Loading...
APPROVED BLD2022-0240+Plumbing_Plan+2.23.2022_2.29.31_PM+2698715w` PLUMBING GENERAL ABBREVIATIONS ABBV FULL NAME ABBV FULL NAME ABBV FULL NAME AAV AIR ADMITTANCE VALVE DN DOWN NTS NOT TO SCALE ABV ABOVE DS DOWNSPOUT OFD OVER FLOW DRAIN AFF ABOVE FINISHED FLOOR DWG DRAWING POC POINT OF CONNECTION AP ACCESS PANEL E EXISTING PRV PRESSURE REDUCING VALVE BEL BELOW ELEV ELEVATION PVC POLYVINYL CHLORIDE BFP BACKFLOW PREVENTER ET EXPANSION TANK RD ROOF DRAIN BOP BOTTOM OF PIPE EWH ELECTRIC WATER HEATER RPBA REDUCED PRESSURE BACKFLOW ASSY BV BALL VALVE F FIRE TOG TOP OF GRATE BWV BACK WATER VALVE FCO FLOOR CLEAN OUT UG UNDER GROUND CB CATCH BASIN FD FLOOR DRAIN LINO UNLESS NOTED OTHERWISE CFF CAP FOR FUTURE FU FIXTURE UNIT VTR VENT THRU ROOF CI CAST IRON GI GREASE INTERCEPTOR W/ WITH CL CENTER LINE GPM GALLONS PER MINUTE WCO WALL CLEAN OUT CO CLEAN OUT GWH GAS WATER HEATER WH WALL HYDRANT CPVC CPVC MATERIAL HB HOSE BIBB WHA WATER HAMMER ARRESTOR DCBP DOUBLE CHECK BACKFLOW PREVENTER HP HIGH PRESSURE WM WATER METER DCVA DOUBLE CHECK VALVE ASSEMBLY IE INVERT ELEVATION YH YARD HYDRANT DEMO DEMOLISH MH MANHOLE DFU DRAINAGE FIXTURE UNIT NIC NOT IN CONTRACT PLUMBING SYMBOL LEGEND SYMBOL DESCRIPTION ABBV SYMBOL DESCRIPTION ABBV 0 BALANCING VALVE BALV GAS COCK GC D4 GATE VALVE GV VERTICAL EXPANSION TANK VET D�4 GLOBE VALVE GLV I TEMPERATURE GAUGE TG BALL VALVE - FULL PORTED BV Q THERMOMETER THERM `ILl SILENT CHECK VALVE CV Dzl , BALL VALVE W/ 3/4" HOSE ADAPTOR BV W/ HA ® REDUCED PRESS. BACKFLOW PREVENTER RPBP _ p CONCENTRIC REDUCER CR (� BACKFLOW PREVENTER BFP TWO-WAY CONTROL VAVLE 2WAY = UNION UNION THREE-WAY CONTROL VALVE 3WAY STRAINER STRN POINT OF CONNECTION P.O.C. PRESSURE RELIEF VALVE PTV PIPE BREAK - PIG TAIL PRESSURE REDUCING VALVE PRV 6" cHWS PIPE - SIZE & ABBREVIATION T PRESSURE / TEMPERATURE PORT P/T s cHWS PIPE - SIZE & ABBREVIATION WITH INSULATION Q PRESSURE GAUGE PG @) PUMP CIRCULATION SOLENOID VALVE SV g ROOF DRAIN (RISER) RD PIPE - HEAT TRACE pL� OVER -FLOW DRAIN (RISER) OD HOSE BIB HB 60" OFFSET FOR SUDS 60' OFST 4 SUB -METER WATER FLOW MTR EXPANSION THERMAL EXP WATER HAMMER ARRESTOR WHA 'nTRiT DOMESTIC PEX MANIFOLD MFLD FLEX PIPE PLUMBING TRAP TRAP jig VENT THROUGH ROOF VTR FLTR 1 PLUMBING FIXTURE N.I.C. TAG m FLOOR CLEANOUT WC-1 PLUMBING FIXTURE TAG O-1 WALL CLEANOUT WTR-1 PLUMBING EQUIPMENT TAG 00 ® FLOOR DRAINS 1/2°7� 1/16" PER FOOT PIPE SLOPE ® ® FLOOR SINKS 11 ��%S� 1/8" PER FOOT PIPE SLOPE Qo ®O @® ROOF, OVERFLOW, AND COMBINATION DRAINS 2% SLOPE 1/4" PER FOOT PIPE SLOPE (TYP. UNO) PLUMBING SYSTEM LEGEND LINE TYPE & ABBR FULL NAME LINE TYPE & ABBR FULL NAME ACID GAS, NATURAL ACID VENT NATURAL GAS HIGH PRESSURE ACID WASTE NATURAL GAS LOW PRESSURE BEVERAGE NATURAL GAS MEDIUM PRESSURE BEVERAGE CONDUIT NATURAL GAS 2PS1 DOMESTIC WATER NATURAL GAS 5PS1 - - - DOMESTIC COLD WATER NATURAL GAS VENT DOMESTIC COLD WATER (UNDERGROUND) NATURAL GAS CONDUIT _ _ _ DOMESTIC COLD WATER - HIGH PRESSURE SANITARY SEWER - - - DOMESTIC FILTERED WATER GARAGE DRAIN - - - - - - DOMESTIC HOT WATER GREASE WASTE - - - - - - - DOMESTIC HOT WATER 140 GREASE WASTE (UNDERGROUND) - - - - - - DOMESTIC HOT WATER 160 INDIRECT WASTE - - - - - - - - - - - - - DOMESTIC HOT WATER CIRC - - - - - - - - - - - - - - - LAB VENT - - - - - - - - - - - - - DOMESTIC HOT WATER CIRC 140 - - - - - - - - - - - - - - - LAB WASTE - - - - - - - - - - - - - DOMESTIC HOT WATER CIRC 160 PUMPED SANITARY SEWER - - - - - - - - DOMESTIC HOT WATER - HIGH PRESSURE PUMPED WASTE - - - - - - - - - - - - - DOMESTIC HOT WATER CIRC - HIGH PRESS - - - - - - - - - - - - - - - VACUUM WASTE - - - DOMESTIC TEMPERED WATER - - - - - - - - - - - - - - - VENT DOMESTIC TEMPERED WATER CIRC WASTE FLUE SANITARY SEWER FLUE VENT - CPVC STORM GAS FOOTING DRAIN COMBUSTION AIR - PVC OVERFLOW RAIN LEADER GAS, MEDICAL RAIN LEADER ARGON - - - - - - - - - - - - - - - PUMPED STORM DRAIN CARBON DIOXIDE - - - - - - - - - - - - - - - STORM DRAIN HELIUM NON-POTABALE INSTRUMENT AIR - - - DEIONIZED WATER INSTRUMENT AIR INTAKE - - - - - - - - - - - - - - - IRRIGATION WATER LAB AIR - - - NON POTABLE COLD WATER LAB AIR INTAKE - - - - - - - - - - - - - - - NON POTABLE FILTERED WATER MEDICAL AIR - - - - - - NON POTABLE HOT WATER MEDICAL AIR INTAKE - - - - - - NON POTABLE HOT WATER 140 MEDICAL VACUUM - - - - - - - - - - - - - NON POTABLE HOT WATER CIRC MEDICAL VACUUM EXHAUST - - - - - - - - - - - - - NON POTABLE HOT WATER CIRC 140 NITROGEN - - - - - - - - - - - - - - - NON POTABLE TEMPERED WATER NITROUS OXIDE - - - - - - - - - - - - - - - NON POTABLE TEMPERED WATER CIRC OXYGEN - - - REVERSE OSMOSIS WATER WASTE ANESTHETIC GAS DISPOSAL - - - REV. OSMOSIS/DEIONIZED WATER WASTE ANESTHETIC GAS DISPOSAL EXHAUST - - - TRAP PRIMER - - - TRAP PRIMER UNDERGROUND PLUMBING PIPING MATERIAL SCHEDULE LOCATION PIPING SIZE MATERIAL (FOOTNOTE) JOINT PEX (a, d) MFR APPROVED DOMESTIC WATER 1/2" TO 1" COPPER TYPE L (c, j) PRESSED MECH JOINT DOMESTIC WATER 1-1/4" TO 2" COPPER TYPE L (c, j) PRESSED MECH JOINT PVC DWV/ABS SCH 40 (I, m) SOLVENT CEMENT ABOVE GROUND SANITARY WASTE 1-1/2" TO 4" CAST IRON (k) NO HUB PVC DWV/ABS SCH 40 (m) SOLVENT CEMENT SANITARY VENT 1-1/2" TO 4" CAST IRON (k) NO HUB INDIRECT WASTE 1/2" TO 2" COPPER TYPE L 0) PRESSED MECH JOINT FOOTNOTES (a) ACCEPTABLE FOR PLENUM USE IN SIZES 1/2" THROUGH 1". (c) PRESSURE LIMIT OF 200 PSI (d) LIMITED TO 80 PSI @ 200° F 0) PIPE TO BE SUPPORTED DIRECTLY ON HANGERS (NO INSERT OR SHIELD REQUIRED) INSULATION TO BE APPLIED OVER HANGERS (k) STANDARD NO -HUB BANDS (1) MAY NEED TO CONSIDER ACCOUSTICAL REQUIREMENTS (m) FLAME/SMOKE SPREAD REQUIREMENTS MAY PRECLUDE USE PIPING INSULATION SCHEDULE PIPING PIPE INSULATION INSULATION CONDUCTIVITY TYPE SIZE TYPE THICKNESS RANGE COLD WATER OVERHEAD AND EXPOSED TO SIGHT ALL FIBERGLASS 1/2" 0.21 - 0.27 COLD WATER WITHIN WALLS NOT REQUIRED HOT WATER AND RECIRC (UP TO 140°F) 1/2" - 1-1/4" FIBERGLASS 1" 0.21 - 0.28 1-1/2"-6" FIBERGLASS 1-1/2" 0.21 -0.28 ALL HOT WATER PIPING INSULATION SHALL MEET THE REQUIREMENTS OF THE WASHINGTON STATE ENERGY CODE, 2018 EDITION, TABLE C403.2.9 ALL PIPING INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND AN ASTM SMOKE DEVELOPED RATING OF 50 OR LESS ELASTOMERIC INSULATIONS WHICH MEET THESE RATINGS MAY BE USED AS A SUBSTITUTE FOR FIBERGLASS. PROVIDE A VAPOR BARRIER COVERING ON ALL COLD WATER PIPING INSULATION. PROVIDE A COVERING FOR ALL INSULATION EXPOSED TO SIGHT WITHIN THE BUILDING. BACKFLOW PREVENTER SCHEDULE MANUFACTURER & MAX DESIGN FLOW WEIGHT SYMBOL TYPE SYSTEM SIZE MODEL NO. PRESSURELOSS NOTES (LBS) BFP-5 REDUCED MED-3 MEDIVATOR WATTS 009-PC-QT 1/2" 17 PSI @ 5 GPM 6 1 PRESSURE BFP-6 REDUCED PRESSURE MED-3 MEDIVATOR WATTS 009-PC-QT 1/2" 17 PSI @ 5 GPM 6 1 NOTES: 1. CONFIGURED WITH PRESSURE DIFFERENTIAL RELIEF VALVE LOCATED BETWEEN TWO INDEPENDENTLY OPERATED SPRING LOADED CHECK VALVES, TWO RESILIENT SEAT BALL VALVES AND FOUR RESILIENT SEATED BALL TEST PORTS. BRONZE CONSTRUCTION, ASSE 1013 & NSF-61 LISTED. DRAIN CONNECTION SCHEDULE NO. DRAIN DESCRIPTION LOCAL CONNECTION WASTE VENT WOB-1 WALL MOUNTED OUTLET BOX - GUY GRAY TT200, DUAL OUTLET, QTY (2) 2" DRAINS, NO VALVES, WHITE POWDER COATED STEEL. 2" 1 1/2" PLUMBING EQUIPMENT SCHEDULE NO. EQUIPMENT DESCRIPTION MV-2 MIXING VALVE - WATTS LFMMV, THERMOSTATIC MIXING VALVE, 1/2" SIZE, INTEGRAL INLET FILTER WASHERS AND CHECK VALVES, LEAD-FREE CAST COPPER CONSTRUCTION. OWNER PROVIDED EQUIPMENT FIXTURE CONNECTION SCHEDULE LOCAL CONNECTION NO. OWNER PROVIDED EQUIPMENT INDIRECT WASTE WASTE VENT HOT COLD NOTES MED-1 MEDIVATORS ENDOSCOPE WASHER/DISINFECTOR (1) V DRAIN, 1/2" 1/2" EXISTING, RELOCATE (2) 1/4" AIR TANK PURGE MED-3 MEDIVATORS ENDOSCOPE WASHER/DISINFECTOR (1) 1" DRAIN, (2) 1/4" AIR TANK PURGE 1/2" 1/2" NOTES 1. INSTALL RP BACKFLOW ON DHW AND DCW CONNECTIONS. INSTALL MIXING VALVE. SEE MEDIVATORS PIPING DETAILS ON SHEET TP6.01. 2. PROVIDED WITH FACTORY WATER FILTERS. NEW, 1, 2 PLUMBING GENERAL NOTES 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE PLUMBING CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2018 EDITION OF THE UNIFORM PLUMBING CODE AS AMENDED BY THE STATE OF WASHINGTON. 3. ALL PIPE SIZES NOTED ON DRAWINGS ARE MINIMUMS. 4. SLOPE ALL WASTE PIPING AT 2% UNLESS OTHERWISE NOTED ON DRAWINGS. OBTAIN APPROVAL FROM CODE AUTHORITY BEFORE INSTALLING WASTE PIPING AT LESS THAN 2% (EVEN IF LESSER SLOPE IS INDICATED ON DRAWINGS). 5. HANGERS AND SUPPORTS FOR PIPING SHALL BE IN ACCORDANCE WITH SECTION 313 AND TABLES 313.3 AND 313.6 OF THE 2018 UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS. 6. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 7. FOR EXACT ROUGH -IN LOCATIONS AND ELEVATIONS OF PLUMBING FIXTURES REFER TO ARCHITECTURAL DRAWINGS. 8. PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS. 9. CLEANOUTS SHALL BE INSTALLED SO THEY ARE EASILY ACCESSIBLE. 10. PLUMBING VALVES SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED BY THE PLUMBING CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR. 11. THE PLUMBER SHALL PROVIDE AND LOCATE ALL REQUIRED FLOOR, WALL, AND FOOTING SLEEVES. 12. WATER DISINFECTION TEST SHALL BE PERFORMED IN ACCORDANCE WITH SECTION 609.9 OF THE 2018 PLUMBING CODE PRIOR TO FINAL APPROVAL OF PLUMBING PERMIT 13. ALL ITEMS IN THE DOMESTIC WATER DISTRIBUTION SYSTEM MUST SHOW COMPLIANCE WITH NSF-61 LEAD FREE REQUIREMENTS. DOCUMENTATION MUST BE AVAILABLE ON SITE. CONTACT LIST TITLE NAME COMPANY PHONE NUMBER EMAIL SENIOR DESIGN ENGINEER CHRIS LEE MACDONALD MILLER 206-768-4266 CHRIS.LEE@MACMILLER.COM PROJECT MANAGER JAKE BURSTEIN MACDONALD MILLER 206-225-6723 JAKE.BURSTEIN@MACMILLER.COM HEALTHCARE PROJECT EXECUTIVE LOGAN ORDONA MACDONALD MILLER 206-768-4012 LOGAN.ORDONA@MACMILLER.COM PLUMBING FOREMAN FRANK TINNIN MACDONALD MILLER 206-571-9813 FRANK.TINNIN@MACMILLER.COM G.C. PROJECT MANAGER CRYSTAL LASNIER BN BUILDERS PLUMBING SCOPE OF WORK CRYSTAL.LASNIER@BNBUILDERS.COM PHASE 1 SCOPE: RELOCATE MEDIVATORS SCOPE WASHER MED-1 FROM INSTRUMENT PROCESSING ROOM W6017 TO A TEMPORARY LOCATION IN DECONTAM ROOM W1268. INSTALL THE FOLLOWING TO SUPPORT SCOPE WASHER MED-1 IN ROOM W1268: (2) RP BACKFLOWS, (1) MIXING VALVE, (1) WATER FILTER, DOMESTIC HOT AND COLD WATER PIPING. SCOPE WASHER SHALL INDIRECTLY DRAIN TO THE EXISTING FLOOR DRAIN IN ROOM W1268. PHASE 2 SCOPE: INSTALL THE FOLLOWING TO SUPPORT (2) SCOPE WASHERS IN ROOM W6017: (4) RP BACKFLOWS, (2) MIXING VALVES, (2) WATER FILTERS, (2) WALL OUTLET BOXES, DOMESTIC HOT AND COLD WATER PIPING, WASTE AND VENT PIPING. RELOCATE SCOPE WASHER MED-1 FROM ROOM W1268 TO ROOM W6017. INSTALL NEW SCOPE WASHER MED-3 IN ROOM W6017. SCOPE WASHERS SHALL INDIRECTLY DRAIN TO THE WALL OUTLET BOXES. GENERAL SHEET LIST - PLUMBING SHEET UMBER SHEET NAME UMBER SHEET SHEET NAME TP0.01 SCHEDULES TP2.01 1ST FLOOR PARTIAL PLAN DP2.06 6TH FLOOR PARTIAL DEMO PLAN TP2.06 6TH FLOOR PARTIAL PLAN TP6.01 DETAILS LEGAL DESCRIPTION PARCEL NUMBER: 00580700002500 LEGAL DESCRIPTION: SOLNERS 5 ACRE TRACTS BLK 000 D-00 - N 1/2 OF TRS 27 & 28 & S 1/2 OF TRS 25 & 26 TGW TH PTN OF VAC 10TH ST SE (FORMERLY 216TH ST SW ADJ THRTO) & TGW TH PTN OF TR 29 SD PLAT LY WLY OF FDL - COM AT NWCOR SD TR 29 TH ELY ALG N BDY 42.12FT TO BEG OF LN HEREIN DESC TH SLY TAP 35.44FT FIR SW CR OF SD TR 29 AS MEAS ALG S BDY SD TR & TERM OF LN HEREIN DESC (PER CITY EDM BLA REC AF NO 199909155005) 21 6th St SW 215th St SW SITE o - 216th St SW Q _0 c N 218th SW (D c S� r` 220th St SW N VICINITY MAP NO SCALE om m - z Q� C) 00 O C G E U) )u_ co O U) �0, E O ~ =� A C J ¢'C.0 Z C U_ _j Q Zo N ❑ LL c: w Q ❑ 66 Z 0 w w Q z 0 0. 0. Ow Q Z w pC Lu J 2i Q U) C) 0� w w Z Cn O N w� a) �� O 0 �W LL Q 0 w 0�� w w C w r° z = C)2 U) U/ N L1J U) ENGINEER: LAST REVISED: C LEE 02-21-22 CHECKED BY: DATE PLOTTED: T BOVEY 02-21-22 CAD: ISSUE DATE: F MAMERTO DRAWING NUMBER: D-3579-77212478-00 SHEET NUMBER: TPO.01 a w DCW POC AT kNICAL ROOM I � 3/4" DCW ' 3/4" DHW i I i i � I i i it i i I i I I ' I ,I I I � I INSTALL TEMPORARY DCW & DHW BETWEEN MECH RM AND RM W1268. i i I I ,I i I i i I i E12070 i I LL i I I i i i I I I I I I I a I I I I I U I I I W 1260 STERILE STORAGE RM. W1268 DECONTAMINATION AREA I I I I TEMP LOCATION OF MEDIVATORS SCOPE WASHER MED-1 DURING PLUMBING WORK ON 6TH FLOOR 4 ?o TP6.01 y o (E) FD � N I I AREA OF WORK I C7 MAIN INPATIENT WORK AREA PLUMBING GENERAL NOTES 1. TEMPORARY DCW AND DHW PIPING MATERIAL SHALL BE PEX. 2. MEDIVATORS SCOPE WASHER MED-1 SHALL BE TEMPORARILY RELOCATED FROM ROOM W6017 TO ROOM W1268. 3. REMOVE TEMPORARY DCW AND DHW PIPING BETWEEN ROOM W1269 AND THE MECHANICAL ROOM ONCE SCOPE WASHER MED-1 IS RELOCATED TO ROOM W6017. z 1 /4" = 1'-0" 00 � — z Qco 0 0 �CD � �oEC/) J) LL ���C) Co 0 U) EE U)o0Q 0,E� O= °' 0 J Z C °o U_ J Q N 0 j c: � EL I I I I I I I I w 0 66 z 0 w I I I I I I I I w Q 0 z 0 I I I I I I I I ly- 0. 0. O Lu z Q Z W pC J wJ Q (D 2i Q - U)C z W �� 0- Lu Z� O N (.0 200 O� O 0 �Q< O LL w J� ow Cw�°z �� 2 ° v,U) U/ U) N Wqr-- ow U) ENGINEER: LAST REVISED: C LEE 02-21-22 CHECKED BY: DATE PLOTTED: T BOVEY 02-21-22 CAD: ISSUE DATE: F MAMERTO DRAWING NUMBER: D-3579-77212478-00 SHEET NUMBER: TP2.01 w a N (0 N LL o I I I I I AREA OF WORK I I EXISTING MEDIVATORS SCOPE WASHER TO BE TO 1 ST FLO( DISASSEMBLE PIPING LOCATED ON THE SIDE OF THE HOOD CABINET AND SAVE THE FOL OWING EQUIPMENT FOR REUSE: PRESSURE GAUGE MIXING VALVE WATER FILTER ASSEMBLY ITH PRESSURE REDUCING VALVE REMOVE (2) PRESSURE REDUCING VALVES FROM INSIDE THE HOOD CABINET J AND SAVE FOR REUSE. HOOD AN CABINET TO BE DEMOED BY OTHERS. STAINLESS STEEL COUNTER TO BE MODIFIED BY OTHERS TO ACCOMMODATE THE NEW SCOPE WASHER W6033 z Q LL O > O C9 E o ILL 7 J cn LL O � 0 O CD Q 0 Oa) �00_ a)Q °' �' � Z J � UU °C:) U Z N 0 LL >J r n I I I I I I I I w Q 0 z O LU Ow Qz w pU wJ �Q U)U 00 z w O2 N _�:� 0C/)a< wC)= U LLJ 0 r-z �0 v / C+ / N LUJ ENGINEER: LAST REVISED: C LEE 02-21-22 CHECKED BY: DATE PLOTTED: T BOVEY 02-21-22 CAD: ISSUE DATE: F MAMERTO DRAWING NUMBER: D-3579-77212478-00 SHEET NUMBER: DP2.06 w O LL 0 w Z) C) C) KEY PLAN 1 1 /4" = 1'-01, 1 w 1. DCW AND DHW PIPE MATERIAL SHALL BE COPPER WITH PRESSED FITTINGS. N (0 N LL o Z Q LL O O> C9 0-) E o ILL 7 J cn L� 0 � 0 O CD Q 0 Oa) �_ °' a)00 Q`��'z � J � U U °� U � N 0 LL >J r n I I I I I I I I LU Q z O L LU I I I I I I I I w Q 0 z O LU ry Ow z �-- ~ Q Qz J >w n pU J(DwJ Q UU ry 0p Q` w Z� (.0� O N 0 O� p cn ; Q O w—Q� J� proLL Uwcoz =J C) ENGINEER: LAST REVISED: C LEE 02-21-22 CHECKED BY: DATE PLOTTED: T BOVEY 02-21-22 CAD: ISSUE DATE: F MAMERTO DRAWING NUMBER: D-3579-77212478-00 SHEET NUMBER: TP2.06 w O LL 0 w Z) U) U) KEY PLAN 1 1 /4" = 1'-01, 1 LIU NOTES _ _ 1. INSTALL RP BACKFLOWS NO HIGHER THAN 3/4" DCW 1Aw 60" AFF. 3/4" DHW DHW 2. INSTALL BYPASS VALVE AND TEMPERED - - - - - - - - - - - WATER SHUTOFF VALVE IN EASILY ACCESSIBLE LOCATION. DO NOT INSTALL BEHIND SCOPE WASHER. 3. PROVIDE ADEQUATE CLEARANCE AROUND i I 1/2" DCW o THE WATER FILTER UNIT FOR FILTER 1/2" TEMPERED WATER SHUTOFF VALVE 1/2" DHW CHANGE OUT. a s o 4. TERMINATE INDIRECT DRAINS WITH MIN 1" MEDIVATORS PRV AIR GAP. MEDIVATORS WATER FILTER UNIT T 1/2" VALVE &CAP FOR FUTURE PUMP I 1/2" TEMPERED I T ELECTRICAL WATER TO SCOPE DISCONNECT WASHER, BYPASS VALVE, NORMALLY CLOSED SWITCH TERMINATE WITH Li PRESSURE GAUGE, 0-100 PSI i l HOSE CONNECTION. TEMPERATURE GAUGE, 0-200°F (TYP) I THERMOSTATIC MIXING VALVE, SET TO 95°F. ................................................. ACCEPTABLE TEMP RANGE 95°F ± 4°F I _ _ I I�I I I I I I STERIS 1/2" PRV, CAVIWAVE PRO ACCEPTABLE DYNAMIC WATER ULTRASONIC CLEANER PRESSURE OF 40-87 PSI (TYP 2) I BFP-1, 1/2" RP BACKFLOW I �� BFP-2, 1/2" RP BACKFLOW FLOOR DRAIN OUTLINE OF MEDIVATORS SCOPE WASHER. ..] PIPING TO BE INSTALLED BEHIND THE SCOPE WASHER. RP BACKFLOW DRAIN, RUN FULL SIZE TO INDIRECT DRAIN 4"W 1/2" BYPASS LINE DRAIN, RUN TO INDIRECT DRAIN AT EXISTING FLOOR DRAIN AT EXISTING FLOOR DRAIN 1ST FLOOR TEMP LOCATION, MEDIVATORS SCOPE WASHER - PLUMBING DETAIL TP6.01 SCALE: 1/2" = 1'-0" NOTES 1. INSTALL RP BACKFLOWS NO HIGHER THAN 60" AFF. 2. INSTALL BYPASS VALVES AND TEMPERED WATER SHUTOFF VALVES IN EASILY ACCESSIBLE LOCATION. DO NOT INSTALL BEHIND MEDIVATORS SCOPE WASHER. 3. PROVIDE ADEQUATE CLEARANCE AROUND THE WATER FILTER UNIT FOR FILTER CHANGE OUT. 4. TERMINATE INDIRECT DRAINS WITH MIN 1" AIR GAP. 2" W C( BUILD MEDIVATORS SCOPE WASHER MED-1 0 0 0 MEDIVATORS SCOPE WASHER MED-3 MEDIVATORS SCOPE WASHERS - EQUIPMENT LAYOUT DETAIL 1" DCW 1" DHW - 1/2" DHW 1/2" DCW II I SCALE: 1/2" = 1'-0" FIELD VERIFY POC TO EXISTING VENT I I II I II 1/2" DHW 1/2" DCW I II II DUAL OUTLET BOX WITH (2) 2" DRAIN CONNECTIONS (TYP 2) W (TYP 4) TRAP MEDIVATORS SCOPE WASHER - IN -WALL PLUMBING DETAIL SCALE: 1/2" = 1'-0" MEDIVATORS PRV, MEDIVATORS WATER FILTER UNIT, PROVIDED WITH MEDIVATORS SCOPE WASHER PROVIDED WITH MEDIVATOR (TYP) (TYP) 1/2" VALVE & CAP FOR FUTURE PUMP (TYP) TEMPERATURE GAUGE, 0-200°F (TYP) PRESSURE GAUGE, 0-100 PSI (TYP) 1/2" PRV, ACCEPTABLE DYNAMIC WATER PRESSURE OF 40-87 PSI (TYP 4) P T I I rI IT I THERMOSTATIC MIXING VALVE, SET TO 95°F. P T ACCEPTABLE TEMP RANGE 95°F ± 4°F I ICI (TYP) II P T I I I1 II TI I I Ir P T I� I I I r -- BFP-1, 1/2" RP BACKFLOW BFP-2, 1/2" RP BACKFLOWI�pa— I BFP-5, 1/2 RP BACKFLOW // I BFP-6, 1/2" RP BACKFLOW I I II WALL OUTLET BOX (TYP) 1/2" BYPASS VALVE, NORMALLY CLOSED 1/2" TEMPERED WATER SHUTOFF VALVE (TYP 2) I 1/2" TEMPERED WATER TO SCOPE WASHER, TERMINATE WITH HOSE CONNECTION. HOSE AND HOSE ADAPTER PROVIDED WITH MEDIVATOR. (TYP) RP BACKFLOW DRAIN, RUN FULL SIZE TO INDIRECT DRAIN AT OUTLET BOX (TYP) -J I DRAIN HOSE FROM MEDIVATOR, J RUN TO INDIRECT DRAIN AT OUTLET BOX. 1/2" DCW, 1/2" DHW (TYP) DRAIN HOSE PROVIDED WITH MEDIVATOR. (TYP) 1/2" BYPASS LINE DRAIN, RUN TO INDIRECT DRAIN AT OUTLET BOX (TYP) MEDIVATORS SCOPE WASHER - WALL MOUNTED PLUMBING DETAIL SCALE: 1/2" = 1'-0" rVl/7 � O CO z Q I� 0 0 � C9 � ;oECf) 0 ILL J U) li O _� m 0 O Uo0Q 0 5 co E� O a0 � Z J � U oo J Q N o ILL I I I I I I I I w H Q 0 cj z O w 0. 0. Ow Z w pU(DwJ C Q c U)U � C) w w Lu Z� O N C) 0 O 0�>Q LL LL J < �I— Q w Uwrco 0 _z 3:'-� w � ) C/)c0 NW 0 �/�+ ENGINEER: LAST REVISED: C LEE 02-21-22 CHECKED BY: DATE PLOTTED: T BOVEY 02-21-22 CAD: ISSUE DATE: F MAMERTO DRAWING NUMBER: D-3579-77212478-00 SHEET NUMBER: TP6.01