Building Permit (3)Type: SOLAR Subtype: SOLAR RESIDENTIAL I Status: ISSUED
Parcel No: 00860800000600
Subdivision: 008608, 005489
Fire Sprinklers:
Valuation: $0.00
Code Edition: 0
Scope of Work: SOLAR
Site Address: 906 PUGET WAY EDMONDS,WA 98020-2623
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Applied: 11/2/2022
Issued:11/16/2022
Final:
Expiration Date: 5/16/2023
Issued by: BAC
I WA State Contractor L & I #: PINNARP87OLP I
CONTACTS
NAME TYPE
NAME
ADDRESS I
PHONE
EMAIL
APPLICANT
LENNY SCHWARTZ
5014 208TH ST SW, LYNNWOOD
(206)919-3538
LENNY@PINNACLEROOFINGPROS.CO
WA 98036
M
CONTACT
PINNACLE ROOFING
5014 208TH ST SW, LYNNWOOD
(206)919-3538
lenny@pinnacleroofingpros.com
PROFESSIONALS, LLC
WA 98036
CONTRACTOR
PINNACLE ROOFING
5014 208TH ST SW, LYNNWOOD
(206)919-3538
lenny@pinnacleroofingpros.com
PROFESSIONALS, LLC
WA 98036
SUZANNE STOKOE
& WILL
906 PUGET WAY, EDMONDS WA
OWNER
PHILLIPS
98020-2623
•' "m •
Lu
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
11/6/22
R24240
PER PERMIT
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
11/6/22
R24240
SOLAR - SUB RES BLDG PERMIT FEE
001.000.322.10.000.00
$60.00
$60.00
11/6/22
R24240
SOLAR - SUB RES FIRE INSP FEE
001.000.342.40.000.00
$60.00
$60.00
11/6/22
R24240
TOTALS: $166.50
$166.50
• •
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, November 16, 2022 10:41:15 AM 1 of 2
SOLARPerCity mit
• • • -
•:� i 1 1.
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
EQUIPMENT USAGE
FOR
manufacturer's specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufacture's installation instructions on site for Building Inspector.
FIRE FINAL INSPECTION
FOR
Request final Fire Department Inspection 425-775-7720.
NFORMATION
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
NNSPECTIONTYPE INSPECTOR COMPLETED RESULT
NOTES
X-1 FIRE FINAL
X-3 BUILDING FINAL**
Printed: Wednesday, November 16, 2022 10:41:15 AM 2 of 2