OLD REVISED1 BLD2020-0955_Required_Prior_to_Issuance_10-26-2020_DEMO_75%_form - BF - REV. 1Permit #
C� y OF Evyo�Q
Address:
Home Owner:
Contractor:
This form may be used to help establish the percentage of demolition work performed to an existing
home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing
home's replacement cost, the structure will be required to be rebuilt to the standards of new
construction.
Additionally, the NAHB 2019 single family
Replacement cost of existing home $ $1,009,360 cost home cost was breakdown
chart
of % of overall
How was the value determined? Scott DeLap construction cost estimate of $296/sf x 3410 sf = $1,009,360
Component
Value of
Existing
Component
Percentage
removed
Replacement cost
of removed
component
Notes
Foundation
0
0%
0
Floor Framing
30,000
0.01%
300
NAHB: all framing = 13.7% of overall = $138,282.32
Floor Insulation
0
0
0
Wall Framing
60,000
19.5%
11,700
NAHB: all framing = 13.7% of overall = $138,282.32
Wall Insulation
8,580
10%
858
NAHB: insulation = 1.7% of overall = $17,159.12
Siding
65,608
18.9%
12,400
NAHB: siding = 6.5% of overall = $65,608.40
Roof Framing
48,000
37.5%
18,000
NAHB: all framing = 13.7% of overall = $138,282.32
Attic Insulation
8,580
37.5%
3218
NAHB: insulation = 1.7% of overall = $17,159.12
Windows
20,187
12%
2,422
NAHB: windows = 2% of overall = $20,187.20
Doors
20,187
23.8%
4,805
NAHB: doors = 2% of overall = $20,187.20
Plumbing
50,468
20%
10,094
NAHB: plumbing = 5% of overall = $50,468
Electrical
47,440
5%
2,372
NAHB: electrical = 4.7% of overall = $47,440
HVAC
48,449
5%
2,422
NAHB: HVAC = 4.8% of overall = $48,449.28
Drywall
36,337
19.5%
7,086
NAHB: drywall = 3.6% of overall = $36,337
Cabinets
46,431
90%
41,788
NAHB: cabinets = 4.6% of overall = $46,431
Painting, Flooring
and Finishes
104,973
18%
18,895 NA
HB: painting, finishing, finishes = 2.8% + 3.6% + 4.0% of overall = $104,973.44
Deck
0
0%
0
Other
$393,650
22.9%
90,145 NAHB:
hard construction cost = 61% = 0.61x$1,009,360 = $615,709.60
0
Total
$988,890
$226,505 sou.
x$1,009,360 = $393,650.40
% of total
removed
22.9%
Percentage of Removed equals 'Total of Column 4 divided by Full Replacement cost' equals 22.9 %
Owner
Contractor
Date Nov. 3, 2020
Date Nov. 3, 2020