ENG2022-0531 ROW PERMIT�~ o� RIGHT OF WAY EUC PERMIT
o
fM.
EdmondsCity of Edmonds PERMIT NU�M
98020 1 1
www.edmondswa.gov i
BEL
Description: PUD-REPLACE BO POLE ON 76TH
ISSUED: 11/21/2022
Address: 18301 76TH AVE W EDMONDS WA 98026-5411
EXPIRES:05/21/2023
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00370800300600
CONTACTS
NAME TYPE NAME ADDRESS PHONE
APPLICANT MOE NAVE PO BOX 1107, EVERETT WA 98206 (425)783-5681
CONTACT SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206-1107 (425)870-9753
CONTRACTOR SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-4353
OWNER ASHLEY & MICHAEL SLAGLE 18301 76TH AVE W, EDMONDS WA 98026
FEE INFORMATION
11
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00
ENGINEERING INSPECTION FEE $110.00 $110.00
RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 11/21/2022
Printed: Monday, November 21, 2022 12:13:03 PM 1 of 2
RIGHT PERMIT
PERMIT NUM
City of Edmonds
Edmonds WA 98020
www.edmondswa.gov / 425.1 1
CONDITIONS
CONDITION TYPE
NOTES
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND AND NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
NOTES
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL"
E-7 TRAFFIC CTRL
Printed: Monday, November 21, 2022 12:13:03 PM 2 of 2
RECEIVED
Of Evklo �
r
INC. 1890
SECTION A
FIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E63.
OCT 31 2022
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General
Project Name Pup Mule} An1e� ^ Pdl� 4plaCe�Mn} 61/00 105UJH00
Site Address or if no site address use Property Address at NW corner of project area: Mul 76+1-, Aw— k/ (W W OT f
Associated Permits: BLD �� PLN N��{ ENG NIA_
• • •applicable)
Name of Company SnU65m �{ (� Franchise Ordinance No: N/A
Point of Contact K"twK
u,,
Title beS 1 n%r
Address 1101li � rj
City n A W State W Zip 99036
Phone(Li-jt$ 6-7D- 311H
Email [.IUD S CO
Contractor and Authorized Agent of Owner
Name of Company S R G s
(see note below)
Contractor Contacts During Construction
Primary Name ^ I
Agent Name
Title
Title
Mobile
Address
Email
City State
Zip
Secondary Name
Phone
Title
Email
Mobile
City of Edmonds Business License No:
Email
State License No: -3,2 — oo; — 1 H 1
Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
AWE: EUUC18.60.020 requires that the Application be signed by a hcensea ana bonaea contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
VTraffic Control Only (no associated development)
X Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page i of 3 Updated 3/25/2021
Project Description
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
loo LF
x
'Lo LF
L" 000 SF
$:ObAh- :Op
Alley 72 hours +
WN LF
x
[V(A, LF
IV/X SF
WN
Parking 72 hours +
JV(A. LF
x
U(N LF
p- SF
/4
SECTION E - If you are not a utility company performing work in the City ROW, skip to SECTIONC.
1. The work in the right of way is on or for the following type K facilities:
❑ telecommunications ❑ cable r_(power ❑ gas
❑ water ❑ sewer ❑ storm
Details
1.
of Work to be Completed
1 Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
2.
1 Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
If yes, describe: PJe Tmr6rrve,
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
✓
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
/
✓
5.
Does the work involve proposed additions to an aboveground utility system? If es:
✓
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
✓
Details
of • to be CompletedNo
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
How many are existing? How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
I Does your project involve poles? If yes:
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced? ` i
How many? What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/ ep ace If yes: 'yeS
How many? I J I What is the height of the poles after? y •'
Describe the modification rebuild: RAP, repicv,,P n',
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
APPLICANT PRINTED NAME:
APPLICANT TITLE:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
SNO_O_I II COUNTY
p T� PUBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY
LOCATION 18301 76TH AVE W. EDMONDS, WA, 98026 LYNNWOODAREA
POLE NO. 8768 NE1/4S 18 T 27 R 4 DATE 10/24/2022 ORDER 100102487
REASON FOR WORK PUD MAINTENANCE ENGINEER K. LUU OPERATION 0030
BO POLE - PLI 8768 DRAFTER U.G. N0,
SCALE 1"=40'
APPROVED
& DATE PRINTED
DATE WORK COMPLETED
FOREMAN
FEES REO'D ❑ YES ■ NO
PRIMARY OVERHEAD
❑ RESIDENTIAL
❑ COMMERCIAL
LEO NO.
'@$ '=$
BASIC FEE $
METER/CONV.POLE $
PRIMARY UNDERGROUND
❑ RESIDENTIAL
❑ COMMERCIAL
BASIC FEE S
LEU NO.
SECONDARY UNDERGROUND
BASIC FEE $
UNDERGROUND PLAT
BASIC FEE $
CE FT.@$
STREET LIGHTING
CL FT.@$
WORK IN RIGHT OF WAY
❑ PRIMARY
❑ SECONDARY
(� FT.@$ _$
MISCELLANEOUS FEES
VAULT $
PERMIT
TOTAL DUE $
DATE PAID
RECEIPT NO.
SERVICE ORDER NO.
I FC;FNn:
NESC VIOLATIONS
■ NO ❑ YES (SEE NOTES)
PERMITS (DATE GRANTED)
❑ TREE TRIM
❑ STATE
❑ COUNTY
■ CITY
11
EASEMENTS
❑ REQUIRED ■ NOT REQUIRED
DATE RELEASED
FOREIGN CONTACTS
■ JPN#
❑ JOINT TRENCH ZIPLY & CATV
❑ JOINT BORE ZIPLY & CATV
POLE STENCILING
FROM TO
TAKE OFF POLE
PRE-CONST. REQUIRMENTS
❑ TREE TRIM ❑ PUD LOCATOR
❑ BACKHOE ■ FLAGGING
■ ONE CALL DATE 11/02/22
No. 22475878
STREET LIGHTING
■ YES ❑ NO
M&R AS -BUILT
GIs
GIs QC M&R
GIs Ph JOINT USE
LOCATION MAP PAGE 455 A2
O EXISTING POLE
X EXISTING POLE -TO BE REMOVED
• NEW POLE
NEW POLE TO REPLACE EXISTING POLE
DATE
SUBSTATION PRV
CIRCUIT NO. 12-93 PHASE 2
WORK AREA
ENGR'S TEL. #
425-670-3214
ENGR'S CELL #
425-870-9753
TRANSFER OF UTILITIES, REMOVAL OF POLE AND FINAL RESTORATION TO BE CONSISTENT
WITH APPLICABLE POLE ATTACHMENT AGREEMENT(S) AND JOINT OWNERSHIP POLE AGREEMENT.
- PUD TO ENFORCE POLE ATTACHMENT
AGREEMENT.
- PUD IS RESPONSIBLE FOR ENSURING THAT THE
OLD POLES ARE REMOVED.
VICINITY MAP
POLE PLI# 8768
SET 45CL 2 POLE 20' SW OF PLI 8768
AT DEPTH OF 7'(PW2045) SL-130654-A
FRAME POLE AS 7.2KV VERT TANGENT
PER AS12V101
RMV 7 KVA OH XFMR (OBS XFMR CU, 12V601)
UTC# ------------------
SER# -------------------
HANG 15 KVA OH XFMR (BA21L,12V601)
UTC# ------------------
SER# -------------------
XFR OH PRI& NEUT SVCS
XFR 10OW SIZE A STLT (L0210,LO501)
STLT # -------------------
RMV 45POLE
OVHD
2
PLI 8768
RMV 7 KVA
HANG 15KVA
•
061FAIIIIII•
18301
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
ENGINEERING DIVISION
APPROVED AS NOTED
RECEIVED
OCT 31 2022
c H F M T T (� I Jell tVo✓J�p 11/17/2022
VV CITY OF EDMONDS
N T S DEVELOPMENT
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING SERVICES DEPARTMENT
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY OWNER/CONTRACTOR IS RESPONSIBLE FOR
UTILITIES MAY REQUIRE A SEPERATE PERMIT. EROSION CONTROL AND DRAINAGE SHEET OF
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
TRAFFIC CONTROL INSPECTION SHALL BE
REQUIRED WHENEVER WORK ZONE IS SET UP
LANE CLOSURE IN ADVANCE OF AN INTERSECTION
(WORK AREA ON THE THROUGH ROAD)
�*x-
ONE
W20-1
LANE
W20-4 ROAD �
AHEAD
x
W20-7A
�V x
7
7
W20-76
BE
PREPARED
TO STOP
OPTIONAL IF
40 MPH OR LESS
48" x 24'
g ROADNWORK G 2 0- 2
x (OPTIONAL) W20-4
W20-7A ONE LANE W20-1
p ROAD
AHEAD
ROAD
WORK
IN
AHEAD
X X X
`STOP p
a
PVT ACCESS
USPS
ONEW POLE
xPL I 8768
x L<j'>
W20-7A
x
ONE LANE
8 ROAD W20-4
AHEAD
x
ROAD
g WORK W20-1
AHEAD
ENGINEERING DIVISION
APPROVED AS NOTED
% 11 JAI_ 1rt,44.j 11/17/2022
vv
RECEIVED
OCT 31 2022
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
GENERAL NOTES:
1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD.
2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND
DATES (OPTIONAL).
3. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD
CONDITIONS.
4. PROTECTIVE VEHICLE RECOMMENDED -MAY BE A WORK TRUCK.
5. ALL SIGNS MINIMUM 48" X 48", UNLESS OTHERWISE SPECIFIED.
6. CHANNELIZATION DEVICES ARE 28" REFLECTIVE CONES. SEE TABLE 1
FOR SPACING DISTANCES.
7. ALL SPACING MAY BE ADJUSTED TO ACCOMODATE AT -GRADE
INTERSECTIONS AND/OR DRIVEWAYS.
SIGN SPACING = X
FREEWAYS & EXPRESSWAYS
55-70 MPH
1500'±
RURAL HIGHWAYS
60-65 MPH
800'±
RURAL ROADS
45-55 MPH
500'±
RURAL ROADS & URBAN ARTERIALS
35-40 MPH
350'±
RURAL ROADS & URBAN ARTERIALS
RESIDENTIAL & BUSINESS DISTRICTS
25-30 MPH
200'± (2)
URBAN STREETS
25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE
RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
TABLE 1
CHANNELIZATION DEVICE
SPACING (FEET)
MPH
TAPER
TANGENT
50-65
10 TO 20
80
35-45
10 TO 20
60
25-30
1 10 TO 20
40
LEGEND:
O
CHANNELIZING DEVICE
FLAGGING STATION
g
PORTABLE SIGN AND SUPPORT
�®
WORK VEHICLE WITH FLASHING
LIGHT
WORK AREA
RECEIVED
CITY OF EDMONDS
OCT 31 2022
MyBui ldi ngPermi t. com
CITY OF EDMONDS
Right -of -Way Application #1222683 - WO 100102487 - BO Pole 87E1&,ERVI ESLOPMENT DEPARTMENT
Applicant
First Name Last Name Company Name
Moe Nave Snohomish County PUD
Number Street Apartment or Suite Number E-mail Address
PO Box 1107 jointuse@snopud.com
City State Zip Phone Number Extension
Everett WA 98206 (425) 783-5681
Contractor
Company Name
Owner
Number Street Apartment or Suite Number
City State Zip Phone Number Extension
State License Number License Expiration Date UBI # E-mail Address
Project Location
Number Street Floor Number Suite or Room Number
18301 76TH AVE W
City Zip Code County Parcel Number
EDMONDS 98026 00370800300600
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
Ashley & Michael Slagle
Number Street Apartment or Suite Number
18301 76TH AVE W
City State Zip
EDMONDS WA 98026
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 10/28/2022 Submitted By: Moe Nave
Page 1 of 2
i
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1222683 - WO 100102487 - BO Pole 8768
Project Contact
Company Name: Snohomish County PUD
Name: Kenneth Luu Email: jointuse@snopud.com
Address: PO Box 1107 Phone #: (425) 870-9753
Everett WA 98206-1107
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project Name: WO 100102487 - BO Pole 8768
Replace bad order pole 8768 with new pole set 20' Southwest of existing location. Hang new
transformer and transfer primary and neutral services and streetlight onto new pole. Remove
Description of existing transformer and pole. 200' section of Southbound lane of 76th Ave W to be closed for
Work: approximately 5 hours between 8am-4pm. Location of closure is on 76th Ave W across from
18301 76th Ave W. Sidewalk closure between Olympic View Dr and private driveway of 18104
76th Ave W. No tree trimming needed. Auger to drill pole into new location.
Project Details
Project Information
Job Number
WO 100102487
Page 2 of 2