ROW PERMITOF EDP
RIGHT OF WAYPERMIT
� � G
PERMIT NUMBER
City of Edmonds
•
121 5th Ave N, Edmonds WA 98020
www.cityofedmonds.gov425.771.0220
Description: LARSEN-ROW IMPROVEMENTS PER BLD2020-0564 ISSUED: 11/24/2020
Address: 7329 158TH ST SW EDMONDS WA 98026-4521
EXPIRES: 05/23/2021
rmit Type: RIGHT OF WAY Permit Subtype: RESIDENTIAL Parcel Number: 00513300002700
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT LISA MONTALVO 23020 EDMONDS WAY 113, EDMONDS WA 98020 (206)542-3734
CONTACT H2D ARCHITECTURE + DESIGN 23020 EDMONDS WAY 113, EDMONDS WA 98020 (206)542-3734
CONTRACTOR DIG -IT EXCAVATION & LAND DESIGN, 910 156TH ST NE, ARLINGTON WA 98223-5429 (425)239-7449
LLC
OWNER LARSEN SHARON E 9832 MARINE VIEW DR, MUKILTEO WA 98275
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00 $40.00
ENGINEERING INSPECTION FEE
$110.00 $110.00
RIGHT OF WAY STANDARD PERMIT FEE
$330.00 $330.00
REQUIREMENTS
REQUIREMENT TYPE
NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
RELEASED BY
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
DATE
Printed: Tuesday, November 24, 2020 9:53:34 AM 1 of 2
OF EDP
RIGHT OF WAY PERMIT
G
PERMIT NUMBED!
City of • • •
Edmonds WA 98020 •
CONDITIONS
CONDITION TYPE
NOTES
Contractor/Owner shall be responsible for repair/replacement of all damage to utilities and/or
DAMAGE TO FRONTAGE
frontage improvements in city right of way per city standards that is caused by or occurs during the
IMPROVEMENTS
permitted project.
ESC REQUIRED
Maintain erosion & sediment control per city standards.
INSPECTION PRIOR TO
Call for all required inspections. All work shall be inspected prior to backfill.
BACKFILL
ROW COMPACTION TEST
Right of way compaction tests required per City standards.
UNDERGROUND UTILITY
Call for locates of underground utilities prior to any excavation.
LOCATES
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
NOTES
COMPLETE
E-7 DWY APPROACH
E-7 PUBLIC ROAD
E-7 PVMT SUBGRADE
E-7 RESTOR LIMITS
A-1 ENGINEERING PRECON
A-1 TESC AND MOBILIZE
X-2 ENGINEERING FINAL"
Printed: Tuesday, November 24, 2020 9:53:34 AM 2 of 2