Loading...
APPROVED RESUB1 BLD2021-0070+Transportation_Impact_Form+4.8.2021_1.42.07_PM+2135353RESUB Apr 08 2021 CITY OF EDMONDS ' DEVELOPMENT SERVIJF DEPARTMENT T+ Oc, 1�, PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: Owner/Applicant Select Homes BLD2021-0070 REVIEWED BY ENGINEERING APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet Name 16531 13th Ave W, Suite A-107 Street/Mailing Address Lynnwood WA 98037 City State Zip Telephone: (425) 742-6044 Applicant Contact Person: Kayla Clark Nichols Name 16531 13th Ave W, Suite A-107 Street/Mailing Address Lynnwood WA 98037 City State Zip Telephone: (206) 963-3365 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): RAM Engineering, Inc. Rob Long, PE Firm Name Contact Name Telephone: (425) 678-6960 1. PROJECT DESCRIPTION E-mail: RobL@RAMengineeringlnc.com a. Location - Street address: 1006 Walnut Street (Lot 2 of Walnut Short Plat) (Attach a vicinity map and site plan.) b. Specify existing land use: Single Family Residential c. Specify proposed type and size of development: Single Family Residential, One Lot/SFR (# of residential units and/or square footage of building) d. Date construction will begin and be completed: Start May. 2021 / End December 2021 e. Define proposed access locations: From exisiting private road off Walnut Street APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: Adequate access sight distance at existing private road. 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. i New Use Fee: $ 6,249.14 - Prior Use Fee.000 ❑ NEW DEVELOPMENT ITE Land Use Category New Use ❑ OTHER DEMO CREDIT IS BEING APPLIED TO LOT 1 Units in Per Unit square feet, Fee Rate # of dwelling, vfa, etc. XI — MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $ TOTAL TRANSPORTATION IMPACT FEE $ 6,249.14 City of Edmonds, Engineering Division Approval 5/6/2021 Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.