Loading...
ROW PERMITOF EDP RIGHT OF WAYPERMIT � � G PERMIT NUMBER City of Edmonds • 121 5th Ave N, Edmonds WA 98020 www.cityofedmonds.gov425.771.0220 Description: LARSEN-ROW IMPROVEMENTS PER BLD2020-0564 ISSUED: 11/24/2020 Address: 7329 158TH ST SW EDMONDS WA 98026-4521 EXPIRES: 05/23/2021 rmit Type: RIGHT OF WAY Permit Subtype: RESIDENTIAL Parcel Number: 00513300002700 i NAME TYPE NAME ADDRESS PHONE APPLICANT LISA MONTALVO 23020 EDMONDS WAY 113, EDMONDS WA 98020 (206)542-3734 CONTACT H2D ARCHITECTURE + DESIGN 23020 EDMONDS WAY 113, EDMONDS WA 98020 (206)542-3734 CONTRACTOR DIG -IT EXCAVATION & LAND DESIGN, 910 156TH ST NE, ARLINGTON WA 98223-5429 (425)239-7449 LLC OWNER LARSEN SHARON E 9832 MARINE VIEW DR, MUKILTEO WA 98275 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $110.00 $110.00 RIGHT OF WAY STANDARD PERMIT FEE $330.00 $330.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW DATE Printed: Tuesday, November 24, 2020 9:53:34 AM 1 of 2 OF EDP RIGHT OF WAY PERMIT G PERMIT NUMBED! City of • • • Edmonds WA 98020 • CONDITIONS CONDITION TYPE NOTES Contractor/Owner shall be responsible for repair/replacement of all damage to utilities and/or DAMAGE TO FRONTAGE frontage improvements in city right of way per city standards that is caused by or occurs during the IMPROVEMENTS permitted project. ESC REQUIRED Maintain erosion & sediment control per city standards. INSPECTION PRIOR TO Call for all required inspections. All work shall be inspected prior to backfill. BACKFILL ROW COMPACTION TEST Right of way compaction tests required per City standards. UNDERGROUND UTILITY Call for locates of underground utilities prior to any excavation. LOCATES INSPECTIONS INSPECTION TYPE DATE RESULT NOTES COMPLETE E-7 DWY APPROACH E-7 PUBLIC ROAD E-7 PVMT SUBGRADE E-7 RESTOR LIMITS A-1 ENGINEERING PRECON A-1 TESC AND MOBILIZE X-2 ENGINEERING FINAL" Printed: Tuesday, November 24, 2020 9:53:34 AM 2 of 2