ENG2022-0513 ROW PERMITRIGHT PERMIT
• M.
City of Edmonds
Edmonds 98020
www -• • • •• 1 1
Description: PUD - REPLACE 2 BO POLES
ISSUED: 11/09/2022
Address: 6615 172ND ST SW EDMONDS WA 98026-5220
EXPIRES: 05/09/2023
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00478300000100
CONTACTS
NAME TYPE NAME ADDRESS PHONE
APPLICANT MOE NAVE PO BOX 1107, EVERETT WA 98206 (425)783-5681
CONTACT SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-8559
CONTRACTOR SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-4353
OWNER AARON & ERIN LYN GRAY 6615 172ND ST SW, EDMONDS WA 98026
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
94
RELEASED BY: MAJ DATE: 11/09/2022
Printed: Wednesday, November 09, 2022 12:50:58 PM 1 of 2
RIGHT PERMIT
PERMIT NUM
City of Edmonds
Edmonds WA 98020
www.edmondswa.gov / 425.1 1
CONDITIONS
CONDITION TYPE NOTES
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND AND NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE DATE
RESULT
NOTES
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL"
Printed: Wednesday, November 09, 2022 12:50:58 PM 2 of 2
WO 100102302
of EDAtD���
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
'Nc. 1890 Requirements outlined in Right-of-WU permit Handol3lA,Q3a
S301AN3S 1N3 WdOl3A30
3 0
If any field is not applicable to your project, write':'Qgins'te"ad of leaving blank.
All fields required. Incomplete Application&&Qed.
a3A1333M
SECTION A
General- Project Name t 0. -I 'IS PO C -1n f n . k, S i
Site Address or if no site address use Property Address at NW corner of project area: 6615 172nd t SW, Edmonds
Associated Permits: I BLD PLN ENG
Owner and Entity
Name of Company
Holding•
S VJ I,V m cl
••
Lkp Franchise Ordinance No:
Point of Contact
ftope l i
Title
�' Qs,
Address Lco
l Nr' (r.
City
£'j
State
Zip
Phone
4 5-- -7 & y?- 95- SS
Email
aS �[
C,�,"
Contractor and Authorizedof • ier (see note •• •w)
Name of Company S1V�VxUM( sti V—L 1-, C,(%�
"l
Contractor ContactsDuring Construction
Primary Name i2 _ � L J
Agent Name NO - W
Title S LJ VU^
Title R
Mobile Z� , , 3 _ VS51
Address Z � 4-i S r (, S "
Email s , �� SNL ,p,
City State (/� Zip >�� ?
Secondary Name —
Phone 3 - gs 5r,
Title
Email �J t FQ� ma
Mobile
City of Edmonds Business License No:
Email _
State License No: 113 - or)5--ig k
y� Contractor verifies it is currently bonded
Ik Contractor verifies it currently has general liability insurance
NOTE: ECDC18.6o.o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
•• of Development - Check ALL that apply
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
)traffic Control Only (no associated development)
,Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page i of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.) \ 1 n j p
PLOD Cze v) S -b rOJo i ow C_a TwJ � i s 4,, �T4-hj /JL1� s G�n� A CAIAr9
4(S— �� ; �ai►o la a tX 1 2ZI�) 4pd 1.
/_ 1 ,'A s - . ) S r"Pr, T in "Ic'A CL4 15--.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
LF
SF
72 hours +
LF
x
LF
SF
Cj
-Alley
Parking 72 hours +
LF
x
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTIONC.
•• of
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details
of Work to be Completed
Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
1.
2.
Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
,(
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
V
5.
Does the work involve proposed additions to an aboveground utility system? If es:
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details
of • to be Completed
Does your project involve rebuilding or replacing utility equipment which currently serves more
6.
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
How many are existing? I I How many are to be added?
U
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
I Does your project involve poles? If yes:
Ix
How many poles are existing in the project area? -2-
What is the height of the existing poles? '
How many poles are to be removed?
Are additional poles to be laced?
How many? 2 What is the height of the additional oles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
How many? What is the height of the poles after?
Describe the modification rebuild: I, I c.,_ ,
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
APPLICANT PRINTED NAME:
APPLICANT TITLE:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
CONSTRUCTION NOTES:
n v
�I mi
I ��o
1 s=adsNj,L[iYl DIS3IQf G3(HZ)GOMISH COUNTY
LOCATION 6615 172nd ST SW
LYNNWOODAREA
LOCA
SET 45PLI-4876
SET FT POLE T,E.OF EXSTING POLE
POLE NO. 4875 4876 SEI/4S 08 T 27 R 04
DATE 10/14/22
ORDER 100102302
SET POLE 6.5FT DEEP
REASON FOR WORK REPLACE BAD ORDER POLES
ENGINEER A. RIFE
OPERATION 0030
FRAME POLE PER CS-12V113, 12V601, 12U111
FOR PUD PRI-5 S
DRAFTER A. RIFE
No.
TRANSFER PRI/NEUT CONDUCTORS (1)#2ACSR PRI/NEU
SC
SCALE 1"=100'
TRANSFER 1PH PRI/LATERAL TO N. AND SOLID TAP PRI
TRANSFER OVHD SEC SVC'S
APPROVED
DATE PRINTED
BUILD NEW PRI RISER PER CS-12U111 AND REUSE EXISTING UG C#73789
DATE WORK COMPLETED
FOREMAN
FEES REQ'D ❑ YES ■ NO
PRIMARY OVERHEAD
❑ RESIDENTIAL
❑ COMMERCIAL
LEO NO.
SECONDARY OVERHEAD
NESC VIOLATIONS
BASIC FEE 3
■ NO ❑ YES (SEE NOTES)
PERMITS (DATE GRANTED)
❑ TREE TRIM
❑ STATE
'@3 '=$
METER/CONV. POLE 3
PRIMARY UNDERGROUND
❑ RESIDENTIAL
❑ COUNTY
■ CITY EDMONDS
❑ COMMERCIAL
BASIC FEE 3
❑
EASEMENTS
LEU No.
❑ REQUIRED ■ NOT REQUIRED
SECONDARY UNDERGROUND
BASIC FEE 3
DATE RELEASED
@$ -$
FOREIGN CONTACTS
UNDERGROUND PLAT
■ JPN# 100102302
BASIC FEE 3
FT.@S '-3
❑ JOINT TRENCH ZIPLY & CATV
❑ JOINT BORE ZIPLY & CATV
STREET LIGHTING
El
POLE STENCILING
FROM TO
WORK IN RIGHT OF WAY
❑ PRIMARY
TAKE OFF POLE
❑ SECONDARY
PRE-CONST. REQUIRMENTS
❑ TREE TRIM ❑ PUD LOCATOR
FT.93 _$
MISCELLANEOUS FEES
❑ BACKHOE ■ FLAGGING
VAULT 3
0 ONE CALL DATE
PERMIT 3
No.
STREET LIGHTING
3
3
❑ YES ■ NO
3
M&R
AS -BUILT
3
GIS
TOTAL DUE 3
DATE PAID
GIS QC
M&R
GIS Ph
JOINT USE
RECEIPT NO.
SERVICE ORDER NO.
LOCATION MAP PAGE 455E-1
FC,'FNn:
DATE HANG LBCU AND FU UG PRI AT 65 AMPS
TRANSFER SL-129582
SUBSTATION MDL INSTALL 3/8" DO W Idga�( MO1 ) HELIX ANCHOR W/L-8FT
CIRCUIT No. 12-1839 PHASE 2 �Hl1RV9i'ff1�2ifT rh ��BI�9�:1>4gI nn,l -
INSTALL XFMR BAG AND CAUTIOISINMACI DWMR
ENGR'S TEL. # MARK 1 1 uPafld -
425-783-8559
ENGR'S CELL #
425-239-8210
HANG A 1PH 37.5KVA XFMR 120/240/7200V
NUTC# 37.5- ;I5:)yniNinien�3
SER# 210d 3191SNOdS3b SI 2J=V0 J1N00/2i3NMO
SEC V
FUSE XFMR AT 10AMPS
NOTE:'ERGMdUMOJTd!UVIaOaa, MIRO GFSMUIIRAL TO COMM POSITION
ANV Ol NOISIA]2]/NOIiV00_1321 'S311r1I1n 311S NO �_1`d
LOC B-PLI-4875 EftiV00-1 210d 3191SNOdS32J 2J=V0 J1N00/2i3NMO
SET 45FT POLE T.E. OF EXSTING POLE
SET POLE 6.5FT DEEP
FRAME POLE PER CS-12V113 & 12V601
TRANSFER PRI/NEUT CONDUCTORS 0)#2ACSR PRI/NEU PLAN VIEW:
TRANSFER 1PH PRI/LATERAL TO N. AND SOLID TAP PRI
TRANSFER OVHD SEC SVC
TRANSFER SL-110674
INSTALL 3/8" DOWNGUY TO S W/12" SINGLE HELIX ANCHOR W/L-8FT 11/14
TRANSFER XFMR 25-12766 1 631 1
STRIP AND TOP POLE FOR 60MM
17126 615
2 2
(1)#2ACSR PRI TAP
(1)#2ACSR NEUTSOL
: OL 5
SOL TAP --_, MDL 12-1839
------�-------------------- FU65
25
UG
SCHEMATIC
NTS
O EXISTING POLE
X EXISTING POLE -TO BE REMOVED AA • NEW POLE TRAN FER OF UTILITIES, REI
ZZOZ/80/66 ITH APP�1'� 0AMtV LEp�„�T
NEW POLE TO REPLACE EXISTING POLE aopasneoslieylspiepuels�(�loaa
Tenn-;o-}y6ia Aj!0 ui s}uauaanoadwl
---------------�
6103 611
2
1 2ND
12
1839
7 /1NU 5 I bW / __\-___--
------------------- --�
�875 7,66601
4 S6108 FU65
25-12766 O
SL-11 674-A 1
17125 15
I6505
839
E-49684
j.J 31128317 M 251
SL-129582-A
/ S� 192fi -A ---6608
L___ SL-102658 A-SL4J
v44V-396629 2 1379-396628
8
VAL OF POLE AND FINAL RESTORATION TO BE CONSISTENT
:HMENT AGREEMENT(S) AND JOINT OWNERSHIP POLE AGREEMENT.
12
SHEET
OF
0
N
0
0
0
w
oLr)
i0
3�
�0
C N
Q N
� U
ww
J~
a
�a
1N3 W1?JVd30 NOISIAIO ON12J33NION3 I Ile aoeldaa/nedaa lleys jueoilddV
N -�
LANE CLOSURE ON A LOW VOLUME ROAD
(NO FLAGGER, TRAFFIC SELF-REGULATING, 35 MPH OR LESS)
W20-1 xnRK„=
TREAD =�
X
ONElANE_
W 2 0 — 4 ROAD °w
AHEAD-
X
LLJ
LLJ
ry
z
N
O
O a
O O
Ll
m
O W ?a
O Log
O
x
ONE LAN
ROAD W 2 0 ' 4
AHEAD
X
'_ ROAD
WORK W20-1
AHEAD=
1N3W1NVd3O
S301Aa3S 1N3WdM3A34
SONOW43 �O A11O
ZZOZ 81, 100
a3AI303E
ZZOZ/80/ 6 6
4310N S`d (IDAO2JddV
NOISING ONRJ33NION3
RECEIVED
Oct 18 2022
CITY OFDEVELOPMENT
EDMONDS CITY OF EDMONDS MyBuildingPermit.com
DEVELOPMENT SERVICES
DEPARTMENT
Right -of -Way Application #1217310 - WO 100102302 Replace BO Poles 4875 & 4876
Applicant
First Name Last Name Company Name
Moe Nave Snohomish County PUD
Number Street Apartment or Suite Number E-mail Address
PO Box 1107 jointuse@snopud.com
City State Zip Phone Number Extension
Everett WA 98206 (425) 783-5681
Contractor
Company Name
Owner
Number Street Apartment or Suite Number
City State Zip Phone Number Extension
State License Number License Expiration Date UBI # E-mail Address
Project Location
Number Street Floor Number Suite or Room Number
6615 172ND ST SW
City Zip Code County Parcel Number
EDMONDS 98026 00478300000100
Associated Building Permit Number Tenant Name
100102302
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
Aaron & Erin Lyn Gray
Number Street Apartment or Suite Number
6615 172ND ST SW
City State Zip
EDMONDS WA 98026
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 10/18/2022 Submitted By: Moe Nave
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1217310 - WO 100102302 Replace BO Poles 4875 & 4876
Project Contact
Company Name: Snohomish County PUD
Name: Andrew Rife Email: jointuse@snopud.com
Address: PO Box 1107 Phone #: (425) 783-8559
Everett WA 98206
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work No Disturbance of Surface
Project Name: WO 100102302 Replace BO Poles 4875 & 4876
WO 100102302 - PUD crews will replace 2 bad order poles with 45' poles located near 6615
Description of 172nd ST SW, Edmonds. Tree trimming will be required to access pole at location B. No
Work: pedestrian traffic will be impacted, no surface disturbance and total hours of work will be 24
hrs max.
Project Details
Project Information
Job Number
100102302
Page 2 of 2