Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
APPROVED BLD PLN RAINBOW_RESUB3 BLD2021-0173+Mechanical_Plan+11.4.2021_9.33.35_AM+2501955
GENERAL INFORMATION PROPERTY TAX NO.: 00576700002002 LEGAL DESCRIPTION: SKELTONS LK MC ALEER 5 ACRE TRS BLK 000 D-02 — TH PTN TRS 20 & 21 LY W OF ST RD & SLYOF N LN OF S 338,16FT OF TR 21 PROD ELY TO W LN SD ST RD &ELY OF W 183FT OF TR 21 PROJECT LOCATION: 23400 HWY 99 EDMONDS, WA 98057 PROJECT DESCRIPTION: VENTILATION OF GARAGE, CORRIDORS, LOBBY, COMMON AREAS, TRASH ROOMS, AND APARTMENT UNITS, PRESSURIZATION SYSTEMS FOR STAIR A, STAIR B, AND ELEVATOR CABS 1 AND 2, CONDITIONING OF LOBBY, FITNESS, AND AMENITY SPACES VIA MINISPLIT HEATPUMPS AND ELECTRIC HEAT, HVAC CONTRACTOR: EMERALD AIRE INC 5108 D STREET AUBURN, WA 98001 PROJECT MANAGER: CONTACTISCOTT HOFFMAN VOICEI 253 872 5665 FAXI 253 872 5797 GENERAL CONTRACTOR: GOODMAN REAL ESTATE INC, 2801 ALASKAN WAY #310, SEATTLE, WA 98121 CONTACTITITUS UOMOTO VO I CEI C 206) 8988-9354 INDEX: Sheet fist Table Sheet Number Sheet Title M0.00 HVAC COVERSHEET M 0.01 LOAD CALCULATION S M0.02 LOAD CALCULATIONS M0.03 LOAD CALCULATIONS M0.04 EQUIPMENT SCHEDULES M2.00 P 1 HVAC PLAN M2.01 P2 HVAC PLAN M2.02 R 1 HVAC PLAN M2.03 R2 HVAC PLAN M2.04 R3 HVAC PLAN M2.05 R4 HVAC PLAN M2.06 R5 HVAC PLAN M2.07 ROOF HVAC PLAN M3.00 NORTH EAST ELEVATIONS M3.01 SOUTH WEST ELEVATIONS M4.00 HVAC DETAILS M 4.01 HVAC DETAILS M4.02 HVAC DETAILS M5.00 HVAC CONTROL DIAGRAMS M 5.01 HVAC CONTROL DIAGRAM S GRE GENERAL MECHANICAL: STANDARDSI EQUIPMENT AND MATERIALS SHALL CONFORM WITH APPROPRIATE PROVISIONS OF ARL, ASME, ASTM, UL, NEMA, ANSI, SMACNA, ASHRAE, MFPA, OTHER APPLICABLE AGENCIES AND AHJ AS APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY CODESI ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES AND ORDINANCES, IN CASE OF CONFLICT BETWEEN THE DRAWINGS/SPECIFICATIONS AND THE CODES AND ORDINANCES, THE MOST STRICT STANDARD CIN THE OPINION OF THE ENGINEER) SHALL APPLY, THE MECHANICAL CONTRACTOR SHAL SATISFY CODE REQUIREMENTS &REQUIREMENTS OF THE CONTRACT DOCUMENTS AS A MINIMUM STANDARD, APPLICABLE CODESI 2015 IMC W/WASHINGTON STATE AMENDMENTS, 2015 IBC W/WASHINGTON STATE AMENDMENTS, 2015 WASHINGTON STATE ENERGY CODE, GENERAL CONTRACTOR TO PROVIDE ACCESS TO FIRE AND/OR COMBINATION FIRE/SMOKE DAMPERS, .4PPR0' EDMONDS VICINITY MAP: �� WSEC &COMMISSIONING NOTES: THERMOSTATS SHALL BE INTERLOCKED TO PREVENT SIMULTANEOUS HEATING AND `� � r � ,'' CODLING PER WSEC 403, 2, 4, 1 22Bth St SW ��� 228th St. SW M r1�' � U1 Y � ///�1. f �' � ECONOMIZERS SHALL MODULATE OUTSIDE AIR FROM MINIMUM TU 100% r D � � � Ballinger 230th 5k sw � Playf�ield ECONOMIZER CONTROLS SHALL BE CAPABLE OF EVALUATING OUTDOOR AIR COOLING � '� 23�rh CAPACITY PER WSEC C403� 3, 1, 1 231 st St SW ; ��� } 3 st.`tl `� Ba I linger INSULATE REFRIGERANT PIPING PER WSEC TABLE C403, 2, 9 =' �' Lake Park Holly Ln � °° � = 44 � ¢ � °' SEAL DUCTWORK PER WSEC C403, 2, 8, 1 Maple Ln D � �� �` �? 23+1th PI sw � ��atmslsw � � �� INSULATE DUCTWORK PER WSEC C403, 2, 8, 1 AND C403, 2, 8, 2 .JW, o COMMISSIONING PER WSEC C408 INCLUDING COMMISSIONING PLAN SYSTEMS � � z36khstsw � Baat Ramp At �" Lake Ballinger BALANCING, FUNCTIONAL TESTING, CONTROLS TESTING, OPERATION AND '' � �: Q MAINTENANCE MANUALS, AND RECORD DRAWINGS, SHALL BE SUBMITTED TO OWNER s r ON PROJECT COMPLETION, � 238th St SW �3stn st sw � � /� F g �' � EdmoUnt � INSTALL ALL THERMOSTATS AT 48" AFF �A �� .� / m Island � �,���r Programmable thermostats required WSEC C403.2.4.10. NOT TO SCALE CLANS MUST BE ON JOB SITE ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE HVAC LEGEND &ABBREVIATIONS: N K S E N C FM E GRD IDENTIFIER CFM n U SIDE WALL GRILL ® SUPPLY GRILLE ® THERMAFUSER ® RETURN AIR GRILLE 0 EXHAUST GRILLE ® EXHAUST FAN AHU-1 EQUIPMENT TAG O T—STAY gas CO/NO 2 SENSOR occ OCCUPANCY SENSOR —� LINE VOLTAGE WIRE BY EC ® DUCT RUN � � ELBOW � � REDUCER � � SIDE TAPS 90 ELBOW ��''� W/ TURNING VANES nni���`` mu���`` FLEXIBLE DUCT � � MANUAL DAMPER FD♦ FD FIRE DAMPER SDI SD SMOKE DAMPER SFD SFD SMOKE/FIRE DAMPER >� MOTORIZED DAMPER DD DD BACKDRAFT DAMPER »� VARIABLE VOLUME/TEMPERATURE HP HEAT PUMP HP HORSEPOWER HTG HEATING HTR HEATER ID INSIDE DIAMETER IN INCHES KW KILOWATT LAT LEAVING AIR TEMPERATURE LBS. POUNDS LV LINE VOLTAGE LWV LOW VOLTAGE LWT LEAVING WATER TEMPERATURE MA MIXED AIR MAX MAXIMUM MBH THOUSAND BTU'S PER HOUR MIN MINIMUM MS MOTOR STARTER NC NOISE CRITERIA NTS NOT TO SCALE OA OUTSIDE AIR OBD OPPOSED BLADE DAMPER OC ON CENTER OD OUTSIDE DIAMETER PH PHASE PSI POUNDS PER SQUARE INCH QTY QUANTITY R/A RETURN AIR REF REFRIGERANT RET RETURN RH RELATIVE HUMIDITY RLD RELIEF DAMPER RPM REVOLUTIONS PER MINUTE S/A SUPPLY AIR SEER SEASONAL ENERGY EFFICIENCY RATING SH SENSIBLE HEAT SOV SHUT OFF VALVE SP STATIC PRESSURE TEMP TEMPERATURE UC UNDERCUT DOOR V VOLT VAV VARIABLE AIR VOLUME VD VOLUME DAMPER (HAND OPERATOR) VEL VELOCITY W WATT W/ WITH WB WET BULB W/0 WITHOUT City Of Edmonds Building Department Work MECHANICAL Address 23400 HWY 99 ......................................................................................................................................: Owner GRE APTS Approved Date �...............,�..'��r'����2�2�............................. ................................................. ................................................................... Building Official Eri,� C%a�rter ................................. Permit Number gLD 2021-0173 APPROVED BY PLANNING RAiNBGW �GNSULTIt�G l�E��E�11fE� November 5, 2021 REVIEWED BY: S P� I BLD2021-0173 (n z 0 w z 0 U w 0 w Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U � z � cu �, o w � � °� m Q z 3¢ W = 3 J Q � A � W z Ma z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ t0 � m I � � otn�r� ���NInO Z O � _ N Q I —a N O pip � (n �' � � LrJ w w Z Q ��M� �z� w � Z Q . � ��I'7WN� Z w � tc3 � �� X H w w J Lai O O O � U a � I- 0 `� O ��, a o a� a U ry � I�ti U w 7nn IJ HVAC COVERSHEET CITY OF EDMONDS STAMP SCALE: AS —NOTED �, V � - v RESUB Nov 04 2021 CITY OF EDMONDS 4 946 w� DEVELOPMENT SERVICES n n O.O 0 w DEPARTMENT I V I ���s oNat, ti���� BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M0.00 HVAC COVERSHEET.dwg 21 VENTILATION CALCULATIONS THIS FORM APPLIES DEFAULT OCCUPANCY VENTILATION VALUES FROM ASHRAE 62.1 AND ASHRAE 170 INDICATES SIZING BASED ON MANUFACTURER'S RECOMMENDATIONS OR COOLING REQUIREMENTS OF EQUIPMENT IN SPACE BASIC CALCULATION =BREATHING ZONE AREA x (DEFAULT OCCUPANCY DENSITY/1000) x CFM/PERSON +BREATHING ZONE AREA xAREA OUTDOOR AIRFLOW RATE =MINIMUM OUTSIDE AIR REQUIRED OR (AREA x HEIGHT x # OF AIRCHANGES / HR) / 60 MIN/HR = OSA OR AIR MOVEMENT REQUIRED ROOM /ZONE - OCCUPANCY CLASSIFICATIO - AREA (SF) OR FIXTURES (#) OR KVA 62.1 MINIMUM �NTILATION (CFM) DESIGN VENTILATION (CFM) VENTILATION SYSTEM OSA - EXH - OSF , EXF - PARKING LEVEL P1/ 100 GARAGE 37613 0 28210 28250 GEF-1 PARKING LEVEL P2! 200 GARAGE 41141 0 30856 30900 GEF-2 EXERCISE/ 102 FITNESS 1640 426 - 430 ERV-2 YOGA! 102B FITNESS 413 107 - 125 ERV-2 BIKE AMENITY/ 103 FITNESS 580 151 - 175 ERV-2 FITNESS HALL COR. OTHER 339 20 - 20 ERV-2 LOBBY/ 101 ENTRY 2147 236 - 240 240 ERV-1 LOBBY 201 ENTRY 1246 137 - 140 ERV-1 LOBBY RESTROOMS RESTROOM 2 0 100 100 ERV-1 MAIL/ 2026 RES. STORAGE 193 12 - ERV-1 LEASING OFFICE/ 202C OFFICE 333 28 - 30 ERV-1 WORK ROOM/ 202D RES. STORAGE 113 7 - 15 ERV-1 PRIVATE OFFICE? 202E OFFICE 108 9 - 15 ERV-1 DOG WASH/ 203 JANITOR 304 0 304 300 EF-3 STORAGE/ UTILITY / 205 RES. STORAGE 1319 79 - 300 EF-2 STORAGE/ UTILITY / 205 RES. STORAGE 1319 79 - 300 EF-2 AMENITY/308 COMMON ROOM 538 194 - NOTE 3 AMENITY/ 328 COMMON ROOM 1078 388 - NOTE 3 RESTROOM/ 340 RESTROOM 1 0 50 EF-4 AMENITY RESTROOMS RESTROOM 2 0 100 EF-5 & EF-6 CORRIDOR/ 300 COR. WHOLE HOUSE 2805 337 - 350 RTU-1 CORRIDOR/400 COR. WHOLE HOUSE 2805 337 - 350 RTU-1 CORRIDOR/ 500 COR. WHOLE HOUSE 2805 337 - 350 RTU-1 CORRIDOR/ 600 COR. WHOLE HOUSE 2805 337 - 350 RTU-1 CORRIDOR/ 700 COR. WHOLE HOUSE 2805 337 - 350 RTU-1 TRASH ROOM/ 204 TRASH ROOM 600 0 600 600 TEF-1 TRASH ROOM/ 344 TRASH ROOM 55 0 55 55 TEF-1 TRASH ROOM/444 TRASH ROOM 55 0 55 55 TEF-1 TRASH ROOM/ 544 TRASH ROOM 55 0 55 55 TEF-1 TRASH ROOM/ 644 TRASH ROOM 55 0 55 55 TEF-1 TRASH ROOM/ 744 TRASH ROOM 55 0 55 55 TEF-1 1. THIS SPACE IS AN UNOCCUPIED UNDER NORMAL USE. VENTILATION IS NOT REQUIRED PER 2015 WSMC 401.2. 2. THIS NONRETAIL STORAGE SPACE < 100 SQFT HAS NO MIN MECHANICAL VENTILATION REQUIREMENT PER 2015 WSMC TABLE 403.3.1.1 3. THIS SPACE IS NATURALLY VENTILATED VIA LOWERS AND OPENINGS WITH A COMBINED FREE AREA OF AT LEAST 4% OF THE SPACES FLOOR AREA PER 2015 WSMC 402. HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name GRE Edmonds 99 Date 12/10/2020 System Name Yoga 102B Floor Area 423 ENGINEERING CHECKS SYSTEM LOAD Number of Systems COIL CFM Total Room Loads 504 Return Vented Lighting Return Air Ducts Return Fan Ventilation 55 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 10,338 2,303 89 3,820 Total Output (Btuh) o Output (Btuh/sgft) 0 0 Cooling System 0 0 Output per System 561 -503 55 3,034 Total Output (Btuh) 0 1,800 0 Total Output (Tons) 0 0 Total Output (Btuh/sgft) Total Output (sgft/Ton) 10,899 6,855 Air System CFM per System HVAC EQUIPMENT SELECTION Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Jan 1 AM Outside Air (cfm/sgft) Note: values above given at ARI conditions Sep 4 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 19 °F Outside Air 55 cfm 70 °F 57 °F 110 °F Heating Coil �_.. � i 110 °F ROUM 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83/65''I= Outside Air 55 cfm 74/64°F 76/64°F 55/54°F Cooling Coil 55 / 54 °F 60.0 °i° ROOM 74/64°F EnergyPro 5.1 by EnergySoft User Number: 7487 RunCode: 2020-12-10T12:06:35 ID: Page 3 of 40 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name GRE Edmonds 99 Date 12/10/2020 System Name Lobby 101 Floor Area 2,200 ENGINEERING CHECKS SYSTEM LOAD Number of Systems COIL CFM Total Room Loads 1,565 Return Vented Lighting Return Air Ducts Return Fan Ventilation 90 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 32,078 2,035 646 27,888 Total Output (Btuh) 0 Output (Btuh/sgft) 0 0 Cooling System o 0 Output per System 1,112 328 90 4,965 Total Output (Btuh) 0 2,363 0 Total Output (Tons) 0 0 Total Output (Btuh/sgft) Total Output (sgft/Ton) 33,190 32,853 Air System CFM per System HVAC EQUIPMENT SELECTION Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Jan 1 AM Outside Air (cfm/sgft) Note: values above given at ARI conditions � Aug 4 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 19 °F Outside Air 90 cfm 70 °F 66 °F 110 "1= Heating Coil 110 ` RC�L�M 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 85/66°F Outside Air 90 cfm 74 l 62 °F 75/62°F 55/54°F - Cooling Coil 11 55 / 54 °F 49.2 % ROOM�� 74 / 62 °F EnergyPro 5.1 by EnergySoft User Number: 7487 RunCode: 2020-12-10T12:06:35 ID: Page 1 of 40 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name GRE Edmonds 99 Date 12/10/2020 System Name Bike Amenity 103 Floor Area 488 ENGINEERING CHECKS SYSTEM LOAD Number of Systems COIL CFM Total Room Loads 720 Return Vented Lighting Return Air Ducts Return Fan Ventilation 65 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 14,750 3,572 166 7,181 Total Output (Btuh) o Output (Btuh/sgft) 0 0 Cooling System 0 0 Output per System 501 -644 65 3,586 Total Output (Btuh) 0 2,928 0 Total Output (Tons) 0 0 Total Output (Btuh/sgft) Total Output (sgft/Ton) 15,251 10,767 Air System CFM per System HVAC EQUIPMENT SELECTION Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Jan 1 AM Outside Air (cfm/sgft) Note: values above given at ARI conditions Jun 6 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 19 °F Outside Air 65 cfm 70 °F 56 °F 11� ^i --- -- Heating Coil 110 °F R04M 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 81 /65°F Outside Air 65 cfm 74/66°F 76/65°F 55/54°F Cooling Coil ■■ 55 / 54 °F 64.8 % ROQIli11 74/66°F EnergyPro 5.1 by EnergySoft User Number: 7487 RunCode: 2020-12-10T12:06:35 ID: Page 4 of 40 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name GRE Edmonds 99 Date 12/10/2020 System Name Exercise Floor Area 1,640 ENGINEERING CHECKS SYSTEM LOAD Number of Systems COIL CFM Total Room Loads 1,568 Return Vented Lighting Return Air Ducts Return Fan Ventilation 225 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 32,148 7,312 463 19,988 Total Output (Btuh) o Output (Btuh/sgft) 0 0 Cooling System o 0 Output per System 2,779 -826 225 12,414 Total Output (Btuh) 0 6,486 0 Total Output (Tons) 0 0 Total Output (Btuh/sgft) Total Out ut (s ft/Ton) 34,928 32,402 Air System CFM per System HVAC EQUIPMENT SELECTION Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Jan 1 AM Outside Air (cfm/sgft) Note: values above given at ARI conditions Aug 4 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 19 °F Outside Air 225 cfm 70 °F 56 °F 110 °F Heating Coil 110 °F RQG�M a 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 85 1 66 °F Outside Air 225 cfm 74 / 64 °F 77 / 64 °F 55 / 54 °F Cooling Coil 55 / 54 °F 57.6 % R(��� 74 / 64 °F ��= EnergyPro 5.1 by EnergySoft User Number. 7487 RunCode: 2020-12-10T12:O6:35 ID: Page 2 of 40 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name GRE Edmonds 99 Date 12/10/2020 System Name Lobby 201 Floor Area 1,700 ENGINEERING CHECKS SYSTEM LOAD Number of Systems COIL CFM Total Room Loads 1,000 Return Vented Lighting Return Air Ducts Return Fan Ventilation 120 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 20,489 1,217 244 10,534 Total Output (Btuh) o Output (Btuh/sgft) 0 0 Cooling System o 0 Output per System 1,482 503 120 6,621 Total Output (Btuh) 0 1,720 0 Total Output (Tons) 0 0 Total Output (Btuh/sgft) Total Output (sgft/Ton) 21,971 17,154 Air System CFM per System HVAC EQUIPMENT SELECTION Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Jan 1 AM Outside Air (cfm/sgft) Note: values above given at ARI conditions � Aug 4 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 19°F Outside Air 120 cfm 63°F 11n°i �- ----- - Heating Coil � � i 110 °F R04M COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 85/66°F Outside Air 120 cfm 74/61 °F 76/62°F 55/54°F Cooling Coil 55 / 54 °F 48.6 % RVV� 74/61 °F EnergyPro 5.1 by EnergySoft User Number: 7487 RunCode: 2020-12-10T12:06:35 ID: Page 5 of 40 RAINBOU/ ��NSULTING �EV��`c'1iE,� November 5, 2021 z 0 w Z O i= U N Li.l 0 w Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D ClJ � O W H � Q1 z 3 Q N W = 3 J Q � A � W Z Ma z N � L�J w Q � o 0 l� � � U � W � tY Z O � � � � Q _w J U � J I I I I I I I I _ � r\ m I � � ����u7 �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � Z w � z a .-.. u� ��I'7WN� z w � u7 � .Ni � j� H w w J Lai O O O � U a � H 0 �� o 0 c � Q� a U r..y � luti � nnn N U w nnn LJ LOAD CALCULATIONS �EVfEYdE� f3Y: S �� • .� � --��- CITY OF EDMONDS STAMP SCALE: AS -NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES n n 0 , 0 DEPARTMENT I V I ��`�''� " BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\Sheets\M0.01 LOAD CALCULATIONS.dwg HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name GRE Edmonds 99 Date 12/10/2020 System Name L2 Offices Floor Area 747 ENGINEERING CHECKS SYSTEM LOAD Number of Systems COIL CFM Total ROOM Loads 1,024 Return Vented Lighting Return Air Ducts Return Fan Ventilation 28 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 20,996 963 116 4,999 Total Output (Btuh) o Output (Btuh/sgft) 0 0 Cooling System o 0 Output per System 285 -13 28 1,545 Total Output (Btuh) 0 949 0 Total Output (Tons) 0 0 Total Output (Btuh/sgft) Total Output (sgft/Ton) 21,281 6,544 Air System CFM per System HVAC EQUIPMENT SELECTION Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Jan 1 AM Outside Air (cfm/sgft) Note: values above given at ARI conditions Sep 4 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Tem eratures at Time of Heatin Peak) 19 °F Outside Air 28 cfm 70 °F 66 °F 110 °F Heating Coil 110 °F R� L l tdi ItL-- 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83/65°F Outside Air 28 cfm 74/62°F 75/62°F 55/54°F � Cooling Coil 55 / 54 °F 50.1 % ���� �. 74/62°F I EnergyPro 5.1 by EnergySoft User Number: 7487 RunCode: 2020-12-10T12:06:35 ID: Page 6 of 40 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name GRE Edmonds 99 Date 12/10/2020 System Name Amenity 328 Floor Area 1,039 ENGINEERING CHECKS SYSTEM LOAD Number of Systems COIL CFM Total Room Loads 511 Return Vented Lighting Return Air Ducts Return Fan Ventilation 59 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 10,477 2,540 58 2,504 Total Output (Btuh) o Output (Btuh/sgft) 0 0 Cooling System 0 0 Output per System 650 23 59 3,269 Total Output (Btuh) 0 2,563 0 Total Output (Tons) 0 0 Total Output (Btuh/sgft) Total Output (sgft/Ton) 11,126 5,773 Air System CFM per System HVAC EQUIPMENT SELECTION Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Jan 1 AM Outside Air (cfm/sgft) Note: values above given at ARI conditions Jul 5 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 19 °F Outside Air 59 cfm 70 °F 64 °F 110 °F Heating Coil 110 °F � RI�QM 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 84/66°F Outside Air 59 cfm 74/63°F 75/63°F 55/54°F Cooling Coil 55 / 54 °F 53.0 % RO'pM �. 74/63°F EnergyPro 5.1 by EnergySoft User Number: 7487 RunCode: 2020-12-10T12:06:35 ID: Page 7 of 40 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name GRE Edmonds 99 Date 12/10/2020 System Name Amenity 308 Floor Area 538 ENGINEERING CHECKS SYSTEM LOAD Number of Systems COIL CFM Total Room Loads 310 Return Vented Lighting Return Air Ducts Return Fan Ventilation 35 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 6,354 1,432 51 2,1g2 Total Output (Btuh) o Output (Btuh/sgft) 0 0 Cooling System o 0 Output per System 357 -119 35 1,931 Total Output (Btuh) 0 1,313 0 Total Output (Tons) 0 0 Total Output (Btuh/sgft) Total Output (sgft/Ton) 6,711 4,123 Air System CFM per System HVAC EOUIPMENT SELECTION Airflow (cfm) Airflow (cfm/sgft) Airflow (cfm/Ton) Outside Air (%) Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK Jan 1 AM Outside Air (cfm/sgft) Note: values above given at ARI conditions Sep 2 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Tem eratures at Time of Heatin Peak) 19 °F Outside Air 35 cfm 70 °F 63 °F 110 °F Heating Coil 110 °F RQ�3M I� 70 °F COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 83/65°F Outside Air 35 cfm 74/63°F 75/63°F 55/54°F Cooling Coil 55 / 54 °F 53.5 % R'©01'� 74/63°F EnergyPro 5.1 by EnergySoft User Number: 7487 RunCode: 2020-12-10T12:06:35 ID: Page 8 of 40 RAINBOW CON�ULTiNG ������� November 5, 2021 REVIEWED BY: S P� N Z O N>_ W Z O H 0_ U N W W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �O CU O W � Q � O, Q z 3¢ 3 W = J Q � A Z � L1J M O (1.1 � Z Q W w ra � o 0 L� � F— U � W � � Z O � W � � � Q J U � J I I I I I I I I _ � r m I � � o��r� �� u) t�D N QO Z� � N Q W OrO��^O� �Z� W Z—V, Z Q .. lf') I' 7 W N � � `-� Z W In W InQ�.� H H � � o 0 0 U a � H w o �� Q � 0 c �s Q� a U r..y � I�ti � nnn N k LLl fi� LOAD CALCULATIONS CITY OF EDMONDS STAMP SCALE: AS -NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES n n O , O DEPARTMENT I V I °'�� " BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\Sheets\M0.02 LOAD CALCULATIONS.dwg RAINBOW CQN�ULTING November 5, 2021 ��V��Yd�� �Y: S �� N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H °� �� o a� Q � Q c � Q� a U ry � I�ti � nnn N U w n7nnnn IJ LOAD CALCULATIONS CITY OF EDMONDS STAMP SCALE: AS —NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES n n 0 . O DEPARTMENT I\Y/I ��`�''� " BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\Sheets\M0.03 LOAD CALCULATIONS.dwg OUTDOOR CONDENSING/HEAT PUMP UNITS COOLING HEATING ELECTRICAL SEER HSPF # MANUF MODEL LOCATION SERVES (SNS) WT NOTES MBH (EER) MBH (COP) V/PH MCA MOCP OHP-3 MITSUBISHI PUMY-P48NKMU P1 GARAGE EXERCISE 48 22.E 54 12 208/1 36 44 54 273 1,2,3,4 NOTES: 1. POWER FROM CORRESPONDING OUTDOOR UNIT TO BE WIRED BY EC AND MUST ONLY USE THE WIRE SIZE SHOWN IN THE HEAT PUMP INSTALLATION MANUAL. 2. CONDENSATE PIPING BY OTHERS. 3. HP MOUNTED ON WALL BRACKETS. SEE DETAILS. 4. NO ECONOMIZER. PER IECC C403.3 EXCEPTION 1, VENTILATION IS UPPLIED BY DOAS UNIT. 5. ECONOMIZER NOT REQUIRED PER IECC C403.3 EXCEPTION 6. HP EXCEEDS REQUIREMENTS OF TABLE C403.2.1 BY AT LEAST 15%. FAN COIL UNITS OUTDOOR COOLING HEATING ELECTRICAL # MANUF MODEL LOCATION SERVES CFM WT NOTES MBH MBH V/PH MCA MOCP UNIT MARK FC-3A MITSUBISHI PKFY-P24NKMU-E2 EXERCISE EXERCISE OHP-3 24 27 777 208/1 0.63 15 46 1,2,3,4,5 FC-3B MITSUBISHI PKFY-P24NKMU-E2 EXERCISE EXERCISE OHP-3 24 27 777 208/1 0.63 15 46 1,2,3,4,5 NOTES: 1. PROVIDE WITH MHK1 7 DAY PROGRAMMABLE WALL MOUNTED WIRELESS T-STAY. 2. CONDENSATE PIPING BY EAI. PLUMBER TO PROVIDE RECEPTACLE WITHIN 20' OF UNIT. 3. CONDENSATE PIPING BY OTHERS. 4. EAI TO PROVIDE CONDENSATE PUMP. WIRED BY EC. 5. NO ECONOMIZER. PER IECC C403.3 EXCEPTION 1, VENTILATION IS SUPPLIED BY DOAS UNIT. 6. NO ECONOMIZER. PER IECC C403.3 EXCEPTION 6. HP EXCEEDS REQUIREMENTS OF TABLE C403.2.1 BY AT LEAST 15%. MINISPLIT HEATPUMPS COOLING HEATING ELECTRICAL HP HP # FC # MANUF MODEL HP MODEL FC HEATPUMP FANCOIL SERVES CFM HP ANT NOTES HSPF LOCATION LOCATION MBH SEER MBH (COP) V/PH MCA MOCP LWA (LBS) OHP-1 FC-1 MITSUBISHI PUZ-A36NKA7 PKA-A36KA7 P1 GARAGE W LOBBY 101 LOBBY 101 36 18.8 22.4 9.2 920 208/1 25 31 53 214 1,2,3,6,8 OHP-2 FC-2 MITSUBISHI MUZ-HM09NA MSZ-HM09NA P1 GARAGE E ELV. ROOM ELV. ROOM 9 18 10.9 10 405 208/1 10 15 51 81 1,2,3,6,9 OHP-4 FC-4 MITSUBISHI SUZ-KA15NA2 SLZ-KF15NA P1 GARAGE E YOGA YOGA 14.1 19.8 11.9 11.2 405 208/1 10 18 51 81 1,2,3,6,8 OHP-5 FC-5 MITSUBISHI SUZ-KA18NA2 SLZ-KF18NA P1 GARAGE E BIKE 103 BIKE 103 17.7 20.7 12.9 11.E 475 208/1 14 24 55 127 1,2,3,6,8 OHP-6 FC-6 MITSUBISHI PUZ-A24NHA7 PEAD-A24AA7 P2 GARAGE W L2 OFFICES L2 OFFICES 24 19.E 14.8 10.8 635 208/1 19 26 48 153 1,2,3,6,8 OHP-7 FC-7 MITSUBISHI SUZ-KA09NA2 MLZ-KP09NA P2 GARAGE W 308 AMENITY 308 AMENITY 9 19.5 7.7 13.3 283 208/1 9 15 51 81 1,2,3,10 FC-8A MITSUBISHI MLZ-KP09NA P2 GARAGE E 328 AMENITY 328 AMENITY 9 19.5 7.7 13.3 283 208/1 9 15 51 81 1,2,3,10 OHP-8 MXZ-2C20NA2 FC-8B MITSUBISHI MLZ-KP09NA P2 GARAGE E 328 AMENITY 328 AMENITY 9 19.5 7.7 13.3 283 208/1 9 15 51 81 1,2,3,10 OHP-9 FC-9 MITSUBISHI PUZ-A36NKA7 PLA-A36EA7 P2 GARAGE W LOBBY 201 LOBBY 201 36 21.8 22 10.4 850 208/1 25 31 48 214 1,2,3,8 NOTES: 1. PROVIDE WITH MHK1 7 DAY PROGRAMMABLE WALL MOUNTED WIRELESS T-STAT.16:26 2. POWER FROM CORRESPONDING OUTDOOR UNIT TO BE WIRED BY EC AND MUST ONLY USE THE WIRE SIZE SHOWN IN THE OHP INSTALLATION MANUAL. 3. CONDENSATE PIPING BY OTHER. 4. INTEGRAL 22" CONDENSATE LIFT. 5. EAI TO PROVIDE CONDENSATE PUMP. WIRED BY EC. 6. HP MOUNTED ON WALL BRACKETS. SEE DETAILS 7. HP MOUNTED ON ROOF FASTJACK SYSTEM OR SLEEPERS. SEE DETAILS 8. NO ECONOMIZER. PER IECC C403.3 EXCEPTION 1, VENTILATION IS SUPPLIED BY DOAS UNIT. 9. NO ECONOMIZER, PER IECC C403.3 EXCEPTION 10, UNIT IS 15% MORE EFFECIENT AND SERVES EMR. 10. ECONOMIZER NOT REQUIRED PER IECC C403.3 EXCEPTION 6. HP EXCEEDS REQUIREMENTS OF TABLE C403.2.1 BY AT LEAST 15%. FANS # MANUF MODEL LOCATION SERVES DRIVE DAMPER CFM SP (" WC) Hp (W) ELECTRICAL LWA (SNS) WT NOTES V / PH FLA EF-1 BROAN L300 ELEC 105/A ELEC 105/A DD INT BDD 308 0.125 (212) 120/1 2.6 (2.9) 23.1 2 EF-2 BROAN L300 205/ STORAGE 205/ STORAGE DD INT BDD 308 0.125 (212) 120/1 2.6 (2�9) 23.1 3 EF-3 BROAN L300 203/ DOG WASH 203/ DOG WASH DD INT BDD 308 0.125 (212) 120/1 2.6 (2.9) 23.1 3 EF-4 DELTABRZ ITG-80 AMENITY RESTROOMS DD INT BDD 80 0.1 (5) 120/1 0.14 (0.7) 14 1 EF-5 DELTABRZ ITG-80 AMENITY RESTROOMS DD INT BDD 80 0.1 (5) 120/1 0.14 (0.7) 14 1 EF-6 DELTABRZ ITG-80 AMENITY RESTROOMS DD INT BDD 80 0.1 (5) 120/1 0.14 (0.7) 14 1 EF-7 DELTABRZ ITG-50 106/ STORAGE 106/ STORAGE DD INT BDD 50 0.1 (5) 120/1 0.14 (0.7) 14 3 EF-8 DELTABRZ ITG-50 206/ STORAGE 206/ STORAGE DD INT BDD 50 0.1 (5) 120/1 0.14 (0.7) 14 3 EF-9 BROAN L300 104 BIKE ROOM 104 BIKE ROOM DD INT BDD 308 0.125 (212) 120/1 2.6 (2�9) 23.1 3 EF-VAULT FANTECH FADE-18 TRANSFORMER VLT TRANSFORMER VLT DD FD 1600 0.5 (531) 120/1 4.45 (14.3) 30 8 SPF-A GREENHECK SAF-118-20 STAIR A ROOF STAIR A BELT MD 6000 0.5 2 208/3 7.5 75 417 4,6 SPF-B GREENHECK SAF-118-20 STAIR B ROOF STAIR B BELT MD 6000 0.5 2 208/3 7.5 75 417 4,6 EPF-1 GREENHECK SBE-3H36-30 ROOF ELEVATOR BELT MD 15000 0.5 3 208/3 10.E 93 186 4,6 TEF-1 GREENHECK G-099-VG ROOF TRASH CHUTE DD N/A 1000 0.5 1/4 208/1 1.7 74 35 5 GEF-1 GREENHECK SBE-2L54 GARAGE P1 GARAGE BELT N/A 30,000 0.3 5 208/3 16.7 85 269 7 GEF-2 GREENHECK SBE-2L54 GARAGE P1 GARAGE BELT N/A 30,000 0.3 5 208/3 16.7 85 269 7 GTF-1 GREENHECK SBS-3H30 GARAGE P2 GARAGE BELT N/A 7850 0.3 1 120/1 16 84 107 3 GTF-2 GREENHECK SBS-3H30 GARAGE P2 GARAGE BELT N/A 7850 0.3 1 120/1 16 84 107 3 1. FAN TO OPERERATE ON WALL SWITCH. 2. ON COOLING ONLY LINE VOLTAGE TSTAT, SUPPLIED BY MC, WIRED BY EC. 3.T0 RUN CONTINUOUS. 4. PROVIDE W/ 1.5X BELTS NEEDED FOR DUTY, CONNECT TO LEGALLY REQUIRED STANDBY POWER. INTERLOCK WITH FIRE ALARM SYSTEM BY OTHERS. W/ (2) DUCT SMOKE DETECTORS (WIRED TO SHUT DOWN), INSTALLED BY MC. VFD PROVIDED FOR BALANCING. FIRE ALARM SYSTEMS MONITORS FAN OPERATION FROM VFD. 5. TO RUN CONTINUOUS W/ SPEED CONTROLLER. 6. FAN ON LEGALLY REQUIRED STANDBY POWER. 7. TO RUN LOW AT 6% CFM OR 20 HZ, WHICHEVER IS GREATER. FAN TO BE ON VFD, SIGNAL PER CO/NO2 SENSOR ARRAY TO RAMP UP TO HIGH OVER A 15 MIN PERIOD. 8. CONTROLLED VIA LINE VOLTAGE -COOLING ONLY TSTAT. SET TO TURN ON AT 80F, TURN OFF AND TRIGGER ALARM AT 140F. HEATPUMP ROOFTOP UNIT HEATING COOLING ELECTRICAL ESP WT HSPF SEER AUX # MANUF MODEL LOCATION SERVES CFM OSA ( WC) (LBS) LWA NOTES MBH (COP) TONS (EER) V/PH KW MCA MOCP RTU-1 CARRIER 50GCQM06A2A5-OAOAO ROOF R1-R5 CORRIDOR 1992 1012 0.68 55.9 8.3 5 16.2 208/3 15.8 86 90 101E 79 ALL RTU-2 CARRIER 50GCQM06A2A5-OAOAO ROOF R1-R5 CORRIDOR 1600 685 0.68 55.9 8.3 5 16.2 208/3 15.8 86 90 101E 79 ALL NOTES: 1. W/ HONEYWELL PRO 8000 TSTAT 2. UNIT MOUNTED ON CURB 3. AUXILARY ELECTRIC HEAT IN UNIT 4. UNIT MOUNTED ON SPRING ISOLATION CURB, CURB INFILLED WITH BATT INSULATION (BY OTHERS) 5. W/ ECONOMIZER HOOD 6. LBS DISPLAYED IS UNIT WEIGHT+SPRING ISOLATION CURB WEIGHT 7. ORDER BOTH UNITS WITH STAINLESS STEEL HEAT EXCHANGERS ENERGY RECOVERY VENTILATORS # MANUF MODEL LOCATION SERVES CFM , WG ( ) EFFICIENCY ELECTRICAL WT NOTES WINTER SUMMER EFF % EFF % VOLT MCA MOCP ERV-1 LOSSNAY LGH-F470RVX-E LOBBY 101 LOBBY 440.0 0.6 64.0 51.0 208/1 3.1 15.0 110.0 1,2 ERV-2 LOSSNAY LGH-F600RVX-E BIKE ROOM FITNESS 578.0 0.5 64.0 50.0 208/1 3.6 15.0 132.0 1,2 NOTES: 1. ERV TO RUN VIA SCHEDULE SET USING (PZ-61 DR-E). 2. INTERLOCK WITH LOW VOLTAGE MOTORIZED DAMPERS ON OUTSIDE AIR AND EXHAUST DUCTS. SEE CONTROL DRAWING RESIDENTIAL VENTING FANS (FURNISHED &INSTALLED BY OTHERS) ELECTRICAL # MFR MODEL LOCATION SERVES DRIVE DAMPER CFM* ��WC ( ) SONE NOTES V/PH B TBD TBD APARTMENTS BATHROOM DIRECT INT BDD 20/50 0.25 120/1 <1 1,2,3 WH TBD TBD APARTMENTS VARIES DIRECT INT BDD 20/80* 0.25 120/1 <1 1,2,3 TF TBD TBD APARTMENTS TRANSFER FAN DIRECT INT BDD 30 0.1 120/1 0.3 4 NOTES: 1. PROVIDED &INSTALLED BY OTHERS. FANS SHOWN FOR COORDINATION PURPOSES ONLY. FAN SUBMITTALS TO BE REVIEWED BY MC. 2. CFM VALUE INDICATED CONTINUOUS/INTERMITENT AIRFLOW REQUIREMENTS. EC TO CONFIRM OWNER PREFERENCE AND CONTROLS 3. ONE FAN PER UNIT TO BE DESIGNATED WHOLE HOUSE FAN. FAN TO RUN CONTINUOUS AT WHOLE HOUSE CFM PER TABLE PROVIDED BY MC. FAN TO RAMP UP TO HIGH CFM OF MINIMUM 50 CFM FOR SOURCE SPECIFIC EXHAUST REQUIREMENT. IF INTERMITTENET WHOLE HOUSE VENTILATION CONTROLS ARE USED, CONFIRM OPERATION PER WSMC 403.4.2 SECTION 5 4. FAN TO RUN CONTINUOUS DAMPERS *GENERIC SCHEDULE, ADDITIONAL ITEMS NOT INDICATED ON PLANS/SUBMITTALS SHOWN TO ALLOW FLEXIBILITY FOR FIELD CONDITIONS TAG MANUF MODEL DESCRIPTION TYPE VOLTAGE NOTES MD -A POTTORFF CD-42 or CD-21 R OPP BLADE CNTRL CLASS 1A 24V 4,6 MD-B POTTORFF CD-42 or CD-21 R OPP BLADE CNTRL CLASS 1A 120V 1,5,E MD-C POTTORFF CD-42 or CD-21R OPP BLADE CNTRL CLASS 1A 120V 1,2,3,5,E MD-D POTTORFF CD-42 or CD-21 R OPP BLADE CNTRL CLASS 1A 24V 5,6,7 MD-E POTTORFF CVP SRRD TRUE RND BFLY CTRL CLASS 1A 24V 5,6,7 FSD-A POTTORFF FSD-142-OP GRILLE ACCESS FSD UL555/555S 120V 3,6 FSD-B POTTORFF FSD-142 IN WALL FSD UL555/555S 120V 3,6 FSD-C POTTORFF FSD-125R IN WALL TRUE ROUND FSD UL555/555S 120V 3,6 FD-A POTTORFF VFD-10-A or VFD-15R 1.5 HR FIRE DAMPER UL555 NA 6 FD-B POTTORFF VFD-30-A 3 HR FIRE DAMPER UL555 NA 6 FD-C POTTORFF VFD-10-TLA 1.5HR THINLINE FIRE DAMPER UL555 NA 6 SD -A POTTORFF SD-142 SMOKE CONTROL DAMPER UL555S 120V 1,2,3,5 NOTES: TYPICAL ALL, SEE PLANS FOR QUANTITIES AND SIZES. LISTED MODELS ARE RECTANGULAR/ROUND RESPECTIVELY. 1. POWER BY EC 2. WIRED TO BACKUP POWER SOURCE. POWER CLOSED, SPRING OPEN. INCLUDE PI-50 DUAL POS. INDICATOR SWITCH. 3. WIRED TO FA SYSTEM BY OTHERS. 4. 0-10 MODULATING 5. 2 POSITION, (OPEN CLOSE) 6. FIELD VERIFY SIZE AND OPENING PRIOR TO ORDERING 7. POWER OPEN, FAIL CLOSE LOUVERS/HOODS *GENERIC SCHEDULE, ADDITIONAL ITEMS NOT INDICATED ON PLANS/SUBMITTALS SHOWN TO ALLOW FLEXIBILITY FOR FIELD CONDITIONS MAX # MANUF MODEL DESCRIPTION MOUNT TYPE INTAKE SP NOTES FPM L-A POTTORFF EDD-445 4" DEEP LOUVER SIDEWALL INTAKE/EXHAUST 102E 0.1 1,2,3 L-B POTTORFF EFD-245 2" DEEP LOUVER SIDEWALL INTAKE/EXHAUST 955 0.1 1,2,3,5 H-A ACME EV MUSHROOM HOOD ROOF EXHAUST N/A 0.1 1,2,3 H-B ACME IV MUSHROOM HOOD ROOF INTAKE VARIES 0.1 1,2,3 H-C ACME LEV LOUVERED PENTHOUSE ROOF EXHAUST N/A 0.1 1,2,3 H-D ACME LIV LOUVERED PENTHOUSE ROOF INTAKE VARIES 0.1 1,2,3 NOTES: 1. SEE PLANS FOR SIZES AND QUANTITIES. PLANS INDICATE WHOSE SCOPE. 2. STANDARD MILL FINISH; SPECIAL PAINT/COLOR BY OTHERS 3. ARCHITECT TO CONFIRM LOUVER SIZE AND LOCATION, NOTED ON PLANS 4. FOR FUTURE T.I. BLANK OFF AND INSULATE 5. 2" DEEP LOUVER, FOR HEIGHTS <12" OR STOREFRONT GRILLES, REGISTERS &DIFFUSERS *GENERIC SCHEDULE, ADDITIONAL ITEMS NOT INDICATED ON PLANS/SUBMITTALS SHOWN TO ALLOW FLEXIBILITY FOR FIELD CONDITIONS # MANUF MODEL SERVICE MOUNTING NOTES A SHOEMAKER 904 SUPPLY SIDEWALL 1,2 B SHOEMAKER MA SUPPLY TBAR/HARDLID 1,2 C SHOEMAKER 905 RETURN CEILING/WALL 1,2 D SHOEMAKER RD SUPPLY EXPOSED 1,2 E SHOEMAKER 600 XFR/RETURN CEILING/WALL 1,2 F SHOEMAKER AFP SUPPLY FLOOR 1,2 NOTES: 1. SEE PLANS FOR DIMENSIONS AND QUANTITY. 2. SEE ARCH PLANS FOR CEILING TYPE. 3. W/OBD. Residential Unit Heater (Provided and Installed by Others) MANUF MODEL �KW) TYPE (LBS) NOTES KING W SERIES WALL HEATER 0.5-2 IN WALL 6-8 ALL Notes: 1. Electrician to determine location of Residential Unit Heater. 2. See Electrical drawings for heater size and install location RAINBOW CONSULTING November 5, 2021 REVIEWED BY: S �� z 0 w z 0 w U w 0 w Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U � z � cu mo w � � °� m Q z 3¢ W = 3 J Q � A � W z c� a z N� Q L,J w Q � � 0 l� � U W � � Z 0 0 � � � Q _w J U � J I I I I I I I I � I � m I � � o���� �� I.f) O z � N O � _ N Q Ha N O per° � Nam' � � w w w z ��;��Z � Z w a .-.. � � � M W N � Z w � ��.Ni� j� H w w J Lai O O O � U a � -.� c� o ��, Q 0 Q� a U ry I�ti U w 7nn IJ EQUIPMENT SCHEDULES CITY OF EDMONDS STAMP SCALE: AS -NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES n n O . O /� DEPARTMENT I \Y/ I 41 ��`�''� " BLD2021-0173 11/4/2021 �. � 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M0.04 EQUIPMENT SCHEDULES.dwg �R- SH P1 HVAC PLAN SCALE: 3/32" )W C�NSULi'it�G ember 5, 2021 I BY: S �� N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z Ma z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H o �� Q � 0 c its Q U G � nnn U W nL'n�n LJ P1 HVAC PLAN STAMP SCALE: AS —NOTED 2' 10' � a���w , V�o m RESUB Nov 04 2021 ' ' ° � ~ CITY OF EDMONDS �� � 4 946 W� DEVELOPMENT SERVICES SCALE 3/32" = 1'-0" PROJECT O � � C� DEPARTMENT M 2 � 00 NORTH `�� �GISTE�� �� SSIONAL ��G BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.00 P1 HVAC PLAN.dwg CITY OF EDMONDS CJ c c �c � � -�� EENING T SUPPLY I AF�E ANSFER N V RAMP Y P1. °� a_ .4 a _ - � l\ P1 HVAC PLAN NORTH SCALE: 1 /8" = 1' 0" �� CH 7S o0 0 / ,� ��/ /� O� o ,� c� LEA r=, �J CD �CC SCREENED OPENING. BOTTOM OF OPENING 8'6" AFF. DOOR NOT ATED. NO FIRED PERS � � � REQU ED 0 AT NG � -- � � � FAN �OVI G • LLI /� L ` ♦ LLI LL LU W C � I.L.I r---� � I.L I I I I L_-_J NN I.L \ ' � LL W �� F W � L 111 H W � LLI 2KW PROVI �CREENED OP NING BOTT OF OPENING 9'4 AFF. NG SE 0 UI DUCTS EL STF2UCTE�RAL DRAWIN ONCRETE 405'— 1 /2 \ ��� NOT �� W T� �-- �FAN ATED IN OVERHEAD S D INTO P AS 40 '� W 12"X12" OPENIN FOR MAKEUP AIR BOTTOM�OF�OPENING 7'6' A . > DO R IS 45 W //. ���� • �V\.•I. � !� �' �� I, ■ � � I■ , ram, ■ II �III�iV' III �: W_�ly�'; I ��II I!TlT..� I � IIIii�Gll I •:►� ■•�••�• II�II I � I � O O II�II I _ II � � � ��� II�III, II II�II II II 1 � Q ����. II II II II � I' . II LI L L� i -.- - , : � ` � � �� � • -,�-] � 1 1 1 1 �� , _ 0 GI► l� `,����� 18"X,�O VER AT D OF CHASE. 1600 IN IDE C PLEN BY OTHERS. 1.9 SF FI E 0 PROTECT ON RAT SEMBLY AT TRANSF MER RO M P RATION. /� OUVER LOCAT D "AFF. / /\ LL 4" CONC SLAB 409'-10" OVERHEAD STRUCTURE 8" PT CONC 421'-3" BOT OF STRUCTURE 420'-7" FAN DEPTH 5" BOTTOM OF UNIT 8'-6" F JIVK/ U ITY 106 12"X1 0 E FOR KEU I . BOTTO 0 ING 7'6" FF. CA I METAL STU D ALLS LOCATED IN RH D S � JBLASTI P1. � �C7 30. E F-VAULT SEE V DETAILS FOR FAD 1 FIRE DAMPER SLE NSTALL. 13'-4$" L A 20 20 1 6 0 °' 1 .99 SF ASTLOUER'4"D N B F CTURE. OPUD R.QVED VA LT DOOR NOT UD IN CLEARANC UIREME S. �� C1,CA c2 `. ^3 C8 4 �C10 C�1 ■ �C 14 .��5 RAINBOW �QN�ULTING RE�l���1i�1� November 5, 2021 REVIEY+/E� �Y: S �� N z 0 W z 0 U N W W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z � cu �, o w � � °� m Q z 3¢ W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � W � Q U J ��m ' I � � � O �� z � N � N Q I ^I� Q (~� � O � W w � ao°�°r^w z M W N � ��.Ni� j� H w w J Lai O O O � U a � H 0 ��, o Q 0 a� a N w � o�sriN ti CITY OF EDMONDS STAMP SCALE: AS —NOTED J`� °F wAs �-o 2' $' 0 a�"��w �o m RES U 6 Nov 04 2021 0' 4' 16' � � ~ CITY OF EDMONDS �1 4 946 W� DEVELOPMENT SERVICES • /� SCALE: 1 /8" = 1'-0" PROJECT O � � C� DEPARTMENT M L . 00/ NORTH `�� �GIST>v�� �� SSIONAL ��G BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.00A P1 HVAC PLAN NORTH.dwg � � ,\ .\ ,\ .\ ,� \ ��, P1 HVAC PLAN SOUTH SCALE: 1 /8" = 1' 0" ,\ 1,CA RA�NBO�/V �0�15ULT1I�G �������� November 5, 2021 �EV��Yd�� �Y: S �� - �_ -� �, Z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z Ma z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � Z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H o �� Q m 0 c xs Q U N �nnn N k W f� P1 HVAC PLAN SOUTH CITY OF EDMONDS STAMP SCALE: AS -NOTED A Nov 04 2021 SET ON PAGE 0. 0' 4' 16' � '' CITY OF EDMONDS 4 946 W� DEVELOPMENT SERVICES SCALE: 1 /8" = 1'-0" PROJECT O � � C� DEPARTMENT M 2 � O O 6 NORTH `�� �GISTE�� �� SSIONAL ��G BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.00B P1 HVAC PLAN SOUTH.dwg P2 HVAC PLAN 2' � o' 0' S' 20' SCALE 3/32" = 1'-0" PROJECT NORTH RAiNBQW C�N�UL�'ING RE1/I��c'1iE�; November 5, 2021 �EVfEWED BY• S ��_. I N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H o �� Q � 0 c its Q U G � nnn U W nL'n�n LJ P2 HVAC PLAN CITY OF EDMONDS STAMP SCALE: AS —NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES n n � , 0 DEPARTMENT I V I ��®" BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.01 P2 HVAC PLAN.dwg FLOOR STRUCTURE 8" PT CONC 421'-3" OVERHEAD STRUCTURE 12" PT CONC 432'-9" BOT OF STRUC. 431'-9" oN STOR/ UTILITY I—1 � I I\ / A /� I—1 l n N I N I /1 I� T I I UNIT DEPTH 5" BOTTOM OF UNIT 8'—g„ SCREENED OPENING. BOTTOM OF OPENING 8' 6" AFF. FLOOR STRUCTURE 8" PT CONC 421'-3" OVERHEAD STRUCTURE 12" PT CONC 432'-9" i BOT OF STRUC. 431'-9" C1,CA RAINBOW CONSULTING REdiO�WE� November 5, 2021 REVIEWED BY: S �� N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I � I � m I � � � O �� z � N � _ N Q � Ha N O pip N� � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H °� �� o Q a� � c Q � Q� a U � ry luti � nnn N U w 7nn IJ P2 HVAC PLAN NORTH CITY OF EDMONDS STAMP SCALE: AS —NOTED RESUB -� � y- Nov 04 2021 0' 4' 16' � � CITY OF EDMONDS SCALE: 1 �H" = 1'—O" �NORTHT ��� ��GISTER�� ����� DEVELDEPARTMENRVICES � � . SIONAL ��� BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.01A P2 HVAC PLAN NORTH.dwg 2 8 P 2 HVAC P BAN SOUTH SCALE: 1 /8" = 1' 0" 2 s 0' 4' 16' SCALE: 1 /8" = 1'-0" PROJECT NORTH RAiNBQW C�N�UL�'ING RE1/I��c'1iE�; November 5, 2021 �EVfEWED BY• S ��_. N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z Ma z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H o �� Q m 0 c xs Q U N �nnn N k W f� P2 HVAC PLAN SOUTH CITY OF EDMONDS STAMP SCALE: AS -NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES M 2.016 DEPARTMENT ��®" BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.01 B P2 HVAC PLAN SOUTH.dwg RESIDENTIAL VENTING NOTES: 1. VENTILATION TO EACH UNIT IS ACHIEVED VIA TRICKLE VENTS IN THE EXTERIOR WINDOW FRAM€S WITHIN EACH OCCUPIABLE S ACE. INLETS SHALL COMPLY WITH IP 403.8.1. EACH OCCUPIABLE SPACE SHALL BE PROVIDED WITH A MINIMUM OF 4 SQUARE INCHES OF NET FREE AREA OF 0 ENING. A TOTAL MINIMUM FREE AREA FOR EACH UNIT SHALL BE PROVIDED IN ACCORDANCE WITH THE SCHEDULE LOCATED ON THE MECHANICAL DRAWINGS. 2.ARCHITECT AND GC SHALL COORDINATE WITH THE MINIMUM TRICKLE VENT REQUIREMENTS FROM THE MECHANICAL D � AND NOTIFY IF MINIMUM AREAS CANNOT BE ACHIEVED. v 3.WHOLE HOUSE FAN SIZING IS LOCATED ON THE HVAC DRAWINGS. SEE RESIDENTIAL UNIT HEAT LOSS CALCS FOR TRICKLE VENT SIZING THE FAN OPERATING AS THE WHOLE HOUSE FAN SHALL BE SIZED TO RUN CONTINUOUSLY, AND SHALL HAVE A 1.0 SONE RATING OR LESS. FAN CONTROLS SHALL BE COORDINATED WITH ELECTRICIAN. IF THE WHOLE HOUSE EXHAUST IS TO BE OPERATED INTERMITTENTLY, THE EXHAUST AIRFLOW SHALL BE MODIFIED IN ACCORDANCE WITH IMC 403.8.5.1 EXCEPTION 1. WHOLE HOUSE FAN SHALL HAVE A MANUAL CONTROL AND AUTOMATIC CONTROL, AND SHALL BE AFFIXED WITH A PERMANENT LABEL TO THE CONTROL THAT READS 'WHOLE HOUSE VENTILATION: SEE OPERATING INSTRUCTIONS'. 4.WHERE OUTDOOR AIR SUPPLY INTAKES ARE SEPARATED FROM EXHAUST VENTS BY DOORS, MEANS SHALL BE PROVIDED TO ENSURE AIR TO ALL SEPARATED HABITIBABLE SPACES BY UNDERCUTTING THE DOORS TO A MINIMUM OF 1 /2" ABOVE THE SURFACE OF THE FINISH FLOOR. THIS SHALL BE PERFORMED BY OTHERS. 5.RESIDENCE EXHAUST FANS SHALL BE PROVIDED BY OTHERS PER THE SCHEDULE SHOWN ON THE HVAC DRAWINGS.WHEN FANS ARE PROVIDED BY OTHERS, PRODUCT SUBMITTALS SHALL BE MADE AVAILABLE TO EAI PRIOR TO ORDERING TO ENSURE OVERALL DESIGN INTENTIONS ARE ADHERED. 6.FAN CONTROLS (FOR BOTH WHOLE HOUSE AND SOURCE SPECIFIC EXHAUST) SHALL BE COORDINATED WITH ELECTRICIAN. 7.DUCTWORK SHALL BE 26GA GALVANIZED SHEET METAL PER CODE. DUCTWORK SIZING SHALL ADHERE TO TABLE 403.8.4.2 PRESCRIPTIVE EXHAUST DUCT SIZING. WHERE DUCTWORK IS INSTALLED WITHIN THE FLOOR JOIST ASSEMBLY, THE DUCTWORK SHALL BE INSULATED FOR THE FIRST 10' FROM THE PENETRATION AND CONSTRUCTED PER SBC CA 713.4. INSULATION BY OTHERS. 8.WHERE LAUNDRY DRYER IS LOCATED WITHIN THE BATHROOM, A SEPARATE SOURCE SPECIFIC FAN IS NOT REQUIRED. IF A DOOR SEPARATES THE DRYER CLOSET FROM THE BATHROOM, A MINIMUM OF 100 SQUARE INCHES OF FREE AREA MUST BE PROVIDED IN THE DOOR (OR PER DRYER MANUFACTURERS' INSTALLATION INSTRUCTIONS), WHICHEVER IS GREATER PER SMC. 9.WHERE LAUNDRY DRYER CLOSETS ARE SEPARATED FROM THE BATHROOM, THE CLOSET MUST HAVE A SEPARATE SOURCE SPECIFIC EXHAUST FAN. 10. DRYERS SHALL BE DUCTED TO THE EXTERIOR OF THE BUILDING USING RIGID 26GA GALVANIZED SHEET METAL. NO PROTRUSIONS INTO DRYER DUCTWORK. WHEN DRYER DUCTING IS BY EAI, DRYER LENGTH CALCULATIONS ARE PROVIDED ON THE HVAC DRAWINGS. GC TO COORDINATE TO ENSURE THAT INSTALLED DRYERS MEET THE VENTING CAPABILITIES SHOWN IN THE DRYER LENGTH CALCULATION SCHEDULE. A PERMANENT LABEL INDICATING THE MINIMUM EQUIVALENT LENGTH THAT THE DRYER SHALL BE PROVIDED FOR EACH DRYER RUN. 1 1. THE KITCHEN RANGE AND DRYERS ARE TO BE PROVIDED BY OTHERS. CONNECTIONS TO THESE APPLIANCES IS BY OTHERS. RANGES SHALL EXHAUST A MINIMUM OF 100 CFM, SOURCE SPECIFIC BATH FANS SHALL EXHAUST A MINIMUM OF 50CFM (INTERMITTENT) OR 30 CFM (CONTINUOUS). 12. EXTERIOR VENT TERMINATIONS ARE PROVIDED BY OTHERS. 13,IN ACCORDANCE WITH IMC 504,4 EACH DRYER EXHAUST DUCT SHALL TERMINATE ON THE EXTERIOR OF THE BUILDING WITH A BACKDRAFT DAMPER, SCREEN SHALL NOT BE INSTALLED AT THE DUCT TERMINATION, RESIDENTIAL VENTING LEGEND O ROUTING IN SOFFIT ®ROUTING IN JOIST RA�NBOV�/ �O�1�ULTlt�G November 5, 2021 REVIEWED BY: S P� i N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � z 0 0 � � � Q _w J U � J I I I I I I I I � I � m I � � o���� �� I.f) O z � N O � _ N Q Ha N O pip � Nam' � � w w w z �� ;� � z w � Z a .-.. � � � M W N � Z w � ��.Ni� j� H w w J Lai O O O � U a � @� =.� o ��, Q 0 Q� a U ry � I�ti � nnn N U w nnn LJ R1 HVAC PLAN CITY OF EDMONDS STAMP SCALE: AS -NOTED 2' 10' � QQ-h�w �co m R E S U B -� Nov 04 2021 ' ' � � CITY OF EDMONDS SCALE 3�32" = 1'-O" �� �NORTHT �`�'����'ISTER������� DEVELDEPARTMENRVICES ��.�� �SIONAL ��� BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.02 R1 HVAC PLAN.dwg R1 HVAC PLAN R1 HVAC PLAN NORTH 1 SCALE: 1 /8" = 1' 0" K J I F% E !D � C BA(CA UNIT D4 318 ----��C---- B 149:I - - - - 1 - r� UNIT C 320 1„■■���� 1.■■■,■■ 1�■__■■■■d\ 1■■■■■■■ 1►�1■■■■■■1 �������� 321 `�'' �� ��. � �' � 1 , i • • :� � • � ��� '. �� �?_► ,•, ,:.�� ,n��:� ��C � i:.. NIT B1 336 • • C �\ ,- ,, l � H„ G� CD D ;� C 'CC i �.,; B _ - - �- A CA 1,A�C1,CA z 0 w Z O H w U N w 0 w Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT °, Z o� N �, o W � �� z 3¢ W 0 = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U J L(� I� m ' I � � O In � � L(� �� I.f) O Z � N O � _ N Q Ha N O pip � N �' � � w w w Z Q 0 ��r'jw Z^ c� Z Q � � � M W N � Z w � ��.Ni� j� H w w J Lai O O O � U a � H 0 �� o Q m c 0 xs Q U N �nnn N W fi� RAINBOW �QN�ULTING '^, R E V i � � � '� R1 HVAC PLAN NORTH J November 5, 2021 5 �E�«W���Y: s>�� o�sriN ti CITY OF EDMONDS STAMP I SCALE: AS —NOTED I J`� °F wAs �-o 2' $' 0 a�"��w �o m RES U 6 Nov 04 2021 0' 4' 16' � � ~ CITY OF EDMONDS �1 4 946 W� DEVELOPMENT SERVICES • /� SCALE: 1 /8'� = 1'-0'� PROJECT O � � C� DEPARTMENT M 2 � OL/ NORTH `�� �GISTE�� �� SSIONAL ��G BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.02A R1 HVAC PLAN NORTH.dwg R1 HVAC PLAN SOUTH SCALE: 1 /8" = 1' 0" 2 s 0' 4' 16' SCALE: 1 /8" = 1'-0" PROJECT NORTH RAINBOW �ON�ULTING REv���� November 5, 2021 REVIEWED BY: S ��. N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z Ma z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H o �� Q m 0 c xs Q U N �nnn N k W f� R1 HVAC PLAN SOUTH CITY OF EDMONDS STAMP SCALE: AS —NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES n n � . O DEPARTMENT I V I -.®.- 11/4/2021 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.02B R1 BLD2021-0173 220-0307 HVAC PLAN SOUTH.dwg RAINBOW �®N�ULTING R E �/ � � �c'1f � t November 5, 2021 �EYIEWED BY: �� _�,�,�.—n - �.. N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H o �� Q m 0 c xs Q U N �nnn N k W f� R2 HVAC PLAN CITY OF EDMONDS STAMP SCALE: AS —NOTED 2' �o' � a���w , V�o m RESUB Nov 04 2021 ' ' ° � ~ CITY OF EDMONDS �� � 4 946 W� DEVELOPMENT SERVICES SCALE 3/32" = 1'-0" PROJECT O � � C� DEPARTMENT M 2 � 03 NORTH `�� �GISTE�� �� SSIONAL ��G BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.03 R2 HVAC PLAN.dwg R2 HVAC PLAN 415 l R2 HVAC PLAN NORTH SCALE: 1 /8" = 1' 0" K F g � q �Cq � � �. UNIT Q5 42f �,�I� 9 NIT Al UNIT B1 `EC PANEL LOCATION �JNIT C ,Yg � � � � � � � 4:� 1 H )!: G CD ,, C CC a I' FLAG NOTES � SWITCH OPERABLE OPENING FOR 3' EXHAUST CLEARANCE FROM OPERABLE OPENING. SHIFT WINDOW FOR VENT TERMINATION INSTALL. � 2' TERMINATION CURRENTLY HAS COLLISION WITH KING STUD FRAMING OF WINDOW/DOOR. RESIDENTIAL VENTING LEGEND 0 ROUTING IN SOFFIT ® ROUTING IN JOIST �'CA 14 3 C1,CA Z 0 w z 0 U N Li.l Li.l Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z N � W w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � Z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � �� o Q o a U �nnn N N W f� RAINBOW �QN�ULTiNG ~ � E � � � � �� R2 HVAC PLAN NORTH � November 5, 2021 '5 �EVfEWED BY: � ��, o�sriN ti CITY OF EDMONDS STAMP SCALE: AS —NOTED J`� °F wAs �-o 2' $' 0 a�"��w �o m RES U 6 Nov 04 2021 O' 4' � 6' � � CITY OF EDMONDS 4 946 W� DEVELOPMENT SERVICES SCALE: 1 /8°� = 1 °-0°� PROJECT O � � C� DEPARTMENT M 2.03A NORTH `�� �GISTE�� �� SSIONAL ��G BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.03A R2 HVAC PLAN NORTH.dwg I R 2 HVAC P BAN SOUTH SCALE: 1 /8" = 1' 0" 2 s 0' 4' 16' SCALE: 1 /8" = 1'-0" PROJECT NORTH RAINBOW �Oh1�ULTII�G RE�l���1i�� November 5, 2021 REVIEWED BY: S P� N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z Ma z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H o �� Q m 0 c xs Q U N �nnn N k W f� R2 HVAC PLAN SOUTH CITY OF EDMONDS STAMP SCALE: AS -NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES M 2.O 3 B DEPARTMENT ��®" BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.03B R2 HVAC PLAN SOUTH.dwg R3 HVAC PLAN 2' � o' 0' S' 20' SCALE 3/32" = 1'-0" PROJECT NORTH RAlNBOV1/ CO�I�ULTING November 5, 2021 REVIEWED BY: S P� N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H o �� Q m 0 c xs Q U N �nnn N k W f� R3 HVAC PLAN CITY OF EDMONDS STAMP SCALE: AS —NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES n n � . O /� DEPARTMENT I V I L•� ��®" BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.04 R3 HVAC PLAN.dwg ►� R3 HVAC PLAN NORTH SCALE: 1 /8" = 1' 0" KF UN11 r 518 Yg' H CD UNIT D5 � 4� �� EC PANEL LOCATION ANdL LOCATION ,, C CC B � q � Cq NIT Al UNIT C UNIT C 1 lillli� ri'� `i 1,A�C1,CA d I' FLAG NOTES � SWITCH OPERABLE OPENING FOR 3' EXHAUST CLEARANCE FROM OPERABLE OPENING. SHIFT WINDOW FOR VENT TERMINATION INSTALL. � 2' TERMINATION CURRENTLY HAS COLLISION WITH KING STUD FRAMING OF WINDOW/DOOR. RESIDENTIAL VENTING LEGEND 0 ROUTING IN SOFFIT ® ROUTING IN JOIST i i� B ;i; A ; CA �_ r 14 13 RAINBOW �O�1�ULTING REv���E November 5, 2021 '5 REVIEWED BY� ��. Z 0 w z 0 U N Li.l Li.l Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � Z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � �� o Q o a U �nnn N N W f� o�sriN ti CITY OF EDMONDS STAMP SCALE: AS —NOTED J`� °F wAs �-o 2' $' 0 a�"��w �o m RES U 6 Nov 04 2021 O' 4' � 6' � � CITY OF EDMONDS 4 946 W� DEVELOPMENT SERVICES SCALE: 1 /8°� = 1 °-0°� PROJECT O � � C� DEPARTMENT M 2.04A NORTH `�� �GISTE�� �� SSIONAL ��G BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.04A R3 HVAC PLAN NORTH.dwg R 3 HVAC P BAN SOUTH SCALE: 1 /8" = 1' 0" 2 s 0' 4' 16' SCALE: 1 /8" = 1'-0" PROJECT NORTH RAINBOW �ON�ULTII�G �������� November 5, 2021 REVIEWED BY; S �>�, N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z Ma z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H o �� Q m 0 c xs Q U N �nnn N k W f� R3 HVAC PLAN SOUTH CITY OF EDMONDS STAMP SCALE: AS -NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES M 2.04 6 DEPARTMENT ��®" BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.04B R3 HVAC PLAN SOUTH.dwg R4 HVAC PLAN 2' � o' 0' S' 20' SCALE 3/32" = 1'-0" PROJECT NORTH RAINBOW �Oh1�ULTII�G RE�l���1i�� November 5, 2021 REVIEWED BY: S P� N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z Ma z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H o �� Q m 0 c xs Q U N �nnn N k W f� R4 HVAC PLAN CITY OF EDMONDS STAMP SCALE: AS —NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES n n � . 0 DEPARTMENT I V I ��®" BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.05 R4 HVAC PLAN.dwg R4 HVAC PLAN NORTH SCALE: 1 /8" = 1' 0" CD EC PANEL LOCATION UNIT C 1 n � � 633 ANdL LOCATION UNIT C1 ,.\ C CCI \ Q '! CA C1,CA I' FLAG NOTES � SWITCH OPERABLE OPENING FOR 3' EXHAUST CLEARANCE FROM OPERABLE OPENING. SHIFT WINDOW FOR VENT TERMINATION INSTALL. � 2' TERMINATION CURRENTLY HAS COLLISION WITH KING STUD FRAMING OF WINDOW/DOOR. RESIDENTIAL VENTING LEGEND � 0 ROUTING IN SOFFIT i ®ROUTING IN JOIST / �� �. �; i B j; A N CA y 14 RA�NBO�/V CO�lSULT�NG REV���iE�`; November 5, 2021 REVIEWED BY: �� Z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z cU � L�J w Q 0 U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O Opp � Nam' � � w w w z ao� j� � Z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H �� o Q m c 0 xs Q U �nnn N N W f� R4 HVAC PLAN NORTH �US7/N CITY OF EDMONDS STAMP SCALE: AS —NOTED NORTH y J�O OF WAS �� �' $' a���w �o m RES U 6 Nov 04 2021 D � CITY OF EDMONDS 4 946 W� DEVELOPMENT SERVICES �/A� •�/1� "G� A SCALE: � �$n = � �—O'� PRO ECT O� ��, .�� C� DEPARTMENT 1 Y 1 L . 0 V NO�TH � GISTER �� SSIONAL ��G BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.05A R4 HVAC PLAN NORTH.dwg I R 4 HVAC P BAN SOUTH SCALE: 1 /8" = 1' 0" 2 s 0' 4' 16' SCALE: 1 /8" = 1'-0" PROJECT NORTH RAlNBOU/ �0�1�ULTII�G RE�l���1i�� November 5, 2021 REVIEWED BY: S P� N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z Ma z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H o �� Q m 0 c xs Q U N �nnn N k W f� R4 HVAC PLAN SOUTH CITY OF EDMONDS STAMP SCALE: AS -NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES M 2.O 5 B DEPARTMENT ��®" BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.05B R4 HVAC PLAN SOUTH.dwg R5 HVAC PLAN 2' � o' 0' S' 20' SCALE 3/32" = 1'-0" PROJECT NORTH RAINBOW �4N5ULTING REi/1��1fE� November 5, 2021 �EVlEWED BY• _ S �� ..�.. N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H o �� Q m 0 c xs Q U N �nnn N k W f� R5 HVAC PLAN CITY OF EDMONDS STAMP SCALE: AS —NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES n n � • O DEPARTMENT I V I ��®" BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.06 R5 HVAC PLAN.dwg K F g � q �Cq � � �. UN11 r 18 1 R5 HVAC PLAN NORTH SCALE: 1 /8" = 1' 0" E: H )!: G CD — � ,.\ C CC UNIT D5 0 v�- /Lr SNIT B1 729 d I' FLAG NOTES � SWITCH OPERABLE OPENING FOR 3' EXHAUST CLEARANCE FROM OPERABLE OPENING. SHIFT WINDOW FOR VENT TERMINATION INSTALL. � 2' TERMINATION CURRENTLY HAS COLLISION WITH KING STUD FRAMING OF WINDOW/DOOR. RESIDENTIAL VENTING LEGEND 0 ROUTING IN SOFFIT ® ROUTING IN JOIST CA 14 3 C1,CA RAINBOW �ON�UL��iN� :; REV1�`t'1iE� November 5, 2021 REVIEWED BY: S �% Z 0 w z 0 U N Li.l Li.l Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � Z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � �� o Q o a U �nnn N N W f� R5 HVAC PLAN NORTH o�sriN ti CITY OF EDMONDS STAMP SCALE: AS —NOTED J`� °F wAs �-o 2' $' 0 a�"��w �o m RES U 6 Nov 04 2021 O' 4' � 6' � � CITY OF EDMONDS 4 946 W� DEVELOPMENT SERVICES SCALE: 1 /8°� = 1 °-0°� PROJECT O � � C� DEPARTMENT M 2.06A NORTH `�� �GISTE�� �� SSIONAL ��G BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.06A R5 HVAC PLAN NORTH.dwg R 5 HVAC P BAN SOUTH SCALE: 1 /8" = 1' 0" 2 s 0' 4' 16' SCALE: 1 /8" = 1'-0" PROJECT NORTH RAINBOW COh1�ULTING REVIE�Ii�� November 5, 2021 REVIEWED BY:� P� i N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z Ma z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H o �� Q m 0 c xs Q U N �nnn N k W f� R5 HVAC PLAN SOUTH CITY OF EDMONDS STAMP SCALE: AS -NOTED RESUB Nov 04 2021 CITY OF EDMONDS DEVELOPMENT SERVICES M 2.O 6 B DEPARTMENT ��®" BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.06B R5 HVAC PLAN SOUTH.dwg RAi�IBOW �ONSULTit�G �������� November 5, 2021 REVIEWED BY: P� i N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H °� �� o a� Q � Q c � Q� a U ry � I�ti � nnn N U w ''nnnn IJ ROOF HVAC PLAN CITY OF EDMONDS STAMP SCALE: AS -NOTED 2' 10' � QQ-h�w �co m R E S U B -� Nov 04 2021 ' ' � � CITY OF EDMONDS SCALE 3�32" = 1'-O" �� �NORTHT �`�'����'ISTER������� DEVELDEPARTMENRVICES ��.�� �SIONAL ��� BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.07 ROOF HVAC PLAN.dwg R00� HVAC PLAN K J is 11 !F i iE YC R00� HVAC PLAN NORTH 1 SCALE: 1 /8" = 1' 0" m J L BUILT "'UP CURB-''�'�^^ ""''�"' '��Lr'US1NG: DUCT TO PENETRATE BUILT UP CURB HORIZONTALLY FOR WEATHERPROOFING PENETRATION. YA '/, D C � � TEF-1 E HVAC EQUIPMENT SCHEDULE F R UNIT WEIGHT. SEE HVAC DETAILS P GES FOR TRASH RISER DIAGRAM. EXHAUST TO BE 10' FROM MECHANICAL AIR INTAKES. DUCTS REPRESENT OUTSIDE / DIMENSION. 24X20 EQUIVILANT TO 20X16 FOR AIRFLOW AFTER ' 2" SOUND LINING. LOCATED ABOVE CORRIDOR FOR SOUND ISOLATION. 0 DAMPER ACCESSED � ON ROOF. H i!: G CD D )C HEATPUMP RTU SEE HVAC EQUIPMENT � SCHEDULES FOR UNIT+CURB WEIGHT \DUCTS REPRESENT OUTSIDE DIMENSION. 16X26 EQUIVILANT TO 12X22 FOR AIRFLOW AFTER RTU-1 2" SOUND LINING. ALL EXHAUST AND VENTS TO MAINTAIN 10' FROM OUTSIDE AIR INTAKE. SHAFT FOR RTU. BUILT UP DOGHOUSE FOR WEATHERPROOFING DUCT PENETRATIONS BY OTHERS. PRESSURIZATION SYSTEM SHALL HAVE 20' CLEARANCE FROM ALL EXHAUST AIR OR AIR OUTLETS. IBC 909.21.1 �\ J CC \�, B :I1 CA A � CA 1,A 1 2 5 6 r� 10 11 12 13 14 13 14 15 C1,CA z 0 w z 0 U N Li.l w Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D N �o W ��� z 3¢ W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U J L(� I� m ' I � � O In � � L(� �� I.f) O z � N O � _ N Q Ha N O pip � N� � � w w w z ao�r^� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � -� �� o Q o a� a U � ry I�ti � nnn N w f� RAINBOW CON5ULTING 1 � � � � � � � �� ROOF HVAC PLAN NORTH � November 5, 2021 �EVlEWED BY: S ��. o�sriN ti CITY OF EDMONDS STAMP SCALE: AS —NOTED ��O °F was �9,o 2' $' 0 a�h�w co m RES U B -� Nov 04 2021 0' 4' 16' � � CITY OF EDMONDS SCALE: 1 �H" = 1'—O" �NORTHT ��� ��GISTER�� ����� DEVELDEPARTMENRVICES � � . � �� SIONAL ��� BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.07A ROOF HVAC PLAN NORTH.dwg DETAILS PAGES FOR ELEVATOR PRESSURIZATION DETAIL. HEATPUMP RTU SEE HVAC EQUIPMENT SCHEDULES FOR UNIT+CURB WEIGHT LOCATED ABOVE CORRIDOR FOR SOUND ISOLATION DUCTS REPRESENT OUTSIDE DIMENSION. 16X24 EQUIVILANT TO 12X20 FOR AIRFLOW AFTER 2" SOUND LINING. DUCTS REPRESENT OUTSIDE DIMENSION. 18X24 EQUIVILANT TO 14X20 FOR AIRFLOW AFTER 2" SOUND LINING. I"'I'CCJJUI'CILNIIVIV JTJICM JI-IHLL HAVE 20' CLEARANCE FROM ALL EXHAUST AIR OR AIR OUTLETS. IBC 909.21.1 PRESSURIZATION SYSTEM SHALL HAVE 20' CLEARANCE FROM ALL EXHAUST AIR OR AIR OUTLETS. IBC 909.21.1 SPF-1 DAMPER ACCESSED ON R F. ALL EXHAUST AND VENTS TO MAINTAIN 10' FROM OUTSIDE AIR INTAKE. SHAFT FOR RTU. BUILT UP ' - DOGHOUSE FOR WEATHERPROOFING DUCT PENETRATIONS BY OTHERS. RAINBOW CONSULTING QE�/9EWE� November 5, 2021 REVIEWED BY: S �� N z 0 w z 0 U N Li.l w Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � W � � � Q J U � J I I I I I I I I _ � I � m I � � o��r� ���NInO Z O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H °� �� o a� Q � Q c � Q� a U ry � luti � nnn N U w 'nn IJ ROOF HVAC PLAN SOUTH CITY OF EDMONDS STAMP SCALE: AS -NOTED 2' $' � pQ-h�w �co ° R E S U B -� Nov 04 2021 0' 4' 16' � � CITY OF EDMONDS SCALE: 1 �H" = 1'-O" FNORTHT ��� ��GISTER�� ����� DEVELDEPARTMENRVICES � � . SIONAL ��� BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M2.076 ROOF HVAC PLAN SOUTH.dwg R00� HVAC PLAN SOUTH SCALE: 1 /8" = 1' 0" EAST E�EVAT ON NORTH EAST E�EVATI ON S NORTH ELEVATION ■ RAINBOW �ON�ULTING �E°���E�1iE November 5, 2021 REVIEWED BY• _ S �� N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H °� �� o a� Q � Q c � QQ, a U ry � I�ti � nnn N U w n7nnnn IJ NORTH EAST ELEVATIONS CITY OF EDMONDS STAMP SCALE: AS —NOTED Q�h�w �co m RESUB -� Nov 04 2021 CITY OF EDMONDS 4 946 W� DEVELOPMENT SERVICES M 3.0 0 w DEPARTMENT ���� ANAL ����� BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M3.00 NORTH EAST ELEVATIONS.dwg WEST ELEVATION EX1 SCC REl SOUTH E�EVAT ON 1" 2" 3" C3' C4' C5' C6 C7' C8' Level Roof �� ■ � ��� 482' - 9" Level R5 o �� ■ o 0 472' - 9" Level R4 �� �0 �� � 0 ��� 0�0 0 462' - 9" Level R3 ■ 0 0 �� ■ 0 0 o 452' - 9" Level R2 00 ® ■ ��� 0�� o 442' - 9" Level R1 � 432' - 9" Level P2 421' - 3" AVG GRADE PLANE 417' - 9 1 /4" Level P1 EL. 409' - 10 3/32" EL. 412.00' 414.80' SOUTH WEST E�EVATI ON S E RAI�iBO�N �GN�ULTII�G � �E����� November 5, 2021 REVIEWED BY• _ S �� N z 0 w z 0 U N Li.l W Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU �o W � �� z 3¢ W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � z 0 0 � � � Q _w J U � J I I I I I I I I _ ��m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z 00 00 ; � � Z � � M W N � w � ��.Ni� j� H w w J Lai O O O � U a � N� @� '� o .a, Q � 0 c � QQ, a U ry � I�ti � nnn N U w nnn LJ SOUTH WEST ELEVATIONS CITY OF EDMONDS STAMP SCALE: AS —NOTED Q�h�w �co m RESUB -� Nov 04 2021 ' CITY OF EDMONDS 1 4 946 W� DEVELOPMENT SERVICES M 3.0 w DEPARTMENT ���� ANAL ����� BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M3.01 SOUTH WEST ELEVATIONS.dwg 4" WALL II TRASH RC TYPICAL COMBINATION OF FSD AND GRILLE UNLE OTHERWISE NOTED. fi�Y�lil��ily Bf SHAFT CONSTRUCTION BY OTHERS. INSIDE DIMENSION OF SHAFT 2'-10"X1'-6" TRASH RISER DIAGRAM SCALE: 1/4"= 1'-0" )UNTED ON CURB. ,BONE ROOF DECK ATHERPROOFING. revel Roof 482' - 9" Level R5 - 472' - 9" Level R4 462' - 9" Level R3 452' - 9" Level_ R2 442' - 9" I oval R1 Level P2 421' - 3" Level P1 409' - 10 3/32" ELEVATOR PRESSURIZATION DETAIL SCALE: 1/2" = 1'-0" BACK OF OPENING TO BE ENCLOSED BY GC. MATERIAL (METAL STUD/CONCRETE) TO BE DETERMINED. FROM STRUCTURE P2 TOP OF CONCRETE 421'-3" 8" PT CONC SLAB =BOT OF SLAB 420'7" OSHA GEC SCALE: CONTINUES TO BOTTOM OF STRUCTURE ABOVE. HORIZONTAL MOUNT. �D ON BACK OF FAN FOR MOTOR ACCESS. P1 GARAGE FROM STRUCTURE P1 TOP OF CONCRETE 409' —10" 1 8c 2 � /2' _ i� D ETAI � 1 -0' 2 SMOKE D PROVIDED I 120V MOTORIZED DAMPER POWER CLOSE, SPRING OPEN ON FIRE ALARM, INTERLOCK TO I FIRE SYSTEM BY E.0 (1'-10"). FIELD TO VERIFY 12" MIN FOR WEATHERPROOFIN OF FAN INSTALL SCREENED OPENINGS FOR EXHAUST OUTLET. SCREENING TO MATCH GARAGE INTAKE OPENINGS GEF-1 &2 OPENING SIZE FOR EXHAUST FAN 6'-0"X1 1'8". SEE EQUIPMENT SCHEDULE FOR UNIT WEIGHT. 10'-9" R�ii�BOV1/ CO�I�ULTII�G November 5, 2021 REVIEWED BY: S �� Z 0 w z 0 U N Li.l Li.l Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U � z � cu �, o w � � °� m Q z 3 Q W = 3 J Q � A � W z c� a z N � L�J w Q � o 0 l� � U � W � Z 0o w � Q U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O z � N O � _ N Q Ha N O pip � N �' � � LrJ w w Z Q � � rj � � Z LrJ � Z Q � � � � M W N � Z w � ��.Ni� j� H w w J Lai O O O � U a � �� @� o ��, Q 0 � Q� a U ry � I�ti � nnn N U w nnnnnn LJ HVAC DETAILS CITY OF EDMONDS STAMP SCALE: AS —NOTED Q�h�w �co m RESUB -� Nov 04 2021 CITY OF EDMONDS 4 946 W� DEVELOPMENT SERVICES M 4.0 0 w DEPARTMENT ���� ANAL ����� BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M4.00 HVAC DETAILS.dwg RTU-2 CORRIDOR RISER DIAGRAM ORIENTATION TO RTU-2 FOR SCHEMATIC PURPOSES. SEE PLAN VIEW TO VERIFY DUCT TRANSITIONS AND LAYOUT ON ROOF PLAN. 2" MIN DISTANCE FROM INSIDE OF SHAFT WALL TO OUTSIDE OF DUCT FOR DUCT INSTALL. �_ X N DUCTWORK TO EXTEND ADDITIONAL 2-3' AFTER LAST SMOKE FIRE DAMPER AND TO BE CAPPED AT THE END. 2'-0"X 3'-0" SHAFT CONSTRUCTED BY OTHERS. CORRIDOR RISER DIAGRAMS SCALE: 1/4" = 1'-0" 0 �, u v7 2" SOUND LINER ON 24X18 SUPPLY DUCT TO RTU-2 2" SOUND LINER ON 20X16 RETURN DUCT TO RTU-2 24x 18 20x 16 \ � � P Y ,_ 1'-8" MIN DISTANCE FOR SFD INSTALL (TYP.) 1 WALL THICKNESS FROM ARCH PLAN. 2" SOUND LINER ON 20X24 SUPPLY DUCT 2" SOUND LINER TO RTU-1 ON 20X16 RETURN DUCT TO RTU-2� WIRED THERMOSTAT 50 DOWNSTREAM OF SUPP Y DISCHARGE �NIRED THERMOSTAT 50' ►WNSTREAM OF SUPPLY DISCHARGE 1'-8" MIN DISTANCE FOR SFD INSTALL (TYP.) WALL THICKNESS FROM ARCH AUTOCAD FILES. RTU-1 CORRIDOR RISER DIAGRAM SUPPLY AND RETURN DUCT IN AN ORIENTIATION FOR SCHEMATIC PURPOSES. SEE ROOF PLAN FOR DUCT TRANSTIONS AND LAYOUT. Level Roo 482'-9 2" MIN DISTANCE FROM INSIDE OF SHAFT WALL TO OUTSIDE OF DUCT FOR DUCT INSTALL. Level R2 DUCTWORK TO EXTEND ADDITIONAL 2-3' AFTER LAST SMOKE FIRE DAMPER AND TO BE CAPPED AT THE END. Leve I R 1 SHAFT CONSTRUCTION BY OTHERS. INSIDE DIMENSION OF SHAFT 3'-0"X2'-0" RAINBOV`�/ CONSULTING November 5, 2021 REVIEWED BY: S P� N z 0 w z O U w 0 w Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D CU � O W H � � z 3 Q N W = 3 J Q � A � W z c/'��� a z l V L Q L�J w Q � o 0 l� � �� U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H _ °� �� o a� Q � Q c � Q� a U ry � I�ti � nnn N U w nnnnnn LJ HVAC DETAILS CITY OF EDMONDS STAMP SCALE: AS —NOTED Q�h�w �co m RESUB -� Nov 04 2021 CITY OF EDMONDS 1 4 946 W� DEVELOPMENT SERVICES M4.01 DEPARTMENT ���� ANAL ����� BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M4.01 HVAC DETAILS.dwg DRAIN PAN WHEN REQUIREC HEAT PUM DRAIN PAN WHEN REQUIREC i IrnT nl Inn PARTS FIST DESCRIPTION QTY PART NUMBER DRAIN PAN 1 DIV 6 2748� WALL BRACKET 1 SAU BS520 VIB� DAMPERS 1 SAU BVD40 PAN SITTINGS 1 DIV 6 1 NOTE: MOUNTING DETAIL FOR UNITS LESS THAN 4001bs NOT REQUIRING SEISMIC OR STRUCTURAL CALCULATIONS. M ITS U B I S H I WA�� N STA��AT O N D ETAI � NTS 2"x2" ANGLE F FADE 18 SHOP WELDED BOLTS MATCH FAN BOLT SPACING 2"x2" ANGLE WIDTH FD SLEEVE WITH 2" FLANGE OUT. B RDSCREEN FRAME WELDED TO FLANGE. DAMPER (WELDED IN SLEEVE) BIRDSCREEN WITH 2.5" FRAME WELDED TO SLEEVE 24"12" SLEEVE, :D ON FADE 18 FAN, � TO FAB, ASSEMBLE FIELD INPUTS: 1. WALL HOLE SIZE: 24.5" X 24.5" 2. WALL TH CKNESS: 8" 3. FADE FAN MODEL: FADE 18 4. HR RAT NG: 3HR 5. SLEEVE SIZE: 6. DAMPER SIZE: FADE18 FIRE DAMPER SLEEVE DETAIL NTS 24" X 24" 24" X 24" ( % ") - 4 RAINBOW �O��ULT1��;�. November 5, 2021 �, �EYIEWED BY: �� N z 0 w z 0 U N Li.l Li.l Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT °, Z o� cu �o W � �� z 3¢ W = 3 J Q � A � W Z c� a z N � L�J w Q 0 U W � � Z O � W � Q U � J I I I I I I I I � I � m I � � � O �� Z � N � _ N Q � Ha N O pip Nam' � � w w w z ao� j� � z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H °['� �� o a� Q � Q c � Q� a U r.� � luti � nnn N U w n7nnnn IJ HVAC DETAILS CITY OF EDMONDS STAMP SCALE: AS —NOTED Q�h�w �co m RESUB -� Nov 04 2021 CITY OF EDMONDS 4 946 W� DEVELOPMENT SERVICES M4.�2 DEPARTMENT ���� ANAL ����� BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M4.02 HVAC DETAILS.dwg E �� ENTIRE BATT I N E � � A C UNIT CAVITY W/ INSULATION BY OTHERS GWB UNDER CURB BASE BY OTHERS CROSS BRACE PER STRUCTU RAC GASKET A/C UNIT RAI � SECURE A/C UNIT TO CURB BOLT PER STRUCTURAL ENGINEERING CALCS 8c W/ MANUFACTURER"S REQUIREMENTS SPR NG ISO�AT ON CURB CURB BLOCKING, FURNISHED W TH CURB ROOFING MEMBRANE BY OTHERS ROOF CURB (BY BELOW TOP OF HIGHEST POINT ROOF DECK OTHERS) TO BE 1 " MIN ROOF INSULATION AT ROOF INSULATION BY OTHERS SECURE CURB TO ROOF BOAT PER STRUCTU RAC ENGINEER NG CA�CS 8c W/ MANUFACTURER'S REQUIREMENTS PACKAGE RTU W/ SPRING ISO CURB ON WOOD ROOF MOUNTING R���iBOW CC��I�ULTII�G �������� November 5, 2021 REVIEWED BY: �� Z 0 w z 0 U N Li.l Li.l Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z �D N �o W �� z 3¢ W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 l� � U W � � Z O � � � � Q _w J U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � Z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � H °� �� o a� Q � Q c � Q� a U ry � I�ti � nnn N U w n7nnnn IJ HVAC DETAILS CITY OF EDMONDS STAMP SCALE: AS —NOTED Q�h�w �co m RESUB -� Nov 04 2021 CITY OF EDMONDS 4 946 W� DEVELOPMENT SERVICES M4.03 DEPARTMENT ���� ANAL ����� BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M4.03 HVAC DETAILS.dwg �i DUCT SD-1 DUCT SD-2 Disconnect and wire BY EC �S 1 ___ o�--------------------- L1 1 1 1 1 POWER INPUTS _ _ _ _ _ _ > p 1 _ ' CUSTOMER 1 1 ' 1 24V SUPPLIED 3PH 1 1 1 ,--------------- -- z r-------------------0 1 1 1 1 z x ; ' � 120 ; ; 1 � 24V i �VAC� � 1 1 11 1 1 1 � — — 1 1 1 1 1 1 1 9 10 1 � 1 � 1 1 � 1 1 1 1 AUXILIARY CONTACTS ; ; 1 FOR FAN SHUTDOWN, ETC. 1 ' 1 1 --�----------- 1 1 1 1 1 � , , N C. N. N. C. N. ; ; C U STO M E R ANALOG 1 1 ' � � � , 1 1 16 6 17 8 18 7 ; , 1 1 1 1 1 1 1 AUX A AUX B � 1 , 1 1 POWER INPUTS 1---------------------1 1 , � 1 1 , 1 1 � 1I 120 ' 1 � 24V i �VAC� � 1 1 ' 1 -------� ' ' 9 10 i 1 , 1 , 1 No s , ' AUXILIARY CONTACTS NC � � � -, �,� �, � , , � � � � �------------------------� 1 rc FOR FAN SHUTDOWN ETC. RH1B ' SH1B-05 1 1 � ' 1 � Start Command Input - - - - - - - - - - - - - - - - - - - - - - - - - - 4 C 3 - - - ' 1 1 1 �°" 9 from FA panel 1 N C. N. N. C. N. ' _ _ _ ' - - �� provided by EC 1 1 1 � � �__ 1 1 16 6 17 8 18 7 1 1 • 1 1 . . 1 1 1 1 —,► 1 1 AUX A AUX B ' ' 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Start Command Input Common from FA panel �,--____----® -� �------------------------------------------ ------------------� Output to FA panel Normally Closed provided by EC--------------� _ _� (power proving) Output to FA panel (fan running) Output to FA panel (VFD Fault) "Excellence &Integrity" 5108 D ST. N.W. AUBURN, WA 98001 (253) 872-5665 �� ' ° Q°�� T�FgX� (253� g72�57g719� CONT. � EMERAAI 0558E A6B- SPF/EPF VFD Diagram With smoke control I/O - w/2 Duct Detectors �� ABB-ACH580 DR1 SCR SIGNAL CABLE SHIELD A11 EXTERNAL REFERENCE AGND ANALOG IN COMMON +10V REFERENCE VOLTAGE Al2 PID FEEDBACK AGND ANALOG IN COMMON A01 OUTPUT FREQUENCY A02 OUTPUT CURRENT AGND ANALOG OUT COMMON +24V AUX VOLTAGE OUTPUT OUT1 34 OUT2 35 SGND 36 IN1 '�� IN2 11 DGND AUX VOLTAGE COMMON SLOT 2 DCOM DIGITAL INPUT COMMON '� D 11 START(0) / STO P(1) 14 D12 FORWARD (0) /REVERSE (1) D13 CONSTANT FREQ/SPEED SELECT � D14 START INTERLOCK D15 D16 NOT NOT CONFIGURED CONFIGURED �17 _ Normally Omen ---------------------------- _ Common --------------------------------- _ Normally Closed____________..____ _________ 2,� _ Normally Open -._ ,----- _--- �. _ Common --------------------------------- Normally Closed _ _ _ _ 2 _ Normally Open __ �® CDPI-01 PNL INTF «X2 � �� � G R X1 >i «x3 •••• PWR FLT R01 PROOF OF POWER to VFD 250VAC/30VDC 2A R02 DRIVE RUNNING at 90% FLA 250VAC/30VDC 2A R03 DRIVE FAULT (-1) 250VAC/30VDC 2A TERM ON� BIAS CONSULT MANUAL FOR SETTINGS � DRIVE KEYPAD SLOT 1 A- AGND Wired by EC NOTES: ----------- = Field supplied by others - - - - - - - - - - - =Field supplied by EAI fir- _._ `_'��� "�_ - _.-- RAINBOW CQNSULTING REvf���D November 5, 2021 REVIEWED BY: _ S �� __ - -- -c-� = - - - .. -- Z 0 w Z 0 U N w 0 w Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT °, Z o� cu �o W � �� z 3¢ W = 3 J Q � A � W z c� a z N � L�J w Q � o U W � � Z 0 o w � Q U � J I I I I I I I I � I � m I � � � O �� Z � N � _ N Q � Ha N O pip N��� w w w z a ��;��Z Da�MLi.IN� w � ��.Ni� j� H w w J Lai O O O � U a � H -.� c� o ��, a o a� a U � ry luti � nnn N U w '7nnnn IJ HVAC CONTROL DIAGRAMS CITY OF EDMONDS STAMP SCALE: AS —NOTED RESUB v y - Nov 04 2021 CITY OF EDMONDS 4 946 W� DEVELOPMENT SERVICES M 5.00 DEPARTMENT ���� ANAL ����� BLD2021-0173 11/4/2021 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering1\cad drawings\gre edmonds 99\restored\Sheets\M5.00 HVAC CONTROL DIAGRAMS.dwg . `� cu Qo N GZ7 �'-/: O zDF �� D � N C� �N m W C0�0 v �"�� Z ��- v �v o � D� N � � Z p� � � O� C�1�V �1 � V r � n 0 z N D G7 rn z G� G7 D N 1...10 koh max. 500 c Default I/O connection diagram X1A VERIS V1 1 SCR Signal cable shield (screen) 2 A11 External reference: 0...10 V or 0...20 mA 3 GND Analog input circuit common 4 +10V Reference voltage: +10 V DC, max. 10 mA 5 Al2 PID feedback 0...10 V or 0...20 mA 6 GND Analog input circuit common 7 AO Output frequency value: 0...20 mA 8 GND Analog output circuit common 9 +24V Auxiliary voltage output: +24 V DC, max. 200 mA 10 GND Auxiliary voltage output common 11 DCOM Digital input common 12 D11 Stop (0) /Start (1) 13 D12 Constant speed selection �Low� 14 D13 Constant speed selection cHIGH� 15 D14 Safety Interlock 16 D15 Not Configured 17 ROCOM Relay output 1 Default operation: Ready 18 RONC 19 RONO 20 DOSRC Digital output, max. 100 mA �# No fault [Fault (-1)] 21 DOOUT 22 DOGND 120N W/NO2 SEN90R NiRAY GARARiE VEMN.A710N WIRING 9CFIEMA7IC 8 Control panel (RJ-45) ° � ® o � AMP PROGRAMMABLE RELAY AND DIGITAL OUTPUTS Relay output 250VAC/30VDC/6A Digital/frequency output, PNP transistor type 30 V DC, max. 100 mA GARAGE VENTILATION SEQUENCE OF OPERATIONo • GARAGE VENTILATION IS I�NCHIEIIED WITH MECH�WICAL EXI�lST FANS THAT DCHAUST THE MINIMUM REQUIRED AIR FIUDWS FOR PARKING AREA VENTILATION° MAKE UP AIR IS INTRODUCED VW DOOR AND/ OR TRANSFER GRILLES • GARAGE EXHA�lST FAN�S� ARE LOCATED TO MAINTAIN A NEGATNE PRESSURE TH ,DRAWING OUTSIDE AIR THROUGH TRANSFER GRATES AND DOWN THE GARAGE DRMNG RAMPS° • GARAGE EXHA�lST FAN OPERATES CONTINUOUSLY AT A MINIMUM OF 6o7JC OF THE FAN'S MAXIMUM CFM PER IMC 4040201� OR 20 HZ, WHK:HEVER IS GREATER° FAN IS SIZED T�0 PROVIDE o75 CFM/SQ FT OF PARKING ARE/ • CO/NO= SEIN�SOR ARRAY LOCATED IN PARING ARE CONNECTED TO A VFD AND SEND A SIGNAL WHEN CO LEVELS EXCEED 35 PPM PER WoSoEoCo C403o20503) AND INCREASE THE GARAGE FAN AIR FLOW FROM MINIMUM T+0 100X OVER A 15 MINUTE TIME PERIOD° GARAGE FAN REMAINS AT 100X CFM UNTIL CO SEIN�SOR ARRAY SIGNALS �0/NO= LEVELS HAVE DROPPm �OMI 35 PPM CO/8 PPM N0� o CO/N0� SENSOR ARRAY IS LOCATED TO U'TIL�ZE AIRFLOW FOR DETECTION° • ALL GARAGE EXHAUST TERMINATIONS ARE LOCATED 10' FROM � MECHANICAL INTAKE AND OPERABLE BUILDING OPENINGS° CO/N0� SDr90R.S PLOWS FOR QU/W AND GROUPING) 1 IN PARNIEL l'1S �� PARTS LIST TAG 6lTY PART N1�18ER MINNI�ACTIIRER DESCRIPTI�1 RELAY i V100 VERIS PILOT RELAY CO-1 2 CT2100—ii3VAC—SS—CO AIRIEST 120V CO SENSOt 2 TR3210-1�02 AIRIEST z I�ODIILE VFD i SEE SCFEDI�E MITS'UBISHI DRIVE �EVIE11 I BOW �ON�ULTi?�G �EVI��1i� ovember 5, 2021 VED BY: S ��. I z 0 w z 0 U N Li.l Li.l Q 0 PLOT DATE 11/4/2021 DESIGN DEVELOPMENT ❑ DRAWING ❑ COORDINATION ■ PERMIT ❑ CONSTRUCTION ❑ AS BUILT 0� U Z ~ �D CU � O W H ��� z 3¢ W = 3 J Q � A � W Z c� a z N � L�J w Q � o 0 �� U W � � Z O � W � Q U � J I I I I I I I I _ � I � m I � � o��r� �� I.f) O Z � N O � _ N Q Ha N O pip � Nam' � � w w w z ao� j� � Z w � z a .-.. � � � M W N � z w � ��.Ni� j� H w w J Lai O O O � U a � -� o ��, a o a� a U ry � I�ti � nnn N U w ''nnnn IJ HVAC CONTROL DIAGRAMS CITY OF EDMONDS STAMP SCALE: AS —NOTED Q�h�w �co m RESUB -� Nov 04 2021 � � CITY OF EDMONDS M 5.01 4 946 W DEVELOPMENT SERVICES DEPARTMENT ���� ANAL ����� BLD2021-0173 11/4/2021 ._, , ` ._, ` � 220-0307 p:\working projects\gre edmonds 99 (220-0307)\engineering\cad drawings\gre edmonds 99\restored\Sheets\M5.01 HVAC CONTROL DIAGRAMS.dwg