TOTAL (2023-2028) TOTAL (2029-43) TOTAL Project Cost PWF-01 $150,034 $27,733 $37,453 $32,077 $15,101 $20,000 $282,398 $0 $282,398 PWF-02 $1,954 $2,094 $8,414 $3,377 $818 $1,000 $17,657 $0 $17,657 PWF-03 $150,000 $323,246 $279,064 $70,949 $108,628 $80,000 $1,011,887 $0 $1,011,887 PWF-04 $70,000 $2,971 $2,918 $5,628 $1,043 $1,500 $84,060 $0 $84,060 PWF-05 $525,002 $298,378 $98,892 $20,934 $113,029 $80,000 $1,136,235 $0 $1,136,235 PWF-06 Fire Station i6 $47,689 $81,545 $1,591 $100,000 $69,388 $221,922 $30,107 $27,575 $31,631 $122,245 $35,000 $45,000 $215,406 $598,287 $0 $0 $215,406 $598,287 PWF-07 Fire Station 17 PWF-08 Fire Station 20 Fire Life Safet Communications Historic Log Cabin Historical Museum 11-11brary Library Plaza Deck Waterproofing Project Meadowdale Club House Old Public Works ,000 $16,274 $0 $94,248 $0 $69,782 $0 $23,765 $0 $20,000 $0 $244,069 $60,000 $0 $0 $244,069 $60,000 PWF19 PWF-09 $ $888 $546 $1,361 $6,469 $1,500 $90,764 $0 $90,764 PWF-10 $63, $15,000 $10,000 $4,621 $10,199 $5,000 $107,909 $0 $107,909 PWF-11 $25,0 $231,077 $53,325 $45,038 $35,000 $0 $389,440 $0 $389,440 PWF-23 $0 $0 $0 $0 $4,900,000 $4,900,000 $0 $4,900,000 PWF12 $3,665 $24,308 $7,985 $25,000 $4,446 $25,000 $1,159 $24,519 $5,000 $25,000 $115,681 $231,570 $0 $0 $115,681 $231,570 PWF-13 PWF-14 Parks Maintenance Building 0,789 $40,320 $9,349 $5,177 $69,228 $20,000 $214,863 $0 $214,863 PWF-20 Parks Restrooms Maintenance $55,000 $50,000 0 $25,000 $25,000 $100,000 $305,000 $0 $305,000 PWF-15 Public Safety$50,967 $445,276 $151,481 $515,071 $80,000 $1,297,964 $0 $1,297,964 PWF-16 Public Works O&M $201,570 $79,348 $43,821 $50,000 $673,697 $0 $673,697 PWF-21 Public Works EV Conduit Addition $125,000 $0 $0 $0 $125,000 $0 $125,000 PWF-17 Wade James Theater 9,077 0 $115,734 $21,872 $25,000 $324,163 $0 $324,163 PWFA8 Yost Pool House $26,128 ,409 $19,127 $30,389 $30,000 $0 $179,623 PWF-22 Ci Park Gazebo Roof 0.00 $0 $0$0$0$0 "1796231 $0 $50,000 MPF- Total Projects $2,112,978 $1, 1,156,277 $736,7 67 $624,000 $12,655,673 $0 $12,655,673 Funding Source 2023 2024 2025 028 TOTAL TOTAL TOTAL $ $452, 0 $0 0 (2023-2028) (2029-43) Fund 016 2021 Facilities Bond $1,127,151 $2,968,461 $0 $2,315,378 $0 $2,968,461 $2,315,378 Fund 016 non-bondproceeds) $819,995 L, $76,592 00 General Fund $25,000 $0 $0 $ $25,000 $0 $25,000 Water Utility Fund 421 $12,500 $0 $0 $ $0 $ 12,500 $0 $12,500 Stormwater UtilityFund 422 $12,500 $0 $0 $0 $0 $0 00 $0 $12,500 Sewer UtilityFund 423 $12,500 $0 $0 $0 $0 $0INE $0 $12,500 Unsecured Funding $90,832 $106,074 $25,000 $460,033 $1,122.395 S592,500 $7 $0 $7,296,834 Total Revenue $2,112,978 $1,926,669 $1,156,277 $736,762 $1,1 $12,655,673 2023-2028 CIP-CFP v0.4 101 Packet Pg, 165 R -Iqwr' 7 Project Description This building built in 1900 was the origi field house for Edmonds H Field and not part of the large Civic Fie rk restoration projec Snohomish County Boys and Girls Cluj artnership wit building has sustained some interior ng that med back stairway. It has significant need f a' s if it is e years. Renovation and deferred mainten ecli bui Projects: Exterior plumbing access, Window replacement, I Plumbing replacement, Front entry door replacement, Fire Baseboard heating replacement School. The property is located at Civic ing is solely operated by the and Recreation department. The repair to back hallway floors and the ed to be in operation for another 10 value in its currcent location. ent, Si ent, ADA Access, ne ation, rinkler updates, Project Benefit - Public owned facilities and properties are maintained to assures d property o g conditions assure the protection of the physical asset throughout an expecte ifespan. A well -ma ained facility cr( safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. R and preventative maintenance reduces energy consumption and provides for building systems to opera designed during manufacturer expected lifespan. Estimated Project Cost $282,398 Construction\Professional Services $150,034 $27,733 $37,453 $32,077 $15,101 $20,000 Expense Total $150,034 $27,733 $37,453 $32,077 $15,101 $20,000 Fund 016 (2021 Facilities Bond) $150,034 Fund 016 (non -bond proceeds) $27,733 $37,453 Unsecured Funding $32,077 $15,101 $20,000 Funding Source Total $150,034 $27,733 $37,453 $32,077 $15,101 $20,000 c 2023-2028 CIP-CFP v0.4 102 Packet Pg. 166 �mox�ds McN"M CEhiETEkY Project Description_ This small structure houses the Edmon metery funerary services a d the cemetery Sextant office. The building is in relatively good condition as little deferred ma' backlog. Minor security and communications updates will be need technology di Projects: Minor repair and maintenance Project Benefit Public owned facilities and properties are maintained to assL assure the protection of the physical asset throughout an safe work environment that is clean and sanitary which pro and preventative maintenance reduces energy consumption designed during manufacturer expected lifespan. Estimated Project Cost $17,657 Construction\Professional Services $1,954 $2,094 $8,414 Expense Total $1,954 $2,094 $8,414 Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) $1,954 $2,094 $8,414 Unsecured Funding Funding Source Total $1,954 $2,094 $8,414 tions and to ky creates a e. Routine $3,377 $818 $1,000 $3,377 $818 $1,000 2023-2028 CIP-CFP WA 103 Packet Pg. 167 A&')S iFJ�; MIr _l\ 1r r „1 IN Project Description_ City Hall was built in 1979 and was ope 7asaate busine0ss offic center until the City purchased and renovated the building in the 1990s. T rated Edm all from this location since the renovations were completed. The bui origi needs substantial repair and maintenance. Projects: All Mechanical, Electrical and PI1qWRTY_ste d rE neutral consideration, Center Stairway Code updates and Interior Painting, ADA accessibility improvements. Project Benefit Public owned facilities and properties are maintained to a s assure the protection of the physical asset throughout an ex ct safe work environment that is clean and sanitary which promote and preventative maintenance reduces energy consumption and designed during manufacturer expected lifespan. Estimated Project Cost $1,011,887 Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total lent, Restroo remodels w/gender Lobby rem�try Awning re -glazing, Nbuilding g condl�f s and to rn.Ained faci lit tes a <place confidence. e des forems tooperate $150,000 $323,246 $279,064 $70,949 $1MW8 $80,000 $150,000 $323,246 $279,064 $70,949 $108,628 $80,000 $323,246 $129,064 $150,000 $150,000 $70,949 $108,628 $150,000 $323,246 $279,064 $70,949 $108,628 $80,000 $80,000 2023-2028 CIP-CFP WA 104 Packet Pg. 168 Project Description_ The Pier was recently renovated and is office and restroom facility located ne- functions that operate out of this facilj -ally in good condition. Th east end of the pier A Projects: Electrical panel and pier elec"I f ent Project Benefit Public owned facilities and properties are maintained to assu assure the protection of the physical asset throughout an exK safe work environment that is clean and sanitary which pro and preventative maintenance reduces energy consumpti designed during manufacturer expected lifespan. Estimated Project Cost $84,060 Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total ich Ranger Office is a 1200 square foot season programs and visitor support airs, and maintenance itions and to cility creates a 6e. Routine trate as $5,628 $1,043 $1,500 $70,000 $2,971 $2,918 $5,628 $1,043 $1,500 Packet Pg. 169 2023-2028 CIP-CFP v0.4 105 Project Description The Frances Anderson Center serves programing year round. Due to the a need of replacement or restoration. -ity's main recreation cent offering arts, athletic and cultural high usage of the b are many building systems that are in Projects: Replacement of Heating Boilawwi"Floor, Replacement of all exterior doors (24 ea) , appropriate), Plumbing drainage collector, Gy gender neutral consideration), Replacement of all plumbing classroom flooring, Addition of building security card reader Alarm replacement, Fire Sprinkler replacement. Oil tank ren Project Benefit ill add ventilation, cooling and heating, osures, New WI doves (historically ains ADA corn estroom remodels (w/ Replaceme common area and ing HVAC s to e efficiency, Fire on, and uilding act nce efforts. Public owned facilities and properties are maintained to assure s d property o g conditions assure the protection of the physical asset throughout an expecte ifespan. A well maI ained facility cr( safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. R and preventative maintenance reduces energy consumption and provides for building systems to opera designed during manufacturer expected lifespan. Estimated Project Cost Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $525,002 $298,378 $98,892 $525,002 $298,378 $98,892 $525,002 $298,378 $98,892 $525,002 $298,378 $98,892 $20,934 $113,029 $80,000 $20,934 $113,029 $80,000 $20,934 $113,029 $80,000 $20,934 $113,029 $80,000 2023-2028 CIP-CFP v0.4 106 Packet Pg. 170 Project Description_ This facility is operated by South Snol of 10,700 square feet. The building is replacements to remain operationall, Projects: roll -up bay door controller updates. County Fire and Rescue an was built in 2003 and has a building area condition and will re infrastructure updates or for the need Project Benefit Public owned facilities and properties are maintained to assL assure the protection of the physical asset throughout an safe work environment that is clean and sanitary which pro and preventative maintenance reduces energy consumption designed during manufacturer expected lifespan. Estimated Project Cost $215,406 Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $47,689 $69,388 $1,591 $47,689 $1,591 $69,388 t, gutter replacement, interior coatings itions and to y creates a e. Routine $30,107 $31,631 $35,000 $30,107 $31,631 $35,000 2023-2028 CIP-CFP WA 107 Packet Pg. 171 A 5 y mid- WMIF - rViM =mom Project Description_ This building is operated by South Sno h County Fire and Rescue 9,800 square feet. This building has ha a updates but will n operationally ready. Projects: bay door assessment, draina".Ip I i ceiling replacement. Project Benefit Public owned facilities and properties are maintained to assL assure the protection of the physical asset throughout an safe work environment that is clean and sanitary which pro and preventative maintenance reduces energy consumption designed during manufacturer expected lifespan. Estimated Project Cost $598,287 Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $81,545 $100,000 $221,922 $81,545 $100,000 $221,922 $81,545 $100,000 $221,922 s built in 1999 and has a building area of ynfrastructure upgrades to remain updates, roof soffit enclosure, bay $27,575 $ $27,575 $ $27,575 $122,245 $81,545 $100,000 $221,922 $27,575 $122,245 itions and to y creates a e. Routine $45,000 $45,000 2023-2028 CIP-CFP WA 108 Packet Pg. 172 Project Description_ This building is the eldest of the City's t fire stations and is operate by South County Fire and Rescue. This station serves Esperance and supports ther two fire station ds. The building is 6400 square feet and was built in 1990. The building h significant u rior envelope and is in need of interior and HVAC system updates. Projects: storm water drainage system, i aintin Project Benefit Public owned facilities and properties are maintained to assL assure the protection of the physical asset throughout an safe work environment that is clean and sanitary which pro and preventative maintenance reduces energy consumption designed during manufacturer expected lifespan. Estimated Project Cost $244,069 Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total re replaceme itions and to y creates a e. Routine $20,000 $16,274 $94,248 $69,782 $23, $20,000 $20,000 $16,274 $94,248 $69,782 $ $20,000 $20,000 $16,274 $94,248 $69,782 $23,765 $20,000 $20,000 $16,274 $94,248 $69,782 $23,765 $20,000 2023-2028 CIP-CFP WA 109 Packet Pg. 173 mom A 4 Project Description This Historic log cabin is home to thJE ds Chamber of Commerce isitor center, the structure was a purpose built cabin from the turn of the censtructure is profess' ntained on a three year cycle by a log cabin specialist and requires only mintenance and Projects: new thick cut shingle replace n to Project Benefit Public owned facilities and properties are maintained to assu assure the protection of the physical asset throughout an exK safe work environment that is clean and sanitary which pro and preventative maintenance reduces energy consumpti designed during manufacturer expected lifespan. Estimated Project Cost $90,764 or Fand prop 1 lifespan workpJA itions and to cility creates a 6e. Routine trate as Construction\Professional Services $80,000 $888 $546 $1,361 $6,469 1,500 Expense Total $80,000 $888 $546 $1,361 $6 $1,500 Fund 016 (2021 Facilities Bond) $80,000 Fund 016 (non -bond proceeds) $888 $546 $1,361 $ 1469 $1,500 Unsecured Funding $5,969 Funding Source Total $80,000 $888 $546 $1,361 $12,438 $1,500 Packet Pg. 174 2023-2028 CIP-CFP v0.4 110 r. Project Description - �crki� Y The 110-year-old original Carnegie Libr uilding is home to the Edm ds Museum. The building is on the State of Washington Historic registry and ha n well maintained ov several years. Buildings of this age require specialized maintenance and ination with t rchitect to maintain the historic status. Structural stabilization and weatherp ng are th ican rities to maintain this facility. Projects: minor structural reinforcement, Bade ry r lower entry re oration Project Benefit Public owned facilities and properties are maintained to assu a and pr peratin tions and to assure the protection of the physical asset throughout an e d lifesp II maintaine y creates a safe work environment that is clean and sanitary which pr es wor e cy and confi e. Routine and preventative maintenance reduces energy consumption d p for bui stems to op as designed during manufacturer expected lifespan. Estimated Project Cost $107,909 Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $63,089 $15,000 $10,000 $63,089 $15,000 $10,000 $50,000 $15,000 $10,000 $13,089 $63,089 $15,000 $10,000 $4,621 $10, $4,621 $ $4,621 $10,199 $4,621 $10,199 $5,000 $5,000 $5,000 $5,000 2023-2028 CIP-CFP v0.4 Packet Pg. 175 MR %R% Project Description_ The Edmonds Library is operated by th rental space. The library is a 19,000 sq daily Library programming and comm public and has significant deferred m� waterproofing. -Isle Library system with a eption of the Second floor Plaza room foot building built in uilding hosts special event rentals and services. This i s most heavily used buildings by the nance n g th ding fagade and plaza deck Projects: window replacement, ADA access device upgra ement, gend ive public restroom creation, Plaza Room restroom/changing facilities, Plaza Roo nstallation, my restoration or building cladding, exterior stairway restoration, HVAC ventila n replace uildi zeway remodel, exterior planter box replacement and waterproofing, flood e restor Project Benefit Public owned facilities and properties are maintained to assures d property o g conditions assure the protection of the physical asset throughout an expecte ifespan. A well mai ained facility cre safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. Ro and preventative maintenance reduces energy consumption and provides for building systems to opera designed during manufacturer expected lifespan. Estimated Project Cost $389,440 Construction\Professional Services $25,000 $231,077 Expense Total $25,000 $231,077 Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) $25,000 $150,902 Unsecured Funding $80,175 Funding Source Total $25,000 $231,077 $53,325 $45,038 $35,000 $53,325 $45,038 $35,000 $53,325 $45,038 $35,000 $53,325 $45,038 $35,000 2023-2028 CIP-CFP v0.4 112 Packet Pg. 176 Project Description_ This 4000 square foot facility was built 65 as a community theate Meadowdale community club house. uilding is currently o houses the City operated Meadowdal -school and th r facility. This facility while dated has b ell mai only r� Projects: minor maintenance and repairs, or Project Benefit Public owned facilities and properties are maintained to assL assure the protection of the physical asset throughout an safe work environment that is clean and sanitary which pro and preventative maintenance reduces energy consumption designed during manufacturer expected lifespan. Estimated Project Cost $115,681 paA acility and later was transformed into the aintained by the City of Edmonds and t Meadowdale club house rental es minor maintenance and repairs. and bath fixtu,&e replacement. itions and to y creates a e. Routine Construction\Professional Services $93,426 $3,665 $7,985 $4,446 $1, $5,000 Expense Total $93,426 $3,665 $7,985 $4,446 $5,000 Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) $93,426 $3,665 $7,985 $4,446 $1,159 $5,000 Unsecured Funding Funding Source Total $93,426 $3,665 $7,985 $4,446 $1,159 $5,000 2023-2028 CIP-CFP WA 113 Packet Pg. 177 r ' F - ' j 3 ,L +•AIM _ Project Description_ This facility was built in 1965 to house ity's Public Works Departm nt, the building was converted in 1995 to tenant space and City storage, as well monds Police large e ' rage. This is a vital piece of property adjacent to the Waste Water Treatm ant, and could utility use if regulatory requirements dictate. Building is primarily used as a and w' a upd to maintain current operational readiness. Projects: HVAC updates, roll -up door replacement, parkin Project Benefit Public owned facilities and properties are maintained to ass assure the protection of the physical asset throughout an e� safe work environment that is clean and sanitary which pron and preventative maintenance reduces energy consumption designed during manufacturer expected lifespan. Estimated Project Cost $231,570 Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total nd confidenq kems to ope $107,743 $24,308 $25,000 $25,000 $r $25,000 $107,743 $24,308 $25,000 $25,000 $ 19 $25,000 $22,308 $30,000 $77,743 $24,308 $25,000 $25,000 $24,519 $25,000 $107,743 $46,616 $25,000 $25,000 $24,519 $25,000 Packet Pg. 178 2023-2028 CIP-CFP v0.4 114 0 Project Description lo"" This facility was built in 1967 by Ed HL foot facility now houses all City Facilit seasonal help) This Facility is home to shop and Parks and Facilities mainterli Facility is near end of life and is under who at the time was the C rations staff(11) and ity Carpentry supply s e I as d departm Projects: maintenance and repair to maintain operational replacement, Pine St. facility exit, exterior painting. Project Benefit :�W Public owned facilities and properties are maintained to a s assure the protection of the physical asset throughout an ex ct safe work environment that is clean and sanitary which promote and preventative maintenance reduces energy consumption and designed during manufacturer expected lifespan. Estimated Project Cost $214,863 Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total Facilities supervisor. The 4800 square and Rec Parks Maintenance Staff(12+ ity Flower program, Parks engine repair and Facilities Manager offices. This staffing that are assigned to this facility. tained facilit� k confidence. stems to operate $70,789 $40,320 $9,349 $5,177 $6W8 $20,000 $70,789 $40,320 $9,349 $5,177 $69,228 $20,000 $70,789 $40,320 $9,349 $5,177 $69,228 $20,000 $70,789 $40,320 $9,349 $5,177 $69,228 $20,000 2023-2028 CIP-CFP v0.4 115 Packet Pg. 179 •Y� Project Description_ The Public Safety building houses Edm Police Department, Edmon s Municipal Court and the City Council Chambers. The building was built in 19 compassing 30,000 of office, court and municipal government uses. The building house of the City em ns centers, large police training, simulator facilities and evidence pro g and st ildin had minimal system updates over it's life and has a significant amount of de a and sho retrofitted with new fire sprinklers. Projects: air handler and outdoor ventilation unit replace solar plant in n, parking lot 0 reconfiguration to meet current usage, fire sprinkler installati erior hallwa nd painting, sleeping room remodel and gender specific/neutral accomm ns, gende ve pu trooms, operable windows is specific locations, courts flat roof replacement. Project Benefit - Public owned facilities and properties are maintained to assures d property o g condition assure the protection of the physical asset throughout an expecte ifespan. A well mai ained facility cr( safe work environment that is clean and sanitary which promotes workplace efficiency and confidence. R and preventative maintenance reduces energy consumption and provides for building systems to opera designed during manufacturer expected lifespan. Estimated Project Cost $1,297,964 Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $50,967 $445,276 $55,169 $151,481 $515,071 $50,967 $445,276 $55,169 $151,481 $515,071 $445,276 $50,967 $55,169 $151,481 $515,071 $50,967 $445,276 $55,169 $151,481 $515,071 $80,000 $80,000 $80,000 $80,000 2023-2028 CIP-CFP WA 116 Packet Pg. 180 Project Description This building built in 1995 houses four c Works divisions and the This building is 28,000 square feet and pable of operations disasters. The building has significant red maintena Projects: vehicle yard leveling, HVAC uNre of sysi replacements, fire alarm system replace y re re considerations, electric vehicle charging and maintenance interior hallway flooring thresholds, utility bay HVAC replace Project Benefit Public owned facilities and properties are maintained to a s assure the protection of the physical asset throughout an ex ct safe work environment that is clean and sanitary which promote and preventative maintenance reduces energy consumption and designed during manufacturer expected lifespan. Estimated Project Cost $598,697 liary City Emergency Operations Center fweather emergencies and natural rastructure updates. material bunkers, ventilation fan remodel with ender inclusivity re, emergen unications updates, ter main r uilding connection) tained facilit� k confidence. ems to operate Construction\Professional Services $201,570 $218,643 $80,315 $79,348 $4W1 $50,000 Expense Total $201,570 $218,643 $80,315 $79,348 $43,821 �'`0 $50,000 : Fund 016 (2021 Facilities Bond) $218,643 Fund 016 (non -bond proceeds) $126,570 $80,315 3 a General Fund $25,000 d Water Fund 421 $12,500 E t Stormwater Fund 422 $25,000 r Sewer Fund 423 $12,500 Q Unsecured Funding $79,348 $43,821 $50,000 Funding Source Total $201,570 $218,643 $80,315 $79,348 $43,821 $5 Packet Pg. 181 2023-2028 CIP-CFP v0.4 117 Project DescriptioM This community theater was built by th ftwood Players theater g ownership at a later date. The facility i 0 square feet in size performances and City meetings. The maintenance parking lot, roofing, and grounds. Project Benefit Public owned facilities and properties are maintained to as assure the protection of the physical asset throughout an ex safe work environment that is clean and sanitary which pror and preventative maintenance reduces energy consumption designed during manufacturer expected lifespan. Estimated Project Cost $324,163 Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total in 1967 and was deeded to City Fs the Driftwood Players theatrical fre limited to large infrastructure, nd prope lifespan. A workplac provide conditions and to facility creates a ' ence. Routine n erate as $18,600 $99,077 $43,880 $115,734 $21,872 0 r5,000 $18,600 $99,077 $43,880 $115,734 $21,87 $18,600 $99,077 $43,880 $115,734 $21,872 $25,000 $18,600 $99,077 $43,880 $115,734 $21,872 $25,000 Packet Pg. 182 2023-2028 CIP-CFP WA 118 r —_ Ar G r i •f F ti i s Project Description This recreational facility houses the Cit uatic programing and so 1971 the pool house historically was o perated seasonally. T expanding to year round lap and tea atic activities a programing. The facility requires min' mainten in op of use. Projects: security updates, roof replacement, gutter repla replacements, operational repair and maintenance to accom Project Benefit Public owned facilities and properties are maintained to a safe assure the protection of the physical asset throughout an ex cte safe work environment that is clean and sanitary which promote and preventative maintenance reduces energy consumption and p designed during manufacturer expected lifespan. Estimated Project Cost $179,623 Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $65,570 $26,128 $65,570 $26,128 $65,570 $26,128 $65,570 $26,128 rks and Recreation programs. Built in run aquatic programing is currently o support summer open swim ial and is subject to tenant lease terms imbing fixtu 365 opera , exterior door tained facilit� k confidence. stems to operate $8,409 $19,127 $3W9 $30,000 $8,409 $19,127 $30,389 $30,000 $8,409 $19,127 $30,389 $30,000 $8,409 $19,127 $30,389 $30,000 2023-2028 CIP—CFP v0.4 Packet Pg. 183 Project Description Funding Source Total 'rf $60,000 T� 'f47 P ro taction� 2023-2028 CIP-CFP v0.4 120 Packet Pg. 184 S Project Description ` 0 Facilities will take on the responsibility utine maintenance at sever restroom structures. This L maintenance will include Mechanical, Wical and Plumbing s ell as building envelopes. These structures have traditionally been ma' ed by Parks an of these structures have significant deferred maintenance and will be ad o the Fa ' ' ion sment, for future planning purposes. Project Benefit Maintaining clean and safe Park restrooms helps show case f Edmonds , while meeting ADA requirements for this type of public facility. Estimated Project Cost $305,000 ilm� 0 . 0 . 0 Construction\Professional Services $55,000 $50,000 $50,000 $25,000 $25,000 $100,000 Expense Total $55,000 $50,000 $50,000 $25,000 $25,000 $100 Fund 016 (2021 Facilities Bond) $55,000 Fund 016 (non -bond proceeds) $50,000 $50,000 Unsecured Funding $25,000 $25,0 00,000 Funding Source Total $55,000 $50,000 $50,000 $25,000 $2 $100,000 Packet Pg. 185 2023-2028 CIP-CFP v0.4 121 � r Project Descriptio The City fleet is rapidly changing to el installed once there is demand beyon Project Benefit Adding infrastructure in anticipation c towards mostly electric vehicles. Estimated Project Cost $125,000 Construction\Professional Services Expense Total Fund 016 (2021 Facilities Bond) Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total J;i iri:Jn': £I•._d:4'•.. , a hicles, this conduit will a rrent demand. $125,000 $125,000 $125,000 $125,000 for new EV charging stations to be to remain agile while the fleet evolves 2023-2028 CIP-CFP WA 122 Packet Pg. 186 Project Descriptio The large round gazebo has a very war composite roof material in a similar pa Project Benefit The gazebo is a gathering place for grou ; condition allows for more versatile use of $50,000 r shake roof that is at en Construction\Professional Services $50,000 Expense Total $50,000 Fund 016 (2021 Facilities Bond) $50,000 Fund 016 (non -bond proceeds) Unsecured Funding Funding Source Total $50,000 Park, 2025 life. Roof will be replaced with g this covered space in operational 2023-2028 CIP-CFP WA 123 Packet Pg. 187 Project Description The Library Plaza Deck is essentially a g roof on the second floor surface was waterproofed and remo1,,a n 2003, since that pr through the waterproof membrane. ter intrusion not been deemed a project of signifipreviou est intrusion and offered an initial ROM waterpr plaza deck and replacement of landscape, s, gra em separate construction project. The Parks Director in 2018 irrigations systems. In 2021 a draft structural report was per I consequences from the years of water intrusion, building was E factoring in to building structural stability. Project Benefit Maintaining building in operational and safe condition, in order t/ system. Preservation of the City's physical assets in appropriate co capital investment. Estimated Project Cost Construction\Professional Services Expense Total Fund 001 (Repair & Maint, Prof Services) Fund 016 (2021 Facilities Bond) Fund 016 (2021 Facilities Bond) Unsecured Funding Funding Source Total Jl� he Edmonds Sno-Isle Library. The deck uous water intrusion has occurred fully mitigated over the years and has pecialty Contractors inspected the water e existing plaza deck. Rebuilding the 3shing and han railings would be a timate to re ndscaping and MLA En ' L ver any structural struct oundter intrusion not ith Sno-Isle Lq e facility and hi $4,900,000 $4,900,000 $4,900,000 $4,900,000 2023-2028 CIP-CFP v0.4 124 Packet Pg. 188 6.A.b WastawatPr TraatmPnt Plant Prniectc # CFP .cCT OP 56 20 2025 $300,000 $0 $0 2026 2027 $0 $0 2028 $0 TOTAL (2022-2028) $300,000 TOTAL (2029-43) $0 TOTAL Project Cost $300,000 PWP-04 Nutrient Removal Project PWP-05 Prima Clarifer 54 $350,000 $0 $0 $0 $0 $0 $350,000 $0 $350,000 PWP-06 Joint Sealant 57 $60,000 $0 $0 $0 $0 $0 $60,000 $0 $60,000 PWP-07 Vacuum Filter 55 $187,453 $0 $0 $0 $0 $0 $187,453 $0 $187,453 Total Projects_ AV$897,453 $0 $0 $0 $0 $0 $897,453 $0 $897,453 Funding Source 2024 Edmonds Sewer Fund 423 $0 !237-1.,. 2025 2026 2027 2028 TOTAL (2022.2028) TOTAL (2029.43) TOTAL $0 $0 $0 $0 $455,816 $0 $455,816 Mountlake Terrace , $0 $0 $0 $0 $0 $207,940 $0 $207,940 E$20 OI m is View Water Sewer District $148,5 $0 $0 $0 $0 $0 $148,528 $0 $14Ci of Shoreline $85, $0 $0 $0 $0 $0 $85,168 $0 $85,168 Total Revenue IV $0 $897,453 R .Q R U C fC a ILL U_ c R a N d �r fC ILL l4 Q l4 U 00 N O N M N O N a ILL a U 00 N O N M N Co N y Y O _v 3 a c a) E U t0 Q 2023-2028 CIP-CFP v0.4 126 Packet P9. 190 Project Description The WA Dept of Ecology has imposed full-scale trial on the Nuvoda Process discharged from the treatment plant. results and modeling that will be corn and construction in 2025. Project Benefit get Sound General Perm determined that the !quest is to b in 202 n woy Nutrient reductions have been imposed for our WWTP that t exceeding our cap next year with the return of Edmonds Easi once the cap is exceeded. The predesign effort will assist wA the permit. Estimated Project Cost Sewer Fund 423 Mountlake Terrace Olympic View Water Sewer District City of Shoreline Funding Source Total $300,000 $152,370 $69,510 $49,650 $28,470 $300,000 )n us. We have conducted a preliminary ill reduce the total nitrogen that is the project based on the full-scale test en be followed by full design in 2024 We anticipate Ilan in place knpliance with 2023-2028 CIP-CFP v0.4 127 Packet Pg. 191 .'�'r�77f I W'i ff�IYir •:k 11�.��sar. :A ' S Wr Project Descriptio se The WWTP Annual Capital Replacem{ to ensure that the treatment plant is Rehabilitation, Joint Sealant repairs a $597,453. J i ril louse Projects is intended maintain infrastructure and equipment aintained. Projects f ill include the WWTP Primary Clarifier 1 3cuum Filter. rojects are expected to be delivered for Primary Clarifier #1 cage, center column, iow"rcor arms need replacement due to severe corrosion. The stee The limited access will require that pieces be assembled insi Re -built it and CH Murphy. Both assessments were that the Project Benefit There is a new design that will improve performance of thqseep ensure that a metal fatigue issue will not cause a catastrophic fa4 Estimated Project Cost Design Right of Way Construction Expense Total Sewer Fund 423 Mountlake Terrace Olympic View Water Sewer District City of Shoreline Funding Source Total $350,000 $350,000 $177,765 $81,095 $57,925 $33,215 $350,000 Fe r, counterwe n replaced s' ank. The co ould be r skimming device and rake Lv ginal construction. e been inspected by 2023-2028 CIP-CFP v0.4 128 Packet Pg. 192 Sewer Fund 423 Mountlake Terrace Olympic View Water Sewer District City of Shoreline Funding Source Total $30,474 $13,902 $9,930 $5,694 $60,000 Packet Pg. 193 2023-2028 CIP-CFP v0.4 129 ISHIGAr Project Descriptiori The WWTP Annual Capital Replacem( to ensure that the treatment plant is Rehabilitation, Joint Sealant repairs a $597,453. louse Projects is intended maintain infrastructure and equipment aintained. Projects f ill include the WWTP Primary Clarifier 1 3cuum Filter. rojects are expected to be delivered for Vacuum Filter: When the Carbon Recover Cfcom current plan is to utilize the ash recovery system from the either re -built or replaced. Due to the cost of a new vacuum the biochar production utilize the existing filter to ensure pro Project Benefit A vacuum filter is designed to remove water from ash/bioc marketable biochar. Estimated Project Cost $187,453 Design Right of Way Construction $187,453 Expense Total $187,453 Sewer Fund 423 $95,207 Mountlake Terrace $43,433 Olympic View Water Sewer District $31,023 City of Shoreline $17,789 Funding Source Total $187,452 plochar Aar dewatered. The tor. Ots of the system were Jty staff ing that start-up of eration P ent. 2023-2028 CIP-CFP v0.4 130 Packet Pg. 194 Packet Pg. 195 2023-2028 CIP-CFP v0.4 131 6.A.b UP / CIP COMPARISON (2022 TO 2023) PROJECTS ADDED Type ROJECT NAM CFP DESCRIPTION Transportation 2is Signal and Safety des Estimated future costs for transportation project. Transportation Pedestrian Safety Pr jerwDr Estimated future costs for transportation project. Transportation OI Overlay - 196th / SR Talbot Rd Estimated future costs for transportation project. Transportation Citywide Lighting St Estimated future costs for transportation project. Transportation 2023 Guardrail Pr Estimated future costs for transportation project. Transportation Green St 6th St. SW fr 9 to 236 Estimated future costs for transportation project. Transportation Green Str Ave. S 4 Estimated future costs for transportation project. Water 2023 Waterline Overl Estimated future costs for road repairs due to waterline replacements. Water Yost & Seaview Reservoir Re pg Water Phase 19 Annual Replace gram (20 Estimated future costs for waterline replacements. Storm 2023 Stormwater Overlays lEstimated future costs for road repairs due to storm replacements Storm 7317 Lake Ballinger Way Purchase & Structure Re I Estimated fu re costs for storm drainage project. Storm Perrinville Creek Basin Analysis Update Esti costs for storm drainage project. Sewer Citywide CIPP Sewer Rehabilitation Phase ate a costs for sewer project. Sewer 2023 Sanitary Sewer Overlays Estimat re costs for road repairs due to sewer line replacements. WWTP Primary Clarifier ti uture costs for wa ater treatment plant project. WWTP Joint Sealant future costs for r treatment plant project. WWTP Vacuum Filter d future costs a atment plant project. Facilities Facilities Fire Life Safety Communication Parks Restrooms Maintenance ated futur r facilities proje mated f cilities project. Facilities Public Works EV Conduit Addition timate costs ties project. Facilities City Park Gazebo Roof Esti re costs for project. Facilities Library Plaza Deck Esti future costs for facimWroject. ca U c to a LL U_ c to a m v to LL is r .Q U 00 N O N M N O N IL LL U d U 00 N O N M N O N N Y O _v a c CD E U a 2023-2028 CIP-CFP v0.4 132 Packet Pg. 196 6.A.b CFP /CIP COMPARISON (2022 TO 2023) 'j � PROJECTS REMOVED Type OJECT NAM CFP DESCRIPTION Transportation 84th Av rla - 220th St SW 2th St SW Completed Transportation 2022 Guardrail Pro ra Completed Transportation 2022 Traffic Si naI U r Completed Transportation ide Pedestrian Enhancem ro'ect Completed Water 2022 Waterline O Completed Water eaview Res essmen Completed Storm m Garden Completed Storm 2022 ormwater Overl lCompleted Storm Phase 3 Annual Storm Re lacem Com leted Sewer 2022 Storm w rla s Completed Sewer Citywide CIPP Sewer ReMbilitation Phase 4 WWTP WWTP Annual Capital Replacement In-house Pr WWTP Carbon Recovery Project C WWTP City Park Odor Scrubber d G ca U c to a LL U_ c to d N d .v m LL ms r .Q U co N O N eM N O N- IL LL U d U 00 N O N M N O N N Y L O 3 d a+ C d L V R r� Q 2023-2028 CIP-CFP v0.4 133 Packet Pg. 197 6.A.b UP / CIP COMPARISON (2022 TO 2023) PROJECTS REVISED Type ROJECT NAM CFP CHANGE Transportation Street Preservation m 2025 cost revised from $1,386,0000 to $1,500,000 Transportation Transportation 76th Av erlay from 196th St. SW mpic View Dr. uget Dr. @ OVD Signal U s Addition of $15,000 construction cost to 2023 Cost and funding moved from 2025-2026 to 2026-2027 Transportation I Upgrades - 100th Ave St. SW Cost and funding moved from 2025-2026 to 2026-2027 Transportation ain St. @ 3rd Sign des Cost and funding moved from 2026-2027 to 2027-2028 Transportation 228th from Hwy 9 PI. W Cgd Cost and funding revised, moved from 2025-2027 to 2026-2028 Transportation Hwy 99 y Project 2 Addition of $2,646,000 construction cost to 2023 Cost and funding revised, moved from 2022-2026 to 2023-2027 Transportation Hwy 99 Pi --vita ateway Pro' ge 3 Transportation Hwy 99 Revitalization & Gateway e 4 Cost and funding revised, moved from 2022-2027 to 2023-2028 Transportation SR 524 (196th St. SW) / 88th Ave. W - tion ements Cost and funding revised, moved form 2025-2027 to 2026-2028 Transportation Main St. @ 9th Ave. Inter proveme Cost and funding revised, moved from 2025-2026 to 2026-2027 Transportation 76th Ave. W @ 220th St. SW ection Improv Cost and funding revised, moved from 2022-2025 to 2023-2026 Transportation SR-104 Adaptive Syste - 236th to 226th Cost and funding revised for 2023 and 2025 Transportation SR-104 @100th Ave W. Intersection Improvem Cost a funding revised, moved from 2025-2026 to 2026-2027 Transportation SR-104 @ 95th PI. W Intersection Improvem ding revised, moved from 2025-2026 to 2026-2027 Transportation SR-104 @ 238th St. SW Intersection Improve nding revised, moved from 2025-2026 to 2026-2027 Transportation SR-104 @ 76th Ave. W Intersection Improve 202 6 cost and funding removed, $3,231,000 cost and funding added to 2029-2043 Transportation 175th St SW Slope Repair 20 nstruction cost moved to 2026 Transportation 232nd St. SW Walkway from 100th Ave. to SR-1 C nd funding revised, moved from 2026-2027 to 2027-2028 Transportation 236th St. SW Walkway from Madrona Elementary to 97th A and 2027 cost an ding revised and 2027 cost revised Transportation 84th Ave. W Walkway from 238th St. SW to 234th St. SW Transportation 80th Ave. W Walkway from 212th St. SW to 206th St. SW st and fundin om 2025-2027 to 2026-2028 Transportation 80th Ave. W Walkway from 188th St. SW to Olympic View Dr. ost and fun ed, mo 2025-2026 to 2026-2027 Transportation 218th St. SW Walkway from 76th Ave. W to 84th Ave. W Cost and f evised, moved 26-2027 to 2027-2028 Transportation Walnut St. Walkway from 6th Ave. S to 7th Ave S Cost a ed, moved fro to 2026 Transportation 216th St. SW Walkway from Hwy. 99 to 72nd Ave W Co§MlllMWW ding moved from 2T25 026 Transportation Citywide Bicycle Improvements Project funding re oved from 202 3 Transportation Maplewood Dr. Walkway from Main St. to 200th St. SW and funding reviseaqWed from 2025-2 026-2028 Transportation 95th PI. W Walkway from 224th St. SW to 220th St. SW Cost and funding revised, moved from 2025-2026 -2027 Transportation Railroad St. Walkway from Dayton St. to Main St. / SR-104 Cost and funding revised, moved from 2025-202 27 Transportation SR-104 @ 76th Ave. W Non -Motorized Trans Improvements Cost and funding revised, moved from 2028-2 Transportation Downtown Lighting Improvements Cost and funding revised, moved from 202 0 2026- Transportation SR-104 Walkway: HAWK to Pine / Pine from SR-104 to 9th Cost and funding revised, moved from 7 to 2026-2028 Transportation Elm Way Walkway from 8th Ave. S to 9th Ave. S Cost and funding revised, moved fro -2042 to 2023 Transportation Ferry Storage Improvements from Pine St. to Dayton St. Cost and funding revised, move 25 to 2026 Transportation Transportation Plan Update 2023 cost and funding Chang 185,000 to $1701000 .Q �a U c �a a Um U_ c to a N m v to LL is r .Q U 00 N O N n N 0 N a Um U d U 00 N 0 N M N 0 N N Y O _v Z a c CD E t U R a 2023-2028 CIP-CFP v0.4 134 Packet Pg. 198 6.A.b P / CIP COMPARISON (2022 TO 2023) qW PROJECTS REVISED Type OJECT NAM CFP CHANGE Storm Water Quaility I ements Funding redistributed to include ARPA Funds Storm e Creek Restorati ase 1 rallinger ]Jger Cost and funding extended to 2025 and 2026, ARPA Funds included Storm egional FacilityPhase 2023 cost and funding moved to 2024 Storm Regional Facility Con n Phase Cost revised from $6M to $3M, and moved from 2024 to 2025 Storm S d Surface Water C nsive PI Cost revised from $300,000 to $600,000, and moved from 2022 to 2023 Sewer Sewer Phase 9 proveme ) Annual Cit ewer Re n $30,000 cost and funding added to 2023 Six -year cost and funding (2023-2028) revised Sewer Lake Ballinger Sew Cost and funding shifted from 2023-204 to 2024-2025 WWTP Nutrient Remo ct 2024 cost and funding removed; 2023 cost and funding revised to $300,000 Facilities Boys and Girls Club Six -year cost and funding (2023-2028) revised Facilities Cemetery Building Six -ye cost and funding (2023-2028) revised Facilities City Hall t and funding (2023-2028) revised Facilities Fishing Pier/Beach Ranger Station st and funding (2023-2028) revised Facilities Frances Anderson Center Six- ost and funding (2023-2028) revised Facilities Fire Station 16 Si cost and funding (2023-2028) revised Facilities Fire Station 17 r cost and funding (2023-2028) revised Facilities Fire Station 20 ar cost and fund' 23-2028) revised Facilities Fire Life Safety Communications ear cost and f -2028) revised Facilities Historic Log Cabin -year cost an ( 28) revised Facilities Historical Museum ix -year cost ing (20 revised Facilities Library Six -year c unding (2023- ised Facilities Meadowdale Club House Six -ye ing (2023-202 ed Facilities Old Public Works Six- t and (2023-2028) r vis Facilities Parks Maintenance Building cost and fun 23-2028) revis Facilities Public Safety ear cost and fundin 3-2028) revised Facilities Public Works O&M Six -year cost and funding ( 023-2028) revised Facilities Wade James Theater Six -year cost and funding (2023-2028) revised Facilities Yost Pool House I Six -year cost and funding (2023-2028) revise .Q �a U c to a u_ U_ c to d N m v M u- M r .Q U 00 N O N M N O N IL u_ U d U 00 N 0 N M N 0 N N Y 0 _v a c CD E U a 2023-2028 CIP-CFP v0.4 135 Packet Pg. 199 7.A Planning Board Agenda Item Meeting Date: 10/26/2022 Comprehensive Plan Visioning Summary Staff Lead: Kernen Lien Department: Planning Division Prepared By: Kernen Lien Background/History The City of Edmonds kicked of the community visioning process for the Comprehensive Plan update with a six -week themed outreach over the summer. Over 8,500 comments were received via survey, email and in person commentary throughout the process, which included a range of activities in different areas throughout the City. City staff and the PRR consultant team cataloged all comments and organized them into eight overarching themes chosen for capability with the Comprehensive Plan elements. The overarching themes are: Community Culture Urban Design Economic Development Housing Land Use Parks, Recreation, and Open Space Transportation Other (for comments that could not be reliably categorized) In collaboration with PRR, City staff will draft community vision and value statements, informed by what we heard through the visioning process. Finalizing a vision and value statement will be an iterative process, with feedback from the community, Planning Board, and City Council. However, as the vision is reviewed and refined, it will be important to stay consistent with the initial 8,500 comments to be held accountable for the collective view and to remain inclusive and representative. The final statements will guide development of the Comprehensive Plan. Staff Recommendation N/A Narrative Staff will provide a presentation on results from this summer's community visioning process. This is an opportunity for the Edmonds community to hear results from the visioning process and for staff to receive feedback from City Council regarding which community values are important to highlight as a vision statement is drafted. Some key takeaways have been identified as a result of PRR's cataloging and analysis. These include: Maintain the City of Edmonds' small-town atmosphere Packet Pg. 200 7.A Assess building style per neighborhood, including affordable housing for middle income households Increase diversity and engage people outside of Downtown Edmonds Maintain and restore the environment, specifically trees and marshland Increase walkability and access to public transit The draft vision statement will be revealed on November 5t" during an event called Porchfest Edmonds, which will be held downtown in partnership with the Reimagining Neighborhood and Streets core group downtown stakeholders. Activities will be provided at the event to solicit community feedback. We also intend to take the vision and value statements to citywide neighborhoods, particularly ones that have been historically under -represented, with an approach that 'meets people where they are' with events such as attending community hosted/sponsored meetings, tabling at grocery stores and other community gathering places. Online participation will also be provided for people unable to attend an in -person event. Attachments: Edmonds Visions Survey Summary Packet Pg. 201 7.A.a CITY OF EDMONDS COMP PLAN VISION "Everyone's Edmonds" Public Survey Overview 10/10/2022 In preparation for the update to the City of Edmonds Comprehensive Plan, city staff sought to gather public input from across the city. The City of Edmonds staff distributed surveys across the city to gather insight on people's current experiences and ideas for the future of Edmonds to see where the upcoming Comprehensive Plan update should focus. Surveys were promoted online and posters with a QR Code were hung throughout the city at key gathering spaces. Surveys were available through Survey Monkey using a combination of multiple choice and short answer questions. In -person outreach was conducted at events and meetings using a written survey form. A full list of questions and a workbook of all survey questions is available to view individual responses. Key themes from each of the surveys are described below by topic. Process Six mini surveys, each focusing on different topics, gathered respondents' insight, aspirations, and concerns for the City of Edmonds' future. The topics referred to: identity, quality of life, economic growth, environment, culture, and livability and land use. Each survey had two to four questions that included both qualitative (open ended, written response) and quantitative (multiple choice) input. Mini surveys were time limited and available to the public for one week at a time. At the conclusion of each week a full, combined survey was offered while a new mini survey on the next topic became available. This City staff chosen strategy aimed to increase engagement and make posters advertising the mini surveys evergreen. TopicsSurvey Week 1 Identity <iump to section> .. .- 135 Week 2 Quality of Life <iump to section> 120 Week 3 Economic Growth <iump to section> 50 Week 4 Environment <iump to section> 75 Week 5 Culture <iump to section> 54 Week 6 Livability and Land Use <iump to section> 104 Full survey 536 Events and conversations (written) <iump to section> 410 Tally 1584 Input from surveys with open-ended response questions were categorized, as much as possible, into eight key themes which were chosen for compatibility with the Comprehensive Plan focus areas as defined by the Edmonds planning team. Some surveys have additional subcategories to capture the full breadth of information. Overarching themes are: - Community Culture and Urban Design - Community Sustainability - Economic Development - Housing - Land Use Packet Pg. 202 7.A.a Parks & Recreation and Open Spaces - Transportation - Unknown (other) Participation by neighborhood Neighborhood identifiers were offered for online survey along with an "Other" category with the option to write in a neighborhood not listed. A majority of respondents to online surveys selected the neighborhood location of Downtown Edmonds "the "Bowl" (375) followed by Westgate (105) and Seaview (85). 101 respondents selected other, with a strong presence from Maplewood. The following table does not include locations of respondents from 'live" conversations written comments. Downtown Edmonds (the "Bowl") Week 50 Week 47 Week 18 Week , 38 Week 5 14 Week 6 30 Full Survey 177 Tally 374 Esperance (unincorporated county) 3 2 0 0 1 5 21 32 Firdale 6 2 0 2 1 5 10 26 Five Corners 12 11 2 5 8 8 29 75 Highway 99 6 3 3 1 2 5 12 32 Lake Ballinger 3 3 2 3 1 3 14 29 Meadowdale 2 3 1 1 1 3 14 25 Perrinville 7 4 1 3 1 4 20 40 Pine Ridge 5 7 3 2 4 4 15 40 Seaview 7 11 6 6 5 11 39 85 Sherwood Forest 2 3 2 1 2 3 10 23 Talbot Park 0 2 2 1 1 1 2 9 Town of Woodway 1 0 0 0 0 2 0 3 Maplewood Not optioned Not optioned Not optioned Not optioned Not optioned Not optioned 0 0 Westgate 17 9 5 4 5 12 53 105 1 do not live in Edmonds 0 1 0 0 0 0 7 8 Other 14 12 5 8 8 8 46 101 No answer 67 Tally (no "live" comments) 135 120 50 75 54 104 536 1074 Locations identified in the "other" comments include Emerald Hills, Gateway/99&104, Lynwood, Madrona, Maplewood, Macrons, North of Woodway, Olympic between Main and Caspers, Point Edwards, Richmond Beach, South side, south near Woodway Yost Park, University Colony, Uptown, West of WINCO, 238th & Edmonds Way, 240th/104 South Edmonds. Packet Pg. 203 7.A.a Week 1 Identity: What does Edmonds mean to you? Q1: What do you love about Edmonds Key themes - Edmonds has a walkable "small town charm" with access to waterfront and nature, pretty views, and quiet neighborhoods with trees where children can play. - Respondents commented positively on the recreation available in Edmonds and its walkability, especially in the downtown core. - Respondents commented on the value of the small businesses of Edmonds, especially the feel of a historic small town with a bustling center, local shops, restaurants and a thriving arts and culture scene. Q2: How would you like to see your values reflected in Edmonds Key themes - Community Sustainability was a large category with comments highlighting both environmental sustainability and community health. o Environmental sustainability focused on environmental protection and climate change of which respondents mentioned the importance of restoring and maintaining habitat, protecting the watershed and marine life, reduced impact of land development, and an increased tree canopy o Community Health reflected some respondents' desires to see more diversity of people, community non -profits supported, law enforcement protected, volunteerism fostered, and members of the unhoused community supported. Others expressed the desire to keep Edmonds the same as it is with no change. - Respondents commented on the economic and governmental future of the City and made specific remarks regarding the City's management of infrastructure funds (police, fire, emergency services, social service) and accountability to businesses. - There were disparate comments regarding the development of Edmonds: many respondents opposed high -density and high-rise buildings in favor of land preservation and small-scale neighborhood buildings. Affordable housing for all income levels was a recurring comment. - Many responses support better connectivity of neighborhoods through public transportation, bike lanes, and sidewalks. - Multiple commenters include encouragement to create opportunities for a more equitable, inclusive, welcoming, and culturally diverse city. This includes requests for more community events, increased social services, and support for small businesses outside of the "Bowl". Packet Pg. 204 7.A.a Week 2 Quality of life: Why do you live or play in Edmonds? Q1- What do you like about living in Edmonds? Select all that apply 120 respondents (mini survey), 509 respondents full survey 600 500 400 � W�I�_..�I�IIII 41 cGey y\opo \ �i`°� `eBret e5o� a`ot�` °�� O r°� eo \�ao anti �o 0QQ tea° O t t� 0 0� o� spot �a o� �° er o� �� C.° L°yam Joey a�a :�•o`le �a ayet� °�� o a�\oo Ile \Gate a PGc Key themes Within the option of "other", comments included appreciation of the arts and culture scene, symphony, and library, proximity and access to natural resources and environment, parks and trails, walkability and cleanliness, events and farmers markets, infrastructure (public utilities and police, emergency services), and a sense of community. Access to natural resources and beauty were the most frequent comments along with Edmonds' proximity to a large metropolitan area, Seattle, while still having a "small town" feel. Q2: Is there anything you don't like about Edmonds Key themes Transportation and walkability - Many comments referred to Edmonds being car -centric, a lack of sidewalks, and the need for improved walkability/bike-ability along with more transit options. Street safety and its implications for the safety of pedestrians and cyclists was mentioned often. Additionally, respondents talked about the need for better public transportation, specifically if you are not a Seattle 9-5 commuter. The subcategory "automotive" was used to group recurring themes of speeding, traffic, and parking. a. Motorists that speed make roadways dangerous for drivers and non -drivers b. There is not enough parking in some neighborhoods, while there is too much parking in certain neighborhoods making them unwalkable. Parking needs to be assessed specifically by neighborhood needs. Packet Pg. 205 7.A.a c. Navigating traffic is difficult and seems to begetting worse, and the ferry traffic often exacerbates the current conditions. 2. Government -There is an overall expression that local government does not equitably distribute funding and there is not enough investment in areas outside of "the Bowl". Comments included opinions that there is a lack of governmental transparency and accountability, problematic lack of agreement within government, and that only select, privileged communities are listened to. 3. Many respondents acknowledged that the lack of diversity in Edmonds was an issue, while others expressed resistance to change. 4. There is a mixed response to the Land Capacity of Edmonds, with some respondents saying that increased density is something they dislike, and some saying there is not enough housing. 5. The impact of urbanism on environment was expressed with concerns about trees (lack of, care of existing, trees too big and blocking views) and preservation and restoration of marshland. Access to pools is mentioned frequently as related to both recreation and increasing climate temperatures. 6. Many respondents expressed that housing is not affordable for low- and middle -income households, young families, singles, and seniors. Some responders are concerned that there will be fewer single-family homes built and an increasing focus on condos that disrupts the small- town atmosphere. 7. Comments included concern about the increasing number of people who are unhoused. 8. Increased cost of living as a whole and specifically increased rents for commercial business that make it difficult for small business owners was a concern. Recurring comments on the condition of the Highway 99 area and the need for investment in this vital commercial corridor were prominent. 9. Concerns were expressed about recent increases of crime. Q3: How long have you lived in Edmonds? 120 respondents mini survey, 509 respondents full survey Residency in years 120 100 80 60 40 20 0 1 Less than 1 1-2 3-5 6 - 10 11 - 15 16 - 25 26 - 35 36 - 50 More than I do not live 50 in Edmonds Packet Pg. 206 7.A.a Week 3: Help us plan Edmonds' economic future! Q1: What kind of businesses (goods and services) do you travel outside the city for? Key themes 1. Lynwood and University Village are destinations for shopping. Specific mentions of retailers included Alderwood Mall, Central Market, Costco, Fred Meyer, Home Depot, JoAnn's Fabrics, Lowe's, Macy's, Nordstrom, Office Depot, REI, Target, Trader Joe's, and Whole Foods. 2. Respondents expressed the sentiment that big -box and large retail stores are not needed in Edmonds — it's ok to travel for some things. Goods and services sought outside of the city 160 140 120 100 80 60 40 20 0 , r 6 � e oe�a `e��5 `ate ea �o�e ee a o�a\ye �ey�aJ 5` s�ey Qto "General Purposes" is the most common category for goods and services sought outside the city. Within that category, the following are notable comments: • Air travel • Community: religious centers and houses of worship, cultural connection, LGBTQIA+ • Daycare/nursery • Education — STEM, tutoring • Ethnic grocers, and household goods • Entertainment — music performances, theater, museums, theaters, sporting events, kid's entertainment • Parks, athletics, pools, gyms, sports leagues, dance class • Auto service, tires Packet Pg. 207 7.A.a • Library, books • Major purchases — household furnishings, electronics, appliances, vehicles • Salon: hair, nails, massage • Sporting and camping goods, craft supplies, specialty hobby supplies, cycling supplies and repair • Restaurants —ethnic, vegan, sushi, fine dining • Veterinarian / pet care Q2: Do you work in Edmonds? 50 respondents mini survey, 477 respondents full survey 400 350 300 250 200 150 100 50 0 yes no Q2: If you don't work in Edmonds, what kind of work do you leave the city for? Employment sought outside of the city 140 120 100 80 60 40 20 ■ 1 ■ I I _ _ ■ 1 ■ 1 1 `J\C; �*�°���tac�����a\�r`atete�a�e'�eQa�t �e�a�yia\°�e`,\`e�e�etaa\o�e�\tea Dere O°�5 �e `\C.a ace' a�� az a� C-P° ey5 ah ��a a`Fe �Neo\p ,Jao\°�,Leo Qto �e �Jo` \°o �ap�e O°� \o 01 O Packet Pg. 208 7.A.a Key themes Many respondents to the question of employment location do not work in Edmonds with almost half of non -employed respondents citing "retired". Neighborhoods largely represented by retirees include Downtown Edmonds (the "Bowl"), Seaview, Five Corners, and Westgate. The following categories have notable subcategories: • Education: schoolteacher, professor, education support staff, library • Healthcare: physician, nursing, tech, speech therapist, research, dentist, radiology/imaging • Office management and administration: administrative, analyst, corporate, environment, general office work, human resources, real estate, non-profit, management, program management, wealth management, urban planner • Other / general: art, retail, restaurant/food service/bar • Tech: bio, digital, mechanical, medical, research, science, software Packet Pg. 209 7.A.a Week 4: Environment: What can we do to reduce Edmonds' environmental impact? Within the topic of Environment, subcategories included: - Affordable Housing - Automotive - Bicycling - Climate Change - Global warming, heat, wildfires, air quality - City Revenues - Equitable investments in community, the City's control of environmental plans, natural disaster preparedness - Green Space - tree coverage - Land Capacity - Overpopulation, population density, unsustainable development, development in general, zoning, density in general - Open Space - untouched land - Other — no answer, nothing of concern, or an answer that did not align with other categories - Parks - Public Transportation - Renewable Infrastructure - Carbon footprints, renewable energy, greenhouse gas emissions, compost, recycling, EVs - Vegetation and Wildlife - Water Protection - Clean water supply, rising sea levels, natural resource protection, pollution and contamination, stormwater runoff, Puget Sound health, Edmonds Marsh Q1: Which of these four proposed priorities of the Edmonds Climate Action Plan should the City put the most resources toward? (rank in order of importance from one to four, with the most important being one) 75 respondents mini survey, 486 respondents full survey 3.5 3 2.5 2 1.5 1 0.5 0 Rank 1-4 Buildings and energy Transportation Environment Lifestyles and consumption Packet Pg. 210 7.A.a Key themes Environment has the highest ranking with an average of 2.8, followed closely by buildings and energy with an average ranking of 2.6 Q2 What are you most concerned about when it comes to the environmental future of Edmonds? Key themes The category of "Water Protection" was the most common theme, embodying the community's concern over rising sea levels, protection of local streams and water sources, and pollution of watersheds from littering and untreated stormwater runoff. A common note among those citing water as a primary concern was the Edmonds Marsh and the desire to see it returned to a healthy estuary. Another highly common theme was "Green Space," and reference to Edmonds' tree canopy. Many respondents expressed disappointment to see trees cut down in favor of development and want to see trees planted or replaced. It is important to note comments from other surveys include "right tree, right place" thinking (trees that -are too large for the space or block viewsheds.) In the category of "Land Capacity" population density is a leading theme. There are divergent opinions over whether density is a solution or a problem. Most commonly, respondents considered increased density in zoning, population, and development to be harmful to the environment, often naming increased cars, traffic, and climate refugees as an outcome. Others saw density as a solution, citing the opportunity for more walkable communities and sustainable buildings as an outcome. Packet Pg. 211 7.A.a Week 5 Culture: Help us better understand Edmonds' diversity! Q1: Do you feel like your ethnicity and culture are represented in Edmonds? What ethnicity(s) and culture(s) would you like to see better represented in Edmonds Key themes Many responses were left blank, but for those that responded, most common answer was yes, their culture is represented. Of those yeses that provided further detail, a large majority respondent group self -identified as white. The category "Needs more" was included to highlight those who did not self -identify themselves as feeling represented/not represented, and only commented on which cultures they think need better representation and how. Of those, "all non -white cultures" were named the most, and the second highest identified were Indigenous/Native American cultures. A significant number of respondents declined to answer the question, commenting that the question is divisive and/or that the government should not be asking. Q2: What can the City do to better celebrate diverse cultures? Key themes Respondents requested that the City thoughtfully partner with ethnic and cultural minority communities to host more events that honor holidays that aren't in the white dominant culture and to think of creative ways to honor cultural presence through events, fairs, festivals, public artwork, signage, programs for youth, and cultural centers. The "City revenues" category related to various government structure solutions that the City could take on to address diversity, such as improving hiring practices, increasing diverse representation in elected or appointed positions, supporting small businesses, installing streetscape design that acknowledges culture, heritage, and language, and developing partnerships with community- based organizations. Packet Pg. 212 7.A.a Week 6 Livability and Land Use: What should Edmonds offer the next generation? Q1: What types of housing could you see fitting into your neighborhood? Select all that apply. 104 respondents mini survey, 467 respondents full survey Housing 500 450 400 350 300 250 200 150 1500 0 — `5 ,\ e0 0L� \\A ��Q JtQ �e ��o `�ti air r � y a�\e °,,Je�et `ode to yy 0`� ey e� �a ,��Qo Pao V`; Ae a° �oc �S` rea h a� O tee+ o� �r° ��.� pr Key themes Single family homes is the most frequently selected category for desired housing followed by interest in accessory dwelling units, multigenerational homes, and townhouses. Of the selected preference for single family homes, about half of the responses (211 of 436) were from residents in Downtown Edmonds (the "Bowl"). Comments in "other" included thoughts on building style appropriateness for specific neighborhoods, concerns on environmental impact and tree canopy, ability to accommodate parking, regulation of vacation rental housing (AirBnB) and concerns that existing road size could not accommodate more residents or traffic. Preferences trend toward two themes 1) single family, low -density, low-rise and 2) affordability for young adults, singles, and people down -sizing. Location.. Downtown Edmonds (the "Bowl") 211 Esperance(unincorporated county) 16 Firdale 10 Packet Pg. 213 7.A.a Five Corners 29 Highway 99 9 Lake Ballinger 11 Meadowdale 12 Perrinville 18 Pine Ridge 15 Seaview 43 Sherwood Forest 6 Talbot Park 3 Town of Woodway 2 Maplewood Not optioned Westgate 50 Q: 2 What type of businesses, services, community features and public spaces would you like to see in your neighborhood? Select all that apply. 104 respondents (mini survey) 478 respondents full survey Livability 450 400 350 300 250 - 200 — 150 1500 I 0 e t 8' e e(2' to 0 CV `�`� Qat �yQ oe'� yo at �t hit y�o oe� to 5ea ota �r to 5� oa et °� t�ya w`°� �a P \A\`e0 �x"tea Key themes The most selected category for businesses, services, community features and public spaces that people would like to see in their neighborhoods are walking/biking trails followed by more parks, more small restaurants/bars/coffee shops, and greener streets. Q3. What else could improve your neighborhood? Key themes Packet Pg. 214 7.A.a 1. Walkability including more sidewalks and maintenance/repair of existing sidewalks, lighting, crosswalks for people using assisted mobility devices, strollers, and for dog walkers. 2. Road maintenance and road safety. Traffic calming measures and safer roadways to reduce speeding, increase pedestrian and cyclist safety, including noise reduction and traffic alleviation. 3. More public space or the improvement of existing public space. Maintaining a healthy tree canopy, more green space throughout public spaces, spaces for families with young children, walking trails, parks, and indoor gathering spaces. 4. Keep a local, small-town atmosphere. Packet Pg. 215 7.A.a Written responses Key themes by category: 1) Transportation a. Public Transportation: People want more public transportation options with easy access and fewer connections. b. Automotive: Attitudes diverge regarding parking - some think more public parking should be provided and others want less. Traffic safety and ferry traffic congestion are concerns. Walking: People want more and better sidewalks, and an increase in pedestrian connectivity especially in the Highway 99 Corridor. Bicycling: People want more and safer bike lanes/routes. 2) Land Use a. Land Capacity Summary: Opinions diverge between wanting more density, and those who want to see Edmonds' zoning and land use stay the same, especially in the "Bowl" and downtown. b. Housing Summary: A large number of respondents indicated interest in Middle Housing options (infill in Single Family zones) as housing is becoming increasingly more unaffordable. Many people expressed that younger people and people with low and middle incomes cannot afford to live in the City. 3) Community Sustainability a. Community Health: People expressed appreciation of public engagement and the sense of community they feel as a part of Edmonds. Most feel like Edmonds is safe but have concerns about people who are experiencing homelessness (unhoused). b. Environmental Protection: People want to preserve and increase tree canopy and protect beaches and marshland. 4) Parks and Recreation and Open Space: People are interested in more amenities for dog owners, continued investment on the waterfront and beach, and overall resources for marshland, fishing, boating, parks, and playgrounds. More transportation access to parks was mentioned frequently, 5) Community Culture and Urban Design a. Arts and Culture: People acknowledged the vibrant arts community and strong downtown restaurant culture. People expressed a desire for more diversity in the arts, including youth involvement, indigenous people's involvement, and access to art outside the "Bowl". b. Urban Design: People love the design of Downtown Edmonds and want to preserve the "small town feel" that street frontages and low building heights provide. 6) Diversity Summary: Respondents expressed that the City of Edmonds is not celebrating diversity as much as it could - some demographics are overlooked, especially younger families. Many people also perceive a lack of representation for residents who live outside the "Bowl" and an overall lack of connectivity to the cultural diversity of the Hwy 99 corridor. 7) Economic Development: Respondents expressed that there is a lot of focus on restaurants and places that are already highly invested in, and there is concern about commercial rents being too high, leading to fear that commercial space may disappear as traditional brick -and -mortar businesses change. Packet Pg. 216 7.A.a Key takeaways Recurring themes expressed in all six surveys include: 1. Maintain the City of Edmonds' small-town atmosphere 2. Assess building style per neighborhood, include affordable housing for middle income households 3. Increase diversity and engage people outside of Downtown Edmonds ("the Bowl") 4. Maintain and restore the environment, specifically trees and marshland 5. Increase walkability and access to public transit Packet Pg. 217 8.A Planning Board Agenda Item Meeting Date: 10/26/2022 Development Code Update Work Plan Staff Lead: Mike Clugston Department: Planning Division Prepared By: Michael Clugston Background/History This is a new item for the Planning Board. Staff introduced the topic to Council on September 27. Staff Recommendation Staff will present the proposed plan for the development code modernization work and discuss a proposal for a minor change code amendment process. Narrative As part of the code update process, staff is proposing to update Chapter 20.80 ECDC (Text and Map Changes) to create a new process for minor code amendments. Minor amendments would have a streamlined process to make small code changes that would promote clarity, eliminate redundancy, streamline processes, and correct inconsistencies. Attachments: Attachment 1 - Development code update slides 10.26.22 Attachment 2 - PB draft ECDC 20.80 Text and Map Changes_minor amendment Packet Pg. 218 8.A.a E Development Code - Modernization a W d a+ Work Plan V O E CL 0 E Mike Clugston AICP, Senior Planner��, _ Q Development Services Department c m Edmonds Planning Board E October 26, 2022 Packet Pg. 219 8.A.a Presentation Objective 1. Provide briefing on proposed work plan 2. Identify staff resources 3. Define "code rewrite" 4. Describe phased approach to process 5. Present timeline Packet Pg. 220 8.A.a Purpose of Development Codes • Comply with the GMA • Implement the Comprehensive Plan • Evolve to meet changing municipal, state & federal requirements Packet Pg. 221 tory • 1959: First zoning ordinance • 1980: Code reorganized to current ECDC format • Hundreds of zoning and development code amendments since • Some previous consultant efforts have been done in "fits and starts" due to lack of dedicated staff ability to support extensive legislative changes Packet Pg. 222 8.A.a staff Resources 0 > • Dedicated FTE to manage code (issue identification, process N N improvements, plan concurrence), lead legislation and work with consultants, as needed N • Collaborate with in house subject matter experts • Budget for on -call services 0 0 r C t V fC r Q r-i C d L 8.A.a �efinin� "rndpRewrite„ • Iterative process of improvements to the Edmonds development codes • Includes changes to both structure and content • Ensures code is representative of best practice • Offers both flexibility and predictability to developers, design professionals and contractors • Is outcome focused and mindful of implications - either physical, socioeconomic or environmental Code Work Growth Management Act Council/Administration Issue Identification Shoreline State Management Stormwater Act Mandates State Building Code 8.A.a ImmpdoI a+P Structural Changp-,,- • Reorganize Titles 15 - 24 to be more accessible and usable • Improve search and interactive functions (Code Publishing) • Complete first round of improvements by end of 2022 8.A.a Con' -` Change New amendment process types: minor and major • Council (and staff) want a responsive process that responds to policy decisions • Implemented through changes to ECDC 20.80 Overall changes: • Use plain language • Replace words with graphics and illustrations • Eliminate unnecessary code v Packet Pg. 226 8.A.a ra u9 -0.4 �O ent M i nor Amendments qr_ E CL O • Create streamlined process for minor updates > N N • Promote clarity, eliminate redundancy, streamline processes, better align with best practices • Correct inconsistencies and scrivener's errors 0 • Would be presented directly to Council on a semi-annual basis E OL (December/June) or more frequently as needed 0 • Proposed change to ECDC 20.80 in packet for discussion r E U Q w U R Q Packet Pg. 227 Major Amendment;,, • These take time • Need to be thorough with detailed data/analysis • Inclusive public engagement • Required process through GMA and our own code 8.A.a m 0 U 0 E a 0 m 0 N N tD N O .N 0 d E CL O 0 E Q w d E Packet Pg. 228 8.A.a Examples Minor Majo Remove references to "CG2" code • Zoning district no longer exists • No policy impact; not controversial EV charging infrastructure requirements (ECDC 17.115) • Large policy impact, important to the development community Development Code Modernization Snapshot 8.A.a 7/23/21 Comprehensive Plan Update Comp Plan Start 6/1/22 i i i i i 2/8/22 1 1 8/ Minor Code Amendment Provision Adopted, 12/31/22 i i i Minor Code Omnibus#1, 6/30/23(PLN) BD Designated Street Front (PLN) Timeline Wireless (ENG/PLN) CG Stepbacks(PLN) Minor Code Amend Process (PLN) Structural Reorganization (PLN) Trees (minor/major) (PLN) ROW Permits/Utility Wiring Building Code Update Street/Sidewalk Stds (ENG/PLN) Critical Aquifer Recharge (PLN) Five Corners Code ►i 10/1/23 Minor Code Omnibus #2, 12/21123 (PLN) v i i i i Minor Code Omnibus #3, 6/30/24(PLN) Comp Plan Adopted v 12/31/24 i 4/18/24 11/4/24 Packet Pg. 230 8.A.a Thank you. Questions? Comments? Image Credits • Washington by Tyler Gobberdiel from thenounproject.com • Buffer by Creative Stall from thenounproject.com Packet Pg. 231 8.A.b DRAFT Chapter 20.80 TEXT AND MAP CHANGES Sections: 20.80.000 Scope. 20.80.010 Procedural and nonzoning related changes. 20.80.015 Minor zoning code and map amendments. 20.80.020 Maior zoning code and map amendments.ZeR*Rg and ^'^R^gRg ehaRges 20.80.030 Pre -Annexation zoning. 20.80.000 Scope. This chapter sets forth the procedure for amendment to the text and any applicable maps adopted by and within the community development code, but does not apply to other chapters of the Edmonds City Code. Because various provisions of the community development code are adopted under different state regulations, this chapter is divided into twe three basic divisions as set forth below. 20.80.010 Procedural and nonzoning related changes. Amendments to the following text materials (and where applicable, maps and other incorporated codes or codifications within them) shall be reviewed and made by the city council and may be adopted in the same manner as any other ordinances. The city council may refer a proposal to the planning advisory board, or other board, commission, committee, staff, or other ad hoc group for its or their nonbinding recommendations. A. ECDC 15.00.020, Application Fees; B. ECDC Title 18, Public Works Requirements, except Chapter 18.50, Official Street Map; C. ECDC Title 19, Building Codes; D. Chapter 20.15A ECDC, Environmental Review (SEPA); E. Chapter 20.70 ECDC, Street Vacations. 20.80.015 Minor development code and map amendments. A. Intent. This process is used by City Council to review and decide on minor development code and map amendments. It is a streamlined process used for proposed changes which need little or no policy study. B. Suitability. This process is used for: L:\ECDC_Rewrite\AMD2022-0005, ECDC 20.80 Text_Map Changes\10.26.22 PB intro\draft ECDC 20.80 Text and Map Changes_minor amendment edits v2.rtf Packet Pg. 232 8.A.b 1. Minor development code amendments to promote clarity, eliminate redundancy, correct scrivener's errors, or to correct inconsistencies; and 2. Minor zoning map amendments to correct grammatical, labeling, scriveners, or similar errors on the official zoning map. C. Review process. The Development Services Director periodically prepares a package of amendments for review and presents them to the City Council on their consent agenda. At its discretion. the Council mav: 1. Approve the entire package; or 2. Remove one or more of the proposed amendments from consent for additional discussion about the suitability of an amendment for the minor process or remove an amendment from the minor process roster altogether for processing as a major amendment as described in ECDC 20.80.020 and then apDrove the remainder of the package. 20.80.020 Major zoning code and map amendmentsZeningand planning changes. A. Review. Amendments to the following text materials (and where applicable, maps and other incorporated codes or codifications within them) before amendment by the city council shall first be reviewed by the planning advisory board as a Type V decision using the purposes and criteria set forth in the applicable chapters as the basis for its review and recommendations: 1. ECDC Title 15, Land Use Plans and Policies, except application and permit fees. 2. ECDC Title 16, Zone Districts. 3. ECDC Title 17, General Zoning Regulations. 4. ECDC Title 20, Review Criteria and Procedures, excluding: a. Chapter 20.15A ECDC, Environmental Review (SEPA); b. Chapter 20.70 ECDC, Street Vacations. 5. Chapter 18.50 ECDC, Official Street Map. B. Notice. See ECDC 20.03.003. C-20.80.030. Pre -Annexation Zoning. When the city council, in its discretion, deems it appropriate to adopt pre -annexation zoning comparable to that in effect in Snohomish County for a proposed annexation area, the procedural and notice requirements of RCW 35A.14.340 shall control over the provisions of this L:\ECDC_Rewrite\AMD2022-0005, ECDC 20.80 Text_Map Changes\10.26.22 PB intro\draft ECDC 20.80 Text and Map Changes_minor amendment edits v2.rtf Packet Pg. 233 8.A.b chapter and Chapter 20.03 ECDC. In the event that the city council determines it appropriate to zone property proposed for annexation to the city in a category which is not comparable to zoning in effect in Snohomish County, the provisions of this chapter and Chapter 20.03 ECDC shall apply. Any change to pre -annexation zoning proposed after annexation to the city shall also comply with the provisions of this chapter and Chapter 20.03 ECDC. [Ord. 3817 §§ 13, 14, 2010; Ord. 3736 § 69, 2009; Ord. 3112 § 20, 1996; Ord. 3080 § 1, 1996]. L:\ECDC_Rewrite\AMD2022-0005, ECDC 20.80 Text_Map Changes\10.26.22 PB intro\draft ECDC 20.80 Text and Map Changes_minor amendment edits v2.rtf Packet Pg. 234 9.A Planning Board Agenda Item Meeting Date: 10/26/2022 Extended Agenda Staff Lead: Kernen Lien Department: Planning Division Prepared By: Kernen Lien Background/History N/A Staff Recommendation Review Extended Agenda Narrative Extended Agenda attached. Attachments: 10.20.2022 Extended Agenda Packet Pg. 235 Of F QAf PLAKHMS BOARD Extended Agenda October 20, 2022 November 2022 Items and Dates are subject to change Nov 1 1. Joint meeting with City council Nov 9 1. Civic Park Rules Nov 23 1. No Meeting - Day before Thanksgiving Nov 30 Special Meeting 1. Code Modernization Process and Updates to Chapter 20.80 ECDC Public Hearing 2. Tree Board Joint Meeting December 2022 Dec 14 1. Election of Officers 2. Wireless Update — Work Session 3. Tree Code Update January 2023 Jan 11 1. Jan 25 1. Comprehensive Plan Update 9.A.a Packet Pg. 236 items ana liates are sui 9.A.a o change Pending 1. Implementation / code updates concerning trees and the UFMP For Future 2 Climate Action Plan update and public outreach Consideration 2022 3. Housing policies and implementation (incl Multifamily Design) 4. Comprehensive Plan update preparation and gap analysis 5. Subdivision code updates 6. Community Development Code Amendments / Re -Organization 7. Neighborhood Center Plans & implementation (esp. 5 Corners) 8. Low impact / stormwater code review and updates 9. Sustainable development code(s) review and updates 10. Further Highway 99 Implementation, including: a. Potential for "urban center" or transit -oriented design/development strategies b. Parking standards 11. ADA Transition Plan (Parks) 12. CIP/CFP Recurring 1. Election of Officers (Vt meeting in December) Topics 2. Parks, Recreation & Cultural Services Department Reports & Updates- First meeting after previous quarter (4/13, 7/13, 10/12, 1/11/23) 3. Joint meeting with City Council — April or as needed 4. Development Activity Report r Q Packet Pg. 237