BLD2022-1547_Site_Plan_11.9.2022_3.48.48_PM_3212458Equipment Summary
Modules:
(25) REC 405W
Inverter(s):
(1) SolarEdge 1000OH-US
Racking:
Ironridge XR100
Table of Contents:
Cover Page
Al Site Overview
A2 Roof Layout
E1 Single Line
E2 Electrical Calculations
G1 Roof As Built
G2 Electrician As -Built
G3 Micro/optimizer map
G4 Placards
G5 Equipment BOM
—V,
General Notes:
Additional Electrical Work:
- Service/Panel upgrade (200A)
- Install EV Charger
Li .
i
0
O
Site
—Net Meter
1
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
=
Q
O
i
o
rn
>.
�O
NCO�O�
<
f
ru
Q�
..
4W
^
V
Lo��
ao
Q�
0
op
M
c000
E
w
ao
REVISIONS
Rev. #: I Date:
Designed by: Wes K.
Project Manager:
Arthur Eith
(612) 298-1795
Current Date:Oct 21, 2022
Cover Page
Meter Main, Inverter
EV Charger Customer -Owned Production Meter
MSP
ti
O
O
O
❑ El n ❑ ❑//7
Attachment Detail
Side View (Portrait)
FLASHING AS REQUIRED
TO SEAL ROOF
MINIMUM (1) 5/16 X 4.75 LAC
BOLT EMBEDDED 2" MINIMUM
CENTER ON ROOF FRAMINC
PV MODULE,
BY OTHERS
IRONRIDGE
RAIL
(E) COMPOSITION
SHINGLE ROOF
IRONRIDGE
FLASHFOOT2
(E) ROOF FRAMING
Modules not to exceed height of existing ridge
--- - - - -i-- - - - - --
'611
(sample) Attachment point layout for array.
72" OC Max.
&M-1IPi.
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
Q=
O
i
o
rn
>.
L
CN
ro00
�
O
a)
00
a)
L.L.
"'L<
f��
Q�
..
4W
^
V
ao
0
�p
M
co00
E
ao
w
REVISIONS
Rev. #: I Date:
Designed by: Wes K.
Project Manager:
Arthur Eith
(612)298-1795
Current Date:Oct 21, 2022
Al Site
Overview
Required Setbacks from Ridge:
18.,
Maximum Mount Spacing:
72^
Comp
Roof Type:
Roof Slope:
22.6O
Array Tilt :
Flush
Array Azimuth(s):
1510, 2410
Roof Area:
1788 ft2
Array Area
498 ft2
Array to Roof Coverage
28%
***Roof Attachments/ Fastners; see pg. G5 Equip. BOM * * *
Go
00
c" V
M
Ln
1-4
rV
M
M
rl
L — J
484 1/4"
Module and Rail Selection Guide
REC405AA Pure
40 x 71.7
Clamp Zone "A"
4.0-9.8"
Clamp Zone "B"
8.2-23.8"
Mods per Row
Rail typel+ rail type2
(12)Portrait, (1)row
(4)14', (2)14'
(4)Landscape, (2)rows
(2)14', (2)14'
(3)Landscape, (1)row
(2)14', (2)split 14'
(2)Landscape, (1)row
(2)14',
NA,����i
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
=
Q
O
i
o
rn >.
L
`1
CN
(000
Net Meter
O
a)
00
0')
fo%.0
fua
Q�
..
a.+
^ 00
vi
�C��
N
p
p
M
m
00
E
w
ao
REVISIONS
Rev. #: I Date:
Designed by: Wes K.
Project Manager:
Arthur Eith
(612)298-1795
Current Date:Oct 21, 2022
A2 Roof Layout
(New)
Main Service Panel
(1ph 240V Service)
Main Breaker: 200A
Bus Rating: 225A
Solar OCPD: 2p60A
\ 1 / \ 2 / \ 3 / \ `' /
0 Equipment Schedule
Ref.
Category
Equipment
QTY
1
Modules
REC405AA Pure
25
2
Optimizers
S440 SolarEdge Optimizer
25
3
Jbox
Jbox
2
4
Inverters
Solar Edge SE10000H
1
5
MeterBase
MeterBase-125A 4 Jaw w/ 3.5" AWCAP
1
Meter
Landis Gyr EA110000-OP29 240V
1
Monitoring
SolarEdge Consumption Monitoring (2p2OA breaker+CT's)
1
Breakers
2p6OA
1
ElectricalWork
Service/Panel Upgrade (225A MSP)
1
ElectricalWork
Install ChargePoint HomeFlex EV Charger (customer provided)
1
0 Conductor Schedule
Production Meter
■=A&RScope
= Existing or
Others Scope
Meter Main
(1ph 240V Service)
Main Breaker: 200A
Bus Rating: 200A
Main breaker to serve as
exterior rapid shutdown
initiator
4/0 XHHW-2
(L1 & L2)
2/0 XHHW-2
(N)
#6 THWN-2
(EGC)
nverter Specs
Watts
LW-1
Output
AC
Voltage
# of
Inverters
OCPD
JL
Solar Edge SE10000H
10000
42
240
1
60
****N/A****
0
0
0
0
0
****N/A****
0
0
0
0
0
Module Specs
Watts w
Imp
Vmp
Voc
Isc
REC405AA Pure
405
9.56
42.4
48.9
10.14
Temp. Adjusted
0
0
37
52.7
0
Summary
Distance (ft)
Current
@125%
Operating
Voltage
Voltage
Drop
Volt. Drop
(total)
A
(2)#10 CU, (1)#6 EGC, PV Wire 60OV, AIR
50
18.75A
400V
0.28%
0.74%
B
(6)#10 CU, (1)#10 EGC, THWN-2, 0.75"EMT(min)
50
18.75A
400V
0.28%
C
(2)#6 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min)
10
52.5A
240V
0.17%
General Notes:
Utility: SnoPUD
1. EGC Where exposed to physical damage will be #6AWG
Bare CU
2. If installing conduit on the roof, maintain greater than 7/8"
above the surface
3. NEC 690.12: Rapid Shutdown initiated by loss of Grid or AC
Disconnect
4. For supply side taps, a #6 GEC (min.) will be run separately
from the disconnect and connected to the grounding electrode
with an irreversible crimp
_ I
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
Q
O
O
L
C
N
fu
00
O
(1)003:M
L
I
L..a
U
3:Q�
"o
f0
U
L
^a
0
G7�
�00�
0
�0
M
m
�
00
E
L
�
W
ao
REVISIONS
Rev. #: I Date:
Designed by: Wes K.
Project Manager:
Arthur Eith
(612)298-1795
Current Date:Oct 21, 2022
E1 Single Line
PV Electrical Calculations
I nverter
ppt Input
Amperage (Imp)
Voltage (Vmp)
Itag e(DC)
Amps (DC)
A&RSOLAR
32ttle,W11 inL144(2uther 6)707-g Jr ayS.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING
THE WRITTEN CONSENT OF A&R SOLAR.
= Q
i �
L�
�O
��
U
V
• Q M
L �
o
M >10
CN ro00
�00�0�
L"' La
ru O ra
� Q�
^ a u7
L O O C
0
00 E
a O
W
REVISIONS
Rev. #:
Date:
Total Voltage Drop:
0.74%
Designed by: Wes K.
Project Manager:
Arthur Eith
(612) 298-1795
Current Date:Oct 21, 2022
E2 Electrical
Calculations
Inverter Specs
M
Watts
�
Output
AC
-
Voltage
# of
Inverters
OCPD
Total AC
Comb.
EGC
AC
f�
out. A
OCPD
Solar Edge SE10000H
10000
42.00
240
1
60
42.0
60
#10
Ampe
****N/A****
0
0.00
0
0
0
****N/A****
0
0.00
0
0
0
Module Specs
Watts
ll
I�
Vmp
Voc
Is
Temp. Coef V(oc)
EGC
DC
Volt
REC405AA Pure
405
9.56
42.4
48.9
10.14
Max
Array
Specs
(Adjusted for Temperature)
Solar Edge SE10000H
****N/A****
****N/A****
1
2
3
1
2
3
1
2
3
9.11
8.10
8.10
0.00
0.00
0.00
0.00
0.00
0.00
400.0
400.0
400.0
0.0
0.0
0.0
0.0
0.0
0.0
480.0
480.0
480.0
0.0
0.0
0.0
0.0
0.0
0.0
15.00
15.00
15.00
0.00
0.00
0.00
0.00
0.00
0.00
Max Array
Power(STC):
10.125
kW DC
Max Continuous AC Power: 10kW AC
Interconnection Calcs
Main Breaker
200
Bus Bar
225
Max PV OCD AI lowed
70
PV OCPD Device Used
60
Tap or Breaker?
Breaker
Site Conditions
ASHRAE Site:
Seattle
Low Temp (°F)
19
High 2%Temp (°F)
84
High 0.4%Temp (°F)
91
Ref.
Conductor Description
Distance
AL CU
Wire
Gauge
(CITY) Phase
Neutral
Neutral
EGC
AWG
Wire Type
Conduit
Min.
Conduit
90°C
Rating
Temp
Correct.
Fill
berate
berated
75°C
Rating
Current
Operating_
Voltage
ft
Conductors
AWG
TY
Type
Ampacity
125%
Voltage
Drop
A
String to Jbox
50
Cu
#10
2
N/A
N/A
#6
PV wire 600v
AIR
N/A
40
1
100%
40.00
35
18.8
400
0.28%
B
Jbox to I nverter
50
Cu
#10
6
N/A
N/A
#10
THWN-2
EMT
0.75"
40
1
80%
32.00
35
18.8
400
0.28%
C
Inverter to I nterconnect
10
Cu
#6
2
#8
1
#10
THWN-2
EMT
0.75"
75
1
100%
75.00
65
52.5
240
0.17%
D
E
F
G
H
Typical Placards
A) NEC 2020 690.13 & 691.15
B) NEC 2020 705.12 (13)(3)(2)
C) Utility Requirement
D) Utility Requirement (Utility -Owned)
D) A&R Solar Requirement (Customer -
Owned)
E) A&R Solar Requirement * if combiner used
F) NEC 2020 690.13 (B)
I) NEC 2020 690.31 (D)(2)
K) NEC 2020 690.13 (B)
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
TURN RAPID SHUTDOWN
SWITCH TO THE
"OFF" POSITION TO
SOLAR ELECTRIC
PV PANELS
SHUTDOWN PV SYSTEM
AND REDUCE
SHOCK HAZARD IN THE
ARRAY
L) NEC 2020 690.56 (C)
*Used with Micro Inverters or DC Optimizers
O) A&R Solar Requirement * if
multiple inverters
IAWARNING DUAL POWER SOURCE]
SECOND SOURCE IS PHOTOVOLTAIC SYSTEM
P) NEC 2020 705.12(C) & 690.59
R) AHJ Requirement * if combiner used
S) NEC 2020 230.85(1)
T) NEC 2020 230.85(3)
PLACARD
G) NEC 690.54
Custom Placards
MAX AC OUTPUT CURRENT: 42.0 A AC
OPERATING AC VOLTAGE: 240 V AC
SPECS ()T
Letter Height: 1/8" Inverter
Maintain 1/4" border 1
Interconnection Point
Red / White
Letter Height: 1/8"
Maintain 1/4" border 1 Solar Edge SE10000H
Red / White
Letter Height: 1/8" (1) for each
Maintain 1/4" border 1 Disconnect or upstream
Red / White loadcenters.
&M-1IPi.
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
Q=
o
i
o
rn
>.
L
CN
ro00
�O
�co
rn
'a)
I
<
fo"o�
Q�
..
4W
^
V
ra
a0
O
0
�0M
moo
E
a
LU
REVISIONS
Rev. #: I Date:
IDesioned bv: Wes K. I
Project Manager:
Arthur Eith
(612) 298-1795
Current Date:Oct 21, 2022
G4 Placards
J) NEC 2020 690.56 (C)(2)
Category Equipment QTY Notes
Solar Equipment
Modules REC405AA Pure 25
Optimizers S440 SolarEdge Optimizer 25
Inverters Solar Edge SE10000H 1
Monitoring SolarEdge Consumption Monitoring (2p2OA breaker+CT's) 1
Electrical Equipment
Jbox Jbox 2
MeterBase MeterBase-125A 4Jaw w/ 3.5" AWCAP 1�
Meter Landis Gyr EA11000O-OP29 240V 1
Breakers 2p6OA 1
ElectricalWork Service/Panel Upgrade (225A MSP) 1
ElectricalWork Install Charge Point HomeFlex EV Charger (customer provided) 1
Solar Racking
Iron Ridge Racking BOM
Description
XR100 Black,17'
XR100 Black,14'
Kit, XR100 Bonded Splice BOSS
Universal Module Clamp, Black
Stopper Sleeve 30mm
Grounding Lug, Low Profile
Square -Bolt Bonding Attachment Hardware
1/4 x 3/4 Microinverter Bonding Hardware, T-Bolt
End Caps, 10 sets(package) XR100
IronRidge Flash Foot2, Black (Spacing: 72")
Fastener: 5/16 x 4.75" Lag(Included) (1 /mount)
System Weights
Racking Weight(Ibs)
Total Weight(lbs)
Weight/Attach ment(I bs)
Dead Load(PSF)
CITY
0
19
10
60
20
5
54
25
1
54
275
1400
25.9
2.81
A&RSOLAR
3211 Martin Luther King Jr Way S.
Seattle, WA 98144 (206)707-9937
THIS DRAWING CONSTITUTES THE
CONFIDENTIAL INFORMATION OF A&R SOLAR
AND ITS RECEPTOR. POSSESSION DOES NOT
CONFER ANY RIGHT IN OR LICENSE TO USE IT
OR THE INFORMATION DISCLOSED HEREIN
NOR ANY RIGHT TO REPRODUCE THIS
DRAWING OR ANY PART HEREIN WITHOUT
THE WRITTEN CONSENT OF A&R SOLAR.
Q=
O
i
rn
>10
L�
C(V
ro00
O
O
00
O
Lo��
O
•Q
M
o0
E
L
�
W
ao
REVISIONS
Rev. #: I Date:
Designed by: Wes K.
Project Manager:
Arthur Eith
(612)298-1795
Current Date:Oct 21, 2022
G5 Equipment
BOM