Loading...
Building Permit (3)Type: MECHANICAL Subtype: COMMERCIAL MECHANICAL I Status: ISSUED Parcel No: 00615800000100 Subdivision: 006158 Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Site Address: 10014 238TH ST SW EDMONII 98020-5735 Lot: 0 Lot Area: Zoning: BN Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: TMOBILE- MECHANICAL- DIESEL GENERATOR W/240 GAL TANK ON SLAB Applied: 6/13/2022 Issued:11/7/2022 Final: Expiration Date: 5/6/2023 Issued by: NED I WA State Contractor L & I #: NEXIUS1858NP I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT RUTH SEGURA 7542 WOODLEY AVE, VAN NUYS (661)754-1282 RSEGURA@SYNERGY.CC CA 91406 CONTACT SYNERGY 7542 WOODLEY AVE, VAN NUYS (661)754-1282 rsegura@synergy.cc CA 91406 CONTRACTOR NEXIUS SOLUTIONS INC 2051 MIDWAY RD , LEWISVILLE 'T (703)650-7777 75056 THOMAS & PHAN QUYEN 1005 196TH PL SW, LYNNWOOD OWNER SAWYER WA 98036-7188 •' • DESCRIPTION 71�� ACCOUNT AMOUNT PAID PAID DATE RECEIPT # E FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 11/7/22 R24243 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/7/22 R24243 PER PERMIT MECHANICAL PLAN REVIEW FEE 001.000.345.83.000.00 $110.00 $110.00 11/7/22 R24243 MISC MECHANICAL EQUIPMENT 001.000.322.10.000.00 $30.00 $30.00 11/7/22 R24243 FOR WHICH NO FEE IS INDICATED TOTALS: $230.00 $230.00 7 CONDITION TYPE STATUS NOTES Printed: Monday, November 07, 2022 11:01:08 AM 1 of 2 MECHANICAL City of • • • PERMIT NUM �...Edmonds' : 1 1 i • • www.edmondswa.gov1 1 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-3 MECH EQUIP ATTACHMENT X-0 MECH FINAL" B-2 FOOTINGS Printed: Monday, November 07, 2022 11:01:08 AM 2 of 2