Loading...
APPROVED ENG PLN RESUB1 BLD2021-1612+Site_Plan+3.6.2022_7.10.07_PM+2719953Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. — W �400 00 / EL.14.2555 SS CITY OF EDMONDS LIFT STATION �,� b(3 ITY OF EE EL. 13.5+ + + SANITARY � i + --' EASEMENT + + ,+ + PER AFN 2 + + SS + + + + + 10.00, CITY OF EDMONDS + + + - ICULAR ACCESS EASEMENT + . I+ . + + O0 H FOR MAINTENANCE OF SANITARY SEWER FACILITIES + PER AFN 2362993 1 + 1 f 1 + \\ `\ + Vn + +N + + '\ 4 + + + + 150 ND 00 ' + + I eUFFFR I � �Z I Z � w I w o w I0 I \ N+ 1TI�1 L I + NEW STAIRS I & LANDIN (75 SF) IE TING DE�X I 1$' TO -BE REMOVE (384 SF) I � � I \ I 10.00'CITY OF EDMOA%DS I SANITARY SEWER EASE_ ENT 20,\ PER AFN 21146 I 13.60 SETBACK I I EL. 18.5' L- - - ------------- - \ V ; I C-N I BUFFER IAREA J , O, EXISTING WATER FEATURES w WATE ALL DISTURBED SOILS SHALL BE COMPOST AMENDED PER CITY OF EDMONDS STANDARD DETAIL SD-642 OR APPROVED EQUAL. OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE LOT COVERAGE LOT AREA: 20,213 SF EXISTING HOUSE FOOTPRINT: 2,496 SF PROPOSED DECK: 477 SF PROPOSED STAIRCASE: 75 SF TOTAL LOT COVERAGE: 3,048 SF 15.1% IMPERVIOUS SURFACE COVERAGE LOT AREA: 20,213 SF EXISTING ROOFTOP: 2,963 SF PROPOSED ROOFTOP (OVER FRONT ENTRY): 53 SF EXISTING DRIVEWAY: 1,784 SF PROPOSED DECK & STAIRS: 552 SF EXISTING CONCRETE PATIO: 966 SF PROPOSED CONCRETE WALKWAYS: 237 SF TOTAL IMPERVIOUS SURFACE: 6,555 SF 32.4 AVERAGE LEVEL CALCULATIONS CORNER POINT ELEVATIONS POINT 'A' = 17.0' POINT 'B' = 17.5' POINT 'C' = 17.5' POINT 'D' = 17.0' 9M I_\M9:1_ 0111ma:L11l9, (69.0 / 4) = 17.25" MAXIMUM HEIGHT = (AVERAGE GRADE + 25') 42.25' ACTUAL DECK HEIGHT = 26.83' SITE BENCHMARK: SANITARY SEWER MANHOLE #MH2-77 ELEVATION = 19.5' I RS-20 Zone Corner Flag Setbacks: Required Proposed I ' Front S 25 26 I Side W 10 min/35 13.6 ioa 2 I , � Rear N 5 25+ I 10 min/35 total 60 Side E 5' CONVEYED T'0 CITY OF EDIVIAS / 55 PER AFN 23#591- cri W I cTl g" FORCED MAIN W p L'SS S7 7 —— 1 � TALBOT RD ss - _ �/ so W � BM _ S = — SO SSMM — $,. SEWER MAIN SS SD _-- - _ — EL. 19.5' --__-- SS — cr1 - - SS o _ - o OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. Height 25 11 APPROVED BY PLANNING Mar 11 2022 ENGINEERING DIVISION APPROVED AS NOTED Iwo 03/17/2022 ***No stormwater management system required at this time. If new and/or replaced impervious surface equals 2000sgft or greater a stormwater management system will be required per City of Edmonds Code and Standards.*** Playi - L Browns B Southwest �I Y4 .''County Olympic'' View, ' �J u 1 U Lynndale VICINITY MAP 1 " = 2,000' PROJECT DATA PROPERTY OWNER/APPLICANTS: LISA & GARY SIVILLE 8311 TALBOT RD EDMONDS, WA 98020 PROJECT CONTACT/PLAN PREPARER: PUGET SOUND PLANNING, LLC ATTN: LEE A. MICHAELIS, AICP 5005 200TH ST SW, UNIT 101-B LYNNWOOD, WA 98036 (425) 830-1046 LEE. MICHAELIS@PUGETSOUNDPLANNING.COM CONTRACTOR: LEIF HELLEREN CONSTRUCTION, INC. ATTN: LEIF HELLEREN P.O. BOX 1764 EDMONDS, WA 98020 (206) 533-8200 STATE CONTRACTOR'S LICENSE: LEIFHC10380T SITE DATA SITE ADDRESS: 8311 TALBOT RD PARCEL NUMBER: 005944 000 013 01 TOTAL LOT AREA: 20,213 SF (0.46 AC) ZONING: RS-20 BUILDING SETBACK LINES (BSBL): STREET: 25 FEET SIDE: 10 FOOT MINIMUM / 35 FEET COMBINED REAR: 25 FEET MAXIMUM BUILDING HEIGHT: 25' MAXIMUM COVERAGE: 35 PERCENT SCOPE OF WORK. REPLACE EXISTING DECK WITH A NEW 477 SQUARE FOOT DECK AND BACK STAIRWAY. PERMIT ALSO INCLUDES THE CONSTRUCTION OF A NEW FRONT ENTRY CANOPY OVERHANG. LEGAL DESCRIPTION LOT 1 OF CITY OF EDMONDS BOUNDARY LINE ADJUSTMENT NO. PLN20150049, RECORDED UNDER RECORDING NUMBER 201511235007. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. BLD2021-1612 SCALE 1" = 20' 010' 20' 40' 60' W W N N o M oCO. o w Q y m U M � 7 Nw a =Ww v oz le W A.p z w � N Q W v � Q a LLJ z0 w w LL.zw 0 a Q OO -_--I O � m Z —' W Q W J RESUB Mar 07 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT DRAWN DATE: 11/29/2021 DRAWN BY: LAM CHECKED BY: TL PSP PROJECT NO. 2021-72 SHEET NAME SITE PLAN SHEET NUMBER AO PRINT DATE: 03/03/2022