Building Permit 2020. Permit
ESLHA PERMITS
City of Edmonds
Edmonds , / / / •
www.edmondswa.gov
Type: ESLHA PERMITS Owner/ Business: LISA MONTALVO Status: ISSUED
Subtype: ESLHA ADDITION
Parcel No: 00513300002700 Site Address: 7329 158TH ST SW EDMONDS,WA 98026-4521
Applied: 6/2/2020
Subdivision: 005131, 005133 Lot: 0
Issued: 11/24/2020
Fire Sprinklers: Lot Area: Zoning:
Final:
Valuation: $280,000.00 Occupancy Type: Construction Type:
Expiration Date: 11/14/2022
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Issued by: JOK
Scope of Work: LARSEN-ESLHA-ADDITION TO HOUSE, DECKS, ADD GARAGE, REMODEL
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
LISA MONTALVO
23020 EDMONDS WAY 113,
(206)542-3734
LISA@H2DARCHITECTS.COM
EDMONDS WA 98020
CONTACT
H2D ARCHITECTURE + DESIGN
23020 EDMONDS WAY 113,
(206)542-3734
lisa@h2darchitects.com
EDMONDS WA 98020
CONTRACTOR
CONTRACTOR UNKNOWN
OWNER
SHARON E LARSEN
9832 MARINE VIEW DR,
(425)348-8309
MUKILTEO WA 98275
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
11/24/20
R8738
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
11/24/20
R8738
PERMITS
APPLIANCE VENTS
001.000.322.10.000.00
$30.00
$30.00
11/24/20
R8738
BUILDING REVISION - REVIEW
001.000.345.83.000.00
$110.00
$110.00
11/24/20
R8738
HOURS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
11/24/20
R8738
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$285.00
$285.00
11/24/20
R8738
TRAP
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$550.00
$550.00
11/24/20
R8738
ESLHA ADMINISTRATIVE
001.000.322.10.000.00
$2,385.00
$2,385.00
6/9/20
R5714
PROCESSING FEE
ESLHA CONSULTANT
001.000.322.10.000.00
$500.00
$500.00
11/24/20
R8738
COMPLETENESS REVIEW FEE
ESLHA CONSULTANT REVIEW 1
001.000.62.524.20.41.00
$2,500.00
$2,500.00
6/9/20
R5714
ESLHA CONSULTANT REVIEW 2
001.000.62.524.20.41.00
$1,499.00
$1,499.00
11/24/20
R8738
ESLHA CONSULTANT REVIEW 2
001.000.62.524.20.41.00
$489.00
$489.00
11/24/20
R8738
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$105.00
$105.00
11/24/20
R8738
FURNACE OR FIREPLACE
001.000.322.10.000.00
$60.00
$60.00
11/24/20
R8738
GAS PIPING - NEW OR LOCATED
001.000.322.10.000.00
1 $30.00
1 $30.00
1 11/24/20
1 R8738
Printed: Tuesday, November 24, 2020 9:39:32 AM 1 of 4
OV EDP
g90
' • • • •
DESCRIPTION
ACCOUNT
AMOUNT My
—PAID PAID DATE
RECEIPT #
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$2,180.00
$2,180.00
11/24/20
R8738
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$1,853.00
$1,853.00
6/9/20
R5714
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
11/24/20
R8738
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$195.00
$195.00
11/24/20
R8738
FEE
WATER HEATER - INCLUDING
001.000.322.10.000.00
$15.00
$15.00
11/24/20
R8738
EXPANSION TANK
TOTALS: $12,932.50 $12,932.50
CONDITIONS
CONDITION TYPE STATUS
NOTES
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
FOR
shall be established by Council and shall be paid upon submittal and are nonrefundable.
ALL BUILDING PERMITS
INFORMATION
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections.
CARBON MONOXIDE SYSTEMS
FOR
INFORMATION
FOR
Provide combustion air per IFGC Chapter 3 for commercial and multifamily residential
COMBUSTION AIR
INFORMATION
installations, and IRC chapter 24 for one and two family dwellings.
Contractor/Owner shall be responsible for repair/replacement of all damage to utilities
DAMAGE TO FRONTAGE
FOR
and/or frontage improvements in city right of way per city standards that is caused by or
IMPROVEMENTS
INFORMATION
occurs during the permitted project.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
ENG - SEPARATE PERMIT
FOR
SEPARATE SIDE SEWER PERMIT REQUIRED FOR REPAIRS OR ALTERATION TO EXISTING
REQUIRED
INFORMATION
SANITARY SIDE SEWER.
ESC REQUIRED
FOR
Maintain erosion & sediment control per city standards.
NFORMATION
Printed: Tuesday, November 24, 2020 9:39:32 AM 2 of 4
. • _
ESLHA PERMITS rmit
PERMIT NU
City of • • •
I
-• • • •• 1 1
As required by Ord 3632 the geotechnical engineer of record shall monitor this site during
construction for compliance with the recommendations in the geotechnical report
including site excavation, shoring, soil support for foundation, including piles, soil bearing
capacity, sub drainage installation, soil compactions, and other geotechnical aspects of
the construction. Specific recommendations contained in the approved geotechnical
report must be implemented by the owner. The geotechnical engineer shall make
written dated reports on the progress of the construction and submit the report to the
City on a weekly basis until all site grading, drainage, foundation and associated ground
work is complete. Omissions or deviations from the approved geotechnical report and or
approved plans or specs shall be highlighted and immediately submitted in a separate
letter to the City for review. The City shall be advised in writing of work stoppages of
FOR
more than one week. In addition to the geotechnical monitoring special inspections
ESLHA REPORTS
INFORMATION
based on the provisions of IBC Section 1704 are required when specified. Other special
inspections may also be required by the geotechnical engineer, architect, or structural
engineer of record. At the completion of final site grading and all permitted structures a
final geo technical report prepared by the geotechnical engineer shall be submitted to
the City. This report shall contain a statement that, based upon his/her professional
opinion, site observations, and testing during the monitoring of the construction, the
completed development substantially complies with the recommendations in the
geotechnical report and with all geotechnical related requirements. Any deviations or
omissions in the report, plans, or specifications that occurred during construction shall be
addressed separately. Occupancy, final approval, or release of the bond for the project
shall not be granted until the report has been reviewed and accepted by the Building
Official.
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees
to indemnify defend and hold harmless the City of Edmonds, Washington, its officials,
FOR
employees, and agents from any and all claims for damages of whatever nature, arising
HOLD HARMLESS
INFORMATION
directly or indirectly from the issuance of this permit. Issuance of this permit shall not be
deemed to modify, waive or reduce any requirements of any City ordinance nor limit in
any way the City's ability to enforce any ordinance provision.
INSPECTION PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
LOT LINES STAKED
O
Lot line stakes must be in place at the time of foundation setback inspection.
ORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
FOR
Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the water
PRV REQUIRED
INFORMATION
shutoff.
REQUIRED SPECIAL
FOR
INSPECTIONS
INFORMATION
SPECIAL INSPECTION REPORTS
FOR
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
UNDERGROUND UTILITY
FOR
Call for locates of underground utilities prior to any excavation.
LOCATES
INFORMATION
Printed: Tuesday, November 24, 2020 9:39:32 AM 3 of 4
OV EDP
. • _
ESLHA PERMITS rmit
City of • • • PERMIT NUM
64
www.edmondswa.gov1 1
WHOLE HOUSE FAN
FOR INFORMATION
Installer shall provide the manufacturer installation, operating instructions, and a whole
house ventilation system operation description. A label shall be affixed to the whole
house timer control that reads "Whole house ventilation, see operating instructions".
• •7INSPEC7TORCOMPLETED
INSPECTION TYPE
DATE
pp
Ir
•SEQID
A-1 TESC AND MOBILIZE
E-3 STRM FOOTING DRAIN
E-3 STRM TIGHTLINE
X-2 ENGINEERING FINAL
A-1 ENGINEERING PRECON
A-1 BUILDING PRECON
B-1 SETBACKS
B-2 FND DAMPPROOFING
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-3 EXT WALL SHEATHING
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-3 PLUMB ROUGH IN
B-3 ROOF SHEATHING
B-3 UNDERFLR FRAMING
B-4 FRAMING
B-5 BLDG SPECIAL
INSPECTION
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
B-2 STRUCTURAL SLAB
Printed: Tuesday, November 24, 2020 9:39:32 AM 4 of 4