Loading...
APPROVED 75% REVISED2 BLD2020-0955_Required_Prior_to_Issuance_10-26-2020_DEMO_75%_form - BF - REV. 2Permit # BLD2020-0955 Address: 1615 9th Avenue North Home Owner: Akers, William Contractor: SCOTT DELAP CONSTRUCTION INC RESUB Nov 04 2020 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost, the structure will be required to be rebuilt to the standards of new construction. this number matchestotal from column#1 below Additionally, the NAHB 2019 single family costchart Replacement cost of existing home $ $1,109,002 home cobreakdown was usedof % of overall How was the value determined? Scott DeLap construction cost estimate of $296/sf x 3410 sf = $1,009,360 Component Value of Existing Component Percentage removed Replacement cost of removed component Notes mis numoer Is me s>amng point forgetting NAHB percentages from the overall project cost given by Scott DeLap Construction Foundation 119,104 0% 0 NAHB: foundation = 11.8% of overall = $119,104 Floor Framing 30,000 0.01% 300 NAHB: all framing = 13.7% of overall = $138,282.32 Floor Insulation 6056 0 0 NAHB: insulation = 0.6% of overall = $6,056 Wall Framing 60,000 19.5% 11,700 NAHB: all framing = 13.7% of overall = $138,282.32 Wall Insulation 6056 10% 606 NAHB: insulation = 0.6% of overall = $6,056 Siding 65,608 18.9% 12,400 NAHB: siding = 6.5% of overall = $65,608.40 Roof Framing 48,000 37.5% 18,000 NAHB: all framing = 13.7% of overall = $138,282.32 Attic Insulation 6056 37.5% 2,271 NAHB: insulation = 1.7% of overall = $17,159.12 Windows 20,187 12% 2,422 NAHB: windows = 2% of overall = $20,187.20 Doors 20,187 23.8% 4,805 NAHB: doors = 2% of overall = $20,187.20 Plumbing 50,468 20% 10,094 NAHB: plumbing = 5% of overall = $50,468 Electrical 47,440 5% 2,372 NAHB: electrical = 4.7% of overall = $47,440 HVAC 48,449 5% 2,422 NAHB: HVAC = 4.8% of overall = $48,449.28 Drywall 36,337 19.5% 7,086 NAHB: drywall = 3.6% of overall = $36,337 Cabinets 46,431 90% 41,788 NAHB: cabinets = 4.6% of overall = $46,431 Painting, Flooring and Finishes 104,973 18% 18,895 NA HB: painting, finishing, finishes = 2.8% + 3.6% + 4.0% of overall = $104,973.44 Deck 0 0% 0 Other $393,650 $52,713 NAH : hard construction cost = 61 % = 0.61 x $1,009,360 = $615,709.60 Total $715,352 + 393,65 = 135 161 + $52,713 = = 39 /o of overall, so 0.39 x $1,009,360 = $393,650.40; of total removed 16.9 $187,874 For replacement soft costs cost of $135,161, a 39% increase of this number for = 135,161 x 0.39 = $52,713. So 52713 + 135161 = $187,874 Percentage of Removed equals 'Total of Column 4 divided by Full Replacement cost' equals 16.9 Owner ! Bill Akers Date Nov 3 2020 Contractor Scott DeLap Date Nov. 3, 2020 \ $187,874/ $1,109,002 = 16.9%