Loading...
APPROVED-Transportation_Impact_Form BLD2021-1075PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: Owner/Applicant Adamant Homes, Inc. Name PO Box 14790 APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet Lot 1 of Adamant 240th 4-Lot SP (8711 240th St Street/Mailing Address Mill Creek WA 98082 City State Zip Telephone: (425) 422-9637 Applicant Contact Person: Loree Quade Name RESUB Nov 08 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PO Box 14790 Street/Mailing Address Mill Creek WA 98082 City State Zip Telephone: (425) 422-9637 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): RAM Engineering, Inc. Rob Long, PE Firm Name Contact Name Telephone: (425) 678-6960 1. PROJECT DESCRIPTION a. Location - Street address: 8711 240th St SW E-mail: RobL@RAMengineeringlnc.com (Attach a vicinity map and site plan.) b. Specify existing land use: Single Family Residential c. Specify proposed type and size of development: Single Family Residential, One Lot/SFR (# of residential units and/or square footage of building) d. Date construction will begin and be completed: Start Jan. 2021 / End October 2022 e. Define proposed access locations: Private Short Plat road off 240th St SW, west side APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: Private short plat road, adequate access sight distance. 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X = Prior Use I I$ I X I I — i New Use Fee: $ 6,249.14 - Prior Use Fee: $ 6,249.14 = $ 0.00 ® NEW DEVELOPMENT ITE Land Use Category New Use I SFR, ITE 210 ❑ OTHER Per Unit Fee Rate $ 6,249.14 1 X Units in square feet, # of dwelling, vfa, etc. 1 Fee MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $ TOTAL TRANSPORTATION IMPACT FEE $ 6249.14 ENGINEERING DIVISION APPROVED AS NOTED City of Edmonds, Engineering Division Approval �/7W�12/13/2021 ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.