Loading...
Special Inspection Report 2 Epoxy installationENGINEERING civil & structural engineering & planning STRUCTURAL OBSERVATION REPORT Project: McCallum Foundation and Deck Repair Purpose: Epoxy installation Location: 21630 98`h Ave W, Edmonds, WA Date: May 10, 2022 CG Project: 20371.10 Report: 2 Client: John McCallum General Contractor: Advantage Contractors Field Rep: Dennis Titus, PE, SE PURPOSE AND SCOPE A field representative of CG Engineering was on site on May 10, 2022, to observe the epoxy installation for the column post bases. While on site we met with the foreman from Advantage Contractors. OBSERVATIONS At the time of the observation all of the concrete had been installed. The contractor was in the process of framing the deck. Each deck post is supported by a Simpson ABU post base secured with an epoxied anchor bolt. Prior to the inspection the contractor had drilled and cleaned all of the holes. Each hole was cleaned again while we were on site. The holes were cleaned with a wire brush and compressed air. Simpson Set-XP with an expiration date of 10/21/23 was used. The epoxy was applied with a tube dispenser and mixing nozzle. The initial unmixed epoxy was discarded prior to beginning the epoxy injection. The threaded rod dowels were installed per the manufacturer's instructions by twisting as they were inserted. EPDXY INSPECTION Epoxy: Simpson Set-XP Adequate Expiration: 10/21/23 Adequate Hole Depth: 4" + Adequate Hole Cleaning: Compressed air & wire brush Adequate Epoxy Mixing: Adequate Rebar installation: Adequate *All epoxy installation was completed per the manufacturer's recommendations. tg M. T j og we�,r�, PA DISCLAIMER U�Iif101 This observation is the professional opinion of CG Engineering PLLC based on the information available duringthis assessment or evaluation. This report does not warrant or guarantee that all x� conditions were discovered at the time of the observation. This report was prepared subject to the 5/10/22 standard of care applicable to professional services at the time the services were provided. 250 4th Avenue South, Suite 200 Edmonds, WA 98020 . k n)r 77Q ncnn I F n-)c 77Q CS2C. McCallum Foundation & Deck Repair 1/21/22 CG Project No.: 20371.10 Page 2 of 3 Photo 1— Epoxy Used Photo 2 — Epoxy Expiration 2504th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778.8500 1 f.425.778.5536 a- McCallum Foundation & Deck Repair 1/21/22 CG Project No.: 20371.10 Page 3 of 3 0 Photo 3 — Epoxy Installation Photo 4 — Epoxy Installation 250 4th Avenue South, Suite 200 Edmonds, WA 98020 cw���w�cco�n�r_ ph.425.778.8500 1 f.425.778.5536 NOTE: AT SIM SECTION PROVIDE (2) #4 LONG BARS & #4 @ 12" OC TRANSVERE. I I I DF SHIMS AS REQ'D 4" SLAB ON GRADE PER PLAN o I -III -I I 11/2" :-+ TYP cA U 811 Ole 811 SECTION COLUMN PER PLAN ABU POST BASE W/ 5/8" o x 6" EXPANSION ANCHOR DOWEL & EPDXY INTO EXIST FND W/ SIMPSON SET-XP & 4" EMBED, TYP #4 @ 18" OC EA WAY TO GRADE ELEV 1'-4" x V-4" FTG W/ (2) #4 EA WAY BOT @ EA COLUMN LOCATION 6" (3) #4 BARS 8" PER PILE STEEL PIPE PILING PER PLAN AND STRUCTURAL NOTES 12/ 22/ 21 McCALLUM RESIDENCE 21630 9ST14 AVE W DATE 12/22/21 SHEET PROJECT NO. 20371.11 ENGIN ERM 250 4TH AVE. S.. SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8800 EDMONDS, WA 98020 1 S S - 3 SCAM AS NOTED DRAWN BY LVW TITLE SECTION - - - , _ - _ - _, CHECKED BY DMT