Building Permit (3)I Type: COMMERCIAL BLDG Subtype: CHANGE OF USE I Status: FINAL I
Parcel No: 00449900000100 Site Address: 9649 FIRDALE AVE EDMONDS,WA 98020-6519 Applied: 8/23/2021
Subdivision: 004503, 004499 Lot: 0 Issued: 9/21/2021
Fire Sprinklers: Lot Area: Zoning: FVMU Final: 12/21/2021 KRL
Valuation: $0.00 Occupancy Type: B Construction Type: VB Expiration Date: 9/16/2022
Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED
Scope of Work: TAO MOVEMENT- CHANGE OF USE M TO B. NO ALTERATIONS
WA State Contractor L & I #:
CONTACTS
NAME TYPE
NAME
ADDRESS I
PHONE
EMAIL
APPLICANT
QUAN NGUYEN
9649 FIRDALE AVE, EDMONDS
(206)734-0525
NGUYEN9IQUAN@GMAIL.COM
WA 98020
CONTACT
TAO MOVEMENT
9649 FIRDALE AVE,
EDMONDS
(206)734-0525
NGUYEN9IQUAN@GMAIL.COM
WA 98020
CONTRACTOR
OWNER
9500 ROOSEVELT WAY NE #100,
OWNER
FIRDALE ASSOCIATES LLC
SEATTLE WA 98115
FEE INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT#
CHANGE OF USE - SUB NO CONST -
001.000.322.10.000.00
$210.00
$210.00
9/21/21
R14880
BLDG PERMIT FEE
CHANGE OF USE - SUB NO CONST -
001.000.345.83.000.00
$100.00
$100.00
8/30/21
R14387
BLDG PLAN REVIEW FEE
CHANGE OF USE - SUB NO CONST -
001.000.342.40.000.00
$100.00
$100.00
9/21/21
R14880
FIRE INSP FEE
CHANGE OF USE - SUB NO CONST -
001.000.345.83.100.00
$100.00
$100.00
8/30/21
R14387
FIRE PLAN REVIEW FEE
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
8/30/21
R14387
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
9/21/21
R14880
TOTALS:
$575.00
$575.00
wr
•
R •
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, October 26, 2022 10:19:50 AM 1 of 2
'-
of Edmonds PERMIT NU
!!!7
EdmondsCity
98020 1 .:
-W www . •. •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
INSPECTIONS - Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED
RESULT
NOTES
X-3 BUILDING FINAL"
11/12/2021
CORRECTION
Corrections 1. Provide lever handles at bathroom and
12:00:00 AM
REQUIRED
entry door. 2. Provide double cylinder deadbolt with
indicator at entry door. Signage above door also
required.
X-3 BUILDING FINAL"
12/21/2021
APPROVED
Approved
12:00:00 AM
X-3 BUILDING FINAL"
12/21/2021
APPROVED
Approved
12:00:00 AM
Printed: Wednesday, October 26, 2022 10:19:50 AM 2 of 2