Building Permit 2021Type: RESIDENTIAL BLDG Subtype: ADDITION I Status: ISSUED
Parcel No: 27043100205900
Subdivision: SP S-05-136
Fire Sprinklers:
Valuation: $246,247.96
Code Edition: 0
Site Address: 8729 236TH ST SW EDMONDS,WA 98026-8921
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: LOUGH- ADDITION- 3 LEVELS, P&M INCL
Applied: 3/15/2021
Issued: 7/7/2021
Final:
Expiration Date: 7/2/2022
Issued by: NED
WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 1
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
CHARLES LOUGH
8729 236TH ST. SW, EDMONDS
(425)772-7743
CHARLES@APMNW.COM
WA 98026
CONTACT
CHARLES LOUGH
8729 236TH ST. SW, EDMONDS
(425)772-7743
charles@apmnw.com
WA 98026
CONTRACTOR
CHARLES & JULIE LOUGH
8729 236TH ST SW, EDMONDS
(425)772-7743
WA 98026
OWNER
CHARLES & JULIE LOUGH
8729 236TH ST SW, EDMONDS
(425)772-7743
WA 98026
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
17DESCRIPTION
BASEFEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
7/7/21
R13361
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
7/7/21
R13361
PERMITS
AIR CONITIONING SYSTEM OR HEAT
001.000.322.10.000.00
$50.00
$50.00
7/7/21
R13361
PUMP - 1.75 BTU OR LESS
APPLIANCE VENTS
001.000.322.10.000.00
$30.00
$30.00
7/7/21
R13361
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
3/26/21
R11294
PER PERMIT
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$240.00
$240.00
7/7/21
R13361
TRAP
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$330.00
$330.00
7/7/21
R13361
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$105.00
$105.00
7/7/21
R13361
FURNACE OR FIREPLACE
001.000.322.10.000.00
$60.00
$60.00
7/7/21
R13361
GAS HEATER WHICH IS SUSPENDED,
001.000.322.10.000.00
$90.00
$90.00
7/7/21
R13361
RECESSED OR FLOOR MOUNTED
HOODS TYPE 1 OR 2 OR FUME
001.000.322.10.000.00
$150.00
$150.00
7/7/21
R13361
HOOD INCLUDING DUCTS
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$1,982.00
$1,982.00
7/7/21
R13361
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$1,684.70
$1,684.70
3/26/21
R11294
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
7/7/21
R13361
Printed: Wednesday, July 07, 2021 1:13:16 PM 1 of 3
-RESIDENTIAL BLDG PermitCity
-
• • • •
121 98020 1 1
www.edmondswa.gov• •
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
WATER HEATER - TANKLESS
001.000.322.10.000.00
$15.00
$15.00
7/7/21
R13361
TOTALS: $4,883.20 $4,883.20
CONDITIONS
CONDITION TYPE
STATUS NOTES
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
CARBON MONOXIDE SYSTEMS
O
CARBON MONOXIDE SYSTEMS
ORMATION
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
FOR
Maintain erosion and sedimentation control per City and SWMMW standard
ESC REQ
INFORMATION
requirements.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
HOSE BIBBS
FOR
Hose Bibbs are required to have a permanently affixed anti -siphon device installed.
NFORMATION
INSP PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Printed: Wednesday, July 07, 2021 1:13:16 PM 2 of 3
'RESIDENTIAL BLDG Permit
PERMIT NUM
City of Edmonds
121
. •:� i 1 1
. •. •
Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish
the datum point and the point of average grade. Call for inspections to verify. These
FOR
MAXIMUM HEIGHT
items must be consistent with the approved plan. If the proposed height of a building is
INFORMATION
within 12 inches of the maximum height permitted for the zone an elevation survey is
required.
Final approval on a project or final occupancy approval must be granted by the Building
FOR
OCCUPANCY
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
FOR
PLANNING CONDITION
Not approved as an Accessory Dwelling Unit
INFORMATION
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND OR NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Installer shall provide the manufacturer installation, operating instructions, and a whole
FOR
WHOLE HOUSE FAN
house ventilation system operation description. A label shall be affixed to the whole
INFORMATION
house timer control that reads "Whole house ventilation, see operating instructions".
INSPECTIONS
- Schedule
Online
at: https://Inspection.MvBuildingPermit.com
COMPLETED
RESULT
SEQID
INSPECTION TYPE
INSPECTOR
NOTES
DATE
A-1 BUILDING PRECON
B-2 FOOTINGS
B-2 FOUNDATION WALL
B-3 EXT WALL SHEATHING
B-3 MECH ROUGH IN
B-3 PLUMB ROUGH IN
B-3 ROOF SHEATHING
B-3 UNDERFLR FRAMING
B-3 WATER SERVICE LINE
B-4 DRYWALL FASTENING
B-4 FRAMING
B-4 HEIGHT VERIFICATION
B-4 SHOWER PAN
B-S INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
A-1 TESC AND MOBILIZE
X-2 ENGINEERING FINAL
E-3 STRM MGMT FACILITY
E-3 STRM TIGHTLINE
Printed: Wednesday, July 07, 2021 1:13:16 PM 3 of 3