Loading...
Building Permit 2020. Permit ESLHA PERMITS City of Edmonds Edmonds , / / / • www.edmondswa.gov Type: ESLHA PERMITS Owner/ Business: LISA MONTALVO Status: ISSUED Subtype: ESLHA ADDITION Parcel No: 00513300002700 Site Address: 7329 158TH ST SW EDMONDS,WA 98026-4521 Applied: 6/2/2020 Subdivision: 005131, 005133 Lot: 0 Issued: 11/24/2020 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $280,000.00 Occupancy Type: Construction Type: Expiration Date: 11/14/2022 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: JOK Scope of Work: LARSEN-ESLHA-ADDITION TO HOUSE, DECKS, ADD GARAGE, REMODEL WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT LISA MONTALVO 23020 EDMONDS WAY 113, (206)542-3734 LISA@H2DARCHITECTS.COM EDMONDS WA 98020 CONTACT H2D ARCHITECTURE + DESIGN 23020 EDMONDS WAY 113, (206)542-3734 lisa@h2darchitects.com EDMONDS WA 98020 CONTRACTOR CONTRACTOR UNKNOWN OWNER SHARON E LARSEN 9832 MARINE VIEW DR, (425)348-8309 MUKILTEO WA 98275 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 11/24/20 R8738 PERMITS 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 11/24/20 R8738 PERMITS APPLIANCE VENTS 001.000.322.10.000.00 $30.00 $30.00 11/24/20 R8738 BUILDING REVISION - REVIEW 001.000.345.83.000.00 $110.00 $110.00 11/24/20 R8738 HOURS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/24/20 R8738 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $285.00 $285.00 11/24/20 R8738 TRAP ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $550.00 $550.00 11/24/20 R8738 ESLHA ADMINISTRATIVE 001.000.322.10.000.00 $2,385.00 $2,385.00 6/9/20 R5714 PROCESSING FEE ESLHA CONSULTANT 001.000.322.10.000.00 $500.00 $500.00 11/24/20 R8738 COMPLETENESS REVIEW FEE ESLHA CONSULTANT REVIEW 1 001.000.62.524.20.41.00 $2,500.00 $2,500.00 6/9/20 R5714 ESLHA CONSULTANT REVIEW 2 001.000.62.524.20.41.00 $1,499.00 $1,499.00 11/24/20 R8738 ESLHA CONSULTANT REVIEW 2 001.000.62.524.20.41.00 $489.00 $489.00 11/24/20 R8738 FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $105.00 $105.00 11/24/20 R8738 FURNACE OR FIREPLACE 001.000.322.10.000.00 $60.00 $60.00 11/24/20 R8738 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 1 $30.00 1 $30.00 1 11/24/20 1 R8738 Printed: Tuesday, November 24, 2020 9:39:32 AM 1 of 4 OV EDP g90 ' • • • • DESCRIPTION ACCOUNT AMOUNT My —PAID PAID DATE RECEIPT # PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $2,180.00 $2,180.00 11/24/20 R8738 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $1,853.00 $1,853.00 6/9/20 R5714 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 11/24/20 R8738 STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $195.00 $195.00 11/24/20 R8738 FEE WATER HEATER - INCLUDING 001.000.322.10.000.00 $15.00 $15.00 11/24/20 R8738 EXPANSION TANK TOTALS: $12,932.50 $12,932.50 CONDITIONS CONDITION TYPE STATUS NOTES 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. CARBON MONOXIDE SYSTEMS FOR INFORMATION FOR Provide combustion air per IFGC Chapter 3 for commercial and multifamily residential COMBUSTION AIR INFORMATION installations, and IRC chapter 24 for one and two family dwellings. Contractor/Owner shall be responsible for repair/replacement of all damage to utilities DAMAGE TO FRONTAGE FOR and/or frontage improvements in city right of way per city standards that is caused by or IMPROVEMENTS INFORMATION occurs during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION ENG - SEPARATE PERMIT FOR SEPARATE SIDE SEWER PERMIT REQUIRED FOR REPAIRS OR ALTERATION TO EXISTING REQUIRED INFORMATION SANITARY SIDE SEWER. ESC REQUIRED FOR Maintain erosion & sediment control per city standards. NFORMATION Printed: Tuesday, November 24, 2020 9:39:32 AM 2 of 4 . • _ ESLHA PERMITS rmit PERMIT NU City of • • • I -• • • •• 1 1 As required by Ord 3632 the geotechnical engineer of record shall monitor this site during construction for compliance with the recommendations in the geotechnical report including site excavation, shoring, soil support for foundation, including piles, soil bearing capacity, sub drainage installation, soil compactions, and other geotechnical aspects of the construction. Specific recommendations contained in the approved geotechnical report must be implemented by the owner. The geotechnical engineer shall make written dated reports on the progress of the construction and submit the report to the City on a weekly basis until all site grading, drainage, foundation and associated ground work is complete. Omissions or deviations from the approved geotechnical report and or approved plans or specs shall be highlighted and immediately submitted in a separate letter to the City for review. The City shall be advised in writing of work stoppages of FOR more than one week. In addition to the geotechnical monitoring special inspections ESLHA REPORTS INFORMATION based on the provisions of IBC Section 1704 are required when specified. Other special inspections may also be required by the geotechnical engineer, architect, or structural engineer of record. At the completion of final site grading and all permitted structures a final geo technical report prepared by the geotechnical engineer shall be submitted to the City. This report shall contain a statement that, based upon his/her professional opinion, site observations, and testing during the monitoring of the construction, the completed development substantially complies with the recommendations in the geotechnical report and with all geotechnical related requirements. Any deviations or omissions in the report, plans, or specifications that occurred during construction shall be addressed separately. Occupancy, final approval, or release of the bond for the project shall not be granted until the report has been reviewed and accepted by the Building Official. Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, FOR employees, and agents from any and all claims for damages of whatever nature, arising HOLD HARMLESS INFORMATION directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSPECTION PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION LOT LINES STAKED O Lot line stakes must be in place at the time of foundation setback inspection. ORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. FOR Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water PRV REQUIRED INFORMATION shutoff. REQUIRED SPECIAL FOR INSPECTIONS INFORMATION SPECIAL INSPECTION REPORTS FOR Submit all special inspection reports to the City Building Official on a weekly basis. NFORMATION UNDERGROUND UTILITY FOR Call for locates of underground utilities prior to any excavation. LOCATES INFORMATION Printed: Tuesday, November 24, 2020 9:39:32 AM 3 of 4 OV EDP . • _ ESLHA PERMITS rmit City of • • • PERMIT NUM 64 www.edmondswa.gov1 1 WHOLE HOUSE FAN FOR INFORMATION Installer shall provide the manufacturer installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole house ventilation, see operating instructions". • •7INSPEC7TORCOMPLETED INSPECTION TYPE DATE pp Ir •SEQID A-1 TESC AND MOBILIZE E-3 STRM FOOTING DRAIN E-3 STRM TIGHTLINE X-2 ENGINEERING FINAL A-1 ENGINEERING PRECON A-1 BUILDING PRECON B-1 SETBACKS B-2 FND DAMPPROOFING B-2 FOOTINGS B-2 FOUNDATION WALL B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 PLUMB ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 FRAMING B-5 BLDG SPECIAL INSPECTION B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-2 STRUCTURAL SLAB Printed: Tuesday, November 24, 2020 9:39:32 AM 4 of 4