APPROVED PLN BLD2022-1159+PLAN SET+8.29.2022_10.51.29_AM+3077474City
Qf Edmonds
Building
Department
-----------------------------
Work
TOTEM POLE
Address,
220 RAILROAD AVE
Owner r EDM
--6
DS WATERFRONT CENTER
Approved Date,
--------------------------
/3 -2027------------
Building Official E '
C44fer
Permit Numbers
CQ
11
PLANS MUST BE
61-0"
ASI 017
PHOTOVOLTAIC "
PANELS, TYP.
ASI 017
U)
co
LLI
U
SIM. °-
10
� SK1
U
A7.5
M
ALL WORK SUBJECT APPROVED Y PLANNING,
TO FIELD
INSPECTION FOR Sep C720�2
CODE COMPLIANCE
4'-3°
,-Rql-11,16
a
►=A.. 9 A 6t� -
C 5'A r °'
f g
lA
RgCEIVED
8/?9/22
clTl{ OF EDMONDS
D ELOPMENT i
54V x 29lbs/cf=1,537 lbs- less rear'notch 'and s
31074
wood removed due to carving, say 200lbs
X 4'AL-V. ZA 6 dozrs 4- 644V. al43Ar'2S " 8 ArpD �N6+2 „ % then total wgt:1,300 Ibs '+/- ssloNA�.�'
3� I t Wind loads: fr RECEIV�13
!d (?f 5 "ovrER ont; 45sf [15 x 3 ] x 501bs/SF x .75 reduction
3►2R.�� = 11 x3 s 4051-- '106 �D.�l A-r4ro �°Lloclini� RICOV.�fn,� due to curved surface at front: 1,688 lbs $�29��2
7^-`lo c,yr'/i rear: full exposure: 2,2501bs
CITY OF EDMO DS
DEVELOPME
Lag bolt capacities: 3/4" x 5" 'outer': 525 lbs ea.[x8: 4 200ibs] SERVICES DEeATMENT
CE��2 "W�L w, r��✓G lt'/'� �� 3/4" x 6" in 'inner': 650 lbs ea [x8: 5,200lbs]
[bolts perpendicular to grain, total capacity 16 bolts: 9,400lbs] /_C� 7�
2. Totem sits/bears totally on assembly of cast concrete base with
neoprene pads, total approx 6.5" high [field verify] �`g'j/�j� �VOpD T�pZ'�M P70(,7q1—��
in contact with wood base. Installed totem applies zero lateral
forces (excepting wind) on WF column under roof of building. SG,%l ,' 4S /V2)
3. Totem fastening brackets, 1/4 x 3 inch steel bar stock, powder -
coated following bending, 4 total [bottom, mid (2), and top]
of 15 ft. total height]