Special Inspection Report 1 Epoxy installationENGINEERING civil & structural engineering & planning STRUCTURAL OBSERVATION REPORT Project: McCallum Foundation and Deck Repair Purpose: Epoxy installation Location: 21630 98" Ave W, Edmonds, WA Date: January 21, 2022 CG Project: 20371.10 Report: 1 Client: John McCallum General Contractor: Davison Custom Concrete Field Rep: Dennis Titus, PE, SE PURPOSE AND SCOPE A field representative of CG Engineering was on site on January 21, 2022, to observe the epoxy installation for new concrete patio rebar dowels. While on site we met with Jim Davison from Davison Custom Concrete. OBSERVATIONS At the time of the observation all of the piles had been installed and the subgrade had been prepared for the new concrete slab. The contractor was in the process of placing the reinforcement. The reinforcement for the slab will be doweled an epoxied into the existing house foundation. Prior to the inspection the contractor had drilled and cleaned all holes. Each hole was cleaned again while we were on site. The holes were cleaned with a wire brush and compressed air. The reinforcement was spaced at 18" CIC per and all holes were at least 4" deep per SS-3. Simpson Set-XP with an expiration date of 12/30/22 was used. The epoxy was applied with a tube dispenser and mixing nozzle. The initial unmixed epoxy was discarded prior to beginning the epoxy injection. The reinforcement dowels were installed per the manufacturer's instructions by twisting as they were inserted. EPDXY INSPECTION Epoxy: Simpson Set-XP Adequate Expiration: 12/30/22 Adequate Hole Depth: 4" + Adequate Hole Cleaning: Compressed air & wire brush Adequate Epoxy Mixing: Rebar installation: Adequate Adequate *All epoxy installation was completed per the manufacturer's recommendations. !FO-V WA84*fr?4s DISCLAIMER This observation is the professional opinion of CG Engineering PLLC based on the information available during this assessment or evaluation. This report does not warrant or guarantee that all jL conditions were discovered at the time ofthe observation. This report was prepared subject to the standard of care applicable to professional services at the time the services were provided. 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ..k nlc'7oQ Q9Znn I F nos'77Q ceQG McCallum Foundation & Deck Repair 1/21/22 CG Project No.: 20371.10 Page 2 of 3 o_ Photo 1— Subgrade Preparation Photo 2 — Epoxy Expiration 2504th Avenue South, Suite 200 Edmonds, WA 98020 cwr��w�cco�w� ph.425.778.8500 1 f.425.778.5536 McCallum Foundation & Deck Repair CG Project No.: 20371.10 1/21/22 Page 3 of 3 Photo 3 — Epoxy Installation Photo 4 — Epoxy Installation 2504th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778.8500 1 f.425.778.5536 FOUNDATION PLAN SCALE: 1/8" =1'-0" 0 5'-0" ENGINEERING 4TH AVESUITE Zoo WASHINGTON 98020FOUNDATI0N PHONE 425) 778-SWO McCALLUM RESIDENCE 21630 98TH AVE W EDMONDS, WA 98020 DATE 12/21/21 PROJECT NO. 20371.10 SCALE 1/j8' - 1'-0• ILE PLAN - - - - - - - _ • - - � _, . .. BY BELEOMONDS, HECK CHECKED BY SHEET 12/21/21 SECOND FRAMING 12/ 21/ 21 McCALLUM RESIDENCE 21630 98TH AVE W EDMONDS, WA 98020 DATE 12/21/21 SHEET PROJECT NO. 20371.10 SCALE 1/8' - 1'-0- ENGINEERING 2BD "TN AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE i425) 778-BS00 FOUNDATION PLAN _ _ _ _ - - • _ _ _ _. . .. - DRAWN BY ATD SS'2 CHECKED BY BEL