Building Permit (3)Type: RESIDENTIAL BLDG Subtype: DECK I Status: ISSUED
Parcel No: 00724700000100 Site Address: 1125 OLYMPIC AVE EDMONDS,WA 98020-2514
Subdivision: 007247, 005489, 007661 Lot: 0
Fire Sprinklers: Lot Area: 0.3 acre Zoning: RS-12
Valuation: $11,200.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: COOPER- DECKS
Applied: 10/11/2022
Issued:11/3/2022
Final:
Expiration Date: 5/3/2023
Issued by: BAC
I WA State Contractor L & I #: MVROMC*805MU I
CONTACTS
NAME TYPE
NAME
A
PHONE
EMAIL
APPLICANT
AARON DUPONT
28809 40TH AVE S, AUBURN WA
(206)348-4483
AKD.ARCHDESIGN@GMAIL.COM
98001
CONTACT
AD RESIDENTIAL DESIGNER
28809 40TH AVE S, AUBURN WA
(206)348-4483
akd.archdesign@gmail.com
98001
15811 19TH AVENUE
CONTRACTOR
M. VROMAN CONSTRUCTION
NORTHEAST, ARLINGTON WA
(425)422-5192
98223
NICHOLAS C & KAREN A
1125 OLYMPIC AVE, EDMONDS
OWNER
KACCOOP@COMCAST.NET
COOPER
WA 98020-2514
FEE INFORMATION
DESCRIPTION
CITY TECHNOLOGY FEE CHARGED
0.321.99.100.00
70.322.10.000.00
$40.00
$40.00
10/11/22
R23615
PER PERMITPERMIT
FEE - RESIDENTIAL
$315.00
$315.00
11/3/22
R24189
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$267.75
$267.75
10/11/22
R23615
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
11/3/22
R24189
TOTALS: $629.25
$629.25
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, November 03, 2022 2:21:29 PM 1 of 2
'RESIDENTIAL BLDG PermitCity
-
• • • •
98020 1
. •. -
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ESC REQUIREMENTS
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
INFORMATION
REQUIREMENTS.
RESTORE LANDSCAPE
FOR
Restore landscape to like or better conditions
NFORMATION
INSPECTIONS
- Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
B-2 FOOTINGS
B-4 FRAMING
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
Printed: Thursday, November 03, 2022 2:21:29 PM 2 of 2