Building Permit (3)Type: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED
Parcel No: 00434212001500
Subdivision: 004342
Fire Sprinklers: Yes
Valuation: $200,000.00
Code Edition: 2018
Site Address: 558 MAIN ST #200 EDMONDS,WA 98020-3183
Lot: 0
Lot Area:
Occupancy Type: A2
No. Stories: 0
Zoning:
Construction Type: VB
# of Dwelling Units: 0
Scope of Work: JOHNNY MO'S PIZZA - TENANT IMPROVEMENT - P & M SEPARATE
Applied: 9/13/2022
Issued:11/17/2022
Final:
Expiration Date: 11/12/2023
Issued by: NED
I WA State Contractor L & I #: WESTEVC179KB I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
ERIN KELLY
1938 FAIRVIEW AVE E, SEATTLE
(206)676-5633
ERINK@URBALARCHITECTURE.COM
WA 98102
CONTACT
URBAL ARCHITECTURE
1938 FAIRVIEW AVE E, SEATTLE
(206)676-5633
erink@urbalarchitecture.com
WA 98102
CONTRACTOR
WESTERN VENTURES
PO BOX 298, MOUNTLAKE
(425)640-5050
rcarlisle@westernventures.com
CONSTRUCTION INC.
TERRACE WA 98043-
SEATTLE-SNOHOMISH
MILL
9525 AIRPORT WAY,
OWNER
COMPANY INC
SNOHOMISH WA 98296
•' ' •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
9/14/22
R23036
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
11/16/22
R24487
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$2,020.00
$2,020.00
11/16/22
R24487
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$926.50
$926.50
9/14/22
R23036
TOTALS: $3,011.50
$3,011.50
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, November 17, 2022 8:54:14 AM 1 of 2
•MERCIAL BLDG PermitCity
• • • • -
•:0iBLD2022-1217
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
'
• • • •
-!WnTES�
INSPECTIONTYPE INSPECTOR
COMPLETED RESULT
X-1 FIRE FINAL
X-3 BUILDING FINAL"
Printed: Thursday, November 17, 2022 8:54:14 AM 2 of 2