Loading...
BLD2022-1547_Site_Plan_11.9.2022_3.48.48_PM_3212458Equipment Summary Modules: (25) REC 405W Inverter(s): (1) SolarEdge 1000OH-US Racking: Ironridge XR100 Table of Contents: Cover Page Al Site Overview A2 Roof Layout E1 Single Line E2 Electrical Calculations G1 Roof As Built G2 Electrician As -Built G3 Micro/optimizer map G4 Placards G5 Equipment BOM —V, General Notes: Additional Electrical Work: - Service/Panel upgrade (200A) - Install EV Charger Li . i 0 O Site —Net Meter 1 A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. = Q O i o rn >. �O NCO�O� < f ru Q� .. 4W ^ V Lo�� ao Q� 0 op M c000 E w ao REVISIONS Rev. #: I Date: Designed by: Wes K. Project Manager: Arthur Eith (612) 298-1795 Current Date:Oct 21, 2022 Cover Page Meter Main, Inverter EV Charger Customer -Owned Production Meter MSP ti O O O ❑ El n ❑ ❑//7 Attachment Detail Side View (Portrait) FLASHING AS REQUIRED TO SEAL ROOF MINIMUM (1) 5/16 X 4.75 LAC BOLT EMBEDDED 2" MINIMUM CENTER ON ROOF FRAMINC PV MODULE, BY OTHERS IRONRIDGE RAIL (E) COMPOSITION SHINGLE ROOF IRONRIDGE FLASHFOOT2 (E) ROOF FRAMING Modules not to exceed height of existing ridge --- - - - -i-- - - - - -- '611 (sample) Attachment point layout for array. 72" OC Max. &M-1IPi. A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. Q= O i o rn >. L CN ro00 � O a) 00 a) L.L. "'L< f�� Q� .. 4W ^ V ao 0 �p M co00 E ao w REVISIONS Rev. #: I Date: Designed by: Wes K. Project Manager: Arthur Eith (612)298-1795 Current Date:Oct 21, 2022 Al Site Overview Required Setbacks from Ridge: 18., Maximum Mount Spacing: 72^ Comp Roof Type: Roof Slope: 22.6O Array Tilt : Flush Array Azimuth(s): 1510, 2410 Roof Area: 1788 ft2 Array Area 498 ft2 Array to Roof Coverage 28% ***Roof Attachments/ Fastners; see pg. G5 Equip. BOM * * * Go 00 c" V M Ln 1-4 rV M M rl L — J 484 1/4" Module and Rail Selection Guide REC405AA Pure 40 x 71.7 Clamp Zone "A" 4.0-9.8" Clamp Zone "B" 8.2-23.8" Mods per Row Rail typel+ rail type2 (12)Portrait, (1)row (4)14', (2)14' (4)Landscape, (2)rows (2)14', (2)14' (3)Landscape, (1)row (2)14', (2)split 14' (2)Landscape, (1)row (2)14', NA,����i A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. = Q O i o rn >. L `1 CN (000 Net Meter O a) 00 0') fo%.0 fua Q� .. a.+ ^ 00 vi �C�� N p p M m 00 E w ao REVISIONS Rev. #: I Date: Designed by: Wes K. Project Manager: Arthur Eith (612)298-1795 Current Date:Oct 21, 2022 A2 Roof Layout (New) Main Service Panel (1ph 240V Service) Main Breaker: 200A Bus Rating: 225A Solar OCPD: 2p60A \ 1 / \ 2 / \ 3 / \ `' / 0 Equipment Schedule Ref. Category Equipment QTY 1 Modules REC405AA Pure 25 2 Optimizers S440 SolarEdge Optimizer 25 3 Jbox Jbox 2 4 Inverters Solar Edge SE10000H 1 5 MeterBase MeterBase-125A 4 Jaw w/ 3.5" AWCAP 1 Meter Landis Gyr EA110000-OP29 240V 1 Monitoring SolarEdge Consumption Monitoring (2p2OA breaker+CT's) 1 Breakers 2p6OA 1 ElectricalWork Service/Panel Upgrade (225A MSP) 1 ElectricalWork Install ChargePoint HomeFlex EV Charger (customer provided) 1 0 Conductor Schedule Production Meter ■=A&RScope = Existing or Others Scope Meter Main (1ph 240V Service) Main Breaker: 200A Bus Rating: 200A Main breaker to serve as exterior rapid shutdown initiator 4/0 XHHW-2 (L1 & L2) 2/0 XHHW-2 (N) #6 THWN-2 (EGC) nverter Specs Watts LW-1 Output AC Voltage # of Inverters OCPD JL Solar Edge SE10000H 10000 42 240 1 60 ****N/A**** 0 0 0 0 0 ****N/A**** 0 0 0 0 0 Module Specs Watts w Imp Vmp Voc Isc REC405AA Pure 405 9.56 42.4 48.9 10.14 Temp. Adjusted 0 0 37 52.7 0 Summary Distance (ft) Current @125% Operating Voltage Voltage Drop Volt. Drop (total) A (2)#10 CU, (1)#6 EGC, PV Wire 60OV, AIR 50 18.75A 400V 0.28% 0.74% B (6)#10 CU, (1)#10 EGC, THWN-2, 0.75"EMT(min) 50 18.75A 400V 0.28% C (2)#6 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min) 10 52.5A 240V 0.17% General Notes: Utility: SnoPUD 1. EGC Where exposed to physical damage will be #6AWG Bare CU 2. If installing conduit on the roof, maintain greater than 7/8" above the surface 3. NEC 690.12: Rapid Shutdown initiated by loss of Grid or AC Disconnect 4. For supply side taps, a #6 GEC (min.) will be run separately from the disconnect and connected to the grounding electrode with an irreversible crimp _ I A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. Q O O L C N fu 00 O (1)003:M L I L..a U 3:Q� "o f0 U L ^a 0 G7� �00� 0 �0 M m � 00 E L � W ao REVISIONS Rev. #: I Date: Designed by: Wes K. Project Manager: Arthur Eith (612)298-1795 Current Date:Oct 21, 2022 E1 Single Line PV Electrical Calculations I nverter ppt Input Amperage (Imp) Voltage (Vmp) Itag e(DC) Amps (DC) A&RSOLAR 32ttle,W11 inL144(2uther 6)707-g Jr ayS. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING THE WRITTEN CONSENT OF A&R SOLAR. = Q i � L� �O �� U V • Q M L � o M >10 CN ro00 �00�0� L"' La ru O ra � Q� ^ a u7 L O O C 0 00 E a O W REVISIONS Rev. #: Date: Total Voltage Drop: 0.74% Designed by: Wes K. Project Manager: Arthur Eith (612) 298-1795 Current Date:Oct 21, 2022 E2 Electrical Calculations Inverter Specs M Watts � Output AC - Voltage # of Inverters OCPD Total AC Comb. EGC AC f� out. A OCPD Solar Edge SE10000H 10000 42.00 240 1 60 42.0 60 #10 Ampe ****N/A**** 0 0.00 0 0 0 ****N/A**** 0 0.00 0 0 0 Module Specs Watts ll I� Vmp Voc Is Temp. Coef V(oc) EGC DC Volt REC405AA Pure 405 9.56 42.4 48.9 10.14 Max Array Specs (Adjusted for Temperature) Solar Edge SE10000H ****N/A**** ****N/A**** 1 2 3 1 2 3 1 2 3 9.11 8.10 8.10 0.00 0.00 0.00 0.00 0.00 0.00 400.0 400.0 400.0 0.0 0.0 0.0 0.0 0.0 0.0 480.0 480.0 480.0 0.0 0.0 0.0 0.0 0.0 0.0 15.00 15.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 Max Array Power(STC): 10.125 kW DC Max Continuous AC Power: 10kW AC Interconnection Calcs Main Breaker 200 Bus Bar 225 Max PV OCD AI lowed 70 PV OCPD Device Used 60 Tap or Breaker? Breaker Site Conditions ASHRAE Site: Seattle Low Temp (°F) 19 High 2%Temp (°F) 84 High 0.4%Temp (°F) 91 Ref. Conductor Description Distance AL CU Wire Gauge (CITY) Phase Neutral Neutral EGC AWG Wire Type Conduit Min. Conduit 90°C Rating Temp Correct. Fill berate berated 75°C Rating Current Operating_ Voltage ft Conductors AWG TY Type Ampacity 125% Voltage Drop A String to Jbox 50 Cu #10 2 N/A N/A #6 PV wire 600v AIR N/A 40 1 100% 40.00 35 18.8 400 0.28% B Jbox to I nverter 50 Cu #10 6 N/A N/A #10 THWN-2 EMT 0.75" 40 1 80% 32.00 35 18.8 400 0.28% C Inverter to I nterconnect 10 Cu #6 2 #8 1 #10 THWN-2 EMT 0.75" 75 1 100% 75.00 65 52.5 240 0.17% D E F G H Typical Placards A) NEC 2020 690.13 & 691.15 B) NEC 2020 705.12 (13)(3)(2) C) Utility Requirement D) Utility Requirement (Utility -Owned) D) A&R Solar Requirement (Customer - Owned) E) A&R Solar Requirement * if combiner used F) NEC 2020 690.13 (B) I) NEC 2020 690.31 (D)(2) K) NEC 2020 690.13 (B) SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SOLAR ELECTRIC PV PANELS SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY L) NEC 2020 690.56 (C) *Used with Micro Inverters or DC Optimizers O) A&R Solar Requirement * if multiple inverters IAWARNING DUAL POWER SOURCE] SECOND SOURCE IS PHOTOVOLTAIC SYSTEM P) NEC 2020 705.12(C) & 690.59 R) AHJ Requirement * if combiner used S) NEC 2020 230.85(1) T) NEC 2020 230.85(3) PLACARD G) NEC 690.54 Custom Placards MAX AC OUTPUT CURRENT: 42.0 A AC OPERATING AC VOLTAGE: 240 V AC SPECS ()T Letter Height: 1/8" Inverter Maintain 1/4" border 1 Interconnection Point Red / White Letter Height: 1/8" Maintain 1/4" border 1 Solar Edge SE10000H Red / White Letter Height: 1/8" (1) for each Maintain 1/4" border 1 Disconnect or upstream Red / White loadcenters. &M-1IPi. A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. Q= o i o rn >. L CN ro00 �O �co rn 'a) I < fo"o� Q� .. 4W ^ V ra a0 O 0 �0M moo E a LU REVISIONS Rev. #: I Date: IDesioned bv: Wes K. I Project Manager: Arthur Eith (612) 298-1795 Current Date:Oct 21, 2022 G4 Placards J) NEC 2020 690.56 (C)(2) Category Equipment QTY Notes Solar Equipment Modules REC405AA Pure 25 Optimizers S440 SolarEdge Optimizer 25 Inverters Solar Edge SE10000H 1 Monitoring SolarEdge Consumption Monitoring (2p2OA breaker+CT's) 1 Electrical Equipment Jbox Jbox 2 MeterBase MeterBase-125A 4Jaw w/ 3.5" AWCAP 1� Meter Landis Gyr EA11000O-OP29 240V 1 Breakers 2p6OA 1 ElectricalWork Service/Panel Upgrade (225A MSP) 1 ElectricalWork Install Charge Point HomeFlex EV Charger (customer provided) 1 Solar Racking Iron Ridge Racking BOM Description XR100 Black,17' XR100 Black,14' Kit, XR100 Bonded Splice BOSS Universal Module Clamp, Black Stopper Sleeve 30mm Grounding Lug, Low Profile Square -Bolt Bonding Attachment Hardware 1/4 x 3/4 Microinverter Bonding Hardware, T-Bolt End Caps, 10 sets(package) XR100 IronRidge Flash Foot2, Black (Spacing: 72") Fastener: 5/16 x 4.75" Lag(Included) (1 /mount) System Weights Racking Weight(Ibs) Total Weight(lbs) Weight/Attach ment(I bs) Dead Load(PSF) CITY 0 19 10 60 20 5 54 25 1 54 275 1400 25.9 2.81 A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. Q= O i rn >10 L� C(V ro00 O O 00 O Lo�� O •Q M o0 E L � W ao REVISIONS Rev. #: I Date: Designed by: Wes K. Project Manager: Arthur Eith (612)298-1795 Current Date:Oct 21, 2022 G5 Equipment BOM