ENG2022-0492 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT IM '
City of • • .
98020 ENG2022 04•
www.edmondswa.gov i
Description: COMCAST - DIRECTIONAL DRILL NEW UG SERVICE ISSUED: 11/03/2022
Address: 816 LAUREL WAY EDMONDS WA 98020-3905
EXPIRES: 05/03/2023
rmit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00455800000500
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT VINICIUS FREITAS 11335 NE 122ND WAY 105, KIRKLAND WA 98034 (425)949-9293
CONTACT INFRAWEST INC 11335 NE 122ND WAY 105, KIRKLAND WA 98034 (425)949-9293
CONTRACTOR INFRAWEST INC 11335 NE 122ND WAY 105, KIRKLAND WA 98034 (425)949-9293
OWNER MARK D BISSONETTE 816 LAUREL WAY, EDMONDS WA 98020
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $40.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 11/03/2022
Printed: Thursday, November 03, 2022 4:09:18 PM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NUM11BE
City of Edmonds
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL**
Printed: Thursday, November 03, 2022 4:09:18 PM 2 of 2
RECEIVED
Oct 04 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
of EDAI,4/
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
"'VC. i s90 Requirements outlined in Right -of -Way permit Handout E6s.
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General Info
Project Name 696608 - 816 LAUREL WAY
Site Address or if no site address use PropertyAddress at NW corner of project area: 816 LAUREL WAY
Associated Permits: I BLD PLN I ENG
Owner and Entity Franchise (if pp
Name of Company Holding COMCAST Franchise Ordinance No:
Point of Contact JESSAMIN SANTOS
Title COORDINATOR 2
Address 410 VALLEYAVE
City PUYALLUP State WA Zip 98371
Phone 206401-2188
Email JESSAMIN SANTOS@CABLE.COMCAST
and Authorized Agent of Owner (see note below)
Name of Company INFRAWEST INC
DuringContractor
Contractor Contacts
Primary Name VINICIUS FREITAS
Agent Name VINICIUS FREITAS
Title
11fle
Mobile (425) 949-9293
Address 11335 NE 122ND WAY ste 105
Email VINNY.FREITAS@INFRAWEST.NET
City KIRKLAND State WA Zip 98034
Secondary Name
Phone (425)949-9293
Title
Email VINNY.FREITAS@INFRAWEST.NET
Mobile
City of Edmonds Business License No:
Email
State License No: INFRAI-793NP
M Contractor verifies it is currently bonded M Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o.020 requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as we10
❑ Traffic Control Only (no associated development)
R Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Project Description
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
WILL BE DIRECTIONAL DRILLING 2" COMCAST SERVICE CONDUIT FROM THE UTILITY POLE ON
'I'HE RIGHT OF WAY IN FRONTOF LOT 835, PROPOSED BORE PAYH WILL BE 4'BORE OF SOFT
SURFACE FROM THE UTILITY POLE TO THE DRIVE WAY OF LOT 822. BORE W UNDER THE DRIVE
WAY, BORE Y OF SOFT SURFACE FROM WHERE THE NEW COMCAST HANDHOL_E_WILL BE
INSTALLED. HAND HOLE MEASURING 11 INCHES IN DIAMETER AND 12 INCHES DEEP. FROM THE
COMCAST HANDHOLE WILL CONTINUE TO BORE IN PRIVATE PROPERTY TO THE NORTH WALL
OF HOUSE 916 i,AiiREL WAV_ WTLI. BORE WiTH A DIRECTIONAL DRiLL AT A MiNiMiTM DRPTH OF
36 INCHES WILI MAINTAIN A MINIMUM OF 5 FEET KORIZONTAI AND 17 INCHES VERTICAL
ORIGINAL OR BET -TER CONDIT-IONS.
RIGHT-OF-WAY AREA TOTAL DURATION
CLOSURE (Number of Months)
Sidewalk 72 hours + LF x LF SF
Alley 72 hours + LF x LF SF
Parking 72 hours + LF x LF SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTIONC.
. The work in the right of way is on or for the following type of facilities:
* telecommunications x cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. 1 Does the utility owner have existing overhead infrastructure in the area of work?
Yes
—No
x
2. 1 Will any equipment be added underground or above ground (e.. pedestals, vaults etc.)?
x
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
x
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
x
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
x
Are the additions for the purpose of serving new commercial development?
x
Are the additions for the purpose of serving a single-family residential subdivision?
x
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
x
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
x
How many are existing? 1 How many are to be added? 1
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b. I Does your project involve poles? If yes:
X
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? I I What is the height oft e poles after?
Describe the modification rebuild:
SECTION C
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fe55.
APPLICANT SIGNATURE: Z� DATE: 10/03/2022
APPLICANT PRINTED NAME: VINICIUS FREITAS
APPLICANT TITLE:
Ik!101kW7RMM:I;003DI" 1e19RIs) ;7ICU9:4:7u1Y11f-Ris M Is)6
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
RECEIVED
Oct 04 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
EXISTING UTILITIES PLAN
PAGE 2OF2
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
ENGINEERING DIVISION
APPROVED AS NOTED
Jd] W4,.10,04,t 10/28/2022
RECEIVED
Oct 04 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
SITE PLAN 696608 - 816 LAUREL WAY, EDMONDS
WILL BE DIRECTIONAL DRILLING 2" COMCAST SERVICE CONDUIT FROM THE
UTILITY POLE ON THE RIGHT OF WAY IN FRONT OF LOT 835, PROPOSED BORE
PATH WILL BE 4' BORE OF SOFT SURFACE FROM THE UTILITY POLE TO THE DRIVE
WAY OF LOT 822. BORE 15' UNDER THE DRIVE WAY, BORE 3' OF SOFT SURFACE
FROM WHERE THE NEW COMCAST HANDHOLE WILL BE INSTALLED. HAND HOLE
MEASURING 11 INCHES IN DIAMETER AND 12 INCHES DEEP. FROM THE COMCAST
HANDHOLE WILL CONTINUE TO BORE IN PRIVATE PROPERTY TO THE NORTH
WALL OF HOUSE 816 LAUREL WAY. WILL BORE WITH A DIRECTIONAL DRILL AT A
MINIMUM DEPTH OF 36 INCHES. WILL MAINTAIN A MINIMUM OF 5 FEET
HORIZONTAL AND 12 INCHES VERTICAL SEPARATION BETWEEN ALL UTILITIES.
ALL DISTURBED AREAS WILL BE RESTORED TO ORIGINAL OR BETTER
CONDITIONS.
PAGE 1 OF 2
OIL
COMCAST
696608
816 laurelwgy
Edmonds
CREW
CUSTOMER
NAME
LOCATE I / CIFM DATE
FREITAS
CUTOMER
NIX, WHY?
NOTES
nos
aon
vB
w
ST11 lraDl now RFPYIIF IED7)
_
anon
816 Laurel Way`
•
116
mom
804
-a—
:
15'DW
Osss
Legend
_
'W
*Laur
■ Comcast pedestal
_
v
QComcast HandHole
EElectric Meter of House
® Utility Pole
tl;�
- —
_--Proposed Path
-
SS = Soft Surface
WMAW^
' •
DW = Driveway Bore
_
SW = Sidewalk Bore
RD = Road Bore
'
•
`.
SIGN SPACING
= X (1)
RURAL ROADS & URBAN ARTERIALS
35 140 MPH
350't
RURAL ROADS, URBAN ARTERIALS,
25 130 MPH
200't (2)
RESIDENTIAL & BUSINESS DISTRICTS
URBAN STREETS
25 MPH OR LESS
1001t (2)
(1) ALL SPACING MAY BE ADJUSTED TO
ACCOMMODATE
INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN
URBAN AREAS TO
FIT
ROADWAY CONDITIONS.
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
Posted Speed (mph)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
8'
40
40
60
90
-
-
-
-
-
-
10'
40
60
90
90
USE A 3 DEVICES TAPER FOR SHOULDERS LESS THEN 8'
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
25
30
35
40
45
50
55
60
65
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22,000 lbs.
HOST VEHICLE WEIGHT
> 22,000 lbs.
< 45 MPH
45-55 MPH
> 55 MPH
< 45 MPH
45-55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
PROTECTIVE VEHICLE (WORK VEHICLE) = R
NO SPECIFIED DISTANCE REQUIRED
CHANNELIZATION DEVICE
SPACING feet
MPH
TAPER
TANGENT
35/40
30
60
25/30
20
40
b 4 ® ® �¢ WORK AREA
X X L/3 B R 50,
48' 41"
ROAD SHOULDER ENGINEERING DIVISION RECEIVED
WORK WORK APPROVED AS NOTED
AHEAD
48' 48" AA 1'1III WQ✓..l Oct 04 2022
jW20-1 W21-5 ell .�,4je,0 , 1 0/28/2022 CITY OF EDMONDS
vv DEVELOPMENT SERVICES
DEPARTMENT
NOTES
LEGEND
1. DEVICE SPACING FOR THE DOWNSTREAM TAPER SHALL BE 20'(FT).
K TEMPORARY SIGN LOCATION SHOULDER CLOSURE - LOW SPEED 2. ALL SIGNS ARE BLACK ON ORANGE.
O CHANNELIZING DEVICES
(40 MPH OR LESS)
PROTECTIVE VEHICLE
NOT TO SCALE
FILE NAME S:\Desi n R P& SW-SOndardsl2-Plan Sheet Libra 101-Published PSL\ TC Work Zone Traffic Control\ TC-5 Shoulder Closure - Low Speed 40 MP or Less)\TC-5.dgn Plot 1
TIME 2,59,41 PM —Tr FED.AID PROJ.NO. AmokRux Rv
DATE 1/212018 Y�/�
PLOTTED BY Ilddslf WAS �I/ TCS�
DESIGNED BY Joe xo..ER
ENTERED BY Washington State ....
CHECKED BY coxTRnm x iounox "". Department of Transportation oR
PROJ. ENGR. re —E TRAFFIC CONTROL PLAN
REGIONAL ADM. REVISION DATE BY
RECEIVED
\, MyBuildingPermit.com
Oct 04 2022
CITY OF EDMONDS CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Right -of -Way Application #1210651 - 696608 - 816 LAUREL WAY
Applicant
First Name Last Name Company Name
VINICIUS FREITAS INFRAWEST INC
Number Street Apartment or Suite Number E-mail Address
11335 NE 122ND WAY 105 vinny.freitas@infrawest.net
City State Zip Phone Number Extension
KIRKLAND WA 98034 (425) 949-9293
Contractor
Company Name
INFRAWEST INC
Number Street Apartment or Suite Number
11335 NE 122ND WAY 105
City State Zip Phone Number Extension
KIRKLAND WA 98034 (954)756-0230
State License Number License Expiration Date UBI # E-mail Address
INFRAI*793NP 7/23/2023 BD477f115g vinny.freitas@infrawest.net
Project Location
Number Street Floor Number Suite or Room Number
816 LAUREL WAY
City Zip Code County Parcel Number
EDMONDS 98020 00455800000500
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
Mark D Bissonette
Number Street Apartment or Suite Number
816 LAUREL WAY
City State Zip
EDMONDS WA 98020
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 10/3/2022 Submitted By: VINICIUS FREITAS
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1210651 - 696608 - 816 LAUREL WAY
Project Contact
Company Name: INFRAWEST INC
Name: VINICIUS FREITAS Email: vinny.freitas@infrawest.net
Address: 11335 NE 122ND WAY 105 Phone #: (425) 949-9293
KIRKLAND WA 98034
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project 696608 - 816 LAUREL WAY
Name:
WILL BE DIRECTIONAL DRILLING 2" COMCAST SERVICE CONDUIT FROM THE UTILITY
POLE ON THE RIGHT OF WAY IN FRONT OF LOT 835, PROPOSED BORE PATH WILL BE
4FT OF SOFT SURFACE FROM THE UTILITY POLE TO THE DRIVE WAY OF LOT 822. BORE
15FT UNDER THE DRIVE WAY, BORE 3FT OF SOFT SURFACE FROM WHERE THE NEW
Description COMCAST HANDHOLE WILL BE INSTALLED. HAND HOLE MEASURING 11 INCHES IN
of Work: DIAMETER AND 12 INCHES DEEP. FROM THE COMCAST HANDHOLE WILL CONTINUE TO
BORE IN PRIVATE PROPERTY TO THE NORTH WALL OF LOT 816 LAUREL WAY. WILL
BORE WITH A DIRECTIONAL DRILL AT A MINIMUM DEPTH OF 36 INCHES. WILL MAINTAIN
A MINIMUM OF 5 FEET HORIZONTAL AND 12 INCHES VERTICAL SEPARATION BETWEEN
ALL UTILITIES. ALL DISTURBED AREAS WILL BE RESTORED TO ORIGINAL OR BETTER
CONDITIONS.
Project Details
Project Information
Job Number 696608
Page 2 of 2