ENG2022-0505 Water Availability CertificateU1
WATER AVAILABILITY APPLICATION
Complete and submit this form through www.MyBuildingPermit.com.
SECTION A
Applicant Information
Contact/Applicant Name Brady Berriman
Phone Number 206.556.1615
Email Brady@latitude-48.com
Address 600 1 st Ave
city Seattle
State WA
zip 98104
Property Information
ProjectName Edmonds 222
Associated Permit Number
Address 222 3rd Ave S
city Edmonds
State WA
zip 98020
Parcel No. 270323-004-095-00
Does the property currently have water service? 1&s (City of Edmonds water) ❑ No
Describe project (number of buildings, number of units, number of stories per building):
Construct (5) townhouses in (2) three-story buildings with (2) two -car garages and
(1) one -car garage and associated site improvements.
In what phase is the project?
N( Design Review ❑ Building Permit
❑ Preliminary Plat ❑ Rezone or Other
Associated permit application number(s), if applicable: PRE2022-0003
SECTION B
RECEIVED
OCT 17 2022
CITY OF EDMONDS
DEVEI OPMENT
SERVICES DEPARTMENT
❑ Applicant certifies that this project is a single-family residence, multi -family project of four units or
less with combo water/fire lines, or short plat subdivision (four single-family lots or less), in which case
completion of a full utility availability study shall not be required. Please sign below and submit this form
through www.MyBuildingPermit.com.
VFor all other permit types, a utility availability study is required and associated fees will be due. Please
submit the complete application through www.MyBuildingPermit.com.
APPLICANT SIGNATURE: DATE:10.06.2022
APPLICANT PRINTED NAME: Brady Berriman
Form Updated 12/9/2021
SECTION C
1. V a. Water will be provided by service only to an existing 8" cast iron
(size) water main that is 45 (feet) from the site.
OR
❑ b. Water service will require an improvement to the water system of.
❑ (1). feet of water main to reach the site; and/or
❑ (2). The construction of a distribution system on the site; and/or
❑ (3). Other (describe)
2. V a. The water system is in conformance with a City approved water comprehensive plan.
OR
❑ b. The water system improvement will require a water comprehensive plan amendment.
(This will cause a delay in permit issuance and approval.)
3. 91 a. The proposed project is within the corporate limits of the City, or has been granted
Boundary Review board approval for extension of service outside the City, or is within the City approved
service area of a private water purveyor.
OR
❑ b. Annexation or Boundary Review Board approval will be necessary to provide service.
4. V a. Water is/or will be available at the rate of flow and duration indicated below at no less than
20 psi - Measured at the nearest fire hydrant 45 feet from the building/property (or as marked on
attached map)
Rate of Flow
❑ Less than 500 gpm. (approximate] gpm)
❑ 500 to 999 9Pm
❑ 15oo gpm or more
❑ Less than one (t) hour
❑ One (1) to two (2) hours
❑ Two (2) hours or more
Duration
❑ Flow test of gpm ❑ Other
❑ Calculation of 2784 gpm (Commercial building permits require flow test or
calculation)
OR
❑ b. Water system is not capable of providing fire flow.
WaterAgency Certification
Per model, static pressure is 115.05 psi
At 1000 gpm, pressure is 112.63 psi
At hydrant available flow of 2784 gpm, pressure is 97.24 psi
I hereby certify that the above information is true. This certification shall be valid for one year from the date of signature.
City of Edmonds - Engineering
Russell Lynch
(Agency Name)
(Signatory Printed Name
(Signature/Date)
Associate Engineer
(Title)
, �o�3,/Z 2-
Form Updated 12/9/2021