Loading...
APPROVED-ENG-STM-BLD2020-0564+Civil_Plan+9.14.2020_12.47.40_PMLOT 2, SECTION 5, TOWNSHIP 27 NORTH, RANGE 4 EAST, W.M. LARbEl\ RE61UENUE 7329 158TH ST SW EDMONDS, WA 98026 OWNER/APPLICANT SHARON/CARLLARSEN 9832 MARINE VIEW DR MUKILTEO, WA 98275 425.349.1451 GENERAL NOTES GENERAL NOTES: CONSULTANTS CIVIL ENGINEER CG ENGINEERING 250 4TH AVE S, SUITE 200 EDMONDS, WA 98020 425.778.8500 FAX 778.5536 CONTACT: JARED UNDERBRINK, PE UTILITY PURVEYORS STRUCTURAL ENGINEER WATER/SEWER/STORM NATURAL GAS FIRE CG ENGINEERING CITY OF EDMONDS PUGET SOUND ENERGY SOUTH SNOHOMISH COUNTY FIRE 250 4TH AVE S, SUITE 200 121 5TH AVE N PO BOX 91269 8429 196TH ST SW EDMONDS, WA 98020 EDMONDS, WA 98020 BELLEVUE, WA EDMONDS, WA 98026 425.778.8500 FAX 778.5536 425.551.1200 CONTACT: DENNIS TITUS, PE, SE SURVEYOR SOIL/GEOTECH ENGINEER ASPI LAND SURVEYING NELSON GEOTECHNICAL ASSOCIATES 5205 S 2ND AVE, STE A 17311 135TH AVE NE, A-500 EVERETT, WA 98203 WOODINVILLE, WA 98072 425.252.1884 425.486.1669 FAX 481.2510 CONTACT: MATTHEW SCHNEIDERS, PE CONTACT: KHALED SHAWISH, PE 1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS: - CURRENT INTERNATIONAL BUILDING CODE (IBC) - CURRENT WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION - WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN (CURRENT EDITION) 2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE 3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS. 4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL GOVERNING AUTHORITY. 5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL ASBUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT APPROVAL. 6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION. 7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE. 8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. 9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS. 11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT. 12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT GEOTECHNICAL REPORT. 13. SUBGRADE SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR PERVIOUS PAVEMENT IS TO BE PLACED SHALL BE DELINEATED AND PROTECTED AT ALL TIMES FROM COMPACTIVE ACTIVITIES (i.e. HEAVY EQUIPMENT, STOCKPILING). 14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT. 15. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES. 16. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS. 17. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER. 18. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE. 19. ALL FOOTING DRAINS SERVING BUILDINGS, WALLS, ROCKERIES, ETC. SHALL CONNECT TO THE DRAINAGE SYSTEM DOWNSTREAM OF THE SITE STORMWATER DETENTION SYSTEM. 20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS. 1i7iw1k SNOHOMISH COUNTY PUD PO BOX 1107 EVERETT, WA 98206 425.783.1000 TELEPHONE CO M CAST 15815 25TH AVE W LYNNWOOD, WA 98087 21. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND STANDARDS. 22. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR STABILIZED BY OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ONSITE EROSION AFTER THE COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS. 23. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL. 24. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK MATERIALS ARE REQUIRED. 25. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN. 26. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 5% SLOPE FOR A MINIMUM DISTANCE OF 10 FEET. 27. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED. 28. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL. 29. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES. 30. ALL UTILITIES SHALL BE PLACED UNDERGROUND. 31. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S REPRESENTATIVE PRIOR TO BACKFILLING. 32. NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S REPRESENTATIVE AND CITY. 33. FIELD STAKE ALL UTILITY STUBS AT THE PROPERTY LINE. 34. TRENCH BACKFILL OF UTILITIES LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE COMPACTED TO 95%. COMPACTION TEST REPORTS SHALL BE PROVIDED TO THE CITY PRIOR TO PAVING. 35. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC FOAM AS A CUSHION BETWEEN THE UTILITIES. 36. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES WITHIN THE BUILDING. 37. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK. 38. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM. 39. PIPE MATERIAL AND SIGNAGE SUBMITTALS SHALL BE PROVIDED TO CITY ENGINEERING DIVISION FOR APPROVAL PRIOR TO INSTALLATION. 40. A REQUEST FOR APPROVAL OF MATERIALS AND ASSOCIATED DOCUMENTATION MUST BE SUBMITTED TO THE CITY OF EDMONDS FOR UTILITY MAIN LINE EXTENSIONS WITHIN CITY RIGHT OF WAY. THE CITY WILL PROVIDE A LIST OF MATERIALS IN WHICH THIS REQUIREMENT APPLIES, PRIOR TO CONSTRUCTION. THE REQUEST FOR APPROVAL AND DOCUMENTATION SHALL BE EMAILED TO ENGINEERINGPERMITS@EDMONDSWA.GOV FOR REVIEW AND APPROVAL TEN (10) WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. 41. MATERIALS AND MIX DESIGNS MUST BE PER CITY OF EDMONDS STANDARD DETAILS AND MATERIAL MODIFICATIONS DIVISIONS 7, 8, AND 9. 42. MATERIALS TESTING, INCLUDING COMPACTION AS REQUIRED BY CITY ENGINEERING INSPECTOR. 43. A SEPARATE RIGHT-OF-WAY CONSTRUCTION PERMIT IS REQUIRED FOR ALL WORK WITHIN THE CITY RIGHT-OF-WAY. LEGAL DESCRIPTION TRACT 27, MEADOWDALE BEACH SUPPLEMENTAL PLAT, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 5 OF PLATS AT PAGE 42, RECORDS OF SNOHOMISH COUNTY; SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON. DATUM ►e a:: SHEET INDEX C1.1 COVER SHEET AND GENERAL NOTES C2.1 TEMPORARY EROSION CONTROL AND DEMO PLAN C2.2 EROSION CONTROL DETAILS C3.1 GRADING AND DRAINAGE PLAN AND DETAILS C4.1 WATER AND SEWER PLAN AND DETAILS BENCHMARK CONCRETE MONUMENT IN CAST AT THE INTERSECTION OF 75TH PL WAND 158TH ST SW EL=100.67' TBM "A": MAG NAIL & WASHER LOCATED IN THE WESTERLY EDGE OF ASPHALT OF 72ND AVE W. ACROSS THE STREET AND +/- 10 NORTHERLY OF A FIRE HYDRANT. EL=261.64' CONVERSION FROM NAVD88 TO NGVD29 = 3.62' PROJECT BENCHMARK DERIVED FROM GPS OCCUPATION UTILIZING THE WASHINGTON STATE REFERENCE NETWORK. CONSTRUCTION SEQUENCE NOTES: 1. SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220, EXT. 1326. TWO DAY (48 HR) NOTICE IS REQUIRED. 2. GEOTECHNICAL MONITORING IS REQUIRED. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES AND CONSTRUCTION MONITORING/SPECIAL INSPECTIONS NOTES. 3. CALL FOR UTILITY LOCATES. 4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATION OUTSIDE THE CONSTRUCTION ZONE. 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY ENGINEERING INSPECTOR. ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED. 6. DEMOLISH EXISTING STRUCTURES 7. CLEAR, GRUB & ROUGH GRADE SITE. REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW). 8. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS, INCLUDING FRONTAGE IMPROVEMENTS. 9. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO REVEGETATION OF ENTIRE SITE. 10. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION PER VEGETATION MANAGEMENT PLAN. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR. CONSTRUCTION MONITORING/SPECIAL INSPECTIONS NOTES: 1. THE OWNER/APPLICANT SHALL RETAIN A GEOTECHNICAL ENGINEER TO MONITOR THE SITE DURING CONSTRUCTION. THE OWNER/APPLICANT SHALL PREFERABLY RETAIN THE GEOTECHNICAL ENGINEER WHO PREPARED THE FINAL GEOTECHNICAL REPORT IN THE PLAN SET SUBMITTAL AND WHO HAS REVIEWED THE APPROVED PLANS AND SPECIFICATIONS. IF A DIFFERENT GEOTECHNICAL ENGINEERING CONSULTANT IS RETAINED BY THE OWNER/APPLICANT, THE NEW GEOTECHNICAL ENGINEER SHALL SUBMIT A LETTER TO THE DIRECTOR STATING THAT HE OR SHE HAS READ ALL REPORTS AND RECOMMENDATIONS AND REVIEWS TO DATE AND STATE WHETHER OR NOT HE OR SHE AGREES WITH THE OPINIONS AND RECOMMENDATIONS OF THE ORIGINAL GEOTECHNICAL REPORT AND PEER REVIEW COMMENTS. FURTHER RECOMMENDATIONS, SIGNED AND SEALED BY THE NEW GEOTECHNICAL ENGINEER, AND SUPPORTING DATA SHALL BE PROVIDED SHOULD THERE BE EXCEPTIONS OR CHANGES TO THE ORIGINAL RECOMMENDATIONS THAT WOULD AFFECT THE APPROVED PLANS. 2. DURING THE PERIOD FROM OCTOBER 1ST TO APRIL 30TH, WHEN ON SITE, THE OWNER/APPLICANT OR DESIGNATED EROSION SEDIMENTATION CONTROL (ESC) SITE SUPERVISOR SHALL PERFORM EROSION AND SEDIMENTATION CONTROL INSPECTIONS. RECORDS OF INSTALLED ESC FACILITIES SHALL BE MAINTAINED BY THE EROSION AND SEDIMENTATION CONTROL SUPERVISOR AND COPIES OF ALL ESC RECORDS SHALL BE PROVIDED TO CITY INSPECTORS UPON REQUEST. ESC FACILITIES ON INACTIVE SITES (SITES WHERE NO WORK WILL BE PERFORMED FOR MORE THAN THREE CONSECUTIVE DAYS) SHALL BE INSPECTED WEEKLY BY THE EROSION AND SEDIMENTATION CONTROL SUPERVISOR. DURING ALL OTHER TIMES OF THE YEAR, WEEKLY INSPECTIONS BY THE ESC SITE SUPERVISOR ARE REQUIRED AND SHALL BE RECORDED. 3. THE GEOTECHNICAL ENGINEER SHALL MONITOR, DURING CONSTRUCTION, COMPLIANCE WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL REPORT INCLUDING: SITE EXCAVATION, SHORING, TEMPORARY EROSION CONTROL, SOIL SUPPORT FOR FOUNDATION, SUBDRAINAGE INSTALLATION SOIL COMPACTION AND OTHER GEOTECHNICAL ASPECTS OF THE CONSTRUCTION. UNLESS OTHERWISE APPROVED BY THE DIRECTOR, THE SPECIFIC RECOMMENDATIONS CONTAINED IN THE GEOTECHNICAL REPORT SHALL BE IMPLEMENTED BY THE OWNER/APPLICANT. OMISSIONS OR DEVIATIONS FROM THE APPROVED GEOTECHNICAL REPORT AND CIVIL PLANS SHALL BE HIGHLIGHTED TO THE CITY IN A SEPARATE REPORT. ALL REPORTS SHALL BE SUBMITTED TO THE CITY ON A WEEKLY BASIS FOR REVIEW. FAILURE TO SUBMIT REQUIRED REPORTS MAY RESULT IN THE ISSUANCE OF A STOP WORK ORDER. 4. DURING ALL WORK PERIODS, SPECIAL INSPECTIONS SHALL BE PERFORMED AFTER "STORM EVENTS" AS DEFINED IN ECDC 19.10.020(Q). THE STORM EVENT REPORT SHALL BE PROVIDED WITHIN ONE WEEK OF THE EVENT. 5. THE GEOTECHNICAL ENGINEER OF RECORD SHALL PREPARE A FINAL WRITTEN REPORT TO BE SUBMITTED TO THE BUILDING OFFICIAL STATING THAT, BASED UPON HIS OR HER PROFESSIONAL OPINION, SITE OBSERVATIONS AND FINAL SITE GRADING, THE COMPLETED DEVELOPMENT SUBSTANTIALLY COMPLIES WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL REPORT AND WITH ALL GEOTECHNICAL-RELATED PERMIT REQUIREMENTS AS SHOWN ON THE APPROVED PLANS. "SUBSTANTIALLY COMPLIES" MEANS THAT THE COMPLETED DEVELOPMENT OFFERS AT LEAST THE LEVEL OF STABILITY AND SAFETY, ON- AND OFF -SITE, AS WAS AFFORDED BY THE ORIGINAL RECOMMENDATIONS AND REPORT. RECOMMENDATIONS TO THE OWNER/APPLICANT SHALL BE INCLUDED IN THE REPORT FOR FUTURE MONITORING AND MAINTENANCE OF THE PROPERTY INCLUDING DRAINAGE, TIGHTLINES, CATCH BASINS, BERMS, RETAINING WALL DRAINAGE, HAZARD MITIGATION IMPROVEMENTS, SLOPES, BLUFFS, VEGETATION, AND PERMANENT EROSION CONTROL THAT AFFECT SLOPE STABILITY OVER TIME. OCCUPANCY OF THE RESIDENCE SHALL NOT BE GRANTED UNTIL THE REPORT HAS BEEN REVIEWED AND ACCEPTED BY THE BUILDING OFFICIAL. [ORD. 4029 § 1 (ATT. A), 2016; ORD. 3926 § 1 (EXH. A), 2013; ORD. 3651 § 1, 2007]. HAUL ROUTE FROM SITE: WEST ON 158TH AVE W, SOUTH ON 75TH PL W, ROAD CHANGES TO 76TH AVE W, EAST ON 196TH ST SW, CONTINUE TO 1-5. TO SITE: FROM 1-5, WEST ON 196TH ST SW, NORTH ON 76TH AVE W, ROAD CHANGES TO 75TH PL W, EAST ON 158TH AVE W. NOTE: HAUL ROUTE NOT PERMITTED FOR A TRUCK AND TRAILER. .s Gulch s Cuurth.-Dogs® 4 VictoryCigar �•���s<sw �o N MeadowdaieRd 3 / L Bernard Ford - S / Education Services z / / / HAUL ROUTE Pr Pre r �� f a f ' 16NM1 ASW ,bath ,p S� ,6aM SY Sw � Gn nle VICINITY MAP NTS = PROJECT SITE LEGEND DESCRIPTION EXISTING PROPOSED ABBREVIATIONS PROPERTY LINE - - - - ABN ABANDONED MIN MINIMUM ADJACENT PROPERTY LINE - - - - - - BLDG BUILDING MJ MECHANICALJOINT CENTERLINE BOW BOTTOM OF WALL MON MONUMENT CLEARING LIMITS X X - X X CENTERLINE NTS NOT TO SCALE SILT FENCE CB CATCH BASIN OC ON CENTER CONTOUR LINE - - - - -100 - - - - - 00 CMP CORRUGATED METAL PIPE PC POINT OF CURVATURE FENCE CO CLEANOUT PI POINT OF INTERSECTION SANITARY SEWER LINE --ss- --ss �SS�ss- CONC CONCRETE PIV POST INDICATOR VALVE MANHOLE ® ® CONST CONSTRUCTION FL PROPERTY LINE STORM DRAIN MAIN - - SD - - - SD �SD�SD- CID CONCRETE PIPE PT POINT OF TANGENCY STORM DRAIN PIPE - - - - - - - - - --- CU YD CUBIC YARD PVC POLYVINYL CHLORIDE PIPE ON ROOF DRAIN - - - R - - - R - - - R - -R-R DDCVA DOUBLE DETECTOR CHECK VALVE ASSEMBLY PVI POINT OF VERTICAL INTERSECTION PAVEMENT FOOTING DRAIN - - - F - - - F - - - F - F F DI DUCTILE IRON PIPE PVMT PRESSURE LINE - - - P - - - P - - - P - P P DIA DIAMETER PVT POINT OF VERTICAL TANG. CATCH BASIN (TYPE 1) ❑ ■ DIP DUCTILE IRON PIPE R RADIUS CATCH BASIN (TYPE 2) 0 EA EACH REINF REINFORCEMENT CLEANOUT CLEANOUT AND WYE 0 0 EJ EXPANSION JOINT RJ RESTRAINED JOINT �� -�0 ELEV ELEVATION RET RETAINING GRADE BREAK - - - - - - - - - - - - - - EOP EDGE OF PAVEMENT EXISTING RT RIGHT SURFACE SWALE EX SD STORM DRAIN DRAINAGE ARROW _ FDC FIRE DEPT. CONNECTION SECT SECTION WATER LINE - - WA- - - WA WAWA- FFE FINISHED FLOOR ELEVATION SDMH STORM DRAIN MANHOLE WATER METER ® FH FIRE HYDRANT SIM SIMILAR SQUARE FIRE HYDRANT � FL FLANGE SQ FDC 'Cr FT FEET/FOOT SS SANITARY SEWER PIV 0 • GV GATE VALVE SSMH SANITARY SEWER MANHOLE GATE VALVE TEE g Z J-1 HP HT HIGH POINT HEIGHT STA STATION STANDARD STD 90° BEND �-? ID INSIDE DIAMETER STL STEEL THRUST BLOCKING o A IE INVERT ELEVATION TB THRUST BLOCK CAP L LENGTH/LINE TOC TOP OF CURB CONCRETE PAVEMENT ° ° ° ° a ° LCPE LINED CORRUGATED POLYETHYLENE PIPE TOW TOP OF WALL ASPHALT PAVEMENT LF LINEAL FOOT TOP TOP ELEVATION CRUSHED SURFACING LP LOW POINT TYP TYPICAL ROCKERY f 20.0 f 20.0 LT LEFT MAXIMUM VC VERTICAL CURVE SPOT ELEVATION MAX W/ WITH TELEPHONE LINE POWER LINE - - - T - - - T - - - T - -T-T MECH MECHANICAL MANHOLE WM WATER METER - - - E - - - E - - - E - E E MH GAS LINE SIGN --- G - -- G - -- G- G G r_1 CAUTION! CALL BEFORE YOU DIG11 " BURIED UTILITIES EXIST IN THE AREA AND UTILITY INFORMATION SHOWN MAY NOT BE COMPLETE. CONTACT Q THE ONE- CALL UTILITY LOCATE SERVICE A MINIMUM OF 48 e HOURS PRIOR TO CONSTRUCTION 1-800-424-5555 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: CITY ENGINEERING DIVISION O C I ENGINEERING 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 GUIL 4` pF wA 25385 S'fEg' 'tip Cs SIGNAL 09/ II/ 2020 O O O I- Ln O .� 1 i k.0 m O O O Y Q DESIGN: TAF DRAWN: ATD CHECK: JPU JOB NO: 20039.20 DATE: 05/05/2020 3:: N LLJ N O U 00 Z 0) L L1 N 0 Q L LIoo I-- V) L 0 Z Z W O N Q J I_1 W SHEET: 0 Z LIJ L LI 0 Ld Z V / Lf LL LlaaaJ Ld Ld / Z 0 LL w a U (D I C1.1 LOT 2, SECTION 5, TOWNSHIP 27 NORTH, RANGE 4 EAST, W.M. 0 3�0 �I �.cvn) IE=140.08'(12" N) �a No �-Z TEMPORARY EROSION CONTROL AND DEMO PLAN SCALE: 1" = 20'-0" TREE PROTECTION MEASURES NOTES (FROM ECDC 18.45.050.H): 1. THE APPLICANT MAY NOT FILL, EXCAVATE, STACK OR STORE ANY EQUIPMENT, OR COMPACT THE EARTH IN ANY WAY WITHIN THE AREA DEFINED BY THE DRIP LINE OF ANY TREE TO BE RETAINED. 2. THE APPLICANT SHALL ERECT AND MAINTAIN ROPE BARRIERS ON THE DRIP LINE OR PLACE BALES OF HAY TO PROTECT ROOTS. IN ADDITION, THE APPLICANT SHALL PROVIDE SUPERVISION WHENEVER EQUIPMENT OR TRUCKS ARE MOVING NEAR TREES. 3. IF THE GRADE LEVEL ADJOINING A RETAINING TREE IS TO BE RAISED OR LOWERED, THE APPLICANT SHALL CONSTRUCT A DRY ROCK WALL OR ROCK WELL AROUND THE TREE. THE DIAMETER OF THIS WALL OR WELL MUST BE EQUAL TO THE TREE'S DRIP LINE. 4. THE APPLICANT MAY NOT INSTALL GROUND -LEVEL IMPERVIOUS SURFACE MATERIAL WITHIN THE AREA DEFINED BY THE DRIP LINE OF ANY TREE TO BE RETAINED. 5. THE GRADE LEVEL AROUND ANY TREE TO BE RETAINED MAY NOT BE LOWERED WITHIN THE GREATER OF THE FOLLOWING AREAS: (A) THE AREA DEFINED BY THE DRIP LINE OF THE TREE, OR (B) AN AREA AROUND THE TREE EQUAL TO ONE FOOT IN DIAMETER FOR EACH ONE INCH OF TREE CALIPER. 6. THE APPLICANT MAY PRUNE BRANCHES AND ROOTS AND WATER AS HORTICULTURALLY APPROPRIATE FOR ANY TREES AND GROUND COVER WHICH ARE TO BE RETAINED. 1. THIS SITE IS DESIGNATED AS A STEEP SLOPE CRITICAL AREA AND IS LOCATED WITHIN AN EARTH SUBSIDENCE AND LANDSLIDE HAZARD AREA (ESLHA). 2. SEASONAL RESTRICTION. CLEARING SHALL BE ALLOWED ONLY FROM MAY 1ST TO OCTOBER 1ST OF EACH YEAR; PROVIDED, THAT THE DIRECTOR MAY EXTEND OR SHORTEN THE DRY SEASON ON A CASE -BY -CASE BASIS DEPENDING ON ACTUAL WEATHER CONDITIONS, EXCEPT THAT TIMBER HARVEST, NOT INCLUDING BRUSH CLEARING OR STUMP REMOVAL, MAY BE ALLOWED PURSUANT TO AN APPROVED FOREST PRACTICE PERMIT ISSUED BY THE CITY OF EDMONDS OR THE WASHINGTON STATE DEPARTMENT OF NATURAL RESOURCES. 3. FOR PROJECTS LOCATED IN AN ESLHA, THE FOLLOWING ACTIVITIES ARE NOT EXEMPT FROM THE SEASONAL CLEARING AND GRADING LIMITATIONS: - ROUTINE MAINTENANCE AND NECESSARY REPAIR OF EROSION AND SEDIMENT CONTROL BMPS - ROUTINE MAINTENANCE OF PUBLIC FACILITIES OR EXISTING UTILITY STRUCTURES THAT DO NOT EXPOSE THE SOIL OR RESULT IN THE REMOVAL OF THE VEGETATIVE COVER TO SOIL - ACTIVITIES WHERE THERE IS ONE HUNDRED PERCENT INFILTRATION OF SURFACE WATER RUNOFF WITHIN THE SITE IN APPROVED AND INSTALLED EROSION AND SEDIMENT CONTROL FACILITIES 4. THE OWNER/APPLICANT OR CONTRACTOR SHALL SECURE THE BUILDING OFFICIAL'S APPROVAL BEFORE ENTERING AN EARTH SUBSIDENCE AND LANDSLIDE HAZARD AREA SITE WITH EXCAVATING OR OTHER GRADING AND CLEARING EQUIPMENT TO CLEAR, REMOVE TREES OR GRADE FOR ANY PURPOSE INCLUDING THE CREATION OF ACCESS TO THE SITE. 5. REQUESTS FOR EARLY SITE ACCESS IN ADVANCE OF BUILDING PERMIT APPROVAL OR IN THE TIME PERIOD BETWEEN OCTOBER 1ST AND APRIL 30TH FOR ANY PURPOSE SHALL BE SUBMITTED TO THE BUILDING OFFICIAL ACCOMPANIED BY WRITTEN CONCURRENCE OF THE OWNER/APPLICANT'S GEOTECHNICAL ENGINEER OF RECORD. 6. SEE SHEET C1.1 FOR CONSTRUCTION MONITORING/SPECIAL INSPECTIONS NOTES. 20 0 10 20 ]a 40 1. ALL DISTURBED PERVIOUS SURFACES SHALL BE AMENDED TO MEET DOE T5.13. 2. FROM OCTOBER 1ST TO APRIL 30TH, ANY EXPOSED SOILS NOT BEING WORKED FOR MORE THAN TWO DAYS SHALL BE COVERED. FROM MAY 1ST TO SEPTEMBER 30TH, ANY EXPOSED SOILS NOT BEING WORKED FOR MORE THAN SEVEN DAYS SHALL BE COVERED. 3. INSTALL AND MAINTAIN ALL TESC MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION. O C ENGINEERING 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 GUIL WAs� 'L,Ct' F� ° i 25385 Is cER 1 �`SIONAL �� 09/ 11 / 2020 O O O � Ln 0 r-I Q o m m Ln k.0 0 0 0 Y Q DESIGN: TAF DRAWN: ATD CHECK: JPU JOB NO: 20039.20 DATE: 05/05/2020 3:: N W O U 00 Z 0) I.a.J N O Q LLI oo V) L 0 Z Z W O N Q APPROVED FOR CONSTRUCTION J r-1 W CITY OF EDMONDS SHEET: DATE: BY: CITY ENGINEERING DIVISION Z O O:2 () W � 00 LL I.j 0 Z LL LL O ^O Z LL1 O � U C201 w zz LOT 2 , 2" x Z" WOOD/STEEL FILTER FABRIC SECURED TO 2" x 2' 14 GA WIRE FABRIC EQUAL NATIVE BACKFILL MATERIAL SECTION 5, TOWNSHIP 27 NORTH, RANGE 4 EAST, W.M. FILTER FABRIC MATERIAL IN CONTINOUS ROLLS USE STAPLES OR WIRE RINGS TO AttACH FABRIC TO WIRE 2- x 2" WOOD/STEEL POSTS --\ WIRE MESH FENCE TO SUPPORT FILTER FABRIC I L BURY BOTTOM OF FILTER c" MATERIAL 8" TO 12" 6' MAX NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL THROUGHOUT PROJECT. CITY INSPECTION REQUIRED ON 2. SILT FENCE TO BE PLACED DONNSLOPE OF CONSTRUCTION ALL EROSION CONTROL METHODS ACTIVITY, BEFORE OTHER WORK CAN BEGIN REVISION DATE FILTER FABRIC FENCE AUGUST 2017 CITY OF EDMONDS FILTRATION SYSTEMS PUBLIC WORKS STANDARD DEPARTMENT DEThAI�L� ^' APPf )Ov=D EY- R. ENGLISH - s.f. ER-900 CITY OF EDMONDS STANDARD DETAIL SCALE: NTS 4 TH IN DE FULL WIDTH GRESS/EGRESS DETAIL NOTES: 1D THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE AND/OR INTO THE PUBLIC RIGHT—OF—WAY. AT13 DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN, SEE TABLE BELOW FOR REQUIRED LENGTH. N 1. SURFACE WATER — ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 2. MAINTENANCE — THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT—OF—WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC RIGHT—OF—WAY MUST BE REMOVED IMMEDIATELY. a. WHEELS SHALL BE GLEANED TO REMOVE SEDIMENT PRIOR TO LEAVING THE SITE, WHEN WASHING IS USED, IT SHALL BE DONE ON AN AREA STABILI2ED WITH OJARRY SPALLS AMC) WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 4. INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN, PROJECT SIZE MIN LENGTH OF (FEET) QUARRY SPALLS* [ 1/4 ACRE 30 1 ACRE 50 C 3 ACRE 100 ] 3 ACRE 100 *PROVIDE ATO OR ASPHALT TRANSITION WHERE FRONTAGE ROAD IS AN ARTERIAL LENGTH TO BE DETERMINED BY CITY INSPECTOR. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN CITY OF EDMONDS STABILIZED CONSTRUCTION ENTRANCE PUBLIC WORKS DEPARTMENT APP:�a;/=D PY- R. ENGLISH CITY OF EDMONDS STANDARD DETAIL SCALE: NTS REVISION DATE AUGUST 2017 STANDARD D ETAI L ER-901 CITY OF EDMONDS PU3LIC WOR S DEPARTMENT CATCH 15 A �I V CRATE FILTER 5OCK WITH OVER FLOW HOLES CATCH BASIN NOTES: % CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICAT04 AT ALL TIWES CURING CONSTRUCTION PERIOD. 2_ ANY SEDIMENT IN CATCH LiA;` IV IN; --ENT SHALL BE REVIVED 1'4HE`4 IN EI#T I�5 DNE—THIRD FJLL 3_ CET''' INSPECTION REQ.JIREF) ON ALL ERASION WNTRQL M Ef HQ DS F EFC RE OTHER WORK CAN BEGIN. TEMPORARY SEDIMENT TRAP FOR CATCH BASINS AFPHOVEL; BY: R. ENGU5H CITY OF EDMONDS STANDARD DETAIL SCALE: NTS -.,ATE AUCUST 2017 APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: BY: CITY ENGINEERING DIVISION = <> 4a�ohl ENGINEERING 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 G GUIL WA cn 25385 �`SIONAL 09/ 11 / 2020 a a J a � � H — m m O m w w F— F— F— U w w w w o a a 0- 0 0 0 � In 0 rI 0 0 0 DESIGN: TAF DRAWN: ATD CHECK: JPU JOB NO: 20039.20 DATE: 05/05/2020 W N O U 00 z rn w cn o a v) = 3:: w I— � V) 0 Z � z w O C4 aMo J I� W SHEET: I 0 F— Z 0 0 Z 0 0 0 w C2m2 LOT 2, SECTION 5, TOWNSHIP 27 NORTH, RANGE 4 EAST, W.M. I vi I I 0 o_ I ► ► - a 0 o GRADING AND DRAINAGE PLAN SCALE: 1" = 20'-0" GRADING AND DRAINAGE PLAN NOTES: 1. A MINIMUM OF T HORIZONTAL SEPARATION AND V VERTICAL SEPARATION IS REQUIRED BETWEEN DRY UTILITIES (POWER, GAS, PHONE, CABLE, ETC.) AND SEWER, WATER AND STORM, AND A MINIMUM OF 5' HORIZONTAL SEPARATION AND V VERTICAL SEPARATION FROM ANY CITY -OWNED LINES. 2. DRIVEWAYS SHALL NOT EXCEED 14% SLOPE. 3. ALL DISTURBED AREAS ON AND OFF -SITE SHALL BE COMPOST AMENDED PER THE REQUIREMENTS OF BMP T5.13 IN THE STORMWATER MANUAL VOLUME V, CHAPTER 5. 4. CONTRACTOR SHALL VERIFY THE EXISTENCE OF ROOF AND FOOTING DRAINS AROUND THE HOUSE AND ADD OR REPLACE PER DETAIL 2 IF NEEDED. 5. NEW/REPLACED HARD SURFACES: 3,360 SF - 2,421 SF ROOF AREA. RUNOFF ROUTED THROUGH NEW ROOF DRAINS AND TIED TO EXISTING HOUSE DRAINS. - 464 SF GRAVEL DRIVEWAY. RUNOFF COLLECTED IN NEW CATCH BASIN AND TIED TO NEW ROOF DRAINS. - 475 SF ASPHALT DRIVEWAY. RUNOFF COLLECTED IN NEW CATCH BASIN AND TIED TO NEW ROOF DRAINS. PAVING LEGEND NEW ASPHALT OVERLAY EXISTING ASPHALT/UTILITY SAWCUT NEW GRAVEL I" \,— ..j TOP=145.53' IE=140.08'(12" N) � o� l ���� GRADING QUANTITIES TOTAL EXCAVATION (CUT) - 5 CU YDS TOTAL EMBANKMENT (FILL) - 5 CU YDS TOTAL 10 CU YDS THE QUANTITIES SHOWN ABOVE ARE FOR THE PERMIT PROCESS ONLY. THESE VALUES ARE APPROXIMATE. DO NOT USE FOR BIDDING, PAYMENT, OR ESTIMATING PURPOSES. � a 40 5/8" MINUS CRUSHED SURFACING TOP COURSE PER WSDOT STD SPEC 9-03.9(3) 1 1/4" MINUS CRUSHED SURFACING BASE COURSE PER WSDOT STD SPEC 9-03.9(3) COMPACTED SUBGRADE 90% FOR NATIVE MATERIAL AND 95% FOR IMPORTED GRAVEL PAVING DETAIL SCALE: 1" = V-0" O C ENGINEERING 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 4" DIA PERFORATED PVC PIPE WITH 6" OF 1" MINUS GRAVEL 8" MIN FROM WOOD. ALL AROUND, WRAPPED IN SEE STRUCTURAL DRAWINGS NON -WOVEN GEOTEXTILE FABRIC, SLOPE AT 0.5% MIN. TURN DOWN PERFORATIONS AS SHOWN FINISHED GRADE �- 6 DOWNSPOUT TIGHTLINE TO a a I i- CONVEYANCE SYSTEM @ 0.5% MIN. PLACE NEXT TO FOOTING DRAIN OR AS SHOWN ON - — —� GRADING & DRAINAGE PLAN =1 I a a (CONTRACTOR MAY LOCATE ON O ° o GU I',EITHER SIDE OF FOOTING DRAIN) O O ° 0 a �Q'�0F WAs�jt� ® ° O O a ti G' ° O a � -_ O° ° O LINE OF MAX EXCAVATION. 010 ° o OO IF SOIL IS OVEREXCAVATED, O O ° O o tISBTER� REPLACE WITH LEAN MIX O 000 o O �`SIONAL� CONCRETE � 0911 I / 2020 FOOTING i �1 1 FOOTING AND ROOF DRAIN SECTION 2 SCALE: NTS NOTES: 1. NO PARKING PERMITTED WITHIN TURN-AROUNDS OR CUL-DE-SACS IF PARKING WOULD REDUCE THE RADIUS OF CUL-DE-SAC TO LESS THAN 35' 2. TYPICAL WIDTH AND RADIUS AS REQUIRED TO COMPLY WITH SOUTH SNOHOMISH COUNTY REGIONAL FIRE (SSCRF) 30' MIN (TYP) 30' MIN (TYP) 60, 60, (SEE NOTE 2) (SEE NOTE 2) PAVEMENT VARIES 12 MIN 2D' (SEE NOTE 2) � x � RIGHT-OF-WAY ORAS APPROVED FACE OF CURB TYPICAL CUL—DE—SAC FOR PARKING, ADD 7.5' PER TRAVEL LANE ' RADIUS OF ASPHALT AREA MAY VARY PER SSCFR ?* �N Z � w w v R=20' (TYP) R=25' (SEE NOTE 2) VARIES 12 MIN 20' (SEE NOTE 2) TYPICAL TURNAROUND R-20' (TYP) R-25' (SEE NOTE 2) REV SION DATE CITY OF EDMONDS CUL-DE-SAC MARCH 2O18 AND TURN -AROUND PUBLIC WORKS DETAILS STANDARD DEPARTMENT DETAIL sf. I APPROVED BY: R. ENGLISH TR-51 4 CITY OF EDMONDS STANDARD DETAIL SCALE: NTS APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: BY: CITY ENGINEERING DIVISION Q Q J Q z m m O m N N U W w w w O O O � Ln O r-I I k.0 m O O O Y iy Q DESIGN: TAF DRAWN: ATD CHECK: JPU JOB NO: 20039.20 DATE: 05/05/2020 W C� Q z N Lf co cl Q W N N p Z Ill'- O) Z Q W 0 Q Q 0 W I— Z w OD � N Z Q 0 � Z N � � CA � Q Q Q M 0 w a SHEET: C3ml LOT 2 , SECTION 5, TOWNSHIP 27 NORTH, RANGE 4 EAST, W.M. � I 3�0 I� �c of J L11 W CV W J-[i 444 r0 z� If U) 0 U) c� V) 0 c III 0 W W V) f p 204 11vv)) ?In CB T-1 RIM=96.90' IE=92.06'(12" PVC N) IE=92.56'(12" PVC S) �300002502 NATIVE VEGETATION RETENTION AREA •7!1 17n CnCT 1. !O r)01 nC CITC1 "-C W r V / r UE ROW WITHIN 2' OF Q'v \ ► - ` I I U Uri-- z � � j� / P � � :•..::. PROPOSED Al LO � � \ ', I �° � < Is:p 0- PROPERTY LINE. SEE 1, GARAGE ND UPPER W / E CD v h:; 1 8 8 RESIDENCE a O r7Q �`' P CONC R WA NOTES 1, 2 & J� Off'/ STORY DID TION ° 0 L / '...2. 1�CLEANOUT a_ >- HOUSE BEND AND �, 104 P / / P L TER <v� `�- �' `; .: , , z' CAP : •' FF=142.1 CLEANOUT (NW] GARAGE r (P) zo WATER UTILITY EASEMENT � � � � FF-133.4% -� � � P / TO BE RECORDED NOT TO EXCEED 100' BETWEEN CLEANOUTS vpi 4' Y �`�' / CLEANDUT (WYE +KITH CAP 3 - - - - / --- M 9. i� / 'Y AND CLEANDUT COVER AND z tZ-------- ---y - P INSTALL NEW SSCO'S 4 CONCRETE LEVELING COLLAR - - WA- - .L WA- _ WA- _ - A_ _ IE_=1 8.57 ON I1 - ice/ ON EXISTING LATERAL. ' v 12" LOCKING COVER G / W� 12 - '(4, 1 0� W W SEE NOTES 1 & 2 , a 5EE NOTE 3 p G G - 12"t FINISHED GRADE / �i Ss END OF PIPER GRIPPER PLUG Z (CHERNE 27061 OR APPROVED - - F 87'40 31 W 569.60' a loa.ze r » r, tr, r, r, tr, r. i EQUAL) S N // WATER TIGHT CAP ti p Lj� » „ LEVELING COLLAR (� SSA SS ss S - - - S 1 3. 5 10 �� 18 A „ �� 45• RISER SEE NOTE 4- S Ss ss ss - - - - 12 - - A 8 7A\ \ 45' 12" PVC SLEEVE S- - - 1 „- A 12"- A �Y- 6" RISER i SD S M SD 1 S ss I 43.85 N �� N %� �� 60 1 0 _ 4' OR 6" SIDE SEWER o CB T-1 j SD S SD s _ S 1 4" A S I I GENERAL CLEANOUT DETAIL s" W E AND r6" clTr STUB RIKA=1n7 AR �T ��c ':�:' :_ 1 �-��D 45' BEND 1 RIM=128.48 UIH = RIM=140.47 E L CB T-1 '4N E,NE-OUT W) IE=135.67'(12" CMP E) RIM=140.95 18" VERTICAL PIPE IE=125.40 (18 PVC E) ( CTR CH=134.10 ° RIM=96.51' IE=125.20'(12" CMP W) '(12" HDPE SE) TOP=145.51' IE=136.67 (IN E-OUT W) IE=91.89'(12" PVC S) IE=127.48'(4" PVC E) 135.62'(18" PVC W) IE=139.46'(12" S) IE=92.39'(12" PVC NW) el KEYSTONE WALL IE=139.86'(12" E) IE=92.71'(4" PVC E) o� ��� 18" VERTICAL PIPE IE=139.31'(12" W) TOP=145.53 I EXIST FIRE HYDRANT � IE=140.08'(12" N) � � �vo WATER AND SEWER PLAN SCALE: 1" = 20'-0" WATER AND SEWER PLAN NOTES: 1. POTHOLE EXISTING SIDE SEWER TO VERIFY LOCATION, SIZE, MATERIAL AND DEPTH. 2. NEW CLEANOUTS SHALL BE INSTALLED ON EXISTING LATERAL. 3. POTHOLE EXISTING GAS LINE AT SEWER CROSSING TO VERIFY LOCATION, SIZE, MATERIAL AND DEPTH. 20 0 10 20 PORTION OF ABOVE GROU � a 40 2 4"ORC," 12' LOCKING COVER SIDE SEWER CLEANOUT DETAIL SEE NOTE 3 AT PROPERTY LINE/CITY EASEMENT oz LEVELING COLLAR N OTES: w z oW SEE NOTE 4- 0.93. L ASPHALT SURFACE 1. SEWER PIPE SHALL BE SDR-35 AND JOINTS SHALL BE GASKETED. -- " 12"t 2. PIPE SLOPE TO BE 2% LAIN AND UP TO 50% MAX. 3. SEWER CLEANOUT COVER TO BE EAST JORDAN IRON WORKS 1 FOOT LONG 12" PVC PRODUCT #00366102 STAR PIPE OOSP48L OR APPROVED SLEEVE EQUAL. 6" RISER�J END OF PIPE GRIPPER 4. LEVELING COLLAR SHALL BE CONSTRUCTED AS FOLLOWS: PLUG (CHERNE 27D261 OR APPROVED EQUAL) • IN ROADWAYS PER COE STD DWG GU-424 TYPICAL CLEANOUT • IN SIDEWALK/LANDSCAPED AREAS, EITHER 24"x24"x6" DEEP CONCRETE COLLAR OR 24" DIAMETER x 6" DEEP UNDER ASPHALT OR CONCRETE CONCRETE COLLAR REVISION DATE CITY OF EDMONDS SEWER CLEANOUT DETAILS JANUARY 2018 STANDARD PUBLIC WORKS DEPARTMENT DETAIL SS-200 APPROVED BY: R. ENGLISH CITY OF EDMONDS STANDARD DETAIL SCALE: NTS APPROVED FOR CONSTRUCTION CITY OF EDMONDS DATE: BY: CITY ENGINEERING DIVISION O C1 ENGINEERING 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 Cs GU jL WAsbr ��' cli 25385 ��Is'cER 1 �`SIONAL �� 09/ 11 / 2020 O O O W I-- Ln O .� L1 l\O m O O O Y iy Q DESIGN: TAF DRAWN: ATD CHECK: JPU JOB NO: 20039.20 DATE: 05/05/2020 0 V I w N � W � U co W Z Il'- 0 Q N 0 Q 3:: Z 0 N I..I.J = Il'- Q Z Lo V Q Z � 0 Lf w Z Lj Z O Q W Q N M :2 0 Q w a J I� Ld SHEET: C4.1