Loading...
BLD2022-1476_Site_Plan_10.26.2022_4.22.18_PM_3187554Equipment Summary Modules: (35) REC 405W Inverter(s): (1) SolarEdge 1140OH-US Racking: Ironridge XR100 Table of Contents: Cover Page Al Site Overview A2 Roof Layout E1 Single Line E2 Electrical Calculations G1 Roof As Built G2 Electrician As -Built G3 Micro/optimizer map G4 Placards G5 Equipment BOM General Notes: Additional Electrical Work: Site Net Meter �rdr &111V'A�t A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. U _ Q ' C > o N 0) Ln 00 m�� N O a m 00 � LL U 0 O_�e r6o 0 Ul) a) E O — _0 L. -I =3 LU a rn REVISIONS Rev. #: I Date: Designed by: Brian G Project Manager: Will MacArthur (206)307-1741 Current Date:Sep 15, 2022 Cover Page Modules not to exceed height of existing ridge -------------- 36 '611 AC Disconnect, Owned Production meter Building height MSP &M-1IPi. A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. U Manufactured trusses, .' � •E- o N 24" O.C. 18' 0) LLr) CO O NU a m � U o�iiNo rn 00 Attachment Detail �� -0^N-0 0 00 C .^ C Side View (Portrait) O — -a L rl =3 LU a� rn FLASHING AS REQUIRED TO SEAL ROOF MINIMUM (8) #14 X 2" DF-#14 PH3FASTENERE PV MODULE, BY OTHERS IRONRIDGE RAIL (E) ROLLED TORCHDOWN ROOF U-ANCHOR 2600 (E) ROOF DECKING (sample) Attachment point layout for array. 72" OC Max. REVISIONS Rev. #: I Date: Designed by: Brian G Project Manager: Will MacArthur (206) 307-1741 Current Date:Sep 15, 2022 Al Site Overview Required Setbacks from Ridge: 36" Maximum Mount Spacing: 72^ `„I'' Roof Type: Rolled Torchdown Roof Slope: go A&RSO L_AR Array Tilt : Flush Array Azimuth(s): 89-,269- 3211 Martin Luther King Jr Way S. Roof Area: 1662ft2 Seattle, WA 98144 (206)707-9937 Array Area 697ft2 ` M Array to Roof Coverage 42% M O O N * * *Roof Attachments/ Fastners: see pg. G5 Equip. BOMIlk * All THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN " "B M ^ M NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT M THE WRITTEN CONSENT OF A&R SOLAR. �. N M Ln V -4 N U Q �= o > fV CD Ln 00 Module and Rail Selection Guide �� m N L a OD m � N U LL o r, co p vi V ���� Net Meter `1 fu ON O I Pont L Z) W M ,--I a �' r Fire REVISIONS Access Rev. #: Date: Pathway Fire Access Pathway . r, Designed by: Brian G Project Manager: Will MacArthur (206)307-1741 Current Date:Sep 15, 2022 tD M - A2 Roof Layout REC 405w Alpha BoB 40 x 71.7 Clamp Zone "A" 4.0-9.8" Clamp Zone "B" 8.2-23.8" Mods per Row Rail typel+ rail type2 (9)Portrait, (1)row (2)17', (2)17' (5)Portrait, (3)rows (2)14', (2)split 14' (3)Portrait, (2)rows (2)14', (3)Landscape, (1)row (2)14', (2)split 14' (2)Landscape, (1)row (2)14', b 0 Equipment Schedule Ref. Category Equipment QTY 1 Modules REC 405w Alpha BOB 35 2 Optimizers P485 SolarEdge Optimizer 35 3 Jbox Jbox 3 4 Inverters Solar Edge SE11400H 1 5 MeterBase MeterBase-125A 4 Jaw w/ 3.5" AWCAP 1 Meter Landis Gyr EA110000-OP29 240V 1 6 Disconnect 60A 240V 2 Pole I Heavy Duty, Fuse, Lockable 1 DisconnectFuse FLNR - 60 A Fuses for Disconnect (qty 1 /pole) Monitoring SolarEdge Integrated (inverter) Monitoring 1 a alp Supply Side Connection 705.11 (Existing) Main Service Panel (1ph 240V Service) Main Breaker: 200A Bus Rating:200A Neutral Bar w/ bonding jumper ■=A&RScope = Existing or Others Scope 0 Service entrance conductors 4/0 XHHW-2 (L1 & L2) 2/0 XHHW-2 (N) nverter Specs Watts LW-1 Output � AC Voltage # of Inverters OCPD Solar Edge SE11400H 11400 47.5 240 1 60 ****N/A**** 0 0 0 0 0 ****N/A**** 0 0 0 0 0 Module Specs Watts w Imp Vmp Voc Isc REC 405w Alpha BOB 405 9.56 42.4 48.9 10.14 Temp. Adjusted 1 0 1 0 1 37 1 52.7 0 General Notes: 0 Conductor Schedule Utility: SnoPUD 1. EGC Where exposed to physical damage will be #6AWG Bare CU Summary Distance (ft) Current Operating Voltage Volt. Drop @125% Voltage Drop (total) 2. If installing conduit on the roof, maintain greater than 7/8" above the surface 3. NEC 690.12: Rapid Shutdown initiated by loss of Grid or AC Disconnect A (2)#10 CU, (1)#6 EGC, PV Wire 60OV, AIR 50 18.75A 400V 0.41% 1.21% B (6)#10 CU, (1)#10 EGC, THWN-2, 0.75"EMT(min) 50 18.75A 400V 0.41% 4. For supply side taps, a #6 GEC (min.) will be run separately from the disconnect and connected to the grounding electrode with an irreversible crimp C (2)#6 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min) 10 59.38A 240V 0.19% D (2)#6 CU, (1)#6 N, THWN-2, 1"PVC(min) 10 59.38A 240V 0.19% �i. _ I A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. O N 01 U) 00 O L i--1 a- J m N U) a o�L� r'00n vi C 00 c ro O O a� E w rn REVISIONS Rev. #: I Date: Designed by: Brian G Project Manager: Will MacArthur (206) 307-1741 Current Date:SeD 15. 2022 E1 Single Line PV Electrical Calculations I nverter pptInput Amperage (Imp) Voltage (Vmp) mps (DC) &4A,II,Ai .4 A&RSOLAR 5211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE -INFIDENTIAl INFORMATION OF A&R SOLAR ND ITS RECEPTOR. POSSESSION DOES NOT )NFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. = Q .; � v r V .. Q V �1 � c 0 0Ln 00 m N U') >a � 00 ��� vi : � � ro0 0 a) E Ref. Conductor Description Distance AL CU Wire Gauge �_ (QTY) Phase Neutral Neutral EGC AWG ( ) Wire Type Conduit Min. Conduit 90°C Rating Temp Correct. Fill Derate Derated 75°C Rating@125% Current Operating Voltage ,-I � W ft Conductors AWG �� TY Q ) T ype Ampacity Voltage Drop A String to Jbox 50 Cu #10 2 N/A N/A #6 Pv Wire 600V AIR N/A 40 1 100% 40.00 35 18.8 400 0.41% � B Jbox to Inverter 50 Cu #10 6 N/A N/A #10 THWN-2 EMT 0.75" 40 1 80% 32.00 35 18.8 400 0.41% C Inverter to Disconnect 10 CU #6 2 #8 1 #10 THWN-2 EMT 0.75" 75 1 100% 75.00 65 59.4 240 0.19% D Disco. to Interconnect 10 CU #6 2 #6 1 #6 THWN-2 PVC 1" 75 1 100% 75.00 65 59.4 240 0.19% E REVISIONS Rev. #: Date: F G H Total Voltage Drop: 1.21% Designed by: Brian G Project Manager: Will MacArthur (206)307-1741 Current Date:Sep 15, 2022 E2 Electrical Calculations Inverter Specs M Watts f� Output AC Voltage # of Inverters OCPD Total AC Comb. EGC AC � out. A OCPD Solar Edge SE11400H 11400 47.50 240 1 60 47.5 60 #10 Ampe ****N/A**** 0 0.00 0 0 0 ****N/A**** 0 0.00 0 0 0 Module Specs Watts LW-1 Imp Vmp Voc Isc Temp. Coef V(oc) EGC DC Volt REC 405w Alpha BoB 405 9.56 42.4 48.9 10.14 Max Array Specs (Adjusted for Temperature] Solar Edge SE11400H ****N/A**** ****N/A**** 1 2 3 1 2 3 1 2 3 13.16 12.15 10.13 0.00 0.00 0.00 0.00 0.00 0.00 400.0 400.0 400.0 0.0 0.0 0.0 0.0 0.0 0.0 480.0 480.0 480.0 0.0 0.0 0.0 0.0 0.0 0.0 15.00 15.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 Max Array Power(STC): 14.175 kW DC Max Continuous AC Power: 11.4kW AC Interconnection Calcs Main Breaker 200 Bus Bar 200 Max PV OCD AI lowed 40 PV OCPD Device Used 60 Tap or Breaker? Tap Site Conditions ASHRAE Site: Seattle Low Temp (°F) 19 Temp (°F) FHih�OE491. 84Temp (°F) 91 Typical Placards A) NEC 2020 690.13 & 691.15 B) NEC 2020 705.12 (13)(3)(2) C) Utility Requirement D) Utility Requirement (Commercial Only) D) A&R Solar Requirement (Residential Customer -Owned) E) A&R Solar Requirement * if combiner used F) NEC 2020 690.13 (B) I) NEC 2020 690.31 (D)(2) K) NEC 2020 690.13 (B) SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SOLAR ELECTRIC PV PANELS SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY L) NEC 2020 690.56 (C) *Used with Micro Inverters or DC Optimizers O) A&R Solar Requirement * if multiple inverters IAWARNING DUAL POWER SOURCE] SECOND SOURCE IS PHOTOVOLTAIC SYSTEM P) NEC 2020 705.12(C) & 690.59 R) AHJ Requirement * if combiner used S) NEC 2020 230.85(1) T) NEC 2020 230.85(3) Custom Placards &MI Pi. A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY TO REPRODUCE THIS CITY DRAWING ORIGHT ANY PART HEREIN WITHOUT PLACARD SPECS THE WRITTEN CONSENT OF A&R SOLAR. NEC 690.54 ,;AX AC OUTPUT CURRENT: 47.5 A AC Letter Height: 1/8" Inverter Backfeed Maintain 1/4' border 1 Breaker Red / White NEC 690.53 U MAX DC VOLTAGE: 480.0 V DC Q Letter Height: 1/8" 0 iAX DC CIRCUIT CURRENT: 15.0 A DC Maintain 1/4" border 1 Solar Edge SE11400H i N CURRENTiAX CIRCUIT O . CONVERTER DC Red / White 0) � OD DC 1 A DC�NN�� NEC 690.54 L Q Letter Height: 1/8" CURRENT: (1) for each m U O 00 ,AX AC OUTPUT Maintain 1/4" border 1 Disconnect or upstream ■ ■ C) r' 00 r,F)PEcn •ATING AC VOLTAGE: 1 V AC Red / White loadcenters. V _0 - N _0 _�e fu 0 O I f) N E O F, — -v L �--I :3 LU a� REVISIONS Rev. #: I Date: Designed by: Brian G Project Manager: Will MacArthur (206)307-1741 Current Date:Sep 15, 2022 G4 Placards J) NEC 2020 690.56 (C)(2) Category Equipment CITY Notes Solar Equipment Modules REC405w Alpha BOB 35 Optimizers P485 SolarEdge Optimizer 35 Inverters Solar Edge SE11400H 1 Monitoring SolarEdge Integrated (inverter) Monitoring 1 Electrical Equipment Jbox Jbox 3 MeterBase MeterBase-125A 4Jaw w/ 3.5" AWCAP Meter Landis Gyr EA110000-OP29 240V Disconnect 60A 240V 2 Pole I Heavy Duty, Fuse, Lockable DisconnectFuse FLNR - 60A Fuses for Disconnect (qty 1/pole) Solar Racking Iron Ridge Racking BOM Description XR100 Black,17' XR100 Black,14' Kit, XR100 Bonded Splice BOSS Universal Module Clamp, Black Stopper Sleeve 30mm Grounding Lug, Low Profile Square -Bolt Bonding Attachment Hardware 1/4 x 3/4 Microinverter Bonding Hardware, T-Bolt End Caps, 10 sets(package) XR100 U-Anchor2600, Mill (Spacing:72") Fastener: #14 x 2-8" DF-#14 PH3 (8 /mount) L-Feet, Black System Weights RackingWeight(lbs) Total Weight(lbs) Weight/Attachment(lbs) Dead Load(PSF) CITY 1� 1 1 DH222NRK 4 18 10 86 32 8 65 35 2 65 520 65 338 1913 29.4 2.74 A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. U _ Q 0 fV � Ln 00 O ,-_l CO N � � Q mU o�IL�� .o p r, co r�' vi V : � �1 ro0 O .O a)_0 � L ,--I W a rn REVISIONS Rev. #: I Date: Designed by: Brian G Project Manager: Will MacArthur (206) 307-1741 Current Date:SeD 15. 2022 G5 Equipment BOM